Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

Planning green infrastructure placement based on projected precipitation data

Continued urbanization has led to tremendous changes on the landscape. These changes have exacerbated the effects of extreme climatic events such as flooding because of constrained water infiltration and increased surface flow. Typical runoff control measures involve sophisticated gray infrastructure that guide excess surface flow into storage and disposal sites. In a dynamic climate system, these measures are not sustainable since they cannot be easily modified to accommodate large volumes of runoff. Green Infrastructure (GI) is an adaptable technique that can be used to minimize runoff, in addition to offering an array of additional benefits (urban heat regulation, aesthetics, improved air quality etc.). Strategic placement of GI is key to achieving maximum utility. While physical site characteristics play a major role in determining suitable GI placement sites, knowledge of future precipitation patterns is crucial to ensure successful flood mitigation. Here, suitable GI sites within the city of Knoxville, Tennessee, were determined based on potential impact of an extreme flood event as indicated by site characteristics. Then, the relative potential likelihood of a flood event was determined based on projected precipitation data and knowledge of existing flood zones. By combining potential impact with likelihood information, low, medium, and high priority GI implementation sites were established. Results indicate that high priority sites are in the central parts of the city with priority decreasing outward. The GI prioritization scheme presented here, offers valuable guidance to city planners and policy makers who wish to exploit the GI approach for flood mitigation.

54 ENVIRONMENTAL SCIENCES↗

High Penetration PV Deployment in the Arizona Public Service System

In an effort to better understand the impacts of high penetrations of photovoltaic (PV) generators on distribution systems, Arizona Public Service (APS) and its partners have begun work on a multi-year project to develop the tools and knowledgebase needed to safely and reliably integrate high penetrations of utility and residential scale PV. Building upon the APS Community Power Project - Flagstaff Pilot, this project will analyze the impact of PV on a representative feeder in northeast Flagstaff. To quantify and catalog the effects of the estimated 1.5 MW of PV that will be installed on the feeder (both smaller units at homes as well as large, centrally located systems), high-speed weather and electrical data acquisition systems and digital 'smart' meters are being designed and installed to facilitate monitoring and to build and validate comprehensive, high-resolution models of the distribution system. These models will be used to analyze the impacts of the PV on distribution circuit protection systems (including anti-islanding), predict voltage regulation and phase balance issues, and develop volt/var control schemes. The goal of this paper is to provide insight and lessons learned on the early stages of high penetration PV deployment. Primarily focusing on modeling and data acquisition, this paper describes the overall project, early results, and plans for future phases of the project.

14 SOLAR ENERGY↗

Tracking and data system support for the Pioneer project. Volume 1: Pioneer 10-prelaunch planning through second trajectory correction, 4 December 1969 - 1 April 1972

The tracking and data system support of the launch, near-earth, and deep space phases of the Pioneer 10 mission, which sent a Pioneer spacecraft into a flyby of Jupiter that would eventually allow the spacecraft to escape the solar system is discussed. The support through the spacecraft's second trajectory correction is reported. During this period, scientific instruments aboard the spacecraft registered information relative to interplanetary particles and fields, and radiometric data generated by the network continued to improve knowledge of the celestial mechanics of the solar system. In addition to network support activity detail, network performance and special support activities are covered.

Siegmeth, A. J.↗

Tracking and data system support for the Pioneer project. Volume 2: Pioneer 11 prelaunch planning through second trajectory correction, to 1 May 1973

The tracking and data system support of the planning, testing, launch, near-earth, and deep space phases of the Pioneer 11 Jupiter Mission are described, including critical phases of spacecraft flight and guidance. Scientific instruments aboard the spacecraft registered information relative to interplanetary particles and fields. Knowledge of the celestial mechanics of the solar system was improved through radiometric data gathering. Network performance, details of network support activity, and special support activities are discussed.

