Search NASA⌕ Search

SEARCH · Search NASA

Results for “geosynchronous orbits”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

Advanced Communications Technology Satellite (ACTS) Used for Inclined Orbit Operations

The Advanced Communications Technology Satellite (ACTS) is operated by the NASA Glenn Research Center at Lewis Field 24 hours a day, 7 days a week. ACTS, which was launched in September 1993, is in its 7th year of operations, far exceeding the system s planned 2 years of operations and 4 years of designed mission life. After 5 successful years of operating as a geostationary satellite, the spacecraft s North-South stationkeeping was discontinued in August 1998. The system is now operating in an inclined orbit that increases at a rate of 0.8 /yr. With only scarce fuel remaining, operating in this mode extends the usage of the still totally functional payload. Although tracking systems are now needed on the experimenter Earth stations, experiment operations have continued with very little disruption. This is the only known geosynchronous Ka-band (30/20 GHz) spot-beam satellite operating in an inclined orbit. The project began its transition from geostationary operations to inclined operations in August 1998. This did not interrupt operations and was transparent to the experimenters on the system. For the space segment, new daily procedures were implemented to maintain the pointing of the system s narrow 0.3 spot beams while the spacecraft drifts in the North-South direction. For the ground segment, modifications were designed, developed, and fielded for the three classes of experimenter Earth stations. With the next generation of commercial satellite systems still being developed, ACTS remains the only operational testbed for Ka-band geosynchronous satellite communications over the Western hemisphere. Since inclined orbit operations began, the ACTS experiments program has supported 43 investigations by industry, Government, and academic organizations, as well as four demonstrations. The project s goals for inclined-orbit operations now reflect a narrower focus in the types of experiments that will be done. In these days of "faster, better, cheaper," NASA is seeking to gain greater relevance to the agency s mission from these experiments. One area that is of much interest both to NASA and the commercial world is the investigation of protocol issues related to the interoperability of satellites with terrestrial networks, such as Transmission Control Protocol/Internet Protocol (TCP/IP) and Asynchronous Transfer Mode (ATM) over wideband satellites. Other experiment areas of interest are supporting the U.S. Government and NASA as they begin using commercial space assets to meet their communications needs, evaluating issues related to operating a spot-beam satellite in inclined orbit, and evaluating new Ka-band hardware that requires a satellite link. ACTS is now in its last year of operations. Operations are planned through June 2000, when after 81 months of operations, this very successful spacecraft will be superorbited and made inert.

Bauer, Robert A.↗

Innovative Approach Enabled the Retirement of TDRS-1 Compliant with NASA Orbital Debris Requirements

The first Tracking and Data Relay Satellite (TDRS-1) was deactivated on June 27th 2010 following more than 26 years of operation. The end-of-mission (EOM) operations were developed to address the stringent requirements of NPR 8715.6: NASA Procedural Requirements for Limiting Orbital Debris, which consists of three key items: 1) removal from the geosynchronous arc; 2) depletion of the remaining propellant; and 3) passivation of all sources of energy storage or generation [1]. The EOM approach minimized risks while accomplishing these goals. Raising TDRS-1 over 350 km above geosynchronous was accomplished via proven station change operations. Depleting propellant was the most challenging task, requiring over 20 hours of thruster on-time accumulated within schedule, orbit, and spacecraft subsystem constraints. The attitude configuration and operational procedures, including the unique final passivation method, were thoroughly analyzed and simulated prior to the start of operations. The complete EOM campaign lasted 21 days. The TDRS-1 EOM campaign demonstrated that pre-NPR 8715.6 satellite designs can be made to comply and that lessons learned could be applied to other satellite designs. The significant TDRS-1 effort demonstrates a commitment by NASA to responsible orbital debris management in compliance with international standards.

