Managing Risks via Small/Pilot Scale Testing for INL's Integrated Waste Treatment Unit (IWTU) - 19268

In 2005, the THOR steam reforming fluidized-bed reactor (FBR) technology was selected by the U.S. Department of Energy (DOE) as the technology of choice for treatment of sodium- bearing waste (SBW) at the INL. The basis of the process was to use fluidized bed technology to convert an acidic radioactive nitrate-rich liquid waste into a solid carbonate product suitable for long-term disposal and storage. During initial commissioning, as well as subsequent start-ups, the plant faced many operational challenges, such as stagnant/de-fluidized bed, and wall-scale formation. Such operational issues prompted the original contractor to seek expertise in pilot-scale testing, thereby reaching out to Hazen Research Inc. (HRI, Golden, Co). Several tests were conducted, but the results did not seem to address the underlying issues observed in the full-scale plant, as evidenced by continued operational issues. A systematic approach was then taken by the Fluor-Idaho team (new contractor as of June 2016) with respect to solving these technical issues. First, two different bench-scale, 2-inch fluidized bed reactors (stainless-steal and quartz), were utilized to test several theories to better understand the underlying chemical reactions that may be taking place under expected normal operating conditions. Then, the team designed and built an 18-inch FBR unit, mimicking the full-scale main vessel at IWTU - Denitration Mineralization Reformer (DMR). This was used to test various aspects of operational challenges observed at IWTU, namely particle size control, wall-scale growth-rate control, long-term operational stability, process optimization, and process off- gas filtration challenges. An example of information obtained from bench-scale testing, which was then tested during pilot-scale testing, was the phenomena that an addition of 5 vol % of CO{sub 2} gas into the fluidizing gas system nearly eliminated the formation of agglomerates that had typically led to bed de-fluidization. This change proved to be correct in both the pilot and full-scale testing and will be implemented as part of a long-term operational strategy of IWTU. Several other findings that have provided answers with respect to IWTU operational issues will be discussed in this report. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Addendum 2 to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 12-25-08, Spill H950524F (from UST 12-B-1) • 12-25-10, Spill H950919A (from UST 12-COMM-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

54 ENVIRONMENTAL SCIENCES↗

ROSE MIU Testing

Overview of work done by Rebekah Austin during Pathways Internship work tour. Describes ROSE MIU (Reconfigurable Operational Spacecraft for Science and Exploration Module Interface Unit) features and test plan.

hot-swap↗

NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

I. Motivation and Background Beginning in 2014, the National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The resulting Advanced Electric Propulsion System (AEPS) project has developed a 12 kW Hall Current Thruster in support of the NASA mission to establish a permanent human presence in lunar orbit and to land the next American astronauts on the South Pole of the Moon. The project is led by the NASA Glenn Research Center, supported by the Jet Propulsion Laboratory and development, qualification & flight hardware all provided by L3 Harris Aerojet Rocketdyne (AR).The AEPS project has completed the development testing of a high power, solar electric propulsion Hall Current thruster that will be used on the NASA Power & Propulsion Element (PPE) of the Gateway space station. NASA initially built three Technology Development Units to understand key characteristics of the hall-effect rocket with magnetic shielding. The design led to development testing on two Engineering Test Unit Thrusters and multiple critical components. The project has begun production of the three flight thrusters and entered qualification testing at the component and thruster levels. II. Approach NASA and AR teams completed all development phases of the project, including full development and integration testing of the Engineering Model hardware, Critical Design Review, and ground test equipment validation, as well as fabrication and acceptance testing of the initial qualification thruster. Qualification and verification of the environmental and life requirements of the AEPS design was initiated in the Fall of 2023 and will be accomplished on two thruster units and using a series of component-level tests during 2024 and 2025. Environmental testing will incorporate functional reference firings, shock, vibration, and Thermal Vacuum (TVAC) testing. Life verification will assess the thruster wear and performance over the lifetime of the Gateway spacecraft. Critical component qualification tests include cathode heater, magnet coils, magnet heaters, temperature sensors, and a cathode assembly that will undergo life cycle testing on multiple units. Flight thrusters will complete assembly and acceptance testing and be delivered to the PPE program in early 2025. III. Preliminary and Anticipated Results The program has completed the acceptance testing, including dynamic testing and hot fire characterization, of the first qualification thruster. In the Fall of 2023, the program entered the environmental qualification phase for thruster testing. This paper will present an overview of the AEPS thruster project, thruster capabilities and flight design, preliminary results from the thruster acceptance and qualification testing, component life cycle testing and flight hardware status.

