Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

New X-Ray Spectrometer Developed

X-ray absorption spectroscopy (XAS) and X-ray emission spectroscopy (XES) are useful tools for characterizing numerous properties of a given material. They can give elemental composition, metal oxidation states, spin state, orbital occupancy, and more. A drawback is that these types of measurements have historically needed synchrotron light sources to generate high flux X-ray beams and high-resolution monochromators to provide a monoenergetic excitation source. Synchrotrons are building-sized facilities (often operated in the U.S. by the DOE) and have the scheduling complexities and logistical issues that accompany any large-scale research facility. There are added challenges for scientists wishing to analyze radioactive samples such as plutonium or other actinides. These limitations are now mitigated by a small, “portable” X-ray emission and absorption spectrometers developed by Los Alamos scientists and the University of Washington.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Hydrodynamic Test Requirements Process Improvements

Hydrodynamic testing at Los Alamos National Laboratory would benefit from a process improvement for the requirements process. Cameo was used as a digital solution for requirements management to allow Lead Engineers to track requirements more effectively. This was identified as a process improvement throughout this Capstone project. This report includes a project proposal, business case, literature review, methodology, project plan, data analysis, decision-making report, financial analysis report, discussion, and conclusion. Initially, this project focused on figuring out a solution for the hydrotest requirement process improvements. The scope narrowed to focus on the use of Cameo for requirement capture and management. During this Capstone, four tests had digital models produced for requirements management in Cameo. The initial model was the baseline, with core requirements used across the tests. Commonalities in tests were used and the core requirements allowed for process efficiencies. In the data analysis, it was seen that overall, the implementation of using Cameo for requirements resulted in a decreasing trend for both schedule and normalized cost. Tests have different complexity levels which is also a factor in how long the requirements process will take. Additional data is needed to continue analyzing process improvements. Through decisionmaking and financial analysis, the recommendation was to use Cameo for requirements process improvement. Multiple experts provided feedback for requirements that were then captured within models. Numerous tangible and intangible benefits were identified with this process improvement. For return on investment, the metric of success was schedule reduction, which was overall seen. Four tests were analyzed, so future analysis will be needed. There is also not a great financial risk because the main cost would be purchasing more licenses. Individuals must generate requirements whether using this software or not. Overall, training is needed to help improve the skillsets of Lead Engineers but is already being supported on a regular frequency. A desktop guide was started associated with explaining the process, however, it is a work in progress. The team plans on adding additional information in the digital models to help status when requirements are met using verification methods and artifacts. From working on this project an improved understanding of Cameo and requirements was the result. There are future opportunities to extend the usage for requirements management and progress will continue after this project.

99 GENERAL AND MISCELLANEOUS↗

Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 1: Executive summary

Main elements of the design are identified and explained, and the rationale behind them was reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are presented, and the engineering issues that should be reexamined are identified. The latest (1980-1981) information from the MHD technology program is integrated with the elements of a conventional steam power electric generating plant.

Source record↗

Space Station Power System Advanced Development

The objectives of the Space Station Advanced Development Program are related to the development of a set of design options and/or new capabilities to support Space Station development and operation, taking into account also a quantification of the performance and risk of key state-of-the-art technologies, and a reduction of the cost and schedule risk in Space Station development. Attention is given to the photovoltaic power system, a solar dynamic system, and aspects of power management and distribution. A major issue will be the selection of the power generation system. In view of the advantages of the solar dynamic system, it is attempted to resolve issues associated with this system.

Forestieri, A. F.↗

Optimal Trajectories and Control Strategies for the Helicopter in One-Engine-Inoperative Terminal-Area Operations

