Search NASA⌕ Search

SEARCH · Search NASA

Results for “PRESSING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

STS-100 Flight Day 9 Highlights

On this ninth day of the STS-100 mission, Commander Kent Rominger and Mission Specialist Chris Hadfield answer questions about the mission in an on-orbit press conference. The Expedition 2 crew, Commander Yuriy Usachev and Flight Engineers James Voss and Susan Helms, answer questions about their mission and the Canadian Robotic Arm in another on-orbit press conference. The Rafaello Logistics Module is removed from the Unity Module on the International Space Station and transfers it to the payload bay of Atlantis.

Source record↗

High-Pressure Synthesis of Metal-Ceramic Nano-Composites

The major problems in fabrication of nano-crystal line materials form nano-powders are: (1), coarsening of the initial nano-size grains, (2), insufficient densification (high concentration of pores), and, (3), conversion of diamond into graphite (for diamond-based ceramics). We have developed a novel technique of the synthesis of nano-composite materials applying very high (up to about 10 GPa) pressures. In this technique, one component is pre-compacted and placed next to another having a lower melting point temperature. The whole sample is pressed and the temperature raised above the melting point of the second component, what results in the melt getting pressed into the (nano-size) pores of the compact. Upon subsequent crystallization the melt forms the second nanophase. The process is fast, on the order of seconds, and the temperatures are relatively low what prevents, or at least significantly reduces coarsening of the starting nanophase grains. Also, conversion of diamond into graphite can be prevented. The technique allows for control of the final product properties through a proper selection of (1) the initial compact density and grain size, (2) chemical composition of the source, and (3) the temperature and pressure of the process. The application of the technique to the synthesis of SiC and diamond with Si, Ge, and different metals. Results of the in-situ investigation of the synthesis process by synchrotron X-ray diffraction technique will be presented.

Gierlotka, S.↗

STS-105 Countdown Status Briefing

Joel Wells, NASA Public Affairs, introduces Steve Altemus, NASA Test Director, Glenn Chin, STS-105 Mission Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-105 prelaunch press conference. An overview is given of the launch countdown, payload status (Leonardo Multipurpose Logistics Module), and weather forecast. The men then answer questions from the press.

Source record↗

STS-104 Countdown Status Briefing

George Diller, NASA Public Affairs, introduces Pete Nickolenko, NASA Test Director, Scott Higginbotham, STS-104 Mission Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-104 launch minus two days press conference. An overview is given of the launch vehicle status, countdown procedures, payload status, and weather forecast. The men then answer questions from the press.

Source record↗

STS-104 Countdown Status Briefing

George Diller, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, Louie Garcia, STS-104 Operations Engineer, and Ed Priselac, Shuttle Weather Officer, in this launch minus one day press conference. An overview is given of the launch vehicle status, countdown procedures, payload status, and weather forecast. The men then answer questions from the press.

Source record↗

STS-104 Countdown Status Briefing

Joel Wells, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, Gregory Horvath, STS-104 Mission Integration Engineer, and Ed Priselac, Shuttle Weather Officer, in this STS-104 prelaunch press conference. An overview is given of the launch countdown, payload status, and weather forecast. The men then answer questions from the press.

Source record↗

STS-105 Countdown Status Briefing

Bruce Buckingham, NASA Public Affairs, introduces Steve Altemus, NASA Test Director, and Glenn Chin, STS-105 Mission Manager, in this STS-105 prelaunch press conference. An overview is given of the launch countdown, payload status, and weather forecast. The men then answer questions from the press.

Source record↗

STS-104 Post-Launch News Conference

George Diller, NASA Public Affairs, introduces Jim Halsell, Director of Shuttle Launch Integration, and Mike Leinbach, Shuttle Launch Director, in this STS-104 post-launch press conference. The men give an overview of the successful launch of Atlantis and answer questions from the press.

Source record↗

Rhenium Redefined

Through a Small Business Innovation Research (SBIR) contract with NASA's Glenn Research Center, Rhenium Alloys, Inc., of Elyria, Ohio, developed a new method for producing rhenium combustion chambers. Using room temperature isostatic pressing, Rhenium Alloys, Inc., compacted rhenium powder to a high density and into the approximated end shape and dimension of the rocket thruster. The item was then subjected to sintering and containerless hot isostatic pressing, increasing the density of the powder metallurgy part. With the new manufacturing process, both production time and costs are reduced while quality is significantly increased. The method enabled the company to deliver two chemical rocket thrusters to Glenn Research Center. The company makes rhenium a practical choice in manufacturing fields, including the aerospace, nuclear, and electronic industries, with upcoming opportunities projected in medical instrumentation.

