PRB coal safety design considerations for new greenfield plants: an EPCC's perspective

The article reviews the design and safety aspects to consider in a new greenfield Powder River Basin (PRB) coal-fired power plant such as the 200 MW TS Power Plant (TSPP) in Nevada that Fluor is working on as an engineering, procurement and construction contractor (EPCC). PRB coals can become fragmented and form coal dust that is highly volatile and easily self-ignited. Coal handling systems incorporate features to minimise dust, such as totally enclosed chute works, 'spoon drops' to reduce impact turbulence, and overflow hoods. Conveyors have extended skirtboards and tight clearances between the wear plates and the belts. Storage piles are designed to have high compaction to deprive oxygen and dust suppression monitor hydrants to minimise dust and assist in compaction. The coal silo filling bay is designed to minimise dust once the coal is crushed, and attention is paid to cleaning and lighting. The silos are designed to ensure mass flow to the feeder and incorporate a carbon monoxide monitor and an F-500 fire suppressant. 3 photos.

01 COAL, LIGNITE, AND PEAT↗

Biomass cofiring: another way to clean your coal

Demand for renewable power is burgeoning as state government impose increasingly rigorous environmental and procurement standards on the energy industry. Surprisingly, biomass cofiring has yet to attract much attention, even though it could help many utilities meet their renewable portfolio requirements, reduce carbon emissions, and solve other regional environmental problems. US developers, investors, and regulators should consider including cofiring as part of the energy mix going forward. This is the message of the article. Currently 28 US states and the District of Columbia have mandatory renewable portfolio standard (RPS) regimes and congress has both federal RPS and a national carbon regulation regime as top priority this session. Henry Waxman's RPS proposal, how HR 2454, the American Clean Energy and Security Act of 2009 includes cofiring as a renewable energy source. These options for cofiring biomass with a coal-fired power plant - direct, indirect and paralled cofiring are outlined. 2 figs., 1 photo.

01 COAL, LIGNITE, AND PEAT↗

Development of a Rotary Micro-filter for Radioactive Waste Applications

The processing rates of Savannah River Site (SRS) high-level waste decontamination processes are limited by the flow rate of the solid-liquid separation. The baseline process, using a 0.1 micron cross-flow filter, produces {approx}1.36 x 10{sup -5} m/s ({approx}0.02 gpm/ft{sup 2}) of filtrate under expected operating conditions. Savannah River National Laboratory (SRNL) demonstrated significantly higher filter flux for actual waste samples using a small-scale rotary filter. With funding from the U. S. Department of Energy Office of Cleanup Technology, SRNL personnel are evaluating and developing the rotary micro-filter for radioactive service at SRS. The authors improved the design for the disks and filter unit to make them suitable for high-level radioactive service. They procured two units using the new design, tested them with simulated SRS wastes, and evaluated the operation of the units. Work to date provides the following conclusions and program status. - The authors modified the design of the filter disks to remove epoxy and Ryton{sup R}. The new design includes welding both stainless steel and ceramic coated stainless steel filter media to a stainless steel support plate. The welded disks were tested in the full-scale unit. They showed good reliability and met filtrate quality requirements. - The authors modified the design of the unit, making installation and removal easier. The new design uses a modular, one-piece filter stack that is removed simply by disassembly of a flange on the upper (inlet) side of the filter housing. All seals and rotary unions are contained within the removable stack. - While it is extremely difficult to predict the life of the seal, the vendor representative indicates a minimum of one year in present service conditions is reasonable. Changing the seal face material from silicon-carbide to a graphite-impregnated silicon-carbide is expected to double the life of the seal. Replacement of the current seal with an air seal could increase the lifetime to 5 years and is undergoing testing in the current work. - The bottom bushing showed wear due to a misalignment during the manufacture of the filter tank. Replacing the graphite bushing with a more wear resistant material such as a carbide material will increase the lifetime of the bushing. This replacement requires a more wear resistant part or coating to prevent excessive wear of the shaft. The authors are currently conducting testing with the more wear resistant bushing. - The project team plans to use the rotary micro-filter as a filter in advance of an ion exchange process under development for potential deployment in SRS waste tank risers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank Waste Retrieval Lessons Learned at the Hanford Site

