Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Module”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

The Second European Service Module (ESM-2) Evolutions, Production and Challenges

This paper presents an overview of the Second European Service Module (ESM-2), the second in a series of European Service Modules produced as part of the Barter agreement between NASA and ESA for the Orion Program. The European Industrial consortium is led by the ESA prime contractor Airbus Defence and Space in Bremen. ESA and Airbus signed the ESM-2 contract on 16 February 2017, for this key element of the Orion Exploration Mission 2 (EM-2). EM-2 is the first crewed mission for Orion and will take astronauts farther into the solar system than humanity has ever travelled. EM-2 will also be a historic mission for Europe, as the ESM-2 will be the first European spacecraft to be part of a human transportation system carrying humans beyond low Earth orbit. ESM-2 is mainly a recurring production following ESM-1. Nevertheless, there are a number of important changes being implemented, for example, to incorporate upgrades to further enhance safety and reliability. The challenging delivery schedule for ESM-2 has driven the need to commence manufacturing prior to completion of the qualification on ESM-1. In addition, some requirement deviations and non-compliances approved for ESM-1 have resulted in modifications for ESM-2. In order to manage the competing constraints effectively, the ESM-2 Team has put in place a number of novel approaches to manage schedule, risk, and technical changes. Airbus has set up multi-functional teams according to an approach known as "Major Spacecraft Deliveries" consisting of quality assurance, engineering and procurement. The risk of starting manufacturing prior to qualification is managed through a special risk share agreement. This agreement necessitates rigorous risk reviews across the board for all manufacturing, assembly, integration and test milestones. The ESM-2 changes are managed by Configuration Management, but Airbus has also introduced the Technical Baseline Matrix to provide a transparent top-level overview of the changes from ESM-1 to ESM-2. The tool provides the basis for ESM-2 design and development needs, decisions, as well as the input for the Orion EM-2 Critical Design Review (CDR). The main technical evolutions, status of the production and the novel management approaches for ESM-2 are presented and discussed in the paper.

Orion European Service Module Programme↗

The microgravity environment of the D1 mission

Some characteristic features and results of D1 microgravity measurements are discussed as performed in the Material Science Double Rack (MSDR) and the Materials Science Double Rack for Experiment Modules and Apparatus (MEDEA). Starting with a brief review of the main potential disturbances, the payload aspects of interest to the analysis and the accelerometer measuring systems are described. The microgravity data are analyzed with respect to selected mission events such as thruster firings for attitude control, operations of Spacelab experiment facilities, vestibular experiments and crew activities. The origins are divided into orbit, vehicle, and experiment induced perturbations. It has been found that the microgravity-environment is dictated mainly by payload-induced perturbations. To reduce the microgravity-level, the design of some experiment facilities has to be improved by minimizing the number of moving parts, decoupling of disturbing units from experiment facilities, by taking damping measures, etc. In addition, strongly disturbing experiments and very sensitive investigations should be performed in separate mission phases.

Hamacher, H.↗

The First Joint Report of the General Thomas P. Stafford Task Force and the Academician Vladimir F. Utkin Advisory Expert Council on the Shuttle-Mir Rendezvous and Docking Missions

In October 1992, the National Aeronautics and Space Administration (NASA) and the Russian Space Agency (RSA) formally agreed to conduct a fundamentally new program of human cooperation in space. The 'Shuttle-Mir Program' encompassed combined astronaut-cosmonaut activities on the Shuttle, Soyuz Test Module(TM), and Mir station spacecraft. At that time, NASA and RSA limited the project to: the STS-60 mission carrying the first Russian cosmonaut to fly on the U.S. Space Shuttle; the launch of the first U.S. astronaut on the Soyuz vehicle for a multi-month mission as a member of a Mir crew; and the change-out of the U.S.-Russian Mir crews with a Russian crew during a Shuttle rendezvous and docking mission with the Mir Station. The objectives of the Phase 1 Program are to provide the basis for the resolution of engineering and technical problems related to the implementation of the ISS and future U.S.-Russian cooperation in space. This, combined with test data generated during the course of the Shuttle flights to the Mir station and extended joint activities between U.S. astronauts and Russian cosmonauts aboard Mir, is expected to reduce the technical risks associated with the construction and operation of the ISS. Phase 1 will further enhance the ISS by combining space operations and joint space technology demonstrations. Phase 1 also provides early opportunities for extended U.S. scientific and research activities, prior to utilization of the ISS.

