Search NASA⌕ Search

SEARCH · Search NASA

Results for “program verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

FAST-1.0.1 User Installation and Verification Guide

The purpose of this document is to provide the user information about the installation of FAST-1.0.1 on their computers or servers. General information about the code and supported operating systems is described in Section 1.0.1. Self-service oriented FAST-1.0.1 software licensing steps are described in Section 2.0. An installation verification test suite is provided with FAST-1.0.1 and described in Section 3.0. A convenience script for converting FRAPCON to FAST inputs is discussed in Section 4.0. FAST-1.0.1 was developed and released under a software quality assurance program based upon NQA-1-2017. FAST-1.0.1 is the latest baseline code and the result of a bug fixes to FAST-1.0 with other software and methodology developments. The installation verification test suite contains both steady state and transient Anticipated Operation Occurrences (AOOs). Capability to model accident conditions, such as Reactivity Initiated Accidents (RIAs) and Loss Of Coolant Accidents (LOCAs), are targeted for a later release of FAST. FRAPTRAN-2.0 will continue to be used for accident conditions until the release of FAST with accident condition modeling capabilities.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of verifiability in HAL/S

The ability of HAL/S to write verifiable programs, a characteristic which is highly desirable in aerospace applications, is lacking since many of the features of HAL/S do not lend themselves to existing verification techniques. The methods of language evaluation are described along with the means in which language features are evaluated for verifiability. These methods are applied in this study to various features of HAL/S to identify specific areas in which the language fails with respect to verifiability. Some conclusions are drawn for the design of programming languages for aerospace applications and ongoing work to identify a verifiable subset of HAL/S is described.

Young, W. D.↗

The Integrated Hazard Analysis Integrator

Hazard analysis addresses hazards that arise in the design, development, manufacturing, construction, facilities, transportation, operations and disposal activities associated with hardware, software, maintenance, operations and environments. An integrated hazard is an event or condition that is caused by or controlled by multiple systems, elements, or subsystems. Integrated hazard analysis (IHA) is especially daunting and ambitious for large, complex systems such as NASA s Constellation program which incorporates program, systems and element components that impact others (International Space Station, public, International Partners, etc.). An appropriate IHA should identify all hazards, causes, controls and verifications used to mitigate the risk of catastrophic loss of crew, vehicle and/or mission. Unfortunately, in the current age of increased technology dependence, there is the tendency to sometimes overlook the necessary and sufficient qualifications of the integrator, that is, the person/team that identifies the parts, analyzes the architectural structure, aligns the analysis with the program plan and then communicates/coordinates with large and small components, each contributing necessary hardware, software and/or information to prevent catastrophic loss. As viewed from both Challenger and Columbia accidents, lack of appropriate communication, management errors and lack of resources dedicated to safety were cited as major contributors to these fatalities. From the accident reports, it would appear that the organizational impact of managers, integrators and safety personnel contributes more significantly to mission success and mission failure than purely technological components. If this is so, then organizations who sincerely desire mission success must put as much effort in selecting managers and integrators as they do when designing the hardware, writing the software code and analyzing competitive proposals. This paper will discuss the necessary and sufficient requirements of one of the significant contributors to mission success, the IHA integrator. Discussions will be provided to describe both the mindset required as well as deleterious assumptions/behaviors to avoid when integrating within a large scale system.

Morris, A. Terry↗

On-Board Deployment Event Verification for GOES-R Spacecraft

As is common with many spacecraft designs, the GOES-R vehicles require a series of deployment events to transition from the launch configuration to the operational configuration. Rather than implementing additional sensors to verify various deployments, the GOES-R program developed an alternate approach that uses existing gyro rate sensing. The approach includes two pieces: the first is a new onboard shock detection capability to confirm initiation of individual deployment events, and the second is a ground-based dynamics verification step to confirm completion of deployment events. We first present the algorithm that detects shock events for various deployment devices along with the parameter tuning performed during ground tests. We then show inflight performance of the shock detection algorithm. While shock detection is useful for observing initiation of deployment events, completion of some deployment events cannot be determined by shock detection alone. For these events, such as solar panel latch-up and deployable boom extension, the program developed dynamics models for the deployment transient responses. High-rate gyro data were recorded for these events, which allow the ground team to verify that the appendages were fully deployed. We show the predictive models for these events and corresponding flight results.