One of the environmental remediation challenges facing the nation is the retrieval and permanent disposal of approximately 90 million gallons of radioactive waste stored in underground tanks at the U. S. Department of Energy (DOE) facilities. The Hanford Site is located in southeastern Washington State and stores roughly 60 percent of this waste. An estimated 53 million gallons of high-level, transuranic, and low-level radioactive waste is stored underground in 149 single-shell tanks (SSTs) and 28 newer double-shell tanks (DSTs) at the Hanford Site. These SSTs range in size from 55,000 gallons to 1,000,000 gallon capacity. Approximately 30 million gallons of this waste is stored in SSTs. The SSTs were constructed between 1943 and 1964 and all have exceeded the nominal 20-year design life. Sixty-seven SSTs are known or suspected to have leaked an estimated 1,000,000 gallons of waste to the surrounding soil. The risk of additional SST leakage has been greatly reduced by removing more than 3 million gallons of interstitial liquids and supernatant and transferring this waste to the DST system. Retrieval of SST salt-cake and sludge waste is underway to further reduce risks and stage feed materials for the Hanford Site Waste Treatment Plant. Regulatory requirements for SST waste retrieval and tank farm closure are established in the Hanford Federal Facility Agreement and Consent Order (HFFACO), better known as the Tri- Party Agreement, or TPA. The HFFACO was signed by the DOE, the State of Washington Department of Ecology (Ecology), and U.S. Environmental Protection Agency (EPA) and requires retrieval of as much waste as technically possible, with waste residues not to exceed 360 ft{sup 3} in 530,000 gallon or larger tanks; 30 ft{sup 3} in 55,000 gallon or smaller tanks; or the limit of waste retrieval technology, whichever is less. If residual waste volume requirements cannot be achieved, then HFFACO Appendix H provisions can be invoked to request Ecology and EPA approval of an exception to the waste retrieval criteria for a specific tank. Tank waste retrieval has been conducted at the Hanford Site over the last few decades using a method referred to as Past Practice Hydraulic Sluicing. Past Practice Hydraulic Sluicing employs large volumes of DST supernatant and water to dislodge, dissolve, mobilize, and retrieve tank waste. Concern over the leak integrity of SSTs resulted in the need for tank waste retrieval methods capable of using smaller volumes of liquid in a more controlled manner. Retrieval of SST waste in accordance with HFFACO requirements was initiated at the Hanford Site in April 2003. New and innovative tank waste retrieval methods that minimize and control the use of liquids are being implemented for the first time. These tank waste retrieval methods replace Past Practice Hydraulic Sluicing and employ modified sluicing, vacuum retrieval, and in-tank vehicle techniques. Waste retrieval has been completed in seven Hanford Site SSTs (C-106, C-103, C-201, C-202, C-203, C-204, and S-112) in accordance with HFFACO requirements. Three additional tanks are currently in the process of being retrieved (C-108, C-109 and S-102) Preparation for retrieval of two additional SSTs (C-104 and C-110) is ongoing with retrieval operations forecasted to start in calendar year 2008. Tank C-106 was retrieved to a residual waste volume of 470 ft{sup 3} using oxalic acid dissolution and modified sluicing. An Appendix H exception request for Tank C-106 is undergoing review. Tank C-103 was retrieved to a residual volume of 351 ft{sup 3} using a modified sluicing technology. This approach was successful at reaching the TPA limits for this tank of less than 360 ft{sup 3}and the limits of the technology. Tanks C-201, C-202, C-203, and C-204 are smaller (55,000 gallon) tanks and waste removal was completed in accordance with HFFACO requirements using a vacuum retrieval system. Residual waste volumes in each of these four tanks were less than 25 ft{sup 3}. Tank S-112 retrieval was completed February 28, 2007, meeting the TPA Limits of less than 360 cu ft using salt-cake dissolution, modified sluicing, in-tank vehicle with high pressure water spray and caustic dissolution. Tanks C-108 and C-109 have been retrieved to 90% and 85% respectively. Modified sluicing was no longer effective at retrieving the remaining 5,000 to 10,000 gallons of residual. A Mobile Retrieval Tool (FoldTrac) is scheduled for installation early in 2008 to assist in breaking up chunks of waste and mobilizing the waste for transfer. Lessons learned from application of new tank waste retrieval methods are being documented and incorporated into future retrieval operations. They address all phases of retrieval including process design, equipment procurement and installation, supporting documentation, and system operations. Information is obtained through interviews with retrieval project personnel, focused workshops, review of problem evaluation requests, and evaluation of retrieval performance data. This paper presents current retrieval successes and lessons learned from retrieval of tank waste at the Hanford Site and discusses how this information is used to optimize retrieval system efficiency, improve overall cost effectiveness of retrieval operations, and ensure that HFFACO requirements are met. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress and Status of the Ignalina Nuclear Power Plant's New Solid Waste Management and Storage Facilities

