Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Design, Test and Demonstration of Saturable Reactor High-Temperature Superconductor Fault Current Limiters

Zenergy Power has successfully designed, built, tested, and installed in the US electrical grid a saturable reactor Fault Current Limiter. Beginning in 2007, first as SC Power Systems and from 2008 as Zenergy Power, Inc., ZP used DOE matching grant and ARRA funds to help refine the design of the saturated reactor fault current limiter. ZP ultimately perfected the design of the saturated reactor FCL to the point that ZP could reliably design a suitable FCL for most utility applications. Beginning with a very basic FCL design using 1G HTS for a coil housed in a LN2 cryostat for the DC bias magnet, the technology progressed to a commercial system that was offered for sale internationally. Substantial progress was made in two areas. First, the cryogenics cooling system progressed from a sub-cooled liquid nitrogen container housing the HTS coils to cryostats utilizing dry conduction cooling and reaching temperatures down to less than 20 degrees K. Large, round cryostats with warm bore diameters of 1.7 meters enabled the design of large tanks to hold the AC components. Second, the design of the AC part of the FCL was refined from a six legged spider design to a more compact and lighter design with better fault current limiting capability. Further refinement of the flux path and core shape led to an efficient saturated reactor design requiring less Ampere-turns to saturate the core. In conclusion, the development of the saturable reactor FCL led to a more efficient design not requiring HTS magnets and their associated peripheral equipment, which yielded a more economical product in line with the electric utility industry expectations. The original goal for the DOE funding of the ZP project Design, Test and Demonstration of Saturable Reactor High-Temperature Superconductor Fault Current Limiters was to stimulate the HTS wire industry with, first 1G, then 2G, HTS wire applications. Over the approximately 5 years of ZP's product development program, the amount of HTS wire employed per FCL and its cost as a percentage of the total FCL product content had not dropped substantially from an unsustainable level of more than 50% of the total cost of the FCL, nor had the availability increased (today the availability of 2G wire for commercial applications outside of specific partnerships with the leading 2G wire manufacturers is extremely limited). ZP had projected a very significant commercial potential for FCLs with higher performance and lower costs compared to the initial models built with 1G wire, which would come about from the widespread availability of low-cost, high-performance 2G HTS wire. The potential for 2G wires at greatly reduced performance-based prices compared to 1G HTS conductor held out the potential for the commercial production of FCLs at price and performance levels attractive to the utility industry. However, the price of HTS wire did not drop as expected and today the available quantities of 2G wire are limited, and the price is higher than the currently available supplies of 1G wire. The commercial option for ZP to provide a reliable and reasonably priced FCL to the utility industry is to employ conventional resistive conductor DC electromagnets to bias the FCL. Since the premise of the original funding was to stimulate the HTS wire industry and ZP concluded that copper-based magnets were more economical for the foreseeable future, DOE and ZP decided to mutually terminate the project.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electron Microscopy Laboratory MST-6: Instruments and Capabilities [Slides]

The Electron Microscopy Laboratory (EML) is a lab-wide facility, overseen by MST-6, that is available for use by qualified users. In FY12 the EML service contract costs were covered by funds from LDRD, BES, NE and other programs. Users can be trained to use the equipment independently or work collaboratively with other trained users or EML staff. Users are charged for the labor portion of their training. Most electron microscopy is done by staff or post-docs but some students are performing microscopy, particularly SEM. In the Materials Science Complex (MSC), there are two optical microscopes, two scanning electron microscopes (SEM’s), a SEM/ FIB (a SEM with a focused ion beam (FIB) column added), three transmission electron microscopes (TEM’s) and sample preparation equipment.

36 MATERIALS SCIENCE↗

Nevada National Security Site Site-Directed Research and Development FY 2014 Annual Report

