Search NASA⌕ Search

SEARCH · Search NASA

Results for “Capacity estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Carbon Dioxide Storage and Utilization near Mingo County, West Virginia

Six oil fields within 100 miles of the planned coal-to-liquids facility in Mingo County were found to be prospective for miscible CO 2 -EOR. Four of the oil fields fall along a straight line and could, in concept, be developed sequentially along a single CO 2 pipeline. The total demand for purchased CO 2 from these four fields is estimated to be 47 million metric tons (890 Bcf) over 20 years. Four saline formations within Mingo County could accommodate 50 million metric tons of CO 2 (accounts for uncertainty and a &'buffer zone”). The combined storage capacity – EOR within 100 miles of Mingo County and saline within Mingo County – can accommodate 3 million metric tons per year of vented CO 2 for over 30 years Conclusion: there is enough potential for CO 2 utilization and storage that a next level of study is a reasonable course.

03 NATURAL GAS↗

Impact of Load Following on the Economics of Existing Coal-Fired Power Plant Operations

This report evaluates the effects of increased cold starts on an existing 300 MW coal-fired unit operating and maintenance (O&M) and fuel costs resulting from reduced dispatchability in the market. Component level impacts on equipment are characterized and assessed to estimate changes in O&M costs resulting from 1, 6, and 12 cold starts per year. Report findings discuss the change in both O&M and fuel costs based on different number of cold starts and varying capacity factors. Results are presented in terms of impact to cost of electricity ($/MWh).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Value of Geothermal Energy Storage for Supply-Side and Demand-Side Applications

This report presents the results of a study examining the value potential for geothermal energy storage (GES), a long-duration energy storage resource that stores thermal and/or geomechanical energy in the subsurface. GES could benefit the overall U.S. power system by temporally shifting electricity generation (supply-side) or meeting building heating and cooling load (demand-side). This report analyzes supply-side and demand-side opportunities independently because of differences in applications and models. Currently there is significant uncertainty about the development costs for GES, with only a limited number of demonstration plants for electric energy storage and building heating and cooling storage developments. In this report, we estimate the value of supply-side and demand-side GES to the bulk power system in the contiguous United States. Because of the significant uncertainty about GES development costs, this analysis does not consider GES deployment costs but instead focuses on the value of GES to the U.S. electricity system. The estimated values of GES provide reference points for economically competitive commercial cost targets. Supply-side GES is modeled as part of an enhanced geothermal system (EGS) generation plant in NREL's Regional Energy Deployment System (ReEDS) capacity expansion model (Ho et al. 2021). In contrast to conventional geothermal plants, which generate constant power, EGS plants have unique features that may allow for in-reservoir energy storage for flexible generation. Demand-side GES for heating and cooling, including seasonal hot and cold storage and short-duration heat pump storage, is incorporated into a price-taker model using Cambium electricity marginal cost projections. To establish an upper bound for the value of GES, analysis focused on favorable scenarios for storage with high generation from zero marginal cost, variable renewable energy resources. High penetrations of variable renewable energy generation can increase hourly electricity price variability, which increases the value of temporal energy arbitrage for storage technologies like GES.

15 GEOTHERMAL ENERGY↗

A Life Cycle Analysis of Refinery Fuel Products Air Emissions Using Refinery Emissions Inventory Data

With the transportation sector being a major source of air pollutant emissions, this study seeks to evaluate criteria pollutant emissions associated with the use of petroleum fuels in vehicles using the GREET® (Greenhouse gases, Regulated Emissions, and Energy use in Transportation) well-to-wheel model. The life cycle of petroleum fuels includes the major stages of crude recovery, crude transportation, crude refining, fuel distribution and fuel combustion (vehicle operation). This study focuses on quantifying refinery emissions, in terms of both refinery throughput and various refinery fuel products, by matching a refinery emissions inventory dataset with refinery operation information, at various levels (national, regional, facility, and process unit). The refinery emissions in terms refinery throughput (per refinery crude input, in g/mmbtu crude) are developed at a regional level for various Petroleum Administration for Defense Districts (PADD), and also aggregated at the national level. To allocate refinery emissions to refinery products, a methodology is developed using a refinery operation optimization Linear Programming (LP) model for individual refineries. The results from individual refinery facilities are then aggregated to obtain statistical national average (capacity weighted) emissions for each product. Because refineries vary by complexity of operation, configuration, crude quality, and product slate, the derived emissions demonstrate large variation for each product and per unit of crude input. Relative to previous estimates used in the GREET model, the present research shows reductions in refinery (and life cycle) emissions for most criteria pollutants. The reduction is especially significant for sulfur dioxide (SOx) emissions.