Clayton Kachele↗

The modern rotor aerodynamic limits survey: A report and data survey

The first phase of the Modern Technology Rotor Program, the Modern Rotor Aerodynamic Limits Survey, was a flight test conducted by the United States Army Aviation Engineering Flight Activity for NASA Ames Research Center. The test was performed using a United States Army UH-60A Black Hawk aircraft and the United States Air Force HH-60A Night Hawk instrumented main-rotor blade. The primary purpose of this test was to gather high-speed, steady-state, and maneuvering data suitable for correlation purposes with analytical prediction tools. All aspects of the data base, flight-test instrumentation, and test procedures are presented and analyzed. Because of the high volume of data, only select data points are presented. However, access to the entire data set is available upon request.

Cross, J.↗

Imaging Electron Spectrometer (IES) Electron Preprocessor (EPP) Design

The Aerospace Corporation developed the Electron PreProcessor (EPP) to support the Imaging Electron Spectrometer (IES) that is part of the RAPID experiment on the ESA/NASA CLUSTER mission. The purpose of the EPP is to collect raw data from the IES and perform processing and data compression on it before transferring it to the RAPID microprocessor system for formatting and transmission to the CLUSTER satellite data system. The report provides a short history of the RAPID and CLUSTER programs and describes the EPP design. Four EPP units were fabricated, tested, and delivered for the original CLUSTER program. These were destroyed during a launch failure. Four more EPP units were delivered for the CLUSTER II program. These were successfully launched and are operating nominally on orbit.

Fennell, J. F.↗

Development of a Wide Range Segmented Gamma Scanner for Measuring Radioactive Wastes Arising in the Chinese Nuclear Industry - 16261

There is a requirement to measure a variety of challenging radioactive waste forms generated by the Chinese nuclear industry. These range from low activity waste to high activity waste with a high content of Cs-137 and waste in high density 200 litre drums. This paper describes the design, development and testing of an updated and automated Wide Range Segmented Gamma Scanner (WR-SGS) specifically configured for Chinese nuclear industry radioactive waste measuring requirements. The instrument retains the capabilities of the original SGS developed by Parker and Martin at the Los Alamos National Laboratory and now widely used for radioactive waste assay. It also incorporates additional features to improve measurement efficiency and reduce cost. These features include continuous helical scanning of the waste drum, and separate lifting pillars to lift the detector and the transmission source. In place of a transmission source shutter mechanism, the source is placed in a shielded safe when not in use. The design also incorporates a variable aperture collimator, and tungsten filters that can be deployed for the measurement of high activity, high dose-rate drums. Updated motion control electronics, based on the use of a programed logic controller have been incorporated to address potential future obsolescence. The WR-SGS employs a 40% high purity Germanium detector with electro-mechanical cooling and state of the art digital spectroscopy counting electronics for gamma ray spectrum data acquisition. Testing of the unit has been performed with both point sources and rod sources, which are traceable to international standards. Typical test drums, each with six distributed re-entrant tubes and with different density matrices, have been employed with the rod sources to validate both the calibration and the measurement performance of the WR-SGS for drums of different density. The measurement results have been compared with the reference decay corrected activity values and very good agreement is achieved, confirming the measurement performance of the instrument. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrate Power Conversion Unit with MAGNET to Enable Integrated Microreactor Heat Transfer System Testing

Idaho National Laboratory obtained a closed, Brayton-cycle, power conversion unit (PCU) from Sandia National Laboratories. This PCU began as a commercially available, 30 kWe, C30, gas turbine from Capstone. The C30 was modified to use heat from an electric heater in a closed-loop system pressurized with nitrogen or dry air. INL has modified the unit further to integrate it with MAGNET and use heat from a microreactor test article.