GeoXO↗

The space shuttle launch vehicle aerodynamic verification challenges

The Space Shuttle aerodynamics and performance communities were challenged to verify the Space Shuttle vehicle (SSV) aerodynamics and system performance by flight measurements. Historically, launch vehicle flight test programs which faced these same challenges were unmanned instrumented flights of simple aerodynamically shaped vehicles. However, the manned SSV flight test program made these challenges more complex because of the unique aerodynamic configuration powered by the first man-rated solid rocket boosters (SRB). The analyses of flight data did not verify the aerodynamics or performance preflight predictions of the first flight of the Space Transportation System (STS-1). However, these analyses have defined the SSV aerodynamics and verified system performance. The aerodynamics community also was challenged to understand the discrepancy between the wind tunnel and flight defined aerodynamics. The preflight analysis challenges, the aerodynamic extraction challenges, and the postflight analyses challenges which led to the SSV system performance verification and which will lead to the verification of the operational ascent aerodynamics data base are presented.

Wallace, R. O.↗

Final Reports from the Los Alamos National Laboratory Computational Physics Student Summer Workshop

The two primary purposes of LANL’s Computational Physics Student Summer Workshop are (1) To educate graduate and exceptional undergraduate students in the challenges and applications of computational physics of interest to LANL, and (2) Entice their interest toward those challenges. Computational physics is emerging as a discipline in its own right, combining expertise in mathematics, physics, and computer science. The mathematical aspects focus on numerical methods for solving equations on the computer as well as developing test problems with analytical solutions. The physics aspects are very broad, ranging from low-temperature material modeling to extremely high temperature plasma physics, radiation transport and neutron transport. The computer science issues are concerned with matching numerical algorithms to emerging architectures and maintaining the quality of extremely large codes built to achieve multi-physics calculations. Although graduate programs associated with computational physics are emerging, it is apparent that the pool of U.S. citizens in this multidisciplinary field is relatively small and is typically not focused on the aspects that are of primary interest to LANL. Furthermore, more structured foundations for LANL interaction with universities in computational physics is needed; currently interactions rely almost solely on individuals’ personalities and personal contacts. Thus a tertiary purpose of the Summer Workshop is to build an educational network of LANL researchers, university professors, and emerging students to advance the field and LANL’s involvement in it. This was the second year for the Summer Workshop. Like the previous year, the workshop’s goals were achieved by bringing into LANL a select group of students recruited from across the United States and immersing them for ten weeks in lectures and interesting research projects. The lectures provided an overview of the computational physics topics of interest this year along with some detailed instruction while the projects gave the students a positive experience accomplishing technical goals. Each team consisted of two students working under one or more mentors from LANL on specific research projects associated with predefined topics. This year, the topics were on verification of simulations in plasma and radiation-hydrodynamics codes, hypervelocity material deformation, plasma physics, graphical processor unit (“GPU”) programming, multi-material mixing, turbulence modeling, computational material science, and electromagnetic pulse simulations. The students’ growth was furthered by their participation on teams where their teammates were sometimes of different academic rank. It also developed them by requiring them to produce written and oral reports that they presented to peers, mentors, and management.