A considerable amount of dry radioactive waste from former NPP operation has accumulated up to date and is presently stored at the Ignalina NPP site, Lithuania. Current storage capacities are nearly exhausted and more waste is to come from future decommissioning of the two RMBKtype reactors. Additionally, the existing storage facilities does not comply to the state-of-the-art technology for handling and storage of radioactive waste. In 2005, INPP faced this situation of a need for waste processing and subsequent interim storage of these wastes by contracting NUKEM with the design, construction, installation and commissioning of new waste management and storage facilities. The subject of this paper is to describe the scope and the status of the new solid waste management and storage facilities at the Ignalina Nuclear Power Plant. In summary: The turnkey contract for the design, supply and commission of the SWMSF was awarded in December 2005. The realisation of the project was initially planned within 48 month. The basic design was finished in August 2007 and the Technical Design Documentation and Preliminary Safety Analyses Report was provided to Authorities in October 2007. The construction license is expected in July 2008. The procurement phase was started in August 2007, start of onsite activities is expected in November 2007. The start of operation of the SWMSF is scheduled for end of 2009. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving Remedial Effectiveness at U.S. Department of Energy through Optimization Review and Performance Basis

The U.S. Department of Energy (DOE), Office of Environmental Management (EM) conducted its first Remediation Process Optimization (RPO) review in 2004, following the methodology and guidance issued by the Interstate Technology and Regulatory Council (ITRC). The intent of this paper is to briefly summarize the following: (1) the overall benefits of the review process toward improving remedial effectiveness and efficiency at DOE, (2) the types and objectives of completed reviews, and (3) how RPO facilitates technology transfer and is complementary to performance-based environmental management (PBEM). Contract reform began in 1993, at the U.S. Department of Energy (DOE) as a result of the Government Performance and Results Act, followed by recommendations from oversight groups. The precedence of using management and operating (M and O) contracts at DOE facilities, exempt from open competition by definition, shifted to performance basis. Since 1994, DOE has competed over 70% of its then existing M and O contracts; most now contain specific performance objectives, measures, and targets that focus on results in mission critical areas. In 2001, DOE's Office of Environmental Management (EM) integrated performance-based contracting as a core business process. EM resolved to manage cleanup as a project, encourage innovative contracting strategies, as well as incentives to accelerate risk reduction and cleanup. DOE's efforts to implement performance-based environmental management (PBEM) were further realized by establishing a centralized Office of Acquisitions and the Consolidated Business Center, which support all EM procurements. In 2004, EM began conducting Remediation Process Optimization (RPO) reviews at select field sites, following the methodology published in the 2004 ITRC guidance. To date, EM has completed nine RPO reviews, including: pump and treat system optimization, monitoring program optimization, in situ barrier performance improvement, remedial design review, as well as strategic planning for feasibility studies and Records of Decision. At a higher level, RPO reviews provide EM valuable insight as to how environmental contracts can be improved toward defining better cleanup goals, incentive fees, implementing emerging technologies, and measuring performance against appropriate metrics. As DOE works toward improving its PBEM approach, alliances with other federal agencies have proven valuable in sharing evaluation methods, contracting strategies, software, cost and performance reports, and lessons learned. (authors)