Engine failure represents a major safety concern to helicopter operations, especially in the critical flight phases of takeoff and landing from/to small, confined areas. As a result, the JAA and FAA both certificate a transport helicopter as either Category-A or Category-B according to the ability to continue its operations following engine failures. A Category-B helicopter must be able to land safely in the event of one or all engine failures. There is no requirement, however, for continued flight capability. In contrast, Category-A certification, which applies to multi-engine transport helicopters with independent engine systems, requires that they continue the flight with one engine inoperative (OEI). These stringent requirements, while permitting its operations from rooftops and oil rigs and flight to areas where no emergency landing sites are available, restrict the payload of a Category-A transport helicopter to a value safe for continued flight as well as for landing with one engine inoperative. The current certification process involves extensive flight tests, which are potentially dangerous, costly, and time consuming. These tests require the pilot to simulate engine failures at increasingly critical conditions, Flight manuals based on these tests tend to provide very conservative recommendations with regard to maximum takeoff weight or required runway length. There are very few theoretical studies on this subject to identify the fundamental parameters and tradeoff factors involved. Furthermore, a capability for real-time generation of OEI optimal trajectories is very desirable for providing timely cockpit display guidance to assist the pilot in reducing his workload and to increase safety in a consistent and reliable manner. A joint research program involving NASA Ames Research Center, the FAA, and the University of Minnesota is being conducted to determine OEI optimal control strategies and the associated optimal,trajectories for continued takeoff (CTO), rejected takeoff (RTO), balked landing (BL), and continued landing (CL) for a twin engine helicopter in both VTOL and STOL terminal-area operations. This proposed paper will present the problem formulation, the optimal control solution methods, and the key results of the trajectory optimization studies for both STOL and VTOL OEI operations. In addition, new results concerning the recently developed methodology, which enable a real-time generation of optimal OEI trajectories, will be presented in the paper. This new real-time capability was developed to support the second piloted simulator investigation on cockpit displays for Category-A operations being scheduled for the NASA Ames Vertical Motion Simulator in June-August of 1995. The first VMS simulation was conducted in 1994 and reported.

Chen, Robert T. N.↗

NASA's Global Precipitation Mission Ground Validation Segment

NASA is designing a Ground Validation Segment (GVS) as one of its contributions to the Global Precipitation Measurement (GPM) mission. The GPM GVS provides an independent means for evaluation, diagnosis, and ultimately improvement of the GPM spaceborne measurements and precipitation products. NASA's GPM GVS concept calls for a combination of direct observations executed within a Multidimensional Observing Volume (MOV) and model-based analyses executed by a Satellite Simulator Model (SSM). The MOV consists of ground-based instruments that measure local surface and atmospheric properties required for GPM validation. The SSM utilizes MOV measurements in a forward numerical model. The goal of the SSM forward modeling is calculation of the following properties: top-of-atmosphere microwave radiative quantities to within sensor noise of those measured by the GPM Core Satellite, precipitation quantities identical to those generated by the standard GPM precipitation retrieval algorithms, and quantitative/objective error estimates of both sets of quantities. At present, the GVS is in the early design stage and various scenarios have been generated to assess how it will be used in the GPM era. The GPM GVS will be operational in the year prior to the launch of the GPM core satellite, which has a launch date scheduled for December 2010.

GVS (GROUND VALIDATION SEGMENT)↗

Continuous Improvement in Battery Testing at the NASA/JSC Energy System Test Area

The Energy Systems Test Area (ESTA) at the Lyndon B. Johnson Space Center in Houston, Texas conducts development and qualification tests to fulfill Energy System Division responsibilities relevant to ASA programs and projects. EST A has historically called upon a variety of fluid, mechanical, electrical, environmental, and data system capabilities spread amongst five full-service facilities to test human and human supported spacecraft in the areas of propulsion systems, fluid systems, pyrotechnics, power generation, and power distribution and control systems. Improvements at ESTA are being made in full earnest of offering NASA project offices an option to choose a thorough test regime that is balanced with cost and schedule constraints. In order to continue testing of enabling power-related technologies utilized by the Energy System Division, an especially proactive effort has been made to increase the cost effectiveness and schedule responsiveness for battery testing. This paper describes the continuous improvement in battery testing at the Energy Systems Test Area being made through consolidation, streamlining, and standardization.

