Search NASA⌕ Search

SEARCH · Search NASA

Results for “procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

DYFLOW: A flexible framework for orchestrating scientific workflows on supercomputers

Modern scientific workflows are increasing in complexity with growth in computation power, incorporation of non-traditional computation methods, and advances in technologies enabling data streaming to support on-the-fly computation. These workflows have unpredictable runtime behaviors, and a fixed, predetermined resource assignment on supercomputers can be inefficient for overall performance and throughput. Inability to change resource assignments further limits the scientists to avail of science-driven opportunities or respond to failures.We introduce DYFLOW, a flexible framework that orchestrates scientific workflows on supercomputers based on user-designed policies. DYFLOW compartmentalizes orchestration stages into simplified constructs, and end-users can program and reuse them according to their workflow requirements through an easy-to-use interface. These constructs hide the intricacies involved in runtime management from end-users, for instance, procurement of information to understand the workflow state, assessment, and supervision of the runtime changes. DYFLOW is designed to work alongside existing workflow management systems and reuse the available (static) support for workflow management. We have integrated DYFLOW with an existing workflow management tool as a demonstration. With experiments performed on use cases from three types of scientific workflows and two different parallel architectures, we show that DYFLOW achieves the desired orchestration incurring a small cost to carry out the runtime changes.

Singhal, Swati↗

Semantic Interoperability to Enable Smart, Grid-Interactive Efficient Buildings

Achieving a widespread transition to grid-interactive, efficient buildings (GEBs) depends critically on there being sufficient interoperability among connected building systems. While many critical elements already exist at the technical interoperability level (TCP/IP, BACnet, etc.), a lack of interoperability in the semantic level hinders streamlined integration of interdependent applications. Semantics refers to expressing information about “things” in a way that can be consistently understood by applications. Key components of formalized semantics include identifying what a “thing” is (its “type”), defining general information about that “thing” (its characteristics or properties), and defining the appropriate relationships of that “thing” to other “things” (its function or role in a larger system). Although this might seem initially trivial, the success of smart building applications is highly dependent on maintaining consistent notions of the “things” being self-descriptive. Without semantic interoperability, it is technically difficult, labor-intensive, and cost-prohibitive to enable three key objectives of GEBs: optimizing performance, identifying faults, and delivering grid services. Industry, academia, and standards bodies have invested effort in developing information models to facilitate semantic interoperability, however, they have not been widely adopted across the U.S. commercial building portfolio. This paper will present a pathway to drive semantic interoperability through a three-pronged approach to be led by the DOE Building Technologies Office in partnership with NIST and multiple national laboratories comprising: 1) industry engagement and coordination across existing efforts; 2) a semantic interoperability standard that empowers building owners to identify and require interoperable attributes when procuring equipment and applications; 3) tools to assist in implementation and a test framework that can verify compliance of products with semantic interoperability specifications. This strategic approach is designed to accelerate the timeline for adoption of semantic interoperability standards. The intent is to reduce soft costs associated with implementing advanced controls, fault detection and diagnostics, and other smart building technologies as a necessary step in achieving an energy efficient smart grid future.

semantic interoperability, Semantic modeling, inte↗

ATR Firewater Pump Replacement

The objective of this project is to replace two faulty firewater pumps at INL's Advanced Test Reactor (ATR). Around ATR, firewater pumps can serve from one to all three of these functions: emergency core injection, emergency canal makeup, and firefighting. Both pumps serve firefighting functions but one also serves the function of emergency canal makeup, a nuclear function, so it is required to go through nuclear grade dedication. Both pumps are currently in the process of being procured.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

200 MV Record Voltage Of vCM And LCLS-II-HE Cryomodules Production Start At Fermilab

The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to the facility, enabling higher energy operation. An electron beam is accelerated using superconducting radio frequency (SRF) cavities built into cryomodules. It is planned to build 24 1.3 GHz standard cryomodules and one 1.3 GHz single-cavity Buncher Capture Cavity (BCC) cryomodule for the LCLS-II-HE project. Fourteen of these standard cryomodules and the BCC are planned to be assembled and tested at Fermilab. Procurements for standard cryomodule components are nearing completion. The first LCLS-II-HE cryomodule, referred to as the verification cryomodule (vCM) was assembled and tested at Fermilab. Fermilab has completed the assembly of the second cryomodule. This paper presents LCLS-II-HE cryomodule production status at Fermilab, emphasizing the changes done based on the successes, challenges, mitigations, and lessons learned from LCLS-II; validation of the changes with the excellent vCM results.