54 ENVIRONMENTAL SCIENCES↗

Multipurpose Transportation, Aging, and Disposal Canisters for Used Nuclear Fuel - Getting From Here to There and Beyond

The idea of a universal canister system, in which used fuel can be placed at reactor sites, transported and - without ever needing to be re-opened -, disposed of in a geologic repository, is certainly not new. Originally proposed by DOE in the early 1990's as the Multi-Purpose Canister (MPC) system, this common sense idea has always had considerable appeal as a means to reduce used fuel handling and simplify repository surface facility operations. However, difficulties in launching the development of such a system, in the face of large uncertainties in repository design and limited program funding, caused the original MPC project to be abandoned in 1997. Then, after eight years of inactivity in this area, DOE, while experiencing difficulty completing the repository surface facility design and having missed a December 2004 deadline for submittal of a repository license application to the Nuclear Regulatory Commission (NRC), re-proposed the concept. Under this renewed initiative, the MPC systems were renamed as Transportation, Aging, and Disposal or TAD canister systems. DOE's repository design had advanced significantly at this point and industry, having gained considerable experience through the design, licensing, manufacture, and loading of over 800 used fuel dry storage systems, was well positioned to provide DOE with the meaningful technical input that would be necessary to bring the TAD concept to reality. With a firm foundation on which to build, industry actively engaged DOE in an extensive series of interactions to facilitate TAD development. This paper describes the evolution of the TAD concept through the industry/DOE dialogue that occurred over an 18 month period beginning in January 2006. It discusses the technical issues that were addressed and resolved through this collaboration. Successful completion of this dialogue led to the issuance, by DOE, of a final TAD design specification in July, 2007. This specification is being used by DOE as a fundamental input to the Yucca Mountain license application that DOE expects to submit to the NRC no later than June 2008. DOE is now in the process completing a procurement of TAD demonstrations. As part of these demonstrations, DOE expects industry vendors to seek and obtain storage and transportation licenses for the TADs by 2010 and for utilities to deploy them at reactor sites by 2012. (authors)

42 ENGINEERING↗

Selection of materials for sodium fast reactor steam generators

Sodium Fast Reactor (SFR) is considered in France as the most mature technology of the different Generation IV systems. In the short-term the designing work is focused on the identification of the potential tracks to demonstrate licensing capability, availability, in-service inspection capability and economical performance. In that frame materials selection for the major components, as the steam generator, is a particularly key point managed within a French Research and Development program launched by AREVA, CEA and EDF. The choice of the material for the steam generator is indeed complex because various aspects shall be considered like mechanical and thermal properties at high temperature, interaction with sodium on one side and water and steam on the other side, resistance to wastage, procurement, fabrication, weldability and ability for inspection and in-situ intervention. The following relevant options are evaluated: the modified 9Cr1Mo ferritic-martensitic grade and the Alloy 800 austenitic grade. The objective of this paper is to assess for both candidates their abilities to reach the current SFR needs regarding material design data, from AFCEN RCC-MRx Code in particular, compatibility with environments and manufacturability. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Certification testing of Quality Secondary Storage (QSS) containers

LANL undertook a program to design, test, and procure a new set of secondary tritium containment vessels to replace older containment vessels. This program was driven by new requirements to meet all metal seal and higher temperature ratings. The testing involved ASME pressure tests, additional pneumatic tests at room and elevated temperature, and drop tests. Testing revealed a fabrication issue with the metal seal and a need to provide a crash bar for drop protection. (authors)