Boyd, William↗

Going from Closed to Open and Then Back Again: How to Keep a Level Head

Nuclear Energy is a mature, reliable low carbon technology with a secure and abundant fuel source and is an essential contributor to the energy mix. The UK has a long history of using nuclear energy and has a long standing world class expertise in the recycling of used nuclear fuel with three generations of industrial scale reprocessing plant operating on the Sellafield site, as well as the Thorp Miniature Pilot Plant in the 1980's, and a vibrant, internationally recognised R and D capability at the National Nuclear Laboratory (NNL). However, the reprocessing plants at Sellafield are both scheduled to finish around 2020 with Thorp and Magnox plants moving to post operational clean out (POCO). This will move the UK from a closed fuel cycle to an open one. Within the UK a decision has been made to refresh the current nuclear energy plants to at least replacement of the existing nuclear fleet. This will mean the building of new nuclear power plant to ensure energy production of 16 GWe per annum. With the closure of the UK's reprocessing plants, these new nuclear power plants will operate on an open fuel cycle with long term storage of used fuel followed by disposal. However it is also recognised that this may not be enough and as such expansion scenarios ranging from 16 to 75 GWe nuclear energy production are being considered through the development of a UK Road map. Within these energy scenarios, a variety of options are being evaluated including electricity generation only, electricity generation plus heat, open versus closed fuel cycles, Generation III versus Generation IV systems and combinations of the above. What is clear is that the deciding factor on the type and mix of any energy programme will not be on technology choice alone. Instead a complex mix of Government policy, relative cost of nuclear power, market decisions and public opinion will influence the rate and direction of growth of any future energy programme. At the ANS Winter Meeting 2013 a number of these techniques were presented. What was clear from the fuel cycle scenario modelling was the requirement for the utilisation of a closed fuel cycle to enable the expansion beyond 16 GWe. It is therefore a necessity for the UK to keep options open for a potential return to a closed fuel cycle in the future. The requirement to maintain the skills and capabilities to do so will be an essential part of any future nuclear strategy. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A NOVEL APPROACH TO SPENT FUEL POOL DECOMMISSIONING

The Idaho National Laboratory (INL) has been at the forefront of developing methods to reduce the cost and schedule of deactivating spent fuel pools (SFP). Several pools have been deactivated at the INL using an underwater approach with divers. These projects provided a basis for the INL cooperation with the Dresden Nuclear Power Station Unit 1 SFP (Exelon Generation Company) deactivation. It represents the first time that a commercial nuclear power plant (NPP) SFP was decommissioned using this underwater coating process. This approach has advantages in many aspects, particularly in reducing airborne contamination and allowing safer, more cost effective deactivation. The INL pioneered underwater coating process was used to decommission three SFPs with a total combined pool volume of over 900,000 gallons. INL provided engineering support and shared project plans to successfully initiate the Dresden project. This report outlines the steps taken by INL and Exelon to decommission SFPs using the underwater coating process. The rationale used to select the underwater coating process and the advantages and disadvantages are described. Special circumstances are also discussed, such as the use of a remotely-operated underwater vehicle to visually and radiologically map the pool areas that were not readily accessible. A larger project, the INTEC-603 SFP in-situ (grouting) deactivation, is reviewed. Several specific areas where special equipment was employed are discussed and a Lessons Learned evaluation is included.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Efficient Scalable Contact Network Generation from Population Data

Modeling the contacts among a population is critical to understanding the dynamics of a disease outbreak. Contact networks, where nodes are individuals and edges are contacts among them, are used to represent these complex individual-level interactions. In this work, we are given the daily activity schedules of an urban population that represent the activity location and time of individuals in a population during a single twenty four hour period over multiple days. Using collocation to determine contact between individuals, our goal is to extract hourly contact networks from large-scale activity data. We improve upon the existing adjacency matrix-based method by implementing our custom sparse matrix multiplication algorithm. Starting with a Python implementation, we achieve a 1600x speed up in the computation with a fast custom designed sparse matrix multiplier algorithm implemented in the C++ language. This work is central to future parallel designs of the problem.

97 MATHEMATICS AND COMPUTING↗

VAS operational procedures and results at the Kansas City Satellite Field Services Station

An operational assessment of VAS data by using a Man-computer Interactive Data Access System (McIDAS) terminal linked by a 9600 band telephone line is discussed. Seven hours of VAS data were processed and edited daily. Data was scheduled 16 hours a day, 7 days a week; however, during this time period there were very few days with 16 hours of data to evalute. The McIDAS terminal, which has 10 display frames and 5 graphics, provide access to the sounding data processed. These data are processed using two procedures. The dwell sounding data are generated by using all 12 spectral channels with a spin budget of 39. To provide coverage for most of the United States, soundings are made starting at 18 minutes after the hour from approximately 49 deg N to 36 deg N and at 48 minutes after the hour from 36 deg N to 26 deg N. The dwell imaging mode uses 11 channels but the spin budge is 17. With the reduced spin budget, retrievals can be made at 18 or 48 minutes after the hour for approximately 44 deg N to 27 deg N. With these constraints a schedule, of data sets was proposed to use the schedule and how the data set could be used are shown.