Barton, W. R.↗

Bantam System Technology Project Ground System Operations Concept and Plan

The Low Cost Booster Technology Program, also known as the Bantam Booster program, is a NASA sponsored initiative to establish a viable commercial technology to support the market for placing small payloads in low earth orbit. This market is currently served by large boosters which orbit a number of small payloads on a single launch vehicle, or by these payloads taking up available space on major commercial launches. Even by sharing launch costs, the minimum cost to launch one of these small satellites is in the 6 to 8 million dollar range. Additionally, there is a shortage of available launch opportunities which can be shared in this manner. The goal of the Bantam program is to develop two competing launch vehicles, with launch costs in the neighborhood of 1.5 million dollars to launch a 150 kg payload into low earth orbit (200 nautical mile sun synchronous). Not only could the cost of the launch be significantly less than the current situation, but the payload sponsor could expect better service for his expenditure, the ability to specify his own orbit, and a dedicated vehicle. By developing two distinct launch vehicles, market forces are expected to aid in keeping customer costs low.

Moon, Jesse M.↗

Onboard Autonomy and Ground Operations Automation for the Intelligent Payload Experiment (IPEX) CubeSat Mission

The Intelligent Payload Experiment (IPEX) is a cubesat manifested for launch in October 2013 that will flight validate autonomous operations for onboard instrument processing and product generation for the Intelligent Payload Module (IPM) of the Hyperspectral Infra-red Imager (HyspIRI) mission concept. We first describe the ground and flight operations concept for HyspIRI IPM operations. We then describe the ground and flight operations concept for the IPEX mission and how that will validate HyspIRI IPM operations. We then detail the current status of the mission and outline the schedule for future development.

project data planning↗

Holistic Energy Management Yields Cost Savings and Resilience Benefits for the U.S. Coast Guard Academy

As the U.S. Coast Guard's third largest energy consumer, the 86-year-old Coast Guard Academy in New London, Connecticut, was ripe for an energy management overhaul. That overdue overhaul was made possible by the largest utility energy service contract (UESC) in U.S. Department of Homeland Security history. Awarded in September 2017, the $72.6 million contract provided for $39 million in capital improvements and is expected to cut total energy costs by 80% - more than $2 million - each year. On-site generation of 82% of the site's electricity needs will dramatically improve site-wide resilience, and savings generated from implementation of the project will pay for all project costs. The UESC project team developed and executed an energy management project to meet several priority objectives, including implementing essential infrastructure improvements, increasing reliability, and enhancing resilience - and engaged the Federal Energy Management Program (FEMP) Utility Partnerships Program for project assistance.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Status of the LANSCE refurbishment project

The Los Alamos Neutron Science Center (LANSCE) accelerator is an 800-MeV proton linac that drives user facilities for isotope production, proton radiography, ultra-cold neutrons, weapons neutron research and various sciences using neutron scattering. The LANSCE Refurbishment Project (LANSCE-R) is an ambitious project to refurbish key elements of the LANSCE accelerator that are becoming obsolete or nearing end-of-life. The preliminary design phase for the project is funded and underway. The 6 year, $150M (US) project will enable future decades of reliable, high-performance operation. It will replace a substantial fraction of the radio-frequency power systems (gridded tubes and klystrons) with modern systems, completely refurbish the original accelerator control and timing systems, replace obsolete diagnostic devices, and modernize other ancillary systems. An overview of the LANSCE-R project will be presented. The project requirements will be discussed, the preliminary technical solutions presented, and the plan for successful project execution while meeting annual customer expectations for beam delivery will be reviewed.

43 PARTICLE ACCELERATORS↗

Project analysis and integration area

The objective of the Project Analysis and Integration Area (PA&I) is to support the planning, analysis, integration, and decision making activities of the Flat-plate Solar Array FSA) Project. Accordingly, PA&I supports the Project by developing and documenting Project plans based, in part, on the technical and economic assessments performed by PA&I of the various technical options. Goals for module technical performance and costs, derived from National Photovoltaics Program goals, are established by PA&I for each of the major technical activities in the Project. Assessments of progress toward achievement of goals are made to guide decision making within the Project.