Source record↗

STS-85 Day 05 Highlights

On this fifth day of the STS-85 mission, the flight crew, Cmdr. Curtis L. Brown, Jr., Pilot Kent V. Rominger, Payload Cmdr. N. Jan Davis (Ph.D.), Mission Specialists Robert L. Curbeam, Jr. and Stephen K. Robinson (Ph.D.), and Payload Specialist Bjarni V. Tryggvason once again test the small robotic arm serving as a prototype for one that will fly as part of the Japanese Experiment Module on the International Space Station. Simulated orbital replacement unit detachment and reattachment will be the focus. Bob Curbeam discusses the progress of the flight with a television station in St Louis, before continuing his work with the Bioreactor Demonstration System designed to perform cell biology experiments under controlled conditions. Immediately after Curbeam's interview, Canadian Payload Specialist Bjarni Tryggvason is set to talk to elementary and high school students at a summer camp in Saskatchewan, Canada.

Source record↗

STS-95 Post Flight Presentation

The STS-95 flight crew, Cmdr. Curtis L. Brown, Pilot Steven W. Lindsey, Mission Specialists Scott E. Parazynski, Stephen K. Robinson, and Pedro Duque, and Payload Specialists Chiaki Mukai and John H. Glenn present a video mission over-view of their space flight. Images include prelaunch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the "whiteroom" for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. The primary objectives, which include the conducting of a variety of science experiments in the pressurized SPACEHAB module, the deployment and retrieval of the Spartan free-flyer payload, and operations with the HST Orbiting Systems Test (HOST) and the International Extreme Ultraviolet Hitchhiker (IEH) payloads are discussed in both the video and still photo presentation.

Source record↗

Research on the Effects of Fatigue within the Corporate/Business Aircraft Environment

In 1980, responding to a Congressional request, NASA Ames Research Center created a program to examine whether 'there is a safety problem of uncertain magnitude, due to transmeridian flying and a potential problem due to fatigue in association with various factors found in air transport operations.' The NASA Ames Fatigue/Jet Lag Program was created to collect systematic, scientific information on fatigue, sleep, circadian rhythms, and performance in flight operations. Three Program goals were established and continue to guide research efforts to: (1) determine the extent of fatigue, sleep loss, and circadian disruption in flight operations; (2) determine the impact of these factors on flight crew performance; (3) develop and evaluate countermeasures to mitigate the adverse effects of these factors and maximize flight crew performance and alertness. Since 1980, studies have been conducted in a variety of aviation environments, in controlled laboratory environments, as well as in a full-mission flight simulation. Early studies included investigations of short-haul, long-haul, and overnight cargo flight crews. In 1991, the name of the program was changed to the Fatigue Countermeasures Program to provide a greater emphasis on the development and evaluation of countermeasures. More recent work has examined the effects of planned cockpit rest as an operational countermeasure and provided analyses of the pertinent sleep/duty factors preceding an aviation accident at Guantanamo Bay, Cuba. The Short-Haul study examined the extent of sleep loss, circadian disruption, and fatigue engendered by flying commercial short-haul air transport operations (flight legs less than eight hours). This was one of the first field studies conducted by the NASA program and provided unique insight into the physiological and subjective effects of flying commercial short-haul operations. It demonstrated that a range of measures could be obtained in an operational environment without disturbing the regular performance of duties. The Long-Haul study examined how long-haul flight crews organized their sleep during a variety of international trip patterns and examined how duty requirements, local time, and the circadian system affected the timing, duration, and quality of sleep. Duty requirements and local time can be viewed as external/environmental constraints on time available for sleep, while the internal circadian system is a major physiological modulator of sleep duration and quality. The Overnight Cargo study documented the psychophysiological effects of flying overnight cargo operations. The data collected clearly demonstrated that overnight cargo operations, like other night work, involve physiological disruption not found in comparable daytime operations.