The reports contained herein are for project activities that occurred from October 2013 through September 2014. Project life cycle is indicated under the title as well as the original proposal number (in the following format: site abbreviation--ID #--originating fiscal year; e.g., STL-03-14). Each of the reports describes in detail the discoveries, achievements, and challenges encountered by our principal investigators. As SDRD, by definition, invests in “high-risk” and hopefully “high-payoff” research, the element of uncertainty is inherent. While many of our efforts are “successful” and result in positive outcomes or technology utilization, some fall short of expectations, but cannot be construed as “failure” in the negative sense. The latter is a natural and valid part of the process of advanced research and often leads to unforeseen new pathways to future discovery. Regardless, either result advances our knowledge base and increases our ability to identify solutions and/or avoid costly and unwarranted paths for future challenges. In summary, the SDRD program continues to provide an unfettered mechanism for innovation that returns multifold to our customers, to national security, and to the general public. The program is a vibrant R&D innovation engine, benefited by its discretionary pedigree, enhanced mission spectrum, committed resources, and sound competitiveness to yield maximum taxpayer benefit. The 25 projects described exemplify the creativity and ability of a diverse scientific and engineering talent base. The efforts also showcase an impressive capability and resource that can be brought to find solutions to a broad array of technology needs and applications relevant to the NNSS mission and national security. Further SDRD performance metrics can be found in the appendix at the end of this report.

36 MATERIALS SCIENCE↗

Resource development peer review report

The Geothermal Program goal is to improve technology performance and reduce market entry costs of geothermal energy to competitive levels, making large geothermal resource available to the Nation

15 GEOTHERMAL ENERGY↗

Final Scientific/Technical Report: Low Cost, Structurally Advanced Novel Electrode and Cell Manufacturing

This document is the final technical report from 24M Technologies on the project titled: Low Cost, Structurally Advanced Novel Electrode and Cell Manufacturing. All of the program milestones and deliverables were completed during the performance of the award. Specific accomplishments are 1) 24M demonstrated the processability and electrochemical performance of semi-solid electrodes with active volume contents increased by 10% relative to the program baseline; 2) electrode-level metrics, quality, and yield were demonstrated at an 80 cm 2 electrode footprint; 3) these electrodes were integrated into cells with consistent capacities and impedances, including cells delivered to Argonne National Laboratory for independent testing; 4) those processes were scaled to a large-format (> 260 cm 2 ) electrode footprint and quality and yield were demonstrated; 5) a high-volume manufacturing approach for large-format electrode fabrication was demonstrated; and 6) large-format cells (> 100 Ah capacity) were prototyped with consistent capacity and impedance, including cells which were delivered to Argonne National Laboratory for independent testing.

30 DIRECT ENERGY CONVERSION↗

Demonstration of Micro-Combined Heat and Power for Light Commercial Applications (Final Report)

In 2014 the United States Department of Energy (DOE) Building Technologies Office (BTO) funded a technology assessment of micro Combined Heat and Power (µCHP) systems for light commercial applications. The technology assessment was part of the BTO High Impact Technology (HIT) Catalyst program. The HIT Catalyst program supports research and development into technologies that will yield cost-effective, efficient buildings. It is estimated µCHP in US has the potential to save 10.5 GW of primary energy in the commercial building sector.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Materials Science of the Interstitial Doping Process

Particle accelerators are an increasingly important tool for frontier science. Growing initial and operating costs are a significant barrier for upgrades and for new machines. While everything matters, the major cost contributor is the SRF cavities and their ancillary facilities (e.g., cryoplant). Accordingly, the accelerator science community devotes much R&D effort to improving their energy efficiency (increased Q o ) and gradient (E acc ). While improved gradient is at the forefront for certain machines (ILC), improved quality factor has broader impact, benefitting all SRF applications. An important opportunity for accelerator science and technology to move forward arose in the course of building the LCLS-II, the second generation Linac Coherent Light Source at SLAC. At more or less the same time, researchers at Fermilab discovered that introducing a small amount of nitrogen to the niobium surface could improve the mid-range quality factor as much as three-fold. A firm resolution of how nitrogen confers its benefit attracts much current research interest. The key elements of the “nitrogen doping” process were vacuum bake at 800 °C, brief exposure to mTorr of nitrogen at several hundred degrees followed by electropolish (EP) to remove several microns from the surface to eliminate unwanted nitrides: While the process as a whole was novel, the comprising unit operations are familiar to the accelerator community. It was judged reasonable to adopt it as a cost-reduction technology for LCLS-II. Researchers carried out a program of varying process parameters and measuring performance in single-cell cavities, leading to a consensus stable protocol for the project. The transition to vendor fabrication and multiple niobium sources has presented unforeseen challenges of performance variation evidently not connected to anything that could be incorporated in a purchase specification. Moving beyond the high temperature N-doping process above, researchers reported a simplified process consisting entirely of tens of hours anneal in a N atmosphere at low temperatures (~120°C – 160°C) after 800 °C UHV bake. These processes typically yield a few-nm doped layer while the high temperature process yields at least a few to many micron doped layer. Even more recently, oxygen has been used to dope instead of nitrogen which leaves a few-µm O-alloyed layer upon vacuum annealing for 300 °C for ~3 hours. The investigation of these materials is just beginning, but the process simplification they may offer is surely attractive. The very low quantity of material that appears to be significant in the “infusion” process indicates the need for very careful control of gas species available for diffusion into the surface during low temperature treatment, both for process control and research to characterize the underlying dynamics. Oxygen alloying offers the further opportunity to utilize the decomposition of the surface native oxide as the dopant source. It is necessary to understand and (thus) manage this process. We have been supported by the Department of Energy Offices of High Energy Physics and Nuclear Physics to pursue this goal.