97 MATHEMATICS AND COMPUTING↗

On-line monitoring of I and C transmitters and sensors for calibration verification and response time testing was successfully implemented at ATR - 326

The Advanced Test Reactor (ATR) has always had a comprehensive procedure to verify the performance of its critical transmitters and sensors, including RTDs, and pressure, level, and flow transmitters. These transmitters and sensors have been periodically tested for response time and calibration verification to ensure accuracy. With implementation of on-line monitoring techniques at ATR, the calibration verification and response time testing of these transmitters and sensors are verified remotely, automatically, hands off, include more portions of the system, and can be performed at almost any time during process operations. The work was done under a DOE funded SBIR project carried out by AMS. As a result, ATR is now able to save the manpower that has been spent over the years on manual calibration verification and response time testing of its temperature and pressure sensors and refocus those resources towards more equipment reliability needs. More importantly, implementation of OLM will help enhance the overall availability, safety, and efficiency. Together with equipment reliability programs of ATR, the integration of OLM will also help with I and C aging management goals of the Department of Energy and long-time operation of ATR. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SEDS1 mission software verification using a signal simulator

The first flight of the Small Expendable Deployer System (SEDS1) is schedule to fly as the secondary payload of a Delta 2 in March, 1993. The objective of the SEDS1 mission is to collect data to validate the concept of tethered satellite systems and to verify computer simulations used to predict their behavior. SEDS1 will deploy a 50 lb. instrumented satellite as an end mass using a 20 km tether. Langley Research Center is providing the end mass instrumentation, while the Marshall Space Flight Center is designing and building the deployer. The objective of the experiment is to test the SEDS design concept by demonstrating that the system will satisfactorily deploy the full 20 km tether without stopping prematurely, come to a smooth stop on the application of a brake, and cut the tether at the proper time after it swings to the local vertical. Also, SEDS1 will collect data which will be used to test the accuracy of tether dynamics models used to stimulate this type of deployment. The experiment will last about 1.5 hours and complete approximately 1.5 orbits. Radar tracking of the Delta II and end mass is planned. In addition, the SEDS1 on-board computer will continuously record, store, and transmit mission data over the Delta II S-band telemetry system. The Data System will count tether windings as the tether unwinds, log the times of each turn and other mission events, monitor tether tension, and record the temperature of system components. A summary of the measurements taken during the SEDS1 are shown. The Data System will also control the tether brake and cutter mechanisms. Preliminary versions of two major sections of the flight software, the data telemetry modules and the data collection modules, were developed and tested under the 1990 NASA/ASEE Summer Faculty Fellowship Program. To facilitate the debugging of these software modules, a prototype SEDS Data System was programmed to simulate turn count signals. During the 1991 summer program, the concept of simulating signals produced by the SEDS electronics systems and circuits was expanded and more precisely defined. During the 1992 summer program, the SEDS signal simulator was programmed to test the requirements of the SEDS Mission software, and this simulator will be used in the formal verification of the SEDS Mission Software. The formal test procedures specification was written which incorporates the use of the signal simulator to test the SEDS Mission Software and which incorporates procedures for testing the other major component of the SEDS software, the Monitor Software.

Pierson, William E.↗

Open Radiation Monitoring: Histogram Builder Module Design

The Open Radiation Monitoring Project seeks to develop and demonstrate a modular radiation detection architecture designed specifically for use in arms control treaty verification (ACTV) applications that will facilitate rapid development of trusted systems to meet the needs of potential future treaties. A modular architecture can be used to reduce more complex systems to a series of single purpose building blocks, thereby facilitating equipment inspection and in turn building trust in the equipment by all treaty parties. Furthermore, a modular architecture can be used to control data flow within the measurement system, reducing the risk of "hidden switches" and constraining the amount of sensitive information that could potentially be inadvertently leaked. This report details the first revision of a prototype circuit that will convert analog pulses directly into a histogrammed data set for further processing. The circuit was designed with both spectroscopy and multiplicity analysis in mind but can, in principle, be used to reduce any raw data stream into a histogram. The number of output channels is limited, and the histogram bin ranges are user configurable to allow for non-uniform and discontinuous bins, which makes it possible to restrict the information being passed down stream if desired. Pulse processing relies entirely on analog circuitry and non- programmable logic, which enables operation without the need for a central processor or other programmable control unit. The circuit remains untested under the Open Radiation Monitoring project due to the closure of the sponsoring program. However, further development and testing is scheduled to take place in support of a purpose-built trusted verification system development effort known as COGNIZANT, which demonstrates the potential benefit of developing a suite of modular trusted system components.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Baseline Characterization Database Verification Report – 2114 Billet A20570