Zaleski, Ronald↗

A statistical study of Pc 3 magnetic pulsations at synchronous orbit, ATS 6

Results are reported for a study designed to determine statistically the nature and variation of the polarization parameters of Pc3 magnetic pulsations at synchronous orbit. Data obtained with a triaxial flux gate magnetometer on the geosynchronous satellite ATS 6 are subjected to routine power spectral and polarization analyses, and the events examined are identified as peaks in the spectra. Coherence analysis of spectral matrices for these events indicates that Pc3 are very common at synchronous orbit and are primarily a local morning phenomenon with an occurrence peak around 1000 LT; that the pulsations occur at all frequencies in the Pc3 band, with the most common frequency at about 0.35 Hz; that the Pc3 at synchronous orbit are most often linear and generally transverse, but some have significant compressional components; and that based on azimuth angle, there are two distinct classes of Pc3 (azimuthal and radial) with different characteristics. These statistical results are compared with model predictions and ground-based observations.

Arthur, C. W.↗

Trends and Options in the Disposal of Launch Vehicle Orbital Stages

An increasing number of agencies and organizations around the world provide guidelines for the disposal of launch vehicle stages placed in Earth orbit. The limitation of orbital lifetime following the satellite delivery mission, particularly in low Earth orbit, is viewed as one of the most important space debris mitigation measures. For higher altitude missions, orbital stages may be maneuvered into more rapidly decaying orbits or may be left in longer-term disposal orbits. This paper summarizes the recent disposal practices of all launch vehicle types and evaluates their compliance with existing national standards. Although the owners and operators of some satellite systems, e.g., Iridium and Globalstar, have levied orbital stage disposal requirements on launch service providers, in general, insufficient attention and communication is given to this topic. Sunsynchronous and geosynchronous missions may pose some of the most difficult challenges for the responsible disposal of orbital stages. A variety of disposal options are normally available, some of which may even influence the design of the spacecraft to be deployed. Also at issue is whether normal launch vehicle propellant reserves can be relied upon for post-mission disposal of orbital stages.

Johnson, Nicholas L.↗

Platforms in space: Evolutionary trends

The problem of physical crowding and the proliferation of separate communication links and ground support systems for multiple free-flying satellites can be overcome by using space platforms and multiplexing the data streams. Pertinent features of the space shuttle orbiter payloads, the solar power satellite, and geostationary and geosynchronous platforms are discussed. Typical payload requirements data which are needed to allow meaningful study of payloads as candidates for platform implementation are cited and factors affecting the compatibility/grouping of payloads are outlined.

Butler, J. M., Jr.↗

Blanket technology workshop report

The solar array blanket, defined as a substrate covered with interconnected and glassed solar cells, but excluding the necessary support structure, deployment, and orientation devices is considered. The interactions between the blanket and the structure that is used to package, deploy, support and, if necessary restow it, are addressed along with systems constraints such as spacecraft configuration, size, and payload requirements. The influence on blanket design is emphasized. The three main mission classes considered are low Earth orbital (LEO), intermediate, or LEO to GEO transfer, and geosynchronous (GEO). Although interplanetary missions could be considered to be a separate class, their requirements, primarily power per unit mass, are generally close enough to geosynchronous missions to allow this mission class to be included within the third type. Examination of the critical elements of each class coupled with considerations of the shuttle capabilities is used to define the type of blanket technology most likely required to support missions that will be flown starting in 1990.

Scott-Monck, J. A.↗

Design of multi-mission spacecraft bus

This paper presents preliminary design of a multimission spacecraft bus for meteorological and communications payloads. The meteorological payload uses sun-synchronous circular orbit and the communications payload uses Molniya type orbit to provide communications for areas not covered by geosynchronous communications satellites. The launch vehicles are Pegasus for the meteorological payload and Taurus for the communications payload. The spacecraft bus uses three-axis stabilization consisting of a three reaction wheel system. The electric power system consists of single-axis tracking silicon solar array and Ni2 H2 batteries. The propulsion subsystem consists of six hydrazine thrusters and one propellant tank.

