Search NASA⌕ Search

SEARCH · Search NASA

Results for “failure analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

Dynamic response of 17-4 stainless steel as a function of manufacturing method and heat treatment

We present a series of plate-impact experiments on 17-4 stainless steel to study the effect of manufacturing method and heat treatment on the Hugoniot elastic limit (HEL), Hugoniot, phase transformation stress, and spallation strength. Two traditional manufacturing methods were considered, wrought processing and casting, as well as two additive manufacturing methods, laser powder-bed fusion (LPBF) and wire-fed electron beam (EBAM). For both LPBF and EBAM 17-4 stainless steel variants, two billets were printed, enabling the application of two unique heat treatments. The HEL stress depended heavily on the thermal history, with the HEL increasing after the formation of Cu-rich precipitates via heat treatment. The Hugoniot response both below and above the phase transition was unaffected by the manufacturing method or heat treatment. The phase transition stress depended heavily on the thermal history, with its variation being attributed to the presence of various microstructural features. This is supported by a marked increase in the phase transition stress after precipitation hardening. These results suggest that the notion of the phase transition stress being dictated by bulk composition is an oversimplification and the stress fields generated by the meso-scale structure are a dominant force. The spallation strength was lower in the cast material compared to all other 17-4 stainless steel variants due to the presence of brittle δ-ferrite inclusions. Additionally, a drop in the tensile strain-rate was observed in the spallation response above the phase transition stress, which was hypothesized to stem from the kinetics of the reversion to the low-pressure phase during spall.

Compressive stress↗

A use-case-driven approach for demonstrating the added value of digitalisation in wind energy

Digitalisation is one of the key drivers for reducing the costs and risks of wind energy. When considering whether to embark on a digitalisation initiative, two key questions arise. The first is what business or operational opportunities might feasibly be addressed and the second is which of the many potential aspects of digitalisation are relevant to those opportunities. In this work, we show how these questions can be answered with a use-case-driven approach, based around a survey aiming to collect and collate the main "pain points" (or everyday challenges) of people in the wind energy sector. Although the relatively low number of participants of the survey (46) means that the results should only be used indicatively, it is still possible to make some general recommendations for priorities for digitalisation efforts in the wind energy sector. Firstly, digitalisation efforts should focus both on supporting people carrying out cross-lifecycle tasks, in particular sharing data, managing data, undertaking general data analyses and accessing data. Tools to do this should deal with varying data formats and naming conventions, make metadata more accessible, define data and metadata standards, make more data publicly available and improve the quality of data. Secondly, efforts should also focus on supporting people in the wind farm operational phase, in particular with failure detection, fault diagnosis, failure rate modelling and predictive maintenance. Solutions to do this should focus on accessible and validated tools for fault detection, cloud or other data pipeline solutions for SCADA data and tools for exhaustive data documentation. Finally, digitalisation efforts should focus on better communicating and helping people become aware of existing solutions and tools, as well as on helping people to exert a stronger influence on possible solutions.

17 WIND ENERGY↗

Risk Assessment of Cascading Outages: Part I - Overview of Methodologies

This paper is a result of ongoing activity carried out by Understanding, Prediction, Mitigation and Restoration of Cascading Failures Task Force under IEEE Computer Analytical Methods Subcommittee (CAMS). The task force's previous papers are focused on general aspects of cascading outages such as understanding, prediction, prevention and restoration from cascading failures. This is the first of two new papers, which will extend this previous work to summarize the state of the art in cascading failure risk analysis methodologies and modeling tools. This paper is intended to be a reference document to summarize the state of the art in the methodologies for performing risk assessment of cascading outages caused by some initiating event(s). A risk assessment should cover the entire potential chain of cascades starting with the initiating event(s) and ending with some final condition(s). However, this is a difficult task and heuristic approaches and approximations have been suggested. This paper discusses diffeent approaches to this and suggests directions for future development of methodologies.