The purpose of this engineering calculations and analysis report (ECAR) is to present data collected in the Baseline Graphite Characterization Program, which is directly tasked with supporting the Idaho National Laboratory’s (INL’s) research and development efforts on the Advanced Reactor Technologies (ART) Program. This program populates a comprehensive database that reflects the baseline properties of nuclear-grade graphite with regard to individual grade, billet, and position within individual billets. The physical- and mechanical-property information being collected will be transferred to the Nuclear Data Management and Analysis System (NDMAS), and that database will help populate the handbook of property data available to member nations of the Generation-IV International Forum. Transfer of these data from the applicable technical lead to the dissemination databases available to other end users requires a full review of the test procedures and data-collection efforts through an analysis of the multiple summary spreadsheets and values being collected. This report represents the analysis for 2114 Billet A20570 and facilitates release of associated data to the NDMAS custodians.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ECAR-4322 Baseline Characterization Database Verification Report - 2114 Billet A20570

The purpose of this engineering calculations and analysis report (ECAR) is to present data collected in the Baseline Graphite Characterization Program, which is directly tasked with supporting the Idaho National Laboratory’s (INL’s) research and development efforts on the Advanced Reactor Technologies (ART) Program. This program populates a comprehensive database that reflects the baseline properties of nuclear-grade graphite with regard to individual grade, billet, and position within individual billets. The physical- and mechanical-property information being collected will be transferred to the Nuclear Data Management and Analysis System (NDMAS), and that database will help populate the handbook of property data available to member nations of the Generation-IV International Forum. Transfer of these data from the applicable technical lead to the dissemination databases available to other end users requires a full review of the test procedures and data-collection efforts through an analysis of the multiple summary spreadsheets and values being collected. This report represents the analysis for 2114 Billet A20570 and facilitates release of associated data to the NDMAS custodians.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Verification study of xRAGE’s multi-ion viscosity model

This report on the adequacy of the plasma viscosity model implemented in LANL’s ASC program code, xRAGE is organized as follows. Section I provides a brief introduction on the kinetic theory which underpins plasma viscosity, and Section II describes how plasma kinetic theory can be used to calculate plasma viscosity coefficients accurate within the hydrodynamic limit. Section III describes the existing model for calculating the plasma viscosity coefficient in xRAGE. Next, Section IV shows tests of the xRAGE viscosity model against established hydrodynamic theory in the case of binary and trinary plasma mixtures.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

High Accuracy U-235 Enrichment Verification Station for Low Enriched Uranium Alloys

The Y-12 National Security Complex is playing a role in the U.S. High Performance Research Reactor (USHPRR) Conversion program sponsored by the U.S. National Nuclear Security Administration's Office of Global Threat Reduction. The USHPRR program has a goal of converting remaining U.S. reactors that continue to use highly enriched uranium (HEU) fuel to low enriched uranium (LEU) fuel. The USHPRR program is currently developing a LEU Uranium-Molybdenum (U-Mo) monolithic fuel for use in the U.S. high performance research reactors.Y-12 is supporting both the fuel development and fuel fabrication efforts by fabricating low enriched U-Mo foils from its own source material for irradiation experiments and for optimizing the fabrication process in support of scaling up the process to a commercial production scale. Once the new fuel is qualified, Y-12 will produce and ship U-Mo coupons with verified 19.75% +0.2% - 0.3% U-235 enrichment to be fabricated into fuel elements for the USHPRRs. Considering this small enrichment tolerance and the transition into HEU being set strictly at 20% U-235, a characterization system with a measurement uncertainty of less than or equal to 0.1% in enrichment is desired to support customer requirements and minimize production costs. Typical uncertainty for most available characterization systems today is approximately 1-5%; therefore, a specialized system must be developed which results in a reduced measurement uncertainty. A potential system using a High-Purity Germanium (HPGe) detector has been procured, and tests have been conducted to verify its capabilities with regards to the requirements. Using four U-Mo enrichment standards fabricated with complete isotopic and chemical characterization, infinite thickness and peak-ratio enrichment measurement methods have been considered for use. As a result of inhomogeneity within the U-Mo samples, FRAM, an isotopic analysis software, has been selected for initial testing. A systematic approach towards observing effects on FRAM's enrichment analysis has been conducted with regards to count and dead time.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Toward Verification of the γ-Reθt Transition Model in OVERFLOW and FUN3D