42 - ENGINEERING↗

Comparing soil boundaries delineated by digital analysis of multispectral scanner data from high and low spatial resolution systems

The author has identified the following significant results. Computer-aided analysis techniques used with aircraft MSS data showed that the spatial resolution was sufficient to recognize each soil mapping unit of the test site. Some difficulties occurred where different soil series were intricately mixed, and this mixture showed as a separate spectral mapping unit, or where the difference between two soils depended on the depth of silty surface material. Analysis of LANDSAT data with computer-aided techniques showed that it was not possible to find spectrally homogeneous soil features of the seven soil series on the 40 ha test site on the digital display or on a picture print map. Cluster techniques could be used on an extended test area to group spectrally similar data points into cluster classes.

Kristof, S. J.↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 411: Double Tracks Plutonium Dispersion (Nellis), Nevada Test and Training Range, Nevada (Rev. 0)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 411, Double Tracks Plutonium Dispersion (Nellis). CAU 411 is located on the Nevada Test and Training Range and consists of a single corrective action site (CAS), NAFR-23-01, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1996 interim corrective action to recommend closure of CAU 411 using the SAFER process. Based on existing data, the presumed corrective action for CAU 411 is clean closure. However, additional data will be obtained during a field investigation to document and verify the adequacy of existing information, and to determine whether the CAU 411 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU. The results of the field investigation will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated based on the data quality objectives (DQOs) developed on November 20, 2014, by representatives of NDEP, the U.S. Air Force (USAF), and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine whether CAU 411 closure objectives have been achieved. The following text summarizes the SAFER activities that will support the closure of CAU 411; Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information; If COCs are no longer present, establish clean closure as the corrective action; If COCs are present, the extent of contamination will be defined and further corrective actions will be evaluated with the stakeholders (NDEP, USAF); and Confirm the preferred closure option is sufficient to protect human health and the environment.

54 ENVIRONMENTAL SCIENCES↗

Statistical analysis of secondary particle distributions in relativistic nucleus-nucleus collisions

The use is described of several statistical techniques to characterize structure in the angular distributions of secondary particles from nucleus-nucleus collisions in the energy range 24 to 61 GeV/nucleon. The objective of this work was to determine whether there are correlations between emitted particle intensity and angle that may be used to support the existence of the quark gluon plasma. The techniques include chi-square null hypothesis tests, the method of discrete Fourier transform analysis, and fluctuation analysis. We have also used the method of composite unit vectors to test for azimuthal asymmetry in a data set of 63 JACEE-3 events. Each method is presented in a manner that provides the reader with some practical detail regarding its application. Of those events with relatively high statistics, Fe approaches 0 at 55 GeV/nucleon was found to possess an azimuthal distribution with a highly non-random structure. No evidence of non-statistical fluctuations was found in the pseudo-rapidity distributions of the events studied. It is seen that the most effective application of these methods relies upon the availability of many events or single events that possess very high multiplicities.

Mcguire, Stephen C.↗

Framework for a Risk-Informed Groundwater Compliance Strategy for Corrective Action Unit 98: Frenchman Flat, Nevada National Security Site, Nye County, Nevada, Revision 1

Note: This document was prepared before the NTS was renamed the Nevada National Security Site (August 23, 2010); thus, all references to the site herein remain NTS. Corrective Action Unit (CAU) 98, Frenchman Flat, at the Nevada Test Site (NTS) was the location of ten underground nuclear tests between 1965 and 1971. As a result, radionuclides were released in the subsurface in the vicinity of the test cavities. Corrective Action Unit 98 and other CAUs at the NTS and offsite locations are being investigated. The Frenchman Flat CAU is one of five Underground Test Area (UGTA) CAUs at the NTS that are being evaluated as potential sources of local or regional impact to groundwater resources. For UGTA sites, including Frenchman Flat, contamination in and around the test cavities will not be remediated because it is technologically infeasible due to the depth of the test cavities (150 to 2,000 feet [ft] below ground surface) and the volume of contaminated groundwater at widely dispersed locations on the NTS. Instead, the compliance strategy for these sites is to model contaminant flow and transport, estimate the maximum spatial extent and volume of contaminated groundwater (over a period of 1,000 years), maintain institutional controls, and restrict access to potentially contaminated groundwater at areas where contaminants could migrate beyond the NTS boundaries.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0 with ROTC 1