Source record↗

U.S. China Carbon Capture and Storage Development Project at West Virginia University

The original overall objective of this activity was to undertake resource evaluation and planning for CCS projects and to describe and quantify the geologic, environmental, and economic challenges to successful development of large-scale CCS in China’s coal sector. Several project execution barriers were encountered in the course of this project, most notably a project stop/delay due to funds availability/costing restrictions from the US State Department to the US Department of Energy at the end of CY2012, which halted project execution from January 2, 2013 to April 1, 2013. At the resolution of this project delay, it was communicated to the project team that the overall project period would also be reduced, from a completion date of February 28, 2014 to December 31, 2013. The net impact of all these changes was a reduction in the project period from 24 months (3/1/2012-2/28/2014) to 22 months (3/1/2012-12/31/2013), with a 3 month stop from 1/1/2013-3/31/2013. The project team endeavored to overcome these project time impacts, focusing heavily on technoeconomic modeling that would be deliverable under Task 3 (Ordos Basin Feasibility Study), and choosing to abandon the full investigation into the Demonstration Site (Task 4) due to the reduced project time. The ultimate focus of this project changed to work with the Chinese on a carbon atlas/geologic characterization, and on mechanisms for CO2 storage options from high-quality streams within China.

20 FOSSIL-FUELED POWER PLANTS↗

Energy Baseline Assessment and Project Considerations for the Wai'anae Moku Community Energy Plan

This report was prepared as a supplement to the Waianae moku community's energy plan and includes results of two activities conducted by the National Laboratory of the Rockies in support of the planning process: (1) an energy baseline assessment and (2) considerations and resources for possible energy projects prioritized by the community in its energy plan. Results of the energy assessment describe the energy landscape in the state of Hawaii, on the island of Oahu, and in the Waianae moku at the time the plan was developed, with the intention of supporting informed community participation in the planning process. Considerations and resources align with each of the energy project ideas identified in the community's energy plan, and are intended to describe the current context and activities related to each, along with possible next steps toward implementation, and additional resources. The report concludes with takeaways for the community to consider as they pursue their energy goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Daily Online Cone Beam Computed Tomography to Assess Interfractional Motion in Patients With Intact Cervical Cancer

Purpose: To quantify interfraction motion in patients with intact cervical cancer and assess implications for clinical target volume (CTV) coverage and required planning margins. Methods and Materials: We analyzed 10 patients undergoing external beam radiotherapy using online cone beam computed tomography (CBCT) before each fraction. CTVs were contoured on the planning CT and on each CBCT. Each CBCT was rigidly registered to the planning CT with respect to bony anatomy. The CTV from each CBCT was projected onto the planning CT and compared to the CTV from the planning CT. Uniform three-dimensional expansions were applied to the planning CTV to assess required planning margins. For each fraction, the minimum margin required to encompass the CTV was calculated, and the volume of CTV (on the CBCT) encompassed by the PTV was determined as a function of margin size. Results: A uniform CTV planning treatment volume margin of 15 mm would have failed to encompass the CTV in 32% of fractions. The mean volume of CTV missed, however, was small (4 cc). The mean planning margin (across patients and fractions) required to encompass the CTV was 15 mm. Variation in margin estimates was high, with interpatient variation being the predominant component. Increased rectal volume was associated with posterior (p < 0.0001) and superior (p = 0.0004) shifts in the CTV, whereas increased bladder volume was associated with superior shifts (p < 0.0001). Conclusions: Interfraction motion results in a high probability of missing the CTV using conventional planning margins, but the volume of CTV missed is small. Adaptive radiotherapy approaches are needed to improve treatment accuracy.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Final Scientific/Technical Report for project “Geomechanical Monitoring for CO 2 Hub Storage: Production and Injection at Kevin Dome

After learning that the TDS value in the target injection formation at the Kevin Dome site is too low to qualify for an EPA Class VI CO2 injection permit, the BSCSP project was re-scoped such that injection of CO2 is no longer planned. With no injection planned, the Geomechanics project was closed. In this final report, we describe the objective and approach of the project as proposed, and the limited results obtained before stopping work. The objective of the proposed research was the development & validation of an integrated monitoring approach for quantifying the interactions between large-scale geological carbon storage (GCS) and subsurface geomechanical state, particularly perturbations relevant to reservoir integrity such as fault reactivation and induced fracturing. In the short period of work before knowing the fate of the Kevin Dome project, we (1) researched designs for both the proposed InSAR corner reflectors as well as the near-surface 3C seismic stations; (2) developed preliminary elastic geomechanical models; (3) developed a second generation deformation prediction for the BSCSP Kevin Dome injection site; and (4) completed a preliminary map of InSAR monuments and shallow MEQ wells in the vicinity of the BSCSP injection pad.