Allocation↗

Quantifying the Value of Hydropower in the Electric Grid: Final Report

The report summarizes research to Quantify the Value of Hydropower in the Electric Grid. This 3-year DOE study focused on defining value of hydropower assets in a changing electric grid. Methods are described for valuation and planning of pumped storage and conventional hydropower. The project team conducted plant case studies, electric system modeling, market analysis, cost data gathering, and evaluations of operating strategies and constraints. Five other reports detailing these research results are available a project website, www.epri.com/hydrogrid. With increasing deployment of wind and solar renewable generation, many owners, operators, and developers of hydropower have recognized the opportunity to provide more flexibility and ancillary services to the electric grid. To quantify value of services, this study focused on the Western Electric Coordinating Council region. A security-constrained, unit commitment and economic dispatch model was used to quantify the role of hydropower for several future energy scenarios up to 2020. This hourly production simulation considered transmission requirements to deliver energy, including future expansion plans. Both energy and ancillary service values were considered. Addressing specifically the quantification of pumped storage value, no single value stream dominated predicted plant contributions in various energy futures. Modeling confirmed that service value depends greatly on location and on competition with other available grid support resources. In this summary, ten different value streams related to hydropower are described. These fell into three categories; operational improvements, new technologies, and electricity market opportunities. Of these ten, the study was able to quantify a monetary value in six by applying both present day and future scenarios for operating the electric grid. This study confirmed that hydropower resources across the United States contribute significantly to operation of the grid in terms of energy, capacity, and ancillary services. Many potential improvements to existing hydropower plants were found to be cost-effective. Pumped storage is the most likely form of large new hydro asset expansions in the U.S. however, justifying investments in new pumped storage plants remains very challenging with current electricity market economics. Even over a wide range of possible energy futures, up to 2020, no energy future was found to bring quantifiable revenues sufficient to cover estimated costs of plant construction. Value streams not quantified in this study may provide a different cost-benefit balance and an economic tipping point for hydro. Future studies are essential in the quest to quantify the full potential value. Additional research should consider the value of services provided by advanced storage hydropower and pumped storage at smaller time steps for integration of variable renewable resources, and should include all possible value streams such as capacity value and portfolio benefits i.e.; reducing cycling on traditional generation.

13 HYDRO ENERGY↗

Isopiestic Kinetics of Powdered Pd/C/DPB Composite

In a 2006 LLNL internal report, a study of DEB and DPB based hydrogen getter materials was described. The materials, consisting of DEB or DPB physically blended with amorphous carbon on which palladium nanoparticle catalyst was supported, were studied during the course of reaction with fixed aliquots of hydrogen gas in order to observe their hydrogen consumption capacities as a function of ambient hydrogen pressure. The experiments demonstrated that the getter capacity was directly proportional to hydrogen fugacity: the lower the initial hydrogen pressure, the lower the resultant capacity at correspondingly low steady-state pressures. In the course of these experiments, further interesting observations were made of DEB and DPB reduction by hydrogen gas that painted a picture of a complicated reaction mechanism. To summarize, it was determined that reaction rate was controlled partly by diffusion of the organic diacetylene toward the catalyst surface. The results indicated this diffusion was in turn enhanced by phase changes in the course of the reaction that result in a liquid phase of the getter, and also by the heat of reaction, itself being proportional to initial reaction rate. However, these same two terms were speculated to have negative impacts on the net reaction kinetics, as well. It was suggested the liquid phase served to block gas access, and that excessively fast initial rates limited rate and capacity at later times by creating a depletion zone of reactant around the catalyst. Because of the nature of the experiments, whereby both hydrogen pressure and getter activity were changing in time, actual kinetic information could not be gathered. Knowledge of the reaction rate characteristics of these materials as a function of pressure and temperature is crucial to understanding the overall behavior of this material in service. Further, direct observation of the reaction rate can permit estimates of the diffusion of the reactive species. The present work centers on the development of an understanding of the kinetics for the hydrogenation of DPB and DEB as a function of temperature and pressure.