43 PARTICLE ACCELERATORS↗

Drawing 445754 rev5

Drawing 445754 contains the details for fabricating plastic flux wands used in ATR and ATRC. The flux wands are used to position flux wires in fuel elements. The flux wands are basically a tool to position the flux wires. The flux wires are later removed from the flux wands and counted to determine the amount of flux they received. The flux wands come in contact with reactor primary coolant, but do not control the primary coolant (this is in reference to 10 CFR Part 810). Additional wands need to be fabricated. This drawing needs to be sent to a vendor or vendors for procurement of new flux wands as done in the past. LWP-11201 rev 11 (pg. 27) indicates providing information to a vender is not a public release. This drawing does not need to be released to all of the public if that is an option. It just needs to go to a vendors or vendors. A vendor will likely need to see the drawing to determine if they can build the flux wands.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Progress on the Proton Power Upgrade at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory will double the proton power capability from 1.4 to 2.8 MW. This will be accomplished through an energy increase from 1.0 to 1.3 GeV and a beam current increase from 26 to 38 mA. The energy increase will be accomplished through the addition of 7 cryomodules to the linear accelerator (Linac). The beam current increase will be supported by upgrading several radio-frequency systems in the normal-conducting section of the Linac. Upgrades to the accumulator ring injection and extraction regions will accommodate the increase in beam energy. A new 2-MW-capable target and supporting systems will be developed and installed. Conventional facility upgrades include build-out of the existing klystron gallery and construction of a tunnel stub to facilitate future beam transport to the second target station. The project received approval to proceed with construction in October 2020. Procurements are in progress, and some installation activities have already occurred. Most of the installation will take place during three outages in 2022-2023. The project early finish is planned for 2025.

Barbier, Charlotte↗

NETL UPGrants LCA Report Template

The NETL UPGrants LCA Report Template is part of the NETL CO2U LCA Guidance Toolkit for Carbon Utilization that has been modified to support Utilization Procurement Grants applications. The NETL UPGrants LCA Report Template is required to be completed by all vendors to consistently document the boundaries and results of their LCA.

Krynock, Michelle↗

Considerations in Development of a Roadmap Toward Resilient and Net-Zero Energy Supply

This presentation considers issues that arise in developing a roadmap toward sustainable and secure energy for US Army and other agency installations in Europe and elsewhere. Issues include scope, baseline, conservation and efficiency, energy balance, grid integration, resilience and security, procurement and financing, performance-period issues and end-of-performance-period issues.

army↗

Advanced Analytical Methodologies Enable Feedstock Screening and Correlation to Pyrolysis Yields and Catalytic Upgrading

Pyrolysis of lignocellulosic biomass can serve as a powerful pathway for the generation of renewable fuels and industrial products. However, procurement of some biomass may be costly, especially when there is competition for alternative uses. Forestry and agricultural byproducts may serve as valuable pyrolysis feedstocks due to their high availability and low cost. Although waste products may fill demand for affordable pyrolysis feedstocks, they are often high in ash and extractives which contribute to unfavorable changes in pyrolysis vapor composition, as well as end products. The work presented here investigates the correlations between various pine anatomical fractions to understand their effect on pyrolysis oil composition for forest residues. Analytical pyrolysis coupled to direct analysis by molecular beam mass spectrometry (MBMS) provides real-time monitoring of pyrolysis vapor composition, even for compounds that are not amenable to gas chromatography. Statistical analysis of MBMS data from the fast pyrolysis (FP) of clean pine, cambium, twigs and branches, needles, bark, and a forest residue samples revealed that bark and needles made the greatest differences in the vapor composition of forest residues during pyrolysis and were enriched in resin acids, furfural derivatives, and ions that have been previously observed from catalysis corresponding to ash content. These results were also compared to catalytic fast pyrolysis (CFP) using a platinum on titania catalyst, and correlations between FP and CFP products were observed for the anatomical fractions. The forest residues and corresponding anatomical fractions from a stand of 23-year-old pine will be converted by fast pyrolysis in a bench-scale 2-inch fluidized-bed reactor, and statistical correlations between the bench-scale products and analytical-scale pyrolysis vapors will be shown. This work highlights the power of advanced analytical methodologies in determining the contributions of vapor components to catalytic pyrolysis outcomes for mixed feedstocks and demonstrates the use of analytical methodologies to better screen feedstocks prior to pyrolysis.