58 GEOSCIENCES↗

CW Room Temperature Re-Buncher for the Project X Front End

At Fermilab there is a plan to construct the Project X Injector Experiment (PXIE) facility - a prototype of the front end of the Project X, a multi-MW proton source based on superconducting linac. The construction and successful operations of this facility will validate the concept for the Project X front end, thereby minimizing the primary technical risk element within the Project. The room temperature front end of the linac contains an ion source, an RFQ accelerator and a Medium Energy Beam Transport (MEBT) section comprising a high bandwidth bunch selective chopper. The MEBT length is about 10 m, so three re-bunching CW cavities are used to support the beam longitudinal dynamics. The paper reports a RF design of the re-bunchers along with preliminary beam dynamic and thermal analysis of the cavities.

43 PARTICLE ACCELERATORS↗

L-325 Sagebrush Habitat Mitigation Project: FY2009 Compensation Area Monitoring Report

Annual monitoring in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades was conducted in June 2009. MAP guidelines defined mitigation success for this project as 3000 established sagebrush transplants on a 4.5 ha mitigation site after five monitoring years. Annual monitoring results suggest that an estimated 2130 sagebrush transplants currently grow on the site. Additional activities in support of this project included gathering sagebrush seed and securing a local grower to produce between 2250 and 2500 10-in3 tublings for outplanting during the early winter months of FY2010. If the minimum number of seedlings grown for this planting meets quality specifications, and planting conditions are favorable, conservative survival estimates indicate the habitat mitigation goals outlined in the MAP will be met in FY2014.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Modeling and Simulation Tool to Improve Urban Search Planning (NA22 Final Report)

The venture project Tool to Improve Urban Search Planning (LL14-V-Urban Search Planning ToolPD3RS) supported two major types of effort: 1) development of a software prototype search planning tool, with the goal of transitioning the tool to operational users for evaluation and possible adoption; 2) enabling research to better understand the radiation characteristics of an urban environment, with implications for deployment of radiation detection systems in that environment. The first effort has resulted in prototype software, Optimization Planning Tool for Urban Search (OPTUS), that has been distributed to a limited set of potential users, including users within the NNSA emergency response community. The second effort supported various research topics including high fidelity radiation transport modeling in urban environments, measurement campaigns for model validation, development of vehicle-based high purity germanium (HPGe) detector systems and supporting data analysis, and computational capabilities for archiving and managing large data sets. While some of these related efforts have informed the models and software design of the OPTUS tool, in large part they pursued more basic research, some of which has evolved into separate DNN R&D projects. Project performers included Oak Ridge National Laboratory (ORNL), Lawrence Berkeley National Laboratory (LBNL) and the Remote Sensing Laboratory (RSL), in addition to Lawrence Livermore Laboratory (LLNL), the project lead. The project also supported university research, including several internships at the laboratories.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

A fast optimization algorithm for multicriteria intensity modulated proton therapy planning

Purpose: To describe a fast projection algorithm for optimizing intensity modulated proton therapy (IMPT) plans and to describe and demonstrate the use of this algorithm in multicriteria IMPT planning. Methods: The authors develop a projection-based solver for a class of convex optimization problems and apply it to IMPT treatment planning. The speed of the solver permits its use in multicriteria optimization, where several optimizations are performed which span the space of possible treatment plans. The authors describe a plan database generation procedure which is customized to the requirements of the solver. The optimality precision of the solver can be specified by the user. Results: The authors apply the algorithm to three clinical cases: A pancreas case, an esophagus case, and a tumor along the rib cage case. Detailed analysis of the pancreas case shows that the algorithm is orders of magnitude faster than industry-standard general purpose algorithms (MOSEK's interior point optimizer, primal simplex optimizer, and dual simplex optimizer). Additionally, the projection solver has almost no memory overhead. Conclusions: The speed and guaranteed accuracy of the algorithm make it suitable for use in multicriteria treatment planning, which requires the computation of several diverse treatment plans. Additionally, given the low memory overhead of the algorithm, the method can be extended to include multiple geometric instances and proton range possibilities, for robust optimization.

60 APPLIED LIFE SCIENCES↗