Search NASA⌕ Search

SEARCH · Search NASA

Results for “ACT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Utilizing the Inflation Reduction Act to Remediate and Redevelop Energy Assets and Sites

There are thousands of retired and operating energy sites located in communities throughout the country waiting to be cleaned up and modernized. Together with other existing federal grants and tax credits, the newly created Energy Infrastructure Reinvestment (EIR) loan guarantees from the Department of Energy can catalyze capital investment in these sites, empowering local communities and reducing carbon pollution. The IRA makes available up to $250 billion in EIR loan guarantees and up to $5 billion in EIR credit subsidy to support remediating, repurposing, and redeveloping eligible sites. EIR provides opportunities for reinvestment in America’s energy communities amid the energy industry’s ongoing transformation to reduce carbon pollution. This resource guide describes four possible redevelopment models that align EIR resources with EPA Brownfield Grants and the energy community tax credit program.

Eisdorfer, Jason G↗

Managing Waste Inventory and License Limits at the Perma-Fix Northwest Facility to Meet CH2M Hill Plateau Remediation Company (CHPRC) American Recovery and Reinvestment Act (ARRA) Deliverables - 12335

CH2M Hill Plateau Remediation Company (CHRPC) is a prime contractor to the U.S. Department of Energy (DOE) focused on the largest ongoing environmental remediation project in the world at the DOE Hanford Site Central Plateau, i.e. the DOE Hanford Plateau Remediation Contract. The East Tennessee Materials and Energy Corporation (M and EC); a wholly owned subsidiary of Perma-Fix Environmental Services, Inc. (PESI), is a small business team member to CHPRC. Our scope includes project management; operation and maintenance of on-site storage, repackaging, treatment, and disposal facilities; and on-site waste management including waste receipt from generators and delivery to on-site and off-site treatment, storage, and disposal facilities. As part of this scope, M and EC staffs the centralized Waste Support Services organization responsible for all waste characterization and acceptance required to support CHPRC and waste generators across the Hanford Site. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 cubic meters (m{sup 3}) of legacy waste was defined as 'no-path-forward waste'. A significant portion of this waste (7,650 m{sup 3}) comprised wastes with up to 50 grams of special nuclear materials (SNM) in oversized packages recovered during retrieval operations and large glove boxes removed from the Plutonium Finishing Plant (PFP). Through a collaborative effort between the DOE, CHPRC, and Perma-Fix Environmental Services, Inc. (PESI), pathways for these problematic wastes were developed that took advantage of commercial treatment capabilities at a nearby vendor facility, Perma-Fix Northwest (PFNW). In the spring of 2009, CHPRC initiated a pilot program under which they began shipping large package, low gram suspect TRU (<15 g SNM per container), and large package contact and remote handled MLLW to the off-site PFNW facility for treatment. PFNW is restricted by the SNM limits set for the total quantity of SNM allowed at the facility in accordance with the facility's radioactive materials license(s) (RML). While both CHPRC and PFNW maintain waste databases to track all waste movements, it became evident early in the process that a tool was needed that married the two systems to better track SNM inventories and sequence waste from the point of generation, through the PFNW facility, and back to the Hanford site for final disposition. This tool, known as the Treatment Integration and Planning Tool (TIPT), has become a robust planning tool that provides real-time data to support compliant and efficient waste generation, transportation, treatment, and disposition. TIPT is developing into the next generation tool that will change the way in which legacy wastes, retrieval wastes and decontamination and decommissioning operations are conducted on the Plateau Remediation Contract (PRC). The real value of the TIPT is its predictive capability. It allows the W and FMP to map out optimal windows for processing waste through the PFNW facility, or through any process that is in some way resource limited. It allows project managers to identify and focus on problem areas before shipments are affected. It has been modified for use in broader applications to predict turnaround times and identify windows of opportunity for processing higher gram wastes through PFNW and to allow waste generators, site-wide, to accurately predict scope, cost, and schedule for waste generation to optimize processing and eliminate storage, double handling, and related costs and unnecessary safety risks. The TIPT addresses the years old problem of how to effectively predict not only what needs to be done, but when. 'When' is the key planning parameter that has been ignored by the generator and processor for many years, but has proven to be the most important parameter for both parties. While further refinement is a natural part of any development process, the current improvements on the TIPT have shown that prediction is a powerful consideration. Even in lean times expected for the foreseeable future, the improved TIPT continues to play a central role in managing our way through those times to assure facilities remain viable and available. It is recommended that other major remediation projects and waste processing facilities incorporate a tool such as TIPT to improve customer-commercial supplier communications and better optimization of resources. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Building a Credible and Updated WIPP Performance Assessment - New Knowledge Versus Conservative Assumptions and FEP Analysis, A Balancing Act - 16299