36 MATERIALS SCIENCE↗

Analysis of Radioactive 65 Zn Contamination using 3D Position Sensitive CdZnTe Detectors

SRNL NMG Goal: In collaboration with ORNL, the aim is to identify and explore innovative technology opportunities that accelerate disposition, reduce life cycle costs, minimize worker radiation exposure, and improve worker safety and minimize program risks. • This process will include 3 glovebox systems that require personnel to dilute and package the plutonium for safe storage at WIPP. • For holdup monitoring and verification, gamma ray spectroscopy and imaging are the methods employed to achieve real time analysis of the plutonium waste. 2

Nwadeyi, Valerie E.↗

The State of Demand Flexibility Programs and Rates

This report provides foundational data on programs and rates that promote demand flexibility in residential and commercial buildings in the United States. Leveraging a dataset of 148 programs and 94 rates collected through a review of utility websites, published electricity tariffs, and a database of demand-side programs, we describe the structure of demand flexibility events and the types and levels of incentives offered. For the two most common program types in our dataset—Wi-Fi thermostat and battery storage programs—we provide additional details on program designs. We also report data on program outcomes, including enrollment and participation, energy and demand savings, and costs. Furthermore, we describe the structure of dynamic rate events, report prices for critical peak pricing and variable peak pricing rates, and describe features of technology rates.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment of Needs for Further Research to Understand the Role of Governments in Supporting Geothermal Exploration

This paper looks at financing barriers to geothermal resource exploration in the United States (U.S.) for electricity generation projects and analyzes why the market is not developing as quickly as foreign geothermal markets or as quickly as other renewable energy technologies in the U.S. Research opportunities and approaches to understanding these discrepancies are discussed, particularly whether government policies and programs are spurring development activities. Further analysis to understand policies, programmatic cost efficiencies, potential project revenues, and other economic impacts are recommended together with the preliminary conclusions.

15 GEOTHERMAL ENERGY↗

Alternative Fuels Data Center and Related Technology Integration Tools

The U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy's Vehicle Technologies Office (VTO) facilitates national coordination of the Clean Cities coalitions through its Technology Integration Program. VTO's Technology Integration Program supports a broad technology portfolio that can reduce transportation energy costs for businesses and consumers. Fleets, cities, and regions can use the tools featured in this guide to implement alternative fuels and advanced vehicles. Also learn how Clean Cities coalitions and their stakeholders across the country have used the tools.

AFDC↗

Alternative Fuels Data Center and Related Technology Integration Tools

The U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy's Vehicle Technologies Office (VTO) facilitates national coordination of the Clean Cities coalitions through its Technology Integration Program. VTO's Technology Integration Program supports a broad technology portfolio that can reduce transportation energy costs for businesses and consumers. Fleets, cities, and regions can use the tools featured in this guide to implement alternative fuels and advanced vehicles. Also learn how Clean Cities coalitions and their stakeholders across the country have used the tools.

47 OTHER INSTRUMENTATION↗

US/German Collaboration in Salt Repository Research, Design and Operation - 13243

Recent developments in the US and Germany [1-3] have precipitated renewed efforts in salt repository investigations and related studies. Both the German rock salt repository activities and the US waste management programs currently face challenges that may adversely affect their respective current and future state-of-the-art core capabilities in rock salt repository science and technology. The research agenda being pursued by our respective countries leverages collective efforts for the benefit of both programs. The topics addressed by the US/German salt repository collaborations align well with the findings and recommendations summarized in the January 2012 US Blue Ribbon Commission on America's Nuclear Future (BRC) report [4] and are consistent with the aspirations of the key topics of the Strategic Research Agenda of the Implementing Geological Disposal of Radioactive Waste Technology Platform (IGD-TP) [5]. Against this background, a revival of joint efforts in salt repository investigations after some years of hibernation has been undertaken to leverage collective efforts in salt repository research, design, operations, and related issues for the benefit of respective programs and to form a basis for providing an attractive, cost-effective insurance against the premature loss of virtually irreplaceable scientific expertise and institutional memory. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Controlled Hydrogen Fleet and Infrastructure Demonstration Project