Agrawal, Brij N.↗

Global Precipitation Analysis Using Satellite Observations

Global precipitation analysis covering the last few decades and the impact of the new TRMM (Tropical Rainfall Measuring Mission) observations are reviewed in the context of weather and climate applications. All the data sets discussed are the result of mergers of information from multiple satellites and gauges, where available. The focus of the talk is on TRMM-based 3 hr. analyses that use TRMM to calibrate polar-orbit microwave observations from SSM/I (and other satellites) and geosynchronous IR observations and merges the various calibrated observations into a final, 3 hr. resolution map. This TRMM standard product will be available for the entire TRMM period (January 1998-present) at the end of 2002. A real-time version of this merged product is being produced and is available at 0.25 deg latitude-longitude resolution over the latitude range from 50 deg N-50 deg S. Examples will be shown, including its use in monitoring flood conditions and in relating weather-scale patterns to climate-scale patterns. The 3-hourly analysis is placed in the context of two research products of the World Climate Research Program's (WCRP/GEWEX) Global Precipitation Climatology Project (GPCP). The first is the 23 year, monthly, globally complete precipitation analysis that is used to explore global and regional variations and trends and is compared to the much shorter TRMM tropical data set. The GPCP data set shows no significant global trend in precipitation over the twenty years, unlike the positive trend in global surface temperatures over the past century. Regional trends are also analyzed. A trend pattern that is a combination of both El Nino and La Nina precipitation features is evident in the Goodyear data set. This pattern is related to an increase with time in the number of combined months of El Nino and La Nina during the 23 year period. Monthly anomalies of precipitation are related to ENSO variations with clear signals extending into middle and high latitudes of both hemispheres. Also shown is the GPCP daily, 1 deg latitude-longitude analysis, which is available from January 1997 to the present. Plans to incorporate the TRMM data and 3-hourly analysis into the GPCP products are outlined. The outcome should be an improved global analysis and climatology on monthly scales for the 23 year period and finer time scale analyses for more recent periods, including real-time 3-hourly (or finer) analyses over much of the globe.

Adler, Robert F.↗

Real-time, Quasi-Global, Multi-Satellite Precipitation Analysis Using TRMM and other Satellite Observations

A TRMM-based 3-hr analyses that use TRMM observations to calibrate polar-orbit microwave observations from SSM/I (and other satellites) and geosynchronous IR observations and merges the various calibrated observations into a final, 3-hr resolution map is described. This TRMM standard product will be available for the entire TRMM period (January 1998-present) in 2003 as part of Version 6 of the TRMM products. A real-time version of this merged product is being produced and is available at 0.25" latitude-longitude resolution over the latitude range from 50 N-500S. Examples will be shown, including its use in monitoring flood conditions and in relating weather-scale patterns to climate-scale patterns. Plans to incorporate the TRMM data and 3-hourly analysis into the Global Precipitation Climatology Project (GPCP) products are outlined. The outcome in the near future should be an improved global analysis and climatology on monthly scales for the 23 year period and finer time scale analyses for more recent periods, including 3-hourly analyses over the globe. These technique developments are potential prototypes for analyses with the Global Precipitation Measurement (GPM) mission.

Adler, Robert F.↗

Systems Engineering Challenges for GSFC Space Science Mission Operations

The NASA Goddard Space Flight Center Space Science Mission Operations (SSMO) project currently manages19 missions for the NASA Science Mission Directorate, within the Planetary, Astrophysics, and Heliophysics Divisions. The mission lifespans range from just a few months to more than20 years. The WIND spacecraft, the oldest SSMO mission, was launched in 1994. SSMO spacecraft reside in low earth, geosynchronous,highly elliptical, libration point, lunar, heliocentric,and Martian orbits. SSMO spacecraft range in size from 125kg (Aeronomy of Ice in the Mesosphere (AIM)) to over 4000kg (Fermi Gamma-Ray Space Telescope (Fermi)). The attitude modes include both spin and three-axis stabilized, with varying requirements on pointing accuracy. The spacecraft are operated from control centers at Goddard and off-site control centers;the Lunar Reconnaissance Orbiter (LRO), the Solar Dynamics Observatory (SDO) and Magnetospheric MultiScale (MMS)mission were built at Goddard. The Advanced Composition Explorer (ACE) and Wind are operated out of a multi-mission operations center, which will also host several SSMO-managed cubesats in 2017. This paper focuses on the systems engineeringchallenges for such a large and varied fleet of spacecraft.