Vaiman, Marianna↗

Review on Switching Device Fault, Protection, and Fault-Tolerant Topologies of Current Source Inverter

The fault modes, protection, and fault-tolerant topologies of voltage source inverters have been investigated for decades. However, issues and solutions related to the fault modes of current source inverters are less well understood. This paper summarizes some of the key topics relevant to a fault in current source inverters, including types of fault modes and their ramifications, post-fault protection methods, and fault- tolerant current source inverter topologies that have been presented in the literature.

42 ENGINEERING↗

Surge-Energy and Overvoltage Ruggedness of P-Gate GaN HEMTs

An essential ruggedness of power devices is the capability of safely withstanding the surge energy. The surge ruggedness of the GaN high-electron-mobility transistor (HEMT), a power transistor with no or minimal avalanche capability, has not been fully understood. This article unveils the comprehensive physics associated with the surge-energy withstand process and the failure mechanisms of p-gate GaN HEMTs. Two commercial p-gate GaN HEMTs with Ohmic- and Schottky-type gate contacts are studied. Two circuits are developed to study the device surge ruggedness: an unclamped inductive switching circuit is first used to identify the withstand dynamics and failure mechanisms, and a clamped inductive switching circuit with a controllable parasitic inductance is then designed to mimic the surge energy in converter-like switching events. The p-gate GaN HEMT is found to withstand the surge energy through a resonant energy transfer between the device capacitance and the load/parasitic inductance rather than a resistive energy dissipation as occurred in the avalanche. If the device resonant voltage goes below zero, the device reversely turns on and the inductor is discharged. The device failure occurs at the transient of peak resonant voltage and is limited by the device overvoltage capability rather than the surge energy, dV/dt , or overvoltage duration. Almost no energy is dissipated in the resonant withstand process and the device failure is dominated by an electric field rather than a thermal runaway. Furthermore, these results provide critical understandings on the ruggedness of GaN HEMTs and important references for their qualifications and applications.

42 ENGINEERING↗

Risk Assessment of Cascading Outages: Methodologies and Challenges

Abstract- This paper is a result of ongoing activity carried out by Understanding, Prediction, Mitigation and Restoration of Cascading Failures Task Force under IEEE Computer Analytical Methods Subcommittee (CAMS). The task force's previous papers are focused on general aspects of cascading outages such as understanding, prediction, prevention and restoration from cascading failures. This is the first of two new papers, which extend this previous work to summarize the state of the art in cascading failure risk analysis methodologies and modeling tools. This paper is intended to be a reference document to summarize the state of the art in the methodologies for performing risk assessment of cascading outages caused by some initiating event(s). A risk assessment should cover the entire potential chain of cascades starting with the initiating event(s) and ending with some final condition(s). However, this is a difficult task and heuristic approaches and approximations have been suggested. This paper discusses different approaches to this and suggests directions for future development of methodologies. The second paper summarizes the state of the art in modeling tools for risk assessment of cascading outages.

Vaiman, Marianna↗

A study on the impact of mid-gap defects on vertical GaN diodes

GaN is a favorable martial for future efficient high voltage power switches. GaN has not dominated the power electronics market due to immature substrate, homoepitaxial growth, and immature processing technology. Understanding the impact of the substrate and homoepitaxial growth on the device performance is crucial for boosting the performance of GaN. Here, we studied vertical GaN PiN diodes that were fabricated on non-homogenous Hydride Vapor Phase Epitaxy (HVPE) substrates from two different vendors. We show that defects which stemmed from growth techniques manifest themselves as leakage hubs. Different non-homogenous substrates showed different distribution of those defects spatially with the lesser quality substrates clustering those defects in clusters that causes pre-mature breakdown. Energetically these defects are mostly mid-gap around 1.8Ev with light emission spans from 450nm to 700nm. Photon emission spectrometry and hyperspectral electroluminescence were used to locate these defects spatially and energetically.