This program was undertaken in response to the US Department of Energy Solicitation DE-PS30-03GO93010, resulting in this Cooperative Agreement with the Ford Motor Company and BP to demonstrate and evaluate hydrogen fuel cell vehicles and required fueling infrastructure. Ford initially placed 18 hydrogen fuel cell vehicles (FCV) in three geographic regions of the US (Sacramento, CA; Orlando, FL; and southeast Michigan). Subsequently, 8 advanced technology vehicles were developed and evaluated by the Ford engineering team in Michigan. BP is Ford's principal partner and co-applicant on this project and provided the hydrogen infrastructure to support the fuel cell vehicles. BP ultimately provided three new fueling stations. The Ford-BP program consists of two overlapping phases. The deliverables of this project, combined with those of other industry consortia, are to be used to provide critical input to hydrogen economy commercialization decisions by 2015. The program's goal is to support industry efforts of the US President's Hydrogen Fuel Initiative in developing a path to a hydrogen economy. This program was designed to seek complete systems solutions to address hydrogen infrastructure and vehicle development, and possible synergies between hydrogen fuel electricity generation and transportation applications. This project, in support of that national goal, was designed to gain real world experience with Hydrogen powered Fuel Cell Vehicles (H2FCV) 'on the road' used in everyday activities, and further, to begin the development of the required supporting H2 infrastructure. Implementation of a new hydrogen vehicle technology is, as expected, complex because of the need for parallel introduction of a viable, available fuel delivery system and sufficient numbers of vehicles to buy fuel to justify expansion of the fueling infrastructure. Viability of the fuel structure means widespread, affordable hydrogen which can return a reasonable profit to the fuel provider, while viability of the vehicle requires an expected level of cost, comfort, safety and operation, especially driving range, that consumers require. This presents a classic 'chicken and egg' problem, which Ford believes can be solved with thoughtful implementation plans. The eighteen Ford Focus FCV vehicles that were operated for this demonstration project provided the desired real world experience. Some things worked better than expected. Most notable was the robustness and life of the fuel cell. This is thought to be the result of the full hybrid configuration of the drive system where the battery helps to overcome the performance reduction associated with time related fuel cell degradation. In addition, customer satisfaction surveys indicated that people like the cars and the concept and operated them with little hesitation. Although the demonstrated range of the cars was near 200 miles, operators felt constrained because of the lack of a number of conveniently located fueling stations. Overcoming this major concern requires overcoming a key roadblock, fuel storage, in a manner that permits sufficient quantity of fuel without sacrificing passenger or cargo capability. Fueling infrastructure, on the other hand, has been problematic. Only three of a planned seven stations were opened. The difficulty in obtaining public approval and local government support for hydrogen fuel, based largely on the fear of hydrogen that grew from past disasters and atomic weaponry, has inhibited progress and presents a major roadblock to implementation. In addition the cost of hydrogen production, in any of the methodologies used in this program, does not show a rapid reduction to commercially viable rates. On the positive side of this issue was the demonstrated safety of the fueling station, equipment and process. In the Ford program, there were no reported safety incidents.

08 HYDROGEN↗

A Survey of State and Local PV Program Response to Financial Innovation and Disparate Federal Tax Treatment in the Residential PV Sector

High up-front costs and a lack of financing options have historically been the primary barriers to the adoption of photovoltaics (PV) in the residential sector. State clean energy funds, which emerged in a number of states from the restructuring of the electricity industry in the mid-to-late 1990s, have for many years attempted to overcome these barriers through PV rebate and, in some cases, loan programs. While these programs (rebate programs in particular) have been popular, the residential PV market in the United States only started to achieve significant scale in the last five years – driven in large part by an initial wave of financial innovation that led to the rise of third-party ownership.