Neri, David F.↗

STS-107 Crew Training Clip

The STS-107 is a Multidiscipline Microgravity and Earth Science Research Mission to conduct international scientific investigations in orbit. The crew consists of Payload Specialist Ilan Ramon, Commander Rick Husband, Pilot William McCool, and Mission Specialists David Brown, Laurel Clark, Michael Anderson, and Kalpana Chawla. The crewmembers are shown getting suited in the Pre-Launch Ingress and Egress training area. The other areas of training include Payload Experiment in Fixed Base/Spacehab, Mist Experiment Combustion Module 2, Phab 4 Experiment in CCT Mid-deck and Payload Experiment Demo-Protein Crystal Growth.

Source record↗

Intern Abstract for Spring 2016

The Human Interface Branch - EV3 - is evaluating Organic lighting-emitting diodes (OLEDs) as an upgrade for current displays on future spacecraft. OLEDs have many advantages over current displays. Conventional displays require constant backlighting which draws a lot of power, but with OLEDs they generate light themselves. OLEDs are lighter, and weight is always a concern with space launches. OLEDs also grant greater viewing angles. OLEDs have been in the commercial market for almost ten years now. What is not known is how they will perform in a space-like environment; specifically deep space far away from the Earth's magnetosphere. In this environment, the OLEDs can be expected to experience vacuum and galactic radiation. The intern's responsibility has been to prepare the OLED for a battery of tests. Unfortunately, it will not be ready for testing at the end of the internship. That being said much progress has been made: a) Developed procedures to safely disassemble the tablet. b) Inventoried and identified critical electronic components. c) 3D printed a testing apparatus. d) Wrote software in Python that will test the OLED screen while being radiated. e) Built circuits to restart the tablet and the test pattern, and ensure it doesn't fall asleep during radiation testing. f) Built enclosure that will house all of the electronics Also, the intern has been working on a way to take messages from a simulated Caution and Warnings system, process said messages into packets, send audio packets to a multicast address that audio boxes are listening to, and output spoken audio. Currently, Cautions and Warnings use a tone to alert crew members of a situation, and then crew members have to read through their checklists to determine what the tone means. In urgent situations, EV3 wants to deliver concise and specific alerts to the crew to facilitate any mitigation efforts on their part. Significant progress was made on this project: a) Open channel with the simulated Caution and Warning system to acquire messages. b) Configure audio boxes. c) Grab pre-recorded audio files. d) Packetize the audio stream. A third project that was assigned to implement LED indicator modules for an Omnibus project. The Omnibus project is investigating better ways designing lighting for the interior of spacecraft-both spacecraft lighting and avionics box status lighting indication. The current scheme contains too much of the blue light spectrum that disrupts the sleep cycle. The LED indicator modules are to simulate the indicators running on a spacecraft. Lighting data will be gathered by human factors personal and use in a model underdevelopment to model spacecraft lighting. Significant progress was made on this project: Designed circuit layout a) Tested LEDs at LETF. b) Created GUI for the indicators. c) Created code for the Arduino to run that will illuminate the indicator modules.

Gibson, William↗

Exploration Toilet Integration Challenges on the International Space Station

On the International Space Station (ISS) there are currently two toilets. One is located in the Russian segment's Service Module and the other is located in the U.S. segment's Node 3. A new Exploration Toilet will be integrated next to the existing Node 3 Waste and Hygiene Compartment (WHC). The Toilet will be evaluated as a technology demonstration for a minimum of three years. In addition, it will support an increase in ISS crew size due to Commercial Crew flights to ISS. The Toilet is designed to minimize mass and volume for Orion, the first Exploration vehicle. Currently ISS does not have a designated volume for an additional Toilet. Furthermore, operating the Toilet on ISS presents a different set of challenges as it must integrate into existing vehicle systems for urine processing. To integrate the Toilet on ISS, a suite of hardware was developed to provide mechanical, electrical, data, and fluid interfaces. This paper will provide an overview of the Toilet Integration Hardware design as well as the engineering challenges, crew interface provisions and vehicle integration complexities encountered during the concept and design phases.

Integration Hardware↗

Exploration Toilet Integration Challenges on the International Space Station

On the International Space Station (ISS) there are currently two toilets. One is located in the Russian Service Module and the other is located in the U.S. segment's Node 3. A new Exploration Toilet will be integrated next to the existing Node 3 Waste and Hygiene Compartment (WHC). The Toilet will be evaluated as a technology demonstration for a minimum of three years. In addition, it will support an increase in ISS crew size due to Commercial Crew flights to ISS. The Toilet is designed to minimize mass and volume for Orion, the first Exploration vehicle. Currently ISS does not have a designated volume for an additional Toilet. Furthermore, operating the Toilet on ISS presents a different set of challenges as it must integrate into existing vehicle systems for urine processing. To integrate the Toilet on ISS, a suite of hardware was developed to provide mechanical, electrical, data, and fluid interfaces. This paper will provide an overview of the Toilet Integration Hardware design as well as the engineering challenges, crew interface provisions and vehicle integration complexities encountered during the concept and design phases.