This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 371, Johnnie Boy Crater and Pin Stripe, located within Areas 11 and 18 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit (CAU) 371 comprises two corrective action sites (CASs): • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 371 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at both CASs. Corrective action investigation (CAI) activities were performed from January 8, 2009, through February 16, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 371 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface soil. However, it was assumed that radionuclides are present in subsurface media within the Johnnie Boy crater and the fissure at Pin Stripe. Due to the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consist of implementing a use restriction and posting warning signs at each site. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 371. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 371. • Corrective Action Unit 371 should be moved from Appendix III to Appendix IV of the FFACO.

54 ENVIRONMENTAL SCIENCES↗

EMU Ag-Zn battery wet-life extension test

The Extravehicular Mobility Unit (EMU) silver/zinc (Ag/Zn) battery is an 11 cell battery of approximately 30 AH. The Ag/Zn battery is comprised of two 4-cell monoblocks and one 3-cell monoblock. A discussion of a wet-life extension test performed on the battery is given in viewgraph form.

Bragg, Bobby J.↗

Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closure Report for Corrective Action Unit 413: Clean Slate II Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 0

This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 413: Clean Slate II Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 413 consists of the release of radionuclides to the surface and shallow subsurface from the conduct of the Clean Slate II storage-transportation test conducted on May 31, 1963. The purpose of this CR is to provide documentation and justification for the clean closure of CAU 413 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, closure activities conducted at the site, and the results of verification samples. Clean closure activities included excavating and disposing of radiologically contaminated soil and debris in the vicinity of ground zero, and collecting verification samples to support the corrective action of clean closure. Results confirmed that further corrective action is not required at CAU 413. Based on the corrective action activities conducted, clean closure of the site is complete; the closure objectives established in the CADD/CAP have been achieved; and no further corrective action at the site is required.

54 ENVIRONMENTAL SCIENCES↗

Experimental evaluation of battery cells for space-based radar application

A test program was conducted to characterize five space-quality nickel-hydrogen (NiH2) battery cells. A subset of those tests was also done on five commercial nickel-cadmium (NiCd) cells, for correlation to the characteristics of an Energy Storage Unit Simulator. The test program implemented the recommendations of a 1991 study, as reported to IECEC-92. The findings of the tests are summarized, and expected impacts on the performance of the electrical power system (EPS) of a large space-based radar (SBR) surveillance satellite are derived. The main characteristics examined and compared were terminal voltage (average and transient) and capacity through discharge, equivalent series resistance, derived inductance and capacitance, charge return efficiency, and inter-pulse charge effectiveness.

Maskell, Craig A.↗

Convertor Development for Dynamic Radioisotope Power Systems

Dynamic power conversion technologies are being developed for future space science and exploration missions by NASA’s Radioisotope Power Systems (RPS) Program, in collaboration with the U.S. Department of Energy (DOE). The Dynamic Radioisotope Power Systems (DRPS) Project is working to mature dynamic power convertors and controllers for infusion into a potential future flight generators.1,2 Maturation of power conversion technologies is being executed by the DRPS Project and the Thermal Energy Conversion Branch, located at NASA’s Glenn Research Center (GRC), and includes convertor technology development contracts and in-house controller development. The convertor technology development contracts consist of three contractors tasked to design, fabricate, and complete performance testing before the units are delivered to GRC for independent assessment. All contractors have completed convertor designs and are fabricating convertors to enable performance testing, while one has demonstrated initial performance of their design. The contractors also have provided generator conceptual designs, which utilize their respective convertor technologies being developed.