Heckman, B.↗

OVERVIEW OF HANFORD SINGLE SHELL TANK (SST) STRUCTURAL INTEGRITY - 12123

To improve the understanding of the single-shell tanks (SSTs) integrity, Washington River Protection Solutions, LLC (WRPS), the USDOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank Integrity Project in 2009. An expert panel on SST integrity, consisting of various subject matters experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration. Seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for the Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement. The structural integrity of the tanks is a key element in completing the cleanup mission at the Hanford Site. There are eight primary recommendations related to the structural integrity of Hanford SSTs. Six recommendations are being implemented through current and planned activities. The structural integrity of the Hanford SSTs is being evaluated through analysis, monitoring, inspection, materials testing, and construction document review. Structural evaluation in the form of analysis is performed using modern finite element models generated in ANSYS{reg_sign} The analyses consider in-situ, thermal, operating loads and natural phenomena such as earthquakes. Structural analysis of 108 of 149 Hanford SSTs has concluded that the tanks are structurally sound and meet current industry standards. Analyses of the remaining Hanford SSTs are scheduled for FY2013. Hanford SSTs are monitored through a dome deflection program. The program looks for deflections of the tank dome greater than 1/4 inch. No such deflections have been recorded. The tanks are also subjected to visual inspection. Digital cameras record the interior surface of the concrete tank domes, looking for cracks and other surface conditions that may indicate signs of structural distress. The condition of the concrete and rebar of the Hanford SSTs is currently being tested and planned for additional activities in the near future. Concrete and rebar removed from the dome of a 65-year-old tank is being tested for mechanics properties and condition. Results indicated stronger than designed concrete with additional Petrographic examination and rebar testing ongoing. Material properties determined from previous efforts combined with current testing and construction document review will help to generate a database that will provide continuing indication of Hanford SST structural integrity.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Description of the plasma diagnostics package (PDP) for the OSS-1 Shuttle mission and JSC plasma chamber test in conjunction with the fast pulse electron gun (FPEG)

The objectives, equipment, and techniques for the plasma diagnostics package (PDP) carried by the OSS-1 instrument payload of the STS-4 and scheduled for the Spacelab-2 mission are described. The goals of the first flight were to examine the Orbiter-magnetoplasma interactions by measuring the electric and magnetic field strengths, the ionized particle wakes, and the generated waves. The RMS was employed to lift the unit out of the bay in order to allow characterization of the fields, EM interference, and plasma contamination within 15 m of the Orbiter. The PDP will also be used to examine plasma depletion, chemical reaction rates, waves, and energized plasma produced by firing of the Orbiter thrusters. Operation of the PDP was carried out in the NASA Space Environment Simulation Laboratory test chamber, where the PDP was used to assay the fields, fluxes, wave amplitudes, and particle energy spectra. The PDP instrumentation is also capable of detecting thermal ions, thermal electrons suprathermal particles, VHF/UHF EMI levels, and the S-band field strength.

Shawhan, S. D.↗

PI-in-a-box: An expert system to advise astronauts during experiments

Perhaps the scarcest resource for manned flight experiments - on Spacelab or on Space Station Freedom - will continue to be crew time. To maximize the efficiency of the crew, and to make use of their abilities to work as scientist collaborators as well as equipment operators, normally requires more training in a wide variety of disciplines than is practical. The successful application of on-board expert systems, as envisioned by the 'Principal Investigator (PI)-in-a-Box' program, should alleviate the training bottleneck and provide the astronaut with the guidance and coaching needed to permit him or her to operate an experiment according to the desires and knowledge of the PI, despite changes in conditions. In addition to the functions of providing expert devise concerning scheduling and repair, the program should bring the astronaut into the scientific evaluation phase of an experiment by sharing with him the guidance and observations regarding the relevance and importance of data as it is being generated. Initial reaction from the astronaut community has been positive.