Node 3↗

Concepts for Phased Development of a Lunar Surface Base

Several design concepts were studied in 2019 and 2020 to explore a range of possibilities for development of a base on the surface of the Moon in preparation for ongoing missions to Mars. The studies included phasing approaches for life support systems to accommodate initial short-term missions under 60 days with eventual ongoing missions with crew rotations every 180 days. The approach presented is not currently in the NASA plans but is one of many approaches that could be considered as a reference for future development by government, commercial, and international partners. Included in the paper are conceptual layouts, life support phasing approaches, and mass properties for a variety of modules leading toward a permanent base on the surface of the Moon that is also applicable to a base development on the surface of Mars.

David Smitherman↗

Extravehicular Activity and Human Surface Mobility Program (EHP) Exploration EVA (xEVA) System Compatibility Standards

Extravehicular Activity (EVA) is a significant capability for Artemis Systems which includes Gateway Program (modules), Human Landing System (HLS) Program (Integrated Lander and Human Class Delivery Lander), Lunar Terrain Vehicle (LTV), Pressurized Rover (PR), Payloads, and any other future lunar surface assets that will be utilized for exploration or science. The EVA and Human Surface Mobility Program (EHP) will provide the following: Exploration EVA (xEVA) suits, xEVA tools and crew aids along with vehicle integration/support hardware, LTV, and PR. Being a distributed and dynamic capability (moving components), xEVA System hardware will interface with almost all elements of the Artemis architecture. As such, it is important to document a singular set of EVA compatibility standards at the programmatic level to articulate “how to interface with xEVA suit hardware” and “how to design hardware that EVA crewmembers will access and manipulate.”

Exploration↗

Crew Member Interface with Space Station Furnace Facility

The Space Station Furnace Facility (SSFF) is a facility located in the International Space Station United States Laboratory (ISS US Lab) for materials research in the microgravity environment. The SSFF will accommodate basic research, commercial applications, and studies of phenomena of metals and alloys, electronic and photonic materials, and glasses and ceramics. To support this broad base of research requirements, the SSFF will operate, regulate, and support a variety of Experiment Modules (EMs). To meet station requirements concerning the microgravity level needed for experiments, station is providing an active vibration isolation system, and SSFF provides the interface. SSFF physically consists of a Core Rack and two instrument racks (IRs) that occupy three adjacent ISS US Lab rack locations within the International Space Station (ISS). All SSFF racks are modified International Standard Payload Racks (ISPR). SSFF racks will have a 50% larger pass through area on the lower sides than ISPRs to accommodate the many rack to rack interconnections. The Instrument Racks are further modified with lowered floors and an additional removable panel (15" x 22") on top of the rack for access if needed. The Core Rack shall contain all centralized Core subsystems and ISS subsystem equipment. The two Instrument Racks shall contain the distributed Core subsystem equipment, ISS subsystem equipment, and the EMs. The Core System, which includes the Core Rack, the IR structures, and subsystem components located in the IRs serves as the central control and management for the IRs and the EMs. The Core System receives the resources provided by the International Space Station (ISS) and modifies, allocates, and distributes these resources to meet the operational requirements of the furnace. The Core System is able to support a total of four EMs and can control, support, and activate/deactivate the operations of two EMs, simultaneously. The IRs can be configured to house two small EMs or one tall vertical EM, and serve as the interface between the Core and the respective EM. The Core Rack and an adjacent Instrument Rack (containing one or more furnaces) will be delivered to the ISS in one launch. This is Integrated Configuration One (ICI). The Core Rack and IRI will be passive during transport in the Mini Pressurized Logistics Module (MPLM): Any subsequent EMs to operate within IRI are installed on-orbit. The second IR (containing one or more furnaces) is delivered to ISS on a subsequent launch which will establish Integrated Configuration Two (IC2). Additional integrated configurations will be established with the replacement of EMs or Instrument Racks.