Spacecraft↗

Manned geosynchronous mission requirements and systems analysis study extension

Turnaround requirements for the manned orbital transfer vehicle (MOTV) baseline and alternate concepts with and without a space operations center (SOC) are defined. Manned orbital transfer vehicle maintenance, refurbishment, resupply, and refueling are considered as well as the most effective combination of ground based and space based turnaround activities. Ground and flight operations requirements for abort are identified as well as low cost approaches to space and ground operations through maintenance and missions sensitivity studies. The recommended turnaround mix shows that space basing MOTV at SOC with periodic return to ground for overhaul results in minimum recurring costs. A pressurized hangar at SOC reduces labor costs by approximately 50%.

Source record↗

Advanced Electric Propulsion for RLV Launched Geosynchronous Spacecraft

Solar Electric Propulsion (SEP) when used for station keeping and final orbit insertion has been shown to increase a geostationary satellite's payload when launched by existing expendable launch vehicles. In the case of reusable launch vehicles or expendable launch vehicles where an upper stage is an expensive option, this methodology can be modified by using the existing on-board apogee chemical system to perform a perigee burn and then letting the electric propulsion system complete the transfer to geostationary orbit. The elimination of upper stages using on-board chemical and electric propulsion systems was thus examined for GEO spacecraft. Launch vehicle step-down from an Atlas IIAR to a Delta 7920 (no upper stage) was achieved using expanded on-board chemical tanks, 40 kW payload power for electric propulsion, and a 60 day elliptical to GEO SEP orbit insertion. Optimal combined chemical and electric trajectories were found using SEPSPOT. While Hall and ion thrusters provided launch vehicle step-down and even more payload for longer insertion times, NH3 arcjets had insufficient performance to allow launch vehicle step-down. Degradation levels were only 5% to 7% for launch step-down cases using advanced solar arrays. Results were parameterized to allow comparisons for future reusable launch vehicles. Results showed that for an 8 W/kg initial power/launch mass power density spacecraft, 50% to 100% more payload can be launched using this method.

Oleson, Steven↗

Launch vehicle and power level impacts on electric GEO insertion

Solar Electric Propulsion (SEP) has been shown to increase net geosynchronous spacecraft mass when used for station keeping and final orbit insertion. The impact of launch vehicle selection and power level on the benefits of this approach were examined for 20 and 25 kW systems launched using the Ariane 5, Atlas IIAR, Long March, Proton, and Sea Launch vehicles. Two advanced on-board propulsion technologies, 5 kW ion and Hall thruster systems, were used to establish the relative merits of the technologies and launch vehicles. GaAs solar arrays were assumed. The analysis identifies the optimal starting orbits for the SEP orbit raising/plane changing while considering the impacts of radiation degradation in the Van Allen belts, shading, power degradation, and oblateness. This use of SEP to provide part of the orbit insertion results in net mass increases of 15 - 38% and 18 - 46% for one to two month trip times, respectively, over just using SEP for 15 years of north/south station keeping. SEP technology was shown to have a greater impact on net masses of launch vehicles with higher launch latitudes when avoidance of solar array and payload degradation is desired. This greater impact of SEP could help reduce the plane changing disadvantage of high latitude launch sites. Comparison with results for 10 and 15 kW systems show clear benefits of incremental increases in SEP power level, suggesting that an evolutionary approach to high power SEP for geosynchronous spacecraft is possible.

Oleson, Steven R.↗

Space tug geosynchronous mission simulation

Near-optimal three dimensional trajectories from a low earth park orbit inclined at 28.5 deg to a synchronous-equatorial mission orbit were developed for both the storable (thrust = 28,912 N (6,500 lbs), I sub sp = 339 sec) and cryogenic (thrust = 44,480 N (10,000 lbs), I sub sp = 470 sec) space tug using the iterative cost function minimization technique contained within the modularized vehicle simulation (MVS) program. The finite burn times, due to low thrust-to-weight ratios, and the associated gravity losses are accounted for in the trajectory simulation and optimization. The use of an ascent phasing orbit to achieve burnout in synchronous orbit at any longitude is investigated. The ascent phasing orbit is found to offer the additional advantage of significantly reducing the overall delta velocity by splitting the low altitude burn into two parts and thereby reducing gravity losses.