analytical↗

The Birth of a Data Center

Since 2005, Research and Education Campus serves as the gateway to INL University Boulevard Consolidates scientific studies, increased interaction and educational opportunities Teams with local commercial developers, the State of Idaho, and Idaho universities Developed University Boulevard 7 major R&D Leased facilities (388,000 sq. ft.) $122M capital value of leased property Some facilities are at and others forecasted to exceed capacity within 2-3 years as mission growth continues DOE awarded the INL contract to BEA, Feb. 2005. Purpose; transform two uniquely different National Laboratories into the newly formed Idaho National Laboratory Become the pre-eminent, internationally recognized nuclear energy research, development and demonstration laboratory within 10 years. Aggressively streamline, upgrade and plan for new infrastructure INL Infrastructure Transformation Plan, Sept 2005, an overall roadmap for transforming INL to meet the new vision. Key goal; procure 400,000 sq ft of new facility space DOE-NE approved Mission Need document for consolidating the INL Research and Education Campus (REC), Dec. 2005; add or replace 200,000 to 500,000 sq ft of professional scientific space, existing facilities were fair to poor condition. Master Campus Plan requirements document and Environmental Assessment approved January and March 2007 respectively. Defined campus location and REC boundaries. INL and DOE-ID decided, in 2007, to suspend quest for third-party financing, because unlikely to succeed. The strategy was; Keep original target of 200,000 to 500,000 sq ft new space Consolidate existing scattered leases Pursue developer-financed facilities in smaller incremental sizes All leased general purpose buildings;No DOE capital investments (except for utility corridor), developed by others (local developers, State, University, private funding), no government land involved INL-funded tenant improvements

99 GENERAL AND MISCELLANEOUS↗

Evolution of Energy Efficiency Programs Over Time: The Case of Standby Power

Issued in 2001, Presidential Executive Order 13221 directed federal agencies to purchase products with low standby power, with the goal of 1) reducing energy consumption in federal facilities, and 2) drawing attention to the problem of high standby power consumption, with guidance provided by the Federal Energy Management Program (FEMP). At that time, standby power was newly recognized as an increasing building energy load. Since then, procurement of products with low standby power have been set in place in acquisition processes, and the purchasing power of the federal government continues to influence manufacturers’ design decisions related to standby power. In recent years, FEMP has shifted effort from direct manufacturer outreach for data collection, to integrating low standby requirement into broader acquisition programs including Energy Star and Electronic Product Environmental Assessment Tool (EPEAT). Another milestone has been the labeling of low standby products on the GSA Advantage website to simplify and enhance compliance. Looking forward into the program’s future, this question arises “How do we design programs over time to reflect market and technology changes, by adjusting programmatic requirements while maintaining effectiveness?” This paper discusses that question for the case of standby power, which transitioned from covering a single to multiple environmental attributes, both in the context of the program’s past and future.

Payne, CT↗

In Cell Thermal Creep Frames for Demonstration Project Preparations

The thrust of advanced nuclear reactor demonstrations demands the accelerated qualification of in-core materials to enable licensing processes and developing the performance data. Due to the high-operating temperatures of such reactors, long-term mechanical behavior under constant load is essential to determine the geometrical and mechanical integrity of in-core components during operation and off-normal conditions. Therefore, the thermal creep behavior of neutron-irradiated advanced reactor materials must be determined. The feasibility of using subsize specimens for the irradiation campaigns and the limited available infrastructure challenge the assessment of thermal creep behavior of advanced reactor materials. Therefore, the U.S. Department of Energy Office of Nuclear Energy (DOE-NE) National Reactor Innovation Center (NRIC) prioritizes the development of a thermal creep testing infrastructure for multiple subsize specimens to accelerate the demonstration and deployment of advanced reactor concepts. This report describes the activities for the construction of a thermal creep testing capability at Idaho National Laboratory (INL). The overall project consists of conceptual design, out-of-cell demonstration, and in-cell demonstration phases. During fiscal year (FY)-2021, the team finished the conceptual design of a thermal creep test facility that can test multiple subsize specimens. This conceptual design consisted of the determination of technical and functional requirements, the determination of the design space, and the preparation of the technical drawings. Technical and functional requirements were categorized as required and desired capabilities and the conceptual design was performed to meet all the required capabilities with the flexibility to achieve the desired capabilities. The design space identified the operational capacity of the creep frame for different advanced reactor relevant materials with the consideration of the feasible operation in the hotcell at the Fuels and Applied Science Building (FASB) at INL. Based on the requirements and design space, the multiple specimen creep frame was designed. The official INL engineering drawing process was started and the procurement of materials for construction was initiated. For FY-2022, the out-of-cell demonstration and final installation of the multiple creep frame is planned.