Young, Laurence R.↗

Application of 50 MHz doppler radar wind profiler to launch operations at Kennedy Space Center and Cape Canaveral Air Station

This paper presents a case study where a significant wind shift, not detected by jimspheres, was detected by the 50 MHz DRWP (Doppler Radar Wind Profiler) and evaluated to be acceptable prior to the launch of a Shuttle. This case study illustrates the importance of frequent upper air wind measurements for detecting significant rapidly changing features as well as for providing confidence that the features really exist and are not due to instrumentation error. Had the release of the jimsphere been timed such that it would have detected the entire wind shift, there would not have been sufficient time to release another jimsphere to confirm the existence of the feature prior to the scheduled launch. We found that using a temporal median filter on the one minute spectral estimates coupled with a constraining window about a first guess velocity effectively removes nearly all spurious signals from the velocity profile generated by NASA's 50 MHz DRWP while boosting the temporal resolution to as high as one profile every 3 minutes. The higher temporal resolution of the 50 MHz DRWP using the signal processing algorithm described in this paper ensures the detection of rapidly changing features as well as provides the confidence that the features are genuine. Further benefit is gained when the profiles generated by the DRWP are examined in relation to the profiles measured by jimspheres and/or rawinsondes. The redundancy offered by using two independent measurements can dispel or confirm any suspicion regarding instrumentation error or malfunction and wind profiles can be examined in light of their respective instruments' strengths and weaknesses.

Schumann, Robin S.↗

A Subjective Assessment of Alternative Mission Architecture Operations Concepts for the Human Exploration of Mars at NASA Using a Three-Dimensional Multi-Criteria Decision Making Model

The primary driver for developing missions to send humans to other planets is to generate significant scientific return. NASA plans human planetary explorations with an acceptable level of risk consistent with other manned operations. Space exploration risks can not be completely eliminated. Therefore, an acceptable level of cost, technical, safety, schedule, and political risks and benefits must be established for exploratory missions. This study uses a three-dimensional multi-criteria decision making model to identify the risks and benefits associated with three alternative mission architecture operations concepts for the human exploration of Mars identified by the Mission Operations Directorate at Johnson Space Center. The three alternatives considered in this study include split, combo lander, and dual scenarios. The model considers the seven phases of the mission including: 1) Earth Vicinity/Departure; 2) Mars Transfer; 3) Mars Arrival; 4) Planetary Surface; 5) Mars Vicinity/Departure; 6) Earth Transfer; and 7) Earth Arrival. Analytic Hierarchy Process (AHP) and subjective probability estimation are used to captures the experts belief concerning the risks and benefits of the three alternative scenarios through a series of sequential, rational, and analytical processes.

Tavana, Madjid↗

Blade vortex interaction noise reduction techniques for a rotorcraft

An active control device for reducing blade-vortex interactions (BVI) noise generated by a rotorcraft, such as a helicopter, comprises a trailing edge flap located near the tip of each of the rotorcraft's rotor blades. The flap may be actuated in any conventional way, and is scheduled to be actuated to a deflected position during rotation of the rotor blade through predetermined regions of the rotor azimuth, and is further scheduled to be actuated to a retracted position through the remaining regions of the rotor azimuth. Through the careful azimuth-dependent deployment and retraction of the flap over the rotor disk, blade tip vortices which are the primary source for BVI noise are (a) made weaker and (b) pushed farther away from the rotor disk (that is, larger blade-vortex separation distances are achieved).

Charles, Bruce D.↗

Blade vortex interaction noise reduction techniques for a rotorcraft

An active control device for reducing blade-vortex interactions (BVI) noise generated by a rotorcraft, such as a helicopter, comprises a trailing edge flap located near the tip of each of the rotorcraft's rotor blades. The flap may be actuated in any conventional way, and is scheduled to be actuated to a deflected position during rotation of the rotor blade through predetermined regions of the rotor azimuth, and is further scheduled to be actuated to a retracted position through the remaining regions of the rotor azimuth. Through the careful azimuth-dependent deployment and retraction of the flap over the rotor disk, blade tip vortices which are the primary source for BVI noise are (a) made weaker and (b) pushed farther away from the rotor disk (that is, larger blade-vortex separation distances are achieved).

Charles, Bruce D.↗