Source record↗

Machine Monitor

When a printing press jams, damage is extensive, repairs are costly, and time and production loss can be expensive. James River Corporation requested G.W. Shelton, a design engineer with Logical Control Systems to solve this problem. Shelton found the solution in a NASA Tech Brief article describing a system of pulley and belt drives. This led to the design of a system that monitors drive components for changes in relative speed that would indicate belt slippage and jam probability. When a combination of variables is not met, an emergency "stop" signal is sent to the press and an alarm is triggered.

Source record↗

Energy Saver

Harris Semiconductor Company used technology which they found in Tech Briefs as the basis for an integrated circuit to reduce onto one chip most of the circuitry of the motors, for example working machines, drill presses, etc. Harris produced an induction motor energy saver (IMES) centered upon a silicon chip. The chip computes the precise voltage and the IMES monitors the motor and provides the energy. An IMES equipped drill press uses only 79 watts of energy as compared to the usual 160 watts.

Source record↗

Non-Radiative Shocks in The Cygnus Loop: H2 in HH2 Fluorescence or Collisions?

The FUSE observations of a non-radiative shock wave in the Cygnus Loop were obtained in June and October 2000. The two main results were near equilibration of the kinetic temperature of oxygen with protons and electrons and inferred 3D structure and pre-shock density for the shock including resonance scattering. The 3D structure in turn implies density fluctuations in keeping with the level expected for interstellar turbulence. Major results are contained in an ApJ paper in press and some extensions are contained in a conference proceedings paper in Rev. Mex. A&A in press. Very early results were given in the Ghavamian et al. paper in 2000. The observations of HH2 have not yet been obtained due to the pointing constraints of FUSE. They were scheduled for early January 2003, but we have not yet received the processed data. We are hoping to get the data shortly.

Raymond, John C.↗

Interaction of Comets and the Solar Wind

We had originally planned to analyze UVCS observations of Comet Machholz, but we obtained higher quality observations of Comet Kudo-Fujikawa in January 2003 at its 0.19 AU perihelion. Besides a large and rapidly increasing water outgassing rate, we detected a bright tail in doubly ionized carbon. The amount of carbon was greater than could be accounted for by GO photodissociation, and we attribute the carbon to evaporation of organics from dust. A spectacular disconnection event was apparent in the C III tail, and it coincides within the uncertainties with the position of the heliospheric current sheet. A paper is in press in Science, and it will be the subject of a press release. We are also analyzing two sungrazing comets. Comet C/2001 C2 shows evidence for sub-fragments and for a very long lasting source of neutrals, which we tentatively identify as evaporation of pyroxene dust grains. Comet C/2002 S2 shows a sudden 2 magnitude drop in optical brightness and an equally sudden recovery. UVCS observations during that time show a steadily increasing outgassing rate. We have derived solar wind densities for both comets, but we are still sorting out the ambiguities involving the fragmentation and optical behavior. We are collaborating with Philippe Lamy on the LASCO measurements.

Wagner, William↗

Impact of resistance exercise during bed rest on skeletal muscle sarcopenia and myosin isoform distribution

Because resistance exercise (REx) and bed-rest unloading (BRU) are associated with opposing adaptations, our purpose was to test the efficacy of REx against the effects of 14 days of BRU on the knee-extensor muscle group. Sixteen healthy men were randomly assigned to no exercise (NoEx; n = 8) or REx (n = 8). REx performed five sets of leg press exercise with 80-85% of one repetition maximum (1 RM) every other day during BRU. Muscle samples were removed from the vastus lateralis muscle by percutaneous needle biopsy. Myofiber distribution was determined immunohistochemically with three monoclonal antibodies against myosin heavy chain (MHC) isoforms (I, IIa, IIx). MHC distribution was further assessed by quantitative gel electrophoresis. Dynamic 1-RM leg press and unilateral maximum voluntary isometric contraction (MVC) were determined. Maximal neural activation (root mean squared electromyogram) and rate of torque development (RTD) were measured during MVC. Reductions (P < 0.05) in type I (15%) and type II (17%) myofiber cross-sectional areas were found in NoEx but not in REx. Electrophoresis revealed no changes in MHC isoform distribution. The percentage of type IIx myofibers decreased (P < 0.05) in REx from 9 to 2% and did not change in NoEx. 1 RM was reduced (P < 0.05) by 9% in NoEx but was unchanged in REx. MVC fell by 15 and 13% in NoEx and REx, respectively. The agonist-to-antagonist root mean squared electromyogram ratio decreased (P < 0.05) 19% in REx. RTD slowed (P < 0.05) by 54% in NoEx only. Results indicate that REx prevented BRU-induced myofiber atrophy and also maintained training-specific strength. Unlike spaceflight, BRU did not induce shifts in myosin phenotype. The reported benefits of REx may prove useful in prescribing exercise for astronauts in microgravity.