36 MATERIALS SCIENCE↗

Hydrogen Production, Grid Integration, and Scaling for the Future

The Hydrogen Production, Grid Integration, and Scaling for the Future project will inform clean hydrogen production deployment across the planning, procurement, and operation stages of hydrogen production on the grid. Hydrogen production from renewables is a clean source of fuel which is near zero for greenhouse gas emissions and criteria pollutants. The results from this project will inform entities looking to build clean energy projects that produce good paying jobs in manufacturing, installation, maintenance and operation of these facilities. This project provides system characterization examples, multiple configurations, optimizations, and suggested metering and custody transfer points through multiple scenarios and hardware testing of NREL's state-of-the-art 1.25 MW polymer electrolyte membrane (PEM) electrolyzer system to characterize system performance in relevant scenarios. This work also creates a digital twin for emulation in the Advanced Research on Integrated Systems (ARIES) virtual environment and performs hardware-in-the-loop (HIL) testing of pilot-scale, decentralized, and centralized hydrogen systems.

centralized hydrogen production↗

Design, Manufacturing, Assembly, and Lessons Learned of the Pre-production 325 MHz Couplers for the PIP-II Project at Fermilab

Five 325 MHz high-power couplers will be integrated into the pre-production Single Spoke Resonator Type-II (ppSSR2) cryomodule for the PIP-II project at Fermilab. Couplers were procured by both Fermilab and IJCLAB for this effort. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life cycle, including design, manufacturing, and assembly, along with the lessons learned at each stage.

43 PARTICLE ACCELERATORS↗

In-Cell Thermal Creep Frame Capability: Out-of-Cell Construction and Subsized Sample Testing

This report describes the activities related to the construction of an in-cell thermal creep test facility for small-scale specimens in the irradiation-assisted stress-corrosion cracking (IASCC) hotcell located at the Fuels and Applied Science Building (FASB) at INL. The whole project includes three stages: (i) conceptual design; (ii) out-of-cell demonstration tests; and (iii) in-cell demonstration testing. During the current fiscal year (FY)-2022, materials and equipment required to construct the conceptual design outlined in a previous report were procured. Frames for conducting out-of-cell testing have been constructed, and testing plans have been developed to assess the operation of the newly constructed frames. Preliminary testing of flat subsized tensile specimens on ASTM creep frames has also been completed for two sample thicknesses: 0.75 mm and 1.0 mm.

36 MATERIALS SCIENCE↗

Optimization and Expansion of the Qweak Database

Weak interactions have been found to violate parity conservation and can be observed in electron-proton scattering. The results of the scattering reveal an asymmetry in the scattering-rate of electrons in the detectors as the helicity of the beam is flopped. By measuring this asymmetry, the Qweak experiment can determine weak charge of the proton. That value can then be used to calculate the weak mixing angle. The weak mixing angle can indicate if there is physics beyond the Standard Model. The experiment will be collecting data for approximately 2200 hours at the Thomas Jefferson Lab National Accelerator Facility. A database has been implemented to allow for storage and organization of the collected data so it can be analyzed at a future time. This database must be optimized in order to allow quick and easy access for every member of the collaboration. This optimization can be accomplished through speed tests to weigh different techniques that can be used in the database as well as altering and expanding the database for improved data procurement.

Trees, Grace↗

Lifecycle Management of Nuclear Security Radiation Detection Systems: Testing and Evaluation

The lifecycle of radiation detection systems functioning within a State’s Nuclear Security Detection Architecture encompasses all activities associated with acquisition, deployment, and eventual disposal. Throughout a system’s lifecycle, testing and evaluation activities are needed to ensure requirements are continually met, as underscored by recent experiences.This paper provides:1.A discussion of reasons why testing should be part of the radiation detection equipment lifecycle before, during, and after acquisition.2.A general process for determining applicable evaluation methods.3.A discussion of issues related to integrating testing and evaluation into procurement and operational processes and mitigation strategies.

Harris, Tyrone↗

Qweak Main Detector Status

The Qweak experiment at Jefferson Laboratory will make the first measurement of the weak charge of the proton. Because this electroweak observable is suppressed in the Standard Model, even the modest projected 4\% uncertainty will allow us to constrain new electron-quark interactions at the multi TeV-scale. The weak charge is accessed through the small ($<$ 1 ppm), parity-violating asymmetry in the elastic scattering of longitudinally polarized electrons from unpolarized protons. Scattered electrons which pass through fused silica bars emit Cerenkov light which is collected and converted to current by phototubes. Most large procurements and R\&D are complete. The status of the construction effort will be summarized. We remain on-track for installation in Spring 2009.

Mack, David↗