Conservative assumptions are important components in conceptual model development where limited data is available. And, as appropriate, during the early 1990's Department of Energy (DOE) adopted many conservative assumptions in the development of the Waste Isolation Pilot Plant's (WIPP's) 24 Conceptual Models incorporated in DOE's 1996 Compliance Certification Application (CCA) performance assessment (PA). Many of these assumptions were formulated and documented in the WIPP relevant features, events and processes (FEPs) analyses; others were adopted when developing input parameter values and their distributions that were used as inputs to computer models. The Agency accepted these conservative assumptions during their 1996 CCA assessment for several reasons; 1) at the time there was a scarcity of data related to long-term behavior of many parameters needed to be incorporated in the PA, 2) sensitivity studies performed during this time period determined that the affected 'conservative' assumptions adopted for some parameters had minimal to no impact on repository performance; and, 3) DOE could demonstrate compliance with EPA's radioactive waste disposal regulations while adopting conservative assumptions and data. Since the initial 1996 CCA DOE has modified the repository panel closure design, and the repository footprint in the experimental areas has expanded. These modifications were incorporated into DOE's 2014 Compliance Re-certification Application for WIPP. Additionally, there have been numerous investigations related to both the short- and long-term behavior of salt in a repository setting. As a result, the Agency is reassessing the use of these conservative assumptions and the continued applicability of the original FEP analyses, primarily developed during DOE's 1996 PA and carried forward to the current re-certification. This paper examines some of these analyses. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

One Man’s Pirate is Another Man’s . . . Nuclear Terrorist? Evaluating the Act of Piracy Against Floating Nuclear Power Plants on the High Seas

The lack of international consensus about whether a floating nuclear power plant is a facility or vessel presents an ambiguity about a pirate's status if they board a floating nuclear power plant, As piracy continues to be a concern for maritime security, the deployment of floating nuclear power plants (FNPPs) on the high seas raises questions about laws on piracy.

Fialkoff, Marc [Oak Ridge National Laboratory (ORN↗

THE POSITIVE IMPACTS OF AMERICAN REINVESTMENT AND RECOVERY ACT (ARRA) FUNDING TO THE WASTE MANAGEMENT PROGRAM ON HANFORD'S PLATEAU REMEDIATION PROJECT

In April 2009, the Department of Energy (DOE) Richland Operations Office (RL) was allocated $1.6 billion (B) in ARRA funding to be applied to cleanup projects at the Hanford Site. DOE-RL selected projects to receive ARRA funding based on 3-criteria: creating/saving jobs, reducing the footprint of the Hanford Site, and reducing life-cycle costs for cleanup. They further selected projects that were currently covered under regulatory documents and existing prime contracts, which allowed work to proceed quickly. CH2M HILL Plateau Remediation Company (CHPRC) is a prime contractor to the DOE focused on the environmental cleanup of the DOE Hanford Site Central Plateau. CHPRC was slated to receive $1.36B in ARRA funding. As of January, 2010, CHPRC has awarded over $200 million (M) in subcontracts (64% to small businesses), created more that 1,100 jobs, and touched more than 2,300 lives - all in support of long-term objectives for remediation of the Central Plateau, on or ahead of schedule. ARRA funding is being used to accelerate and augment cleanup activities already underway under the baseline Plateau Remediation Contract (PRC). This paper details challenges and accomplishments using ARRA funding to meet DOE-RL objectives of creating/saving jobs, expediting cleanup, and reducing lifecycle costs for cleanup during the first months of implementation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