42 ENGINEERING↗

Improved Management of the Technical Interfaces Between the Hanford Tank Farm Operator and the Hanford Waste Treatment Plant - 13383

The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize approximately 114 million gallons of high level radioactive waste (after all retrievals are accomplished). In order for the WTP to be designed and operated successfully, close coordination between the WTP engineering, procurement, and construction contractor, Bechtel National, Inc. and the tank farms operating contractor (TOC), Washington River Protection Solutions, LLC, is necessary. To develop optimal solutions for DOE and for the treatment of the waste, it is important to deal with the fact that two different prime contractors, with somewhat differing contracts, are tasked with retrieving and delivering the waste and for treating and immobilizing that waste. The WTP and the TOC have over the years cooperated to manage the technical interface. To manage what is becoming a much more complicated interface as the WTP design progresses and new technical issues have been identified, an organizational change was made by WTP and TOC in November of 2011. This organizational change created a co-located integrated project team (IPT) to deal with mutual and interface issues. The Technical Organization within the One System IPT includes employees from both TOC and WTP. This team has worked on a variety of technical issues of mutual interest and concern. Technical issues currently being addressed include: - The waste acceptance criteria; - Waste feed delivery and the associated data quality objectives (DQO); - Evaluation of the effects of performing a riser cut on a single shell tank on WTP operations; - The disposition of secondary waste from both TOC and WTP; - The close coordination of the TOC double shell tank mixing and sampling program and the Large Scale Integrated Test (LSIT) program for pulse jet mixers at WTP along with the associated responses to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2010-2; - Development of a set of alternatives to the current baseline that involve aspects of direct feed, feed conditioning, and design changes. The One System Technical Organization has served WTP, TOC, and DOE well in managing and resolving issues at the interface. This paper describes the organizational structure used to improve the interface and several examples of technical interface issues that have been successfully addressed by the new organization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

UP2 400 High Activity Oxide Legacy Waste Retrieval Project Scope and Progress-13048

The High Activity Oxide facility (HAO) reprocessed sheared and dissolved 4500 metric tons of light water reactor fuel the fuel of the emerging light water reactor spent fuel between 1976 and 1998. Over the period, approximately 2200 tons of process waste, composed primarily of sheared hulls, was produced and stored in a vast silo in the first place, and in canisters stored in pools in subsequent years. Upon shutdown of the facility, AREVA D and D Division in La Hague launched a thorough investigation and characterization of the silos and pools content, which then served as input data for the definition of a legacy waste retrieval and reconditioning program. Basic design was conducted between 2005 and 2007, and was followed by an optimization phase which lead to the definition of a final scenario and budget, 12% under the initial estimates. The scenario planned for the construction of a retrieval and reconditioning cell to be built on top of the storage silo. The retrieved waste would then be rinsed and sorted, so that hulls could subsequently be sent to La Hague high activity compacting facility, while resins and sludge would be cemented within the retrieval cell. Detailed design was conducted successfully from 2008 until 2011, while a thorough research and development program was conducted in order to qualify each stage of the retrieval and reconditioning process, and assist in the elaboration of the final waste package specification. This R and D program was defined and conducted as a response and mitigation of the major project risks identified during the basic design process. Procurement and site preparatory works were then launched in 2011. By the end of 2012, R and D is nearly completed, the retrieval and reconditioning process have been secured, the final waste package specification is being completed, the first equipment for the retrieval cell is being delivered on site, while preparation works are allowing to free up space above and around the silo, to allow for construction which is scheduled to being during the first semester of 2013. The elaboration of the final waste package is still undergoing and expected to be completed by then end of 2013, following some final elements of R and D required to demonstrate the full compatibility of the package with deep geological repository. The HAO legacy waste retrieval project is so far the largest such project entering operational phase on the site of La Hague. It is on schedule, under budget, and in conformity with the delivery requirements set by the French Safety Authority, as well as other stakeholders. This project paves the way for the successful completion of AREVA La Hague other legacy waste retrieval projects, which are currently being drafted or already in active R and D phase. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site Eastern Transportation Hub: A Concept For a DOE Eastern Packaging, Staging and Maintenance Center - 13143