Lang, T. J.↗

Forecasting Megaelectron-Volt Electrons Inside Earth's Outer Radiation Belt: PreMevE 2.0 Based on Supervised Machine Learning Algorithms

We present the recent progress in upgrading a predictive model for megaelectron-volt (MeV) electrons inside the Earth's outer Van Allen belt. This updated model, called PreMevE 2.0, provides improved forecasts, particularly at outer L-shells, by adding upstream solar wind speeds to the model's input parameter list that originally includes precipitating electrons observed at low Earth orbits and MeV electron fluxes in situ measured by a geosynchronous satellite. Furthermore, based on several kinds of linear and artificial neural networks algorithms, a list of models was constructed, trained, validated, and tested with 42-month MeV electron observations from Van Allen Probes. Out-of-sample test results from these models show that, with optimized model hyperparameters and input parameter combinations, the top performer from each category of models has the similar capability of making reliable 1-day (2-day) forecasts of 1-MeV electron flux distributions with performance efficiency values ~0.87 (~0.82) averaged over the L-shell range of 2.8–6.6, significantly outperforming the previous version of PreMevE particularly at L-shells > ~4.5. Interestingly, the linear regression model is often the most successful when compared to other models, which suggests the relationship between dynamics of trapped 1-MeV electrons and precipitating electrons is dominated by linear components. Results also show that PreMevE 2.0 can reasonably well predict the onsets of MeV electron events in 2-day forecasts. PreMevE 2.0 is designed to be driven by observations from longstanding space infrastructure to make high-fidelity forecasts for MeV electrons, thus can be an invaluable space weather forecasting tool for the future.

79 ASTRONOMY AND ASTROPHYSICS↗

VAS applications at Colorado State University

The application of the VAS program is outlined. The initial assessments of VAS radiometer and satellite performance were satisfactory; and VAS operations were smoothly carried out by the NESS SOCC and associated processing and retransmission facilities. The availability of advanced image processing systems, previous studies with the geosynchronous European Space Agency Meteorological Satellite (Meteosat), and the polar orbiter multichannel radiance data enabled the progress of the application. The VAS data are implemented as these data are received in the real time VISSR mode, and as dwell sounding (DS) and multispectral imaging (MSI) radiances on magnetic tapes.

Kruidenier, M.↗

Mission to Planet Earth

To preserve the earth, it is necessary to understand the tremendously complex interactions of the atmosphere, oceans, land, and man's activities deeply enough to construct models that can predict the consequences of our actions and help us make sound environmental, energy, agriculture, and economic decisions. Mission to Planet Earth is NASA's suggested share and the centerpiece of the U.S. contribution to understanding the environment, the Global Change Research Program. The first major element of the mission would be the Earth Observing System, which would give the simultaneous, comprehensive, long-term earth coverage lacking previously. NASA's Geosynchronous Earth Observatory with two additional similar spacecraft would be orbited by the U.S., plus one each by Japan and the European Space Agency. These would be the first geostationary satellites to span all the disciplines of the earth sciences. A number of diverse data gathering payloads are also planned to be carried aboard the Polar Orbiting Platform. Making possible the long, continuous observations planned and coping with the torrent of data acquired will require technical gains across a wide front. Finally, how all this data is consolidated and disseminated by the EOS Data and Information System is discussed.

Tilford, Shelby G.↗

Low-Power Ion Propulsion for Small Spacecraft

Analyses were conducted which indicate that sub kW-class ion thrusters may provide performance benefits for near-Earth space commercial and science missions. Small spacecraft applications with masses ranging from 50 to 500 kg and power levels less than 0.5 kW were considered. To demonstrate the efficacy of propulsion systems of this class, two potential missions were chosen as examples; a geosynchronous north-south station keeping application, and an Earth orbit magnetospheric mapping satellite constellation. Xenon ion propulsion system solutions using small thrusters were evaluated for these missions. A payload mass increase of more than 15% is provided by a 300-W ion system for the north-south station keeping mission. A launch vehicle reduction from four to one results from using the ion thruster for the magnetospheric mapping mission. Typical projected thruster performance over the input power envelope of 100-300 W range from approximately 40% to 54% efficiency and approximately 2000 to 3000 seconds specific impulse. Thruster technologies required to achieve the mission-required performance and lifetime are identified.

Patterson, Michael J.↗