42 ENGINEERING↗

Weibull and Bootstrap-Based Data-Analytics Framework for Fatigue Life Prognosis of the Pressurized Water Nuclear Reactor Component Under Harsh Reactor Coolant Environment

In general, the fatigue life of a safety critical pressure component is estimated using best-fit fatigue life curves (S-N curves). These curves are estimated based on underlying in-air condition fatigue test data. The best-fitting approach requires a large safety factor to accommodate the uncertainty associated with large scatter in fatigue test data. In addition to this safety factor, reactor component fatigue life prognostics requires an additional correction factor that in general is also estimated deterministically. This additional factor known as the environmental correction factor F en is to cater the effect of the harsh coolant environment that severely reduces the life of these components. The deterministic F en factor may also lead to further conservative estimation of fatigue life leading to unnecessary early retirement of costly reactor components. To address the above-mentioned issues, we propose a data-analytics framework which uses Weibull and Bootstrap probabilistic modeling techniques for explicitly quantifying the uncertainty/scatter associated with fatigue life rather than estimating the lives based on a best-fit based deterministic approach. We assume the proposed probabilistic approach would provide the first hand information for assessing the maximum and minimum effects of pressurized water reactor water on the reactor component. In the discussed approach, in addition to the probabilistic fatigue curves, we suggest using a probabilistic environment correction factor F en . Here, we assume the probabilistic fatigue curve and F en would capture the S-N data scatter associated with the bulk effect of material grades, surface finish, strain rate, etc. on the material/component fatigue life.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Safety Case for Service Contracts

Safety cases developed for the Facilities Management and Operations Center (FMOC) are based on the requirements in MN471021, Work Planning and Control Criteria for Safe Design and Operations. The FMOC performs maintenance activities in various locations at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM consists of more than 6,000,000 square feet of buildings, structures, and site infrastructure on approximately 13,000 acres of land. The FMOC performs approximately 7500 service contract work orders a year to assist with operations and maintenance at the SNL/NM site and facilities. As part of the continual improvement process, this Safety Case will be reviewed and updated, as needed, or at a minimum every three years. People tend to underestimate the probability of an accident if none have occurred previously or if the person performing the work is skilled, and they tend to trust each other’s competence. Human error within systems must be identified and considered. The FMOC uses failure mode analysis (FMA) to determine how a system might fail and cause accidents, as well as the amount and types of controls needed. The FMOC includes interconnected elements, such as people, environment, procedures, facilities, equipment, and the hazards identified in the work analysis. A daily pre-task plan is required prior to any work activity. Changes in work practices will be communicated clearly to all service contractors and personnel by way of contractor pre-task planning, activity-specific plans, contract amendments, and/or training. The FMOC has created a safe-by-design intent approach for service contract execution starting at the planning stage and extending through the execution phase. The Safety Program (see Figure 2) summarizes how the FMOC connects work analysis elements with service contracts.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Continuous Reliability Enhancement for Wind (CREW). Program Update

Sandia's Continuous Reliability Enhancement for Wind (CREW) Program is a follow on project to the Wind Plant Reliability Database and Analysis Program. The goal of CREW is to characterize the reliability performance of the US fleet to serve as a basis for improved reliability and increased availability of turbines. This document states the objectives of CREW and describes how data collected for CREW will be used in analysis. A critical aspect to the success of the CREW project is data input from participating owner/operators. The level of detail and the quality of input data provided dictates the type of analysis that can be accomplished. Options for analysis range from high level availability summaries to detailed analysis of failure modes for individual equipment items. Specific types of input data are identified followed by samples of the type of output that can be expected along with a discussion of benefits to the user community.