The Department of Energy (DOE) is working to de-inventory sites and consolidate hazardous materials for processing and disposal. The DOE administers a wide range of certified shipping packages for the transport of hazardous materials to include Special Nuclear Material (SNM), radioactive materials, sealed sources and radioactive wastes. A critical element to successful and safe transportation of these materials is the availability of certified shipping packages. There are over seven thousand certified packagings (i.e., Type B/Type AF) utilized within the DOE for current missions. The synergistic effects of consolidated maintenance, refurbishment, testing, certification, and costing of these services would allow for efficient management of the packagings inventory and to support anticipated future in-commerce shipping needs. The Savannah River Site (SRS) receives and ships radioactive materials (including SNM) and waste on a regular basis for critical missions such as consolidated storage, stabilization, purification, or disposition using H-Canyon and HB-Line. The Savannah River National Laboratory (SRNL) has the technical capability and equipment for all aspects of packaging management. SRS has the only active material processing facility in the DOE complex and is one of the sites of choice for nuclear material consolidation. SRS is a logical location to perform maintenance and periodic testing of the DOE fleet of certified packagings. This initiative envisions a DOE Eastern Packaging Staging and Maintenance Center (PSMC) at the SRS and a western hub at the Nevada National Security Site (NNSS), an active DOE Regional Disposal Site. The PSMC's would be the first place DOE would go to meet their radioactive packaging needs and the primary locations projects would go to disposition excess packaging for beneficial reuse. These two hubs would provide the centralized management of a packaging fleet rather than the current approach to design, procure, maintain and dispose of packagings on a project-by-project basis. This initiative provides significant savings in packaging costs and acceleration of project schedules. In addition to certified packaging, the PSMC would be well suited for select designs of 7A Type A packaging and Industrial Packaging. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Application of an Oversize Reusable DOT 7A Type A Overpack Container at the Y-12 National Security Complex - 13150

Waste Management personnel at the Y-12 National Security Complex (Y-12) are concluding a multi-year effort to dispose of a large backlog of low-level waste. Six containers presented a particularly difficult technical challenge in that they each contained large robust equipment (mostly salt baths) with elevated levels of highly enriched uranium (exceeding U.S. Department of Transportation (DOT) fissile-excepted quantities). The equipment was larger than the standard 1.2 m x 1.2 m x 1.8 m (4 ft x 4 ft x 6 ft) DOT Specification 7A Type A box and would have been very difficult to size-reduce because of several inches of steel plate (along with insulating block and concrete) in the equipment design. A critical breakthrough for the success of the project involved procuring and developing two oversize reusable DOT Specification 7A Type A (fissile tested) containers (referred to as the CTI Model 7AF-690-SC) that could be used as overpacks for the original boxes of equipment. The 7A Type A overpack containers are approximately 3.5 m long x 2.7 m wide x 2.8 m high (11.7 ft x 8.9 ft x 9.2 ft) with a maximum gross weight of 10,660 kg (23,500 lb) and a payload capacity of 6,804 kg (15,000 lbs). The boxes were designed and fabricated using a split cavity design that allowed the gasketed and bolted closure to lie along the horizontal centerline of the box. The central closure location in this design allows for strengthening of box corners that tend to be points of weakness or failure in 49CFR173.465 drop tests. By combining the split cavity design with large diameter tubing and diagonal cross bracing, drop test requirements of 49CFR173.465(1) and (2) were met and demonstrated through finite element analysis modeling. The development and use of this new container dramatically reduced the need for down-sizing the equipment and allowed the project to meet objectives within cost and schedule targets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