Cash, Martha B.↗

Review of extravehicular activity for Shuttle program

Extravehicular activity (EVA) is a baselined Shuttle Orbiter capability. It can provide cost-effective servicing operations for payloads, on-orbit repair, and techniques for meeting various on-orbit contingencies. The basic EVA system planned consists of Orbiter-integral provisions, carry-on life support provisions, and EVA support equipment provisions. The Orbiter-integral provisions include the internal airlock, the EVA Egress module, and the docking module, each of which provides an egress path. The carry-on life support provisions will be two Extravehicular Mobility Units (EMU), composed of an Astronaut Life Support Assembly (ALSA) and a Space Suit Assembly (SSA). The support equipment includes tethers, special tools, translation aids, and workstations. The Shuttle Orbiter EVA requirements and possible tasks, EVA crew rescue equipment and techniques, crew support, EVA training, and EVA timeline activities are described.

Covington, J. H.↗

Research centrifuge accommodations on Space Station Freedom

Life sciences research using plants and animals on the Space Station Freedom requires the ability to maintain live subjects in a safe and low stress environment for long durations at microgravity and at one g. The need for a centrifuge to achieve these accelerations is evident. Programmatic, technical, and cost considerations currently favor a 2.5 meter diameter centrifuge located either in the end cone of a Space Station Freedom node or in a separate module. A centrifuge facility could support a mix of rodent, plant, and small primate habitats. An automated cage extractor could be used to remove modular habitats in pairs without stopping the main rotor, minimizing the disruption to experiment protocols. The accommodation of such a centrifuge facility on the Space Station represents a significant demand on the crew time, power, data, volume, and logistics capability. It will contribute to a better understanding of the effects of space flight on humans, an understanding of plant growth in space for the eventual production of food, and an understanding of the role of gravity in biological processes.

Arno, Roger D.↗

STS-82 Flight Day 08 Highlights

The eighth day of the STS-82 mission begins with the crew, Commander Kenneth D. Bowersox, Pilot Scott J. Horowitz, Payload Commander Mark C. Lee, and Mission Specialists Gregory J. Harbaugh, Steven L. Smith, Joseph R. Tanner, and Steven A. Hawley performing the final spacewalk of the mission. Lee and Smith attach several thermal insulation blankets to three equipment compartments at the top of the Support Systems Module section of Hubble which contain key data processing, electronics and scientific instrument telemetry packages. Following the completion of that work, Lee and Smith briefly return to the airlock while flight controllers evaluated a possible glitch with one of four Reaction Wheel Assembly units in Hubble used to maneuver the telescope for its scientific observations. A spare Reaction Wheel Assembly was available aboard Discovery for a swap out during an additional spacewalk had it been necessary, but a few hours later, after further analysis, payload controllers reported that the Reaction Wheel Assembly was in excellent shape and operating at the proper speed.

Source record↗

STS-101: Crew Activity Report/Flight Day 10 Highlights

This video presents a report from the Space Shuttle Atlantis Crew. The crew consists of James D. Halsell, Jr., Mission Commander; Scott Horowitz, Pilot; and Mission Specialists Mary Ellen Weber, Jeffrey N. Williams, James S. Voss, Susan J. Helms, and Yuri Vladimirovich Usachev. The crew made preparations for the Space Shuttle Atlantis return to Earth. Weber gave a general overview of refurbishments done to the International Space Station such as maintenance of the electrical system, one to three thousands of pounds of new hardware supplied to I.S.S. and a supply of personal hygiene products. Also live animation of the Spacehab Module is given where supplies bound for the Space Station are stored.

Source record↗

STS-106 Crew Interviews: Daniel Burbank

This NASA Johnson Space Center (JSC) video production presents an STS-106 pre-launch interview with Mission Specialist Daniel C. Burbank, Lt. Commander, United States Coast Guard (USCG). Among other topics, Burbank discusses how his Coast Guard career evolved into spaceflight, his experiences flying helicopters for the Coast Guard, and his chief duties on the upcoming spaceflight. STS-106 is International Space Station assembly flight ISS-2A.2b and will utilize the SPACEHAB Double Module and the Integrated Cargo Carrier (ICC) to take supplies to the station. The mission will also include 2 spacewalks.

Source record↗