The results of an ongoing assessment of the transition modeling capability in NASA's OVERFLOW and FUN3D programs are presented, with a focus on the Langtry-Menter γ-Reθt transition model in combination with the shear-stress transport (SST) turbulence model. While the effect of numerics and boundary conditions on the accuracy and iterative convergence of RANS solutions for fully turbulent flows has been well documented, especially in the context of canonical flow configurations, the same cannot be said for transport-equation-based transition models coupled with RANS-based turbulence models. Given the criticality of transition modeling for new aircraft design and optimization, there has been a renewed focus on the accuracy of such transition models and their inconsistent implementation across different flow solvers as seen from the AIAA and NATO-AVT workshops. In this work, we aim to establish the verification of such models via these two well established CFD codes with different numerics. The goal is to produce high-quality data, such as grids, solutions, and other auxiliary data, that may be utilized for code verification by others in the CFD community. As a first step, the work reported here is focused on the Langtry-Menter transition model as applied to two simple 2D configurations, namely the flat plate, and the NLF-0416, respectively. The paper also highlights how the boundary conditions and baseline turbulence model can affect the solutions from the SST-based Langtry-Menter transition model. A preliminary evaluation of the automatic mesh adaption capabilities of these solvers and potential benefits for flow configurations involving a mix of laminar, transitional, and fully turbulent flows is also reported.

CFD Modeling↗

Assessing the Costs and Benefits of the Superior Energy Performance Program

Industrial companies are seeking to manage energy consumption and costs, mitigate risks associated with energy, and introduce transparency into reports of their energy performance achievements. Forty industrial facilities are participating in the U.S. DOE supported Superior Energy Performance (SEP) program in which facilities implement an energy management system based on the ISO 50001 standard, and pursue third-party verification of their energy performance improvements. SEP certification provides industrial facilities recognition for implementing a consistent, rigorous, internationally recognized business process for continually improving energy performance and achievement of established energy performance improvement targets. This paper focuses on the business value of SEP and ISO 50001, providing an assessment of the costs and benefits associated with SEP implementation at nine SEP-certified facilities across a variety of industrial sectors. These cost-benefit analyses are part of the U.S. DOE?s contribution to the Global Superior Energy Performance (GSEP) partnership, a multi-country effort to demonstrate, using facility data, that energy management system implementation enables companies to improve their energy performance with a greater return on investment than business-as-usual (BAU) activity. To examine the business value of SEP certification, interviews were conducted with SEP-certified facilities. The costs of implementing the SEP program, including internal facility staff time, are described and a marginal payback of SEP certification has been determined. Additionally, more qualitative factors with regard to the business value and challenges related to SEP and ISO 50001 implementation are summarized.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