K-Basins Sludge Treatment and Packaging at the Hanford Site - 13585

Highly radioactive sludge resulting from the storage of degraded spent nuclear fuel has been consolidated in Engineered Containers (ECs) in the 105-K West Storage Basin located on the Hanford site near the Columbia River in Washington State. CH2M Hill Plateau Remediation Company (CHPRC) is proceeding with a project to retrieve the sludge, place it in Sludge Transport and Storage Containers (STSCs) and store those filled containers within the T Plant Canyon facility on the Hanford Site Central Plateau (Phase 1). Retrieval and transfer of the sludge material will enable removal of the 105-K West Basin and allow remediation of the subsurface contamination plumes under the basin. The U.S. Department of Energy (DOE) plans to treat and dispose of this K Basins sludge (Phase 2) as Remote Handled Transuranic Waste (RH TRU) at the Waste Isolation Pilot Plant (WIPP) located in New Mexico. The K Basin sludge currently contains uranium metal which reacts with water present in the stored slurry, generating hydrogen and other byproducts. The established transportation and disposal requirements require the transformation of the K Basins sludge to a chemically stable, liquid-free, packaged waste form. The Treatment and Packaging Project includes removal of the containerised sludge from T Plant, the treatment of the sludge as required, and packaging of all the sludge into a form that is certifiable for transportation to and disposal at WIPP. Completion of this scope will require construction and operation of a Sludge Treatment and Packaging Facility (STPF), which could be either a completely new facility or a modification of an existing Hanford Site facility. A Technology Evaluation and Alternatives Analysis (TEAA) for the STP Phase 2 was completed in 2011. A Request for Technology Information (RFI) had been issued in October 2009 to solicit candidate technologies for use in Phase 2. The RFI also included a preliminary definition of Phase 2 functions and requirements. Potentially applicable technologies were identified through a commercial procurement process, technical workshops, and review of the numerous previous sludge treatment technology studies. The identified technology approaches were screened using the criteria established in the Decision Plan, and focused bench top feasibility testing was conducted. Engineering evaluations of the costs, schedules, and technical maturity were developed and evaluated. Recommendations were developed based on technical evaluations. The criteria used in the evaluation process were as follows: (1) Safety, (2) Regulatory/stakeholder acceptance, (3) Technical maturity, (4) Operability and maintainability, (5) Life cycle cost and schedule, (6) Potential for beneficial integration with ongoing STP-Phase 1 activities, and (7) Integration with Site-wide RH-TRU processing/packaging, planning, schedule, and approach. The TEAA recommended Warm Water Oxidation (WWO) as the baseline treatment technology and two risk reduction enhancement options for further consideration during development of the process - size reduction and chemical oxidation (Fenton's reagent). The enhancement options would potentially allow a useful reduction in the total operating time required to process the K Basins sludge. The U.S. Department of Energy's Richland Field Office (DOE-RL) has approved this recommended technical approach. The baseline process can be broken down into the following main process steps: (1) STSC transfer from T Plant to the Sludge Treatment and Packaging Facility (STPF). (2) Retrieval of sludge from the STSCs and transfer to the Receipt and Reaction Tank (RRT). (3) Preparation for immobilization by oxidation using heated water (i.e., WWO) for those batches that require it and concentration by evaporating water at about atmospheric pressure in the RRT. (4) Immobilization by using additives to eliminate free liquids and packaging of the treated sludge into drums. (5) Inspection and handling of the filled drums prior to transfer to a separate storage and shipping facility. (6) Handling of vapor, condensate, and other waste streams generated by the process. Each of these steps is discussed in the paper, together with the current state of progress in developing the technology and requirements for continued development. A schematic of the recommended baseline WWO treatment process is given below. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an Automated Remedy Performance Evaluation Program - 13622