17 WIND ENERGY↗

Accelerated Lifetime Testing of Main Shaft Seals for Tidal Turbine Rotors

This document will briefly discuss the observations and results from an NREL conducted accelerated lifetime testing of the main shaft seal for the Verdant Power fifth generation Gen5 underwater Tidal Energy Converter (TEC) turbine, which successfully performed at the RITE project in 2020-2021. In order to evaluate a 5-year Service Interval ( SI) for this component, testing at NREL operated the main shaft seal nearly continuously for over 135 (text says 130 days on page 5 and 125 days on page 7 and 137 days on page 11) days at a rotational velocity of 160 rpm while the test stand recorded water pressure, barrier fluid pressure, temperature, and number of cycles., representing ~ 40% of the SI. An additional separate test was conducted to measure the aging behavior of the rubber drive rings. The water pressure reservoir was held constant as 29 psi. Barrier fluid pressure remained relatively constant throughout the duration of the test but was seen to sink to as low as 10.1 psi. No barrier fluid leakage was observed throughout the test. A sudden failure occurred within the seal after the power to test machine was interrupted for a scheduled building maintenance procedure. Upon restarting, the main shaft seal lost all ability to prevent water ingress. The exact cause is not known but is believed to be either a seal assembly issue or a change in the alignment of the seal components during or following the power outage. Following seal disassembly, significant wear was seen on one of the graphite sealing rings. Based on these results it is recommended that a follow-on TEAMER be conducted to rectify protocol and assembly issues to further evaluate SI of this component. The support and participation of Verdant Power Inc, Dovetail Solutions LLC and Garlock Manufacturing Inc were instrumental in understanding the results. NREL thanks them for their significant effort.

13 HYDRO ENERGY↗

An Operations and Maintenance Roadmap for U.S. Offshore Wind: Enabling a Cost-Effective and Sustainable U.S. Offshore Wind Energy Industry Through Innovative Operations and Maintenance

The United States is currently targeting 30GW of offshore wind to be installed by 2030, and 150GW by 2050. Even considering future turbine sizes, this represents thousands of new turbines installed in a diverse set of environments, each with their unique design, installation, and maintenance challenges. While much can be learned from European and Asian experience with offshore wind over the past two decades, it is important to understand the unique circumstances of the U.S. This document explores operations and maintenance of offshore wind energy, specific to the U.S. and attempts to lay out a roadmap for needed activities to ensure reliability of future installations. The roadmap was informed through dozens of interviews with a wide cross-section of the industry, including representatives from OEMs, owner/operators, service companies, certification agencies, service providers, and researchers. The roadmap first describes the problem by component - blades, drivetrain and nacelle, structures and foundations, and electrical systems - through a look at current practices and opportunities for improvement in the areas of Failure Mode Analysis and Mitigation; Monitoring, Sensing, and Inspection; and Maintenance Execution. Crosscutting areas of Digitalization, Robotics and Automation, Prognostics and Health Management and O&M Optimization, Experimentation and Demonstration, Standardization, and Design Optimization Considering Reliability and O&M are then discussed. Finally, the roadmap summarizes all of these topics with recommendations for short (1-3 years), medium (4-7 years), and long term (8-12 years) activities, with a description of needed public and private sector contributions.

17 WIND ENERGY↗

A Survey of WEC Reliability, Survival and Design Practices

A wave energy converter must be designed to survive and function efficiently, often in highly energetic ocean environments. This represents a challenging engineering problem, comprising systematic failure mode analysis, environmental characterization, modeling, experimental testing, fatigue and extreme response analysis. While, when compared with other ocean systems such as ships and offshore platforms, there is relatively little experience in wave energy converter design, a great deal of recent work has been done within these various areas. Here, this article summarizes the general stages and workflow for wave energy converter design, relying on supporting articles to provide insight. By surveying published work on wave energy converter survival and design response analyses, this paper seeks to provide the reader with an understanding of the different components of this process and the range of methodologies that can be brought to bear. In this way, the reader is provided with a large set of tools to perform design response analyses on wave energy converters.

16 TIDAL AND WAVE POWER↗