Science and the Path from Here to There
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
No abstract provided
No abstract provided
Explore the source record for details and available documents.
Developing innovative technologies to reprocess low value waste into high value base products will enable a new “Waste-to-Base” (WtB) capability leading to innovative approaches to space mission design. Systems engineers and mission architects will work together under a new paradigm in logistics planning. Equipment, components, packaging, storage, and structures will be understood not only by functional requirements, but also in terms of useful lifetimes and materials of construction. The advent of a new technical discipline - reprocess engineering - will grow from the intersection between chemical, mechanical, and systems engineering, mission design, and logistics planning. A crowdsourcing approach was employed to gather low Technology Readiness Level (TRL) concepts into workable solutions for issues in trash management, CO 2 processing, foam reprocessing, and fecal processing. The results of the crowdsourcing activities are summarized along with a discussion for future technology development work.
The prebiotic origins of ribose, nucleosides, and eventually RNA are enduring questions whose answers are central to the RNA world hypothesis. The abiotic synthesis of sugars was first demonstrated over a century ago, but no known prebiotic reaction produces ribose (an aldose sugar) selectively and in good yield. In contrast, ribulose, and fructose (ketose sugars) and other monosaccharides are formed in high yield by several robust abiotic reactions. It is reported here that ketose sugars - both ketopentoses and ketohexoes - serve as precursors for the formation of ribosides and other aldosides, as demonstrated by glycoside-forming reactions involving barbituric acid, a plausibly prebiotic nucleobase. Moreover, a one-pot reaction of glyceraldehyde and barbituric acid was discovered which under mild conditions, and without special minerals or other catalysts, results in the formation of glycosides. These results reveal that an exclusive or high-yielding generation of free ribose was not required for its incorporation into processes that provided the foundations for life.
Dual hydrogen-jet fuel aircraft have the potential to reduce greenhouse gas emissions and align with U.S. Aviation Climate Action Plan goals. However, the use of liquid hydrogen solely as fuel introduces significant challenges such as low energy per unit volume, cryogenic storage, and safety risks. Addressing these challenges will require significant investments in infrastructure and technology. The transition to a low carbon aviation sector to meet the stringent mass, volume, safety, and emission requirements economically will require a mix of sustainable aviation fuels including hydrogen, as well as an abundance of renewable energy. Dual hydrogen-jet fuel aircraft with only 14% green hydrogen by weight would require double the total fuel volume of a conventional aircraft, but it could reduce carbon emissions 30%. With less quantities of green hydrogen required, dual hydrogen-jet fuel aircraft will reduce renewable energy, hydrogen infrastructure, and technology demands. The presentation will include an overview of dual hydrogen-jet fuel concepts and describe key sustainable aviation fuel challenges including availability and costs.
Explore the source record for details and available documents.
Developing innovative technologies to reprocess low value waste into high value base products will enable a new “Waste-to-Base” (WtB) capability leading to innovative approaches to space mission design. Systems engineers and mission architects will work together under a new paradigm in logistics planning. Equipment, components, packaging, storage, and structures will be understood not only by functional requirements, but also in terms of useful lifetimes and materials of construction. The advent of a new technical discipline - reprocess engineering - will grow from the intersection between chemical, mechanical, and systems engineering, mission design, and logistics planning. A crowdsourcing approach was employed to gather low Technology Readiness Level (TRL) concepts into workable solutions for issues in trash management, CO2 processing, foam reprocessing, and fecal processing. The results of the crowdsourcing activities are summarized along with a discussion for future technology development work.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The Artemis era of human space exploration beyond low Earth orbit launched at 1:47 a.m. EST on November 16, 2022. Artemis I was the first integrated flight of the agency’s new super heavy-lift rocket, the Space Launch System (SLS), and the next-generation spacecraft for astronauts, Orion. The mission sent an uncrewed Orion spacecraft into a distant retrograde orbit about the Moon. During the 25-day mission, NASA collected valuable data on the performance of the launch vehicle and crew spacecraft and information on the deep space environment where crews will soon operate. Orion splashed down approximately 80 miles off the coast of Baja, California, at the conclusion of the mission December 11. This paper will provide a summary of the launch campaign from vehicle integration and testing through completion of the upper stage phase with primary emphasis on SLS. It will also discuss highlights of progress on manufacturing and testing of SLS hardware and software for upcoming Artemis missions.
The Mars Sample Return (MSR) campaign is one of the most ambitious and complex exoplanet scientific exploration missions currently underway. With the participation of NASA, ESA, and a large number of industry partners, MSR aims to bring back Martian rock and atmosphere samples with the goal of answering key questions about Mars’ geological, climatological, and (potentially) biological evolution. To accomplish this ambitious goal, the campaign relies on three distinct flight elements and a ground element. The Earth Return Orbiter (ERO) mission that would host the Capture, Containment, and Return System (CCRS) is the last element of the trio. The mission would capture the orbiting sample in low Mars orbit (launched into orbit by another mission), contain it and return it to Earth, landing it at the Utah Test and Training Range (UTTR). The CCRS continues its development. Since its early architecture, several changes were adopted by the project in order to improve overall payload efficiency and reduce mass. CCRS is currently on track to achieve the next milestone, Critical Design Review, expected in late 2024. This paper will discuss the CCRS design, how the current architecture contributes to an improved mission baseline, and the next critical steps of the mission towards its launch.
On Nov. 16, 2022, NASA launched the Artemis I mission on the agency’s new SLS (Space Launch System) rocket. The debut launch of the integrated vehicle sent an uncrewed Orion spacecraft into a distant retrograde (DRO) orbit about the Moon to accomplish multiple mission objectives, including evaluating Orion’s heatshield at lunar return velocities and collecting critical data from the first flight of the new superheavy lift launch vehicle. Post-flight data analyses show that the rocket performed with a high degree of precision and accuracy. In addition to completing testing and launch of the Artemis I SLS in 2022, notable progress was made on hardware for future launch vehicles that will support Artemis missions II, III, IV, and V. The Artemis II core stage is mostly complete, and its RS-25 engines were integrated in the fall of 2023. The Artemis II solid rocket booster motor segments were shipped to the launch site in September 2023. Propellant tanks are being manufactured for additional missions, solid booster segments are being cast and prepared, software is being developed, and production of new RS-25 engines is underway. A more capable upper stage is in development, as well as a large adapter to encapsulate a 10-metric ton (t) co-manifested payload. This paper will provide details on the Artemis I flight as well as cover hardware progress for the future flights as available.