Performance monitoring is a vital element of groundwater remediation. Unfortunately, the enormous efforts and costs that are expended procuring, managing, processing and storing monitoring data are often not subject to correspondingly rigorous evaluation. This is despite the fact that many steps in the process are predictable and are repeated many times over the remedy life cycle. At the Department of Energy (DOE) Hanford Site, a program is underway to automate many of these steps - processing, formatting any analyzing large volumes of heterogeneous data associated with the operation of several groundwater pump-and-treat (P and T) and in-situ remedies. The Automated Remedy Performance Evaluation Program (ARPEP) was developed from a work-flow process designed to deliver (a) monthly data summaries and preliminary analysis, (b) quarterly performance assessments, and (c) annual roll-up analyses that detect changes in long-term monitoring datasets and support remedy optimization. The intent of the ARPEP is to provide detailed, systematic and traceable data summaries, depictions and analyses that can be used by project scientists to complete their evaluation of remedy performance. The ARPEP work-flow was formalized following extensive review of applicable guidance, regulation and industry standards. The ARPEP incorporates disparate data types collected over different frequencies, such as water levels and pumping rates recorded every minute, and groundwater sample results obtained on quarterly, annual or irregular intervals. The data are processed, reduced to frequencies suitable for assessment, and combined in various ways leading to performance indicators such as (a) pumped well capacities and system downtime that reflect operational performance; (b) hydraulic gradients and areas of hydraulic containment that reflect hydraulic performance; and (c) time-series (longitudinal) and geo-statistical (spatial) trend analyses that reflect progress toward attainment of Remedial Action Objectives (RAOs). The entire sequence of data processing and analysis is undertaken within the R programming environment, an open-source environment for statistical computing and graphics, and is summarized in a comprehensive PDF project report. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of salt particle collection device for preventing SCC on canister - Effect on particle collection rate by electric field

Now, in Japan, while metal casks are used for spent nuclear fuel storage, a practical use of concrete casks is under review because of its cost effectiveness and procurement easiness. In reviewing the practical use, stress corrosion cracking (SCC) of a canister container in the concrete cask becomes an issue and is needed to be resolved soon. A natural ventilation system is generally adopted for the storage facilities, especially in Japan where facilities are built near coasts so that the cooling air includes sea salt particles. Therefore, the occurrence of SCC is concerned when the sea salt particles adhere to welded parts of the canisters. In this study, we proposed a salt particle collection device with low pressure loss which does not interfere with the air flow into the building or the concrete casks. The device is composed of a stack of 10 parallel stainless steel plates, the air is free to circulate in the space between them. Pressure loss tests in a laboratory and salt particle collection tests in the field have been performed. It has been clarified that the pressure loss of the device is one-thirtieth to one-twentieth of that of a commercial filter and 40% of the particles in the air could be collected and the device would not influence the heat removal performance. Moreover, we evaluated the effect of electric field on the particle collection under supposing the particle charge. In the case of electric field over 10{sup 3} kV/m the particle collection rate could be improved dramatically.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nuclear Safety via Commercial Grade Dedication - Hitting the Right Target - 12163

S.A.Technology has developed and implemented a highly effective Commercial Grade Dedication program that has been used to qualify a variety of equipment to the rigorous requirements of ASTM NQA-1. In specific cases, S.A.Technology personnel have worked closely with clients to develop complex Commercial Grade Dedication plans that satisfy the scrutiny of the US Department of Energy. These projects have been as simple as Passive Mechanical systems, and as complicated as Active Mechanical and Electrical systems. S.A.Technology's Commercial Grade Dedication plans have even been used as presentation materials to a client's internal departments encompassing Engineering, Quality and Procurement. This is the new target of today's CGD: exposing the reasoning behind the dedication process. Previously, only test and inspection results were expected. Today's CGD now needs to show how the decisions presented are the right decisions to make. We must be willing to undergo the process of learning how each new piece of equipment is affected by the system it is placed into, as well as understanding how that equipment can affect the system itself. It is a much more complicated and time-consuming endeavor to undertake. On top of it all, we must be able to voice those discoveries and rationalizations in a clear and concise manner. Unless we effectively communicate our intentions to the reader, we will not be understood. If researched correctly and presented properly, today's Commercial Grade Dedication plans will answer the appropriate questions before they are asked. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