14 SOLAR ENERGY↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Technical Highlight: NREL Tests Integrated Heat Pump Water Heater Performance in Different Climates (Fact Sheet)

This technical highlight describes NREL tests to capture information about heat pump performance across a wide range of ambient conditions for five heat pump water heaters (HPWH). These water heaters have the potential to significantly reduce water heater energy use relative to traditional electric resistance water heaters. These tests have provided detailed performance data for these appliances, which have been used to evaluate the cost of saved energy as a function of climate. The performance of HPWHs is dependent on ambient air temperature and humidity and the logic controlling the heat pump and the backup resistance heaters. The laboratory tests were designed to measure each unit's performance across a range of air conditions and determine the specific logic controlling the two heat sources, which has a large effect on the comfort of the users and the energy efficiency of the system. Unlike other types of water heaters, HPWHs are both influenced by and have an effect on their surroundings. Since these effects are complex and different for virtually every house and climate region, creating an accurate HPWH model from the data gathered during the laboratory tests was a main goal of the project. Using the results from NREL's laboratory tests, such as the Coefficient of Performance (COP) curves for different air conditions as shown in Figure 1, an existing HPWH model is being modified to produce more accurate whole-house simulations. This will allow the interactions between the HPWH and the home's heating and cooling system to be evaluated in detail, for any climate region. Once these modeling capabilities are in place, a realistic cost-benefit analysis can be performed for a HPWH installation anywhere in the country. An accurate HPWH model will help to quantify the savings associated with installing a HPWH in the place of a standard electric water heater. In most locations, HPWHs are not yet a cost-effective alternative to natural gas water heaters. The detailed system performance maps that were developed by this testing program will be used to: (1) Target regions of the country that would benefit most from this technology; (2) Identify improvements in current systems to maximize homeowner cost savings; and (3) Explore opportunities for development of advanced hot water heating systems.

03 NATURAL GAS↗

Cost-Benefit Analysis For Indonesia Building Sector: Whole-Building Cooling Solutions

The Net Zero World (NZW) Initiative Collaborative Work Program with the Government of Indonesia (GoI) includes technical assistance and investment mobilization facilitation to accelerate deployment of energy efficiency technologies and solutions for the building sector. A February 2023 U.S.–Indonesia Joint Workshop on Decarbonizing the Building Sector yielded a NZW Indonesia Building Decarbonization Working Group (NZW IBDWG) with four sub-working groups (SWG): SWG-A National Center, SWG-B Capacity Building, SWG-C Investment and Financing, and SWG-D Pilot Projects. Technical analysis of whole-building cooling solutions for tropical climates of Indonesia was conducted by SWG-A to quantify energy savings, carbon dioxide reductions, and comfort improvements offered by 12 passive or low-energy cooling strategies: ceiling fans with and without thermostat setbacks; cool roofs; cool walls; exterior awnings; exterior shades; interior shades; insulated roofs; insulated walls; low-e windows; solar window films; and natural ventilation. Leveraging the results from SWG-A, cost-benefit analysis (CBA) was conducted by SWG-C to assess the consumer and national costs and impacts associated with these 12 cooling solutions. The evaluation involved estimating life-cycle costs (LCC), payback period (PBP), net present values (NPV), annual electricity burden change for low-income households, and reduced national annual power-sector generation demand by 2030, 2040, 2050, and 2060. This evaluation can help guide Indonesia’s Just Energy Transition Partnership (JETP) investments in policies and programs to advance research, development, deployment, and commercial adoption (RDDCA) of efficient residential building sector cooling technologies and solutions in Indonesia. Four key energy conservation measures (ECM) have been identified to reduce air-conditioning (AC) energy demand in single-family housing in Indonesia: ceiling fan with temperature setback (to 28.1 °Celcius from 25 °C); insulated walls; insulated roof; and cool roof. This study found that low-income households with AC installations in Indonesia currently face a high energy cost burden of approximately 10%. However, by implementing a ceiling fan with temperature setback, this burden could decrease to 2.5% today and further reduce to 1.3% by the year 2060. The PBP for a ceiling fan with temperature setback is one year, indicating one of the lowest LCC and best NPV. In the planned upcoming phase of CBA, a series of building cooling improvement scenarios can be further defined, incorporating more than one ECM in combination with socio-economic factors evaluated in the initial CBA phase. Additionally, the analysis of ECM effects in multifamily housing can be expanded. This broader national analysis aims to encompass a holistic and comprehensive system-level perspective, including factors such as avoided power sector infrastructure investments, domestic job creation, domestic manufacturing job creation, and gross domestic product (GDP) growth.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