From Theory to Practice: Lessons Learned from an Advanced M&V Commercial Pilot

Advanced measurement & verification (M&V), or M&V 2.0, is an energy data analysis method using advanced metering infrastructure (AMI) data in combination with analytics to quantify energy efficiency project savings. Advanced M&V is viewed as an enabler for underutilized behavioral, retrocommissioning, and holistic multi-measure efficiency efforts, as quantifying savings for these programs with existing methods has typically been very challenging. Despite its promise, there are still several unanswered questions about the use of advanced M&V such as: How accurately can these tools quantify energy savings? How can advanced M&V satisfy regulatory requirements for rigorous savings estimates? Where and how does advanced M&V intersect with traditional impact evaluation and the principles of ‘embedded’ evaluation, measurement & verification (EM&V)? Pilots are being pursued in various regions and program contexts to address these research questions. However, results from these pilots are rarely made public, meaning that lessons may not be widely shared and the scope of analyses varies widely. The paper presents encouraging results from a recent advanced M&V pilot and discusses key process-related aspects such as managing AMI data and refining analysis methodologies. An approach to reviewing and classifying projects based on savings characteristics and magnitude is demonstrated, as a potential risk management tool. The authors also demonstrate how advanced M&V can identify underperforming projects and non-routine events in a timely manner. The paper also outlines lessons learned from this and other recent pilot activity and barriers to be overcome in moving toward the goal of widespread adoption of holistic meter-based programs.

Crowe, Eliot↗

New developments and verification of fusion blanket simulation capabilities in the MOOSE framework

Multiphysics modeling capabilities have a crucial role to play in the accelerated deployment of fusion energy. To that end, we developed new multiphysics fusion blanket simulation capabilities in the Multiphysics Object-Oriented Simulation Environment (MOOSE). Firstly, we expanded on the existing capabilities of the previously published work, by coupling 3D tritium transport modeling capabilities using the Tritium Migration Analysis Program, version 8 (TMAP8) to an existing tool including thermal hydraulics, fully three-dimensional (3D) heat transfer, and loosely coupled neutronics analysis. Secondly, we performed a thorough verification of the new capabilities and increased testing code coverage to meet MOOSE’s software quality standards. The MOOSE framework follows a strict software quality assurance plan to be Nuclear Quality Assurance, Level 1 compliant. The new multiphysics fusion blanket simulation capabilities are now held to the same standard. Thirdly, to demonstrate MOOSE’s new fusion blanket modeling capabilities, we performed a fully integrated, multiphysics simulation of a 3D solid ceramic breeder blanket design. This proof-of-concept simulation provides the temperature and tritium distribution across the blanket. In conclusion, the combined efforts towards software quality and the development of multiphysics coupling capabilities provide an effective and reliable framework for modeling solid ceramic fusion blankets using MOOSE.

modeling and simulation↗

EM Program Expectations on Implementation of DOE O 458: Radiation Protection of Public/Environment - 19553

DOE Order 458.1, Radiation Protection of the Public and Environment, was issued in 2011. DOE sites were given 18 months to implement. The revised Order promulgates requirements for property clearance actions and independent verification. DOE Order 458.1 allows for preapproved authorized limits for the clearance of property. However, when property with the potential to contain residual radioactive material does not meet preapproved authorized limits, an authorized limits package must be developed. The Order contains a range of requirements for demonstrating with reasonable assurance that dose constraints are met for any actual or likely future use of the property to be released. EM has developed a draft guidance document that provides the elements of an authorized limits package. These elements are used to review all authorized limits packages that are submitted to EM. Expected elements include property description and process knowledge documentation, current and likely future use, the conceptual site model, dose modeling methodologies, specific authorized limits, dose- or concentration-based constraints, collective dose estimate to the potentially exposed population, stakeholder communications, description of the As Low As Reasonably Achievable (ALARA) analysis, implementation plan, evaluation of difficult to assess surfaces, and independent verification plan. The draft guidance document also provides further explanation of the desired elements of an independent verification (IV) plan. An IV plan should describe the planning phase, implementation phase, assessment phase, and decision phase of an activity. The planning phase includes scope and cost, concurrent with cleanup contractor procurement, and review and approval of site radiological survey clearance program and IV program plans. The implementation phase assures sufficient collection of data and adjustment can be made as necessary. During the assessment phase, data and reports are reviewed, and coordination between the clean-up contractor and IV personnel occurs. A decision of whether or not the clearance actions need to be altered occurs during the decision phase. IV certification that the clearance action is complete also occurs during the decision phase. Issuance of the final guidance document is meant to improve the consultation process and minimize iterative interactions with EM. Standardizing and formalizing property clearance and IV actions also helps assure that cleanup actions are transparent and sustainable for future scrutiny. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