NASA Discipline Musculoskeletal↗

Effects of static fingertip loading on carpal tunnel pressure

The purpose of this study was to explore the relationship between carpal tunnel pressure and fingertip force during a simple pressing task. Carpal tunnel pressure was measured in 15 healthy volunteers by means of a saline-filled catheter inserted percutaneously into the carpal tunnel of the nondominant hand. The subjects pressed on a load cell with the tip of the index finger and with 0, 6, 9, and 12 N of force. The task was repeated in 10 wrist postures: neutral; 10 and 20 degrees of ulnar deviation; 10 degrees of radial deviation; and 15, 30, and 45 degrees of both flexion and extension. Fingertip loading significantly increased carpal tunnel pressure for all wrist angles (p = 0.0001). Post hoc analyses identified significant increase (p < 0.05) in carpal tunnel pressure between unloaded (0 N) and all loaded conditions, as well as between the 6 and 12 N load conditions. This study demonstrates that the process whereby fingertip loading elevates carpal tunnel pressure is independent of wrist posture and that relatively small fingertip loads have a large effect on carpal tunnel pressure. It also reveals the response characteristics of carpal tunnel pressure to fingertip loading, which is one step in understanding the relationship between sustained grip and pinch activities and the aggravation or development of median neuropathy at the wrist.

NASA Center ARC↗

Changes in plasma volume and baroreflex function following resistance exercise

The dynamics of change in plasma volume (PV) and baroreflex responses have been reported over 24 h immediately following maximal cycle exercise. The purpose of this study was to determine if PV and baroreflex showed similar changes for 24 h after resistance exercise. Eight men were studied on 2 test days, 1 week apart. On 1 day, per cent change (% delta) in PV was estimated at 0,3, and 6 h after resistance exercise using haematocrit and haemoglobin. Baseline PV was measured 24 h after exercise using Evans blue dye. The carotid baroreceptor-cardiac reflex response was measured before, and 3, 6, 9, 12, and 24 h post-exercise. Each subject performed six sets of the bench press and leg press with 10 repetitions per set with a load that induced failure within each set. On a control day, the protocol was used without exercise. Plasma volume did not change during the control day. There was a 20% decrease in PV immediately post-exercise; the recovery of the PV was rapid and complete within 3 h. PV was 20% greater 24 h post-exercise than on the control day. There were no differences in any of the baroreflex measurements. Therefore, it is suggested that PV shifts may occur without altering baroreflex sensitivity.

NASA Program Space Physiology and Countermeasures↗

Effects of restricted feeding schedules on circadian organization in squirrel monkeys

Free running circadian rhythms of motor activity, food-motivated lever-pressing, and either drinking (N = 7) or body temperature (N = 3) were recorded from 10 squirrel monkeys maintained in constant illumination with unlimited access to food. Food availability was then restricted to a single unsignaled 3-hour interval each day. The feeding schedule failed to entrain the activity rhythms of 8 monkeys, which continued to free-run. Drinking was almost completely synchronized by the schedule, while body temperature showed a feeding-induced rise superimposed on a free-running rhythm. Nonreinforced lever-pressing showed both a free-running component and a 24-hour component that anticipated the time of feeding. At the termination of the schedule, all recorded variables showed free-running rhythms, but in 3 animals the initial phase of the postschedule rhythms was advanced by several hours, suggesting relative coordination. Of the remaining 2 animals, one exhibited stable entrainment of all 3 recorded rhythms, while the other appeared to entrain temporarily to the feeding schedule. These results indicate that restricted feeding schedules are only a weak zeitgeber for the circadian pacemaker generating free-running rhythms in the squirrel monkey. Such schedules, however, may entrain a separate circadian system responsible for the timing of food-anticipatory changes in behavior and physiology.

Non-NASA Center↗

STS-121: Discovery Post Flight Readiness Review Briefing

This post Flight Readiness Review (FRR) briefing begins with NASA Press Secretary Dean Acosta, introducing the panel who consist of: NASA Administrator, Dr. Michael Griffin; Associate Administrator for Space Operations, Bill Gerstenmaier; Space Shuttle Program Manager, Wayne Hale; and NASA Launch director, Mike Leinbach. The discussion begins with Dr. Michael Griffin, who expresses his gladness to be a part of the FRR. Bill Gerstenmaier talks about how they were very thorough about the subjects reviewed and that they wanted to make sure that they were ready to fly. He discusses and presents two slides. The first slide is a description of the LO2 intertank and LH2 ice/frost ramps staging location and the second are the top ten LH2 Ice/Frost Ramp Foam Loss events. Wayne Hale gives his thoughts on the human element that came into play during the FRRs. He talks about the willingness of everyone to speak their mind, instead of giving short comments. He expressed that this element is a huge step forward for NASA. Mike Leinbach reports on the processing of the vehicle and expresses that everything is going well and there is nothing to prohibit the launch. He also gives a good report on Atlantis, in case there is a need to use the vehicle. This FRR briefing ends with a short question and answer period from the press on topics such as debris, foam loss, ice/frost ramp redesign, crew risks, and launch date.

Source record↗