36 MATERIALS SCIENCE↗

Southeast Offshore Storage Resource Assessment (SOSRA) (Final Technical Report)

Subsurface geologic storage of CO 2 can play a major role in offsetting greenhouse gas emissions in a manner that is safe, economical, and acceptable to the public. Due to legal advantages and potential vast resource capacity, offshore storage offers an attractive alternative to onshore storage. Indeed, the success of the Sleipner project in the North Sea demonstrates the technical feasibility of offshore storage as not only a viable option, but as an early opportunity for commercial deployment. Although the storage capacity of offshore reservoirs is expected to be vast, no comprehensive assessment of the offshore storage resource in the southeastern United States had been performed. In a preliminary analysis of a 10,000 mi 2 area of offshore Alabama and the western Florida Panhandle, Hills and Pashin (2010) suggested that about 170 Gt of CO 2 could be stored in Miocene sandstone and that at least 30 Gt could be stored in deeper Cretaceous formations. A task force convened by the Southern States Energy Board (SSEB) and the Interstate Oil and Gas Compact Commission (IOGCC) found that no assessment had been made of the offshore storage resource potential in the shelf areas of the Atlantic seaboard and the eastern Gulf of Mexico in the southeastern US. Considering that the U.S. Environmental Protection Agency estimates that about 40% of anthropogenic CO 2 emissions in the US are generated in the southeast, the lack of an offshore CO 2 assessment constitutes a major gap in understanding of the regional storage resource. In order to address this significant gap in knowledge of the regional storage resources and geologic capacity the Southern States Energy Board (SSEB) led a coalition of southern universities and technical experts to assess prospective geologic storage resources for carbon dioxide (CO 2 ) in the State and Federal waters of three planning areas: The Mid-Atlantic; The South Atlantic; and The eastern Gulf of Mexico. The Southeast Offshore Storage Resource Assessment (SOSRA) project developed a high-level approximation of the amount of CO 2 that might be stored utilizing key geologic and environmental factors which influence the storage potential. The research included significant advances in knowledge and technology that will facilitate assessment and quantification of offshore CO 2 storage resources in the SOSRA region and provide a pathway toward commercialization.

54 ENVIRONMENTAL SCIENCES↗

ANALYSIS OF THE LEACHING EFFICIENCY OF INHIBITED WATER AND TANK SIMULANT IN REMOVING RESIDUES ON THERMOWELL PIPES

A key component for the accelerated implementation and operation of the Salt Waste Processing Facility (SWPF) is the recovery of Tank 48H. Tank 48H is a type IIIA tank with a maximum capacity of 1.3 million gallons. Video inspection of the tank showed that a film of solid material adhered to the tank internal walls and structures between 69 inch and 150 inch levels. From the video inspection, the solid film thickness was estimated to be 1mm, which corresponds to {approx}33 kg of TPB salts (as 20 wt% insoluble solids) (1). This film material is expected to be easily removed by single-rinse, slurry pump operation during Tank 48H TPB disposition via aggregation processing. A similar success was achieved for Tank 49H TPB dispositioning, with slurry pumps operating almost continuously for approximately 6 months, after which time the tank was inspected and the film was found to be removed. The major components of the Tank 49H film were soluble solids - Na{sub 3}H(CO{sub 3}){sub 2} (Hydrated Sodium Carbonate, aka: Trona), Al(OH){sub 3} (Aluminum Hydroxide, aka: Gibbsite), NaTPB (Sodium Tetraphenylborate), NaNO{sub 3} (Sodium Nitrate) and NaNO{sub 2} (Sodium Nitrite) (2). Although the Tank 48H film is expected to be primarily soluble solids, it may not behave the same as the Tank 49H film. There is a risk that material on the internal surfaces of Tank 48H could not be easily removed. As a risk mitigation activity, the chemical composition and leachability of the Tank 48H film are being evaluated prior to initiating tank aggregation. This task investigated the dissolution characteristics of Tank 48H solid film deposits in inhibited water and DWPF recycle. To this end, SRNL received four separate 23-inch long thermowell-conductivity pipe samples which were removed from the tank 48H D2 risers in order to determine: (1) the thickness of the solid film deposit, (2) the chemical composition of the film deposits, and (3) the leaching behavior of the solid film deposit in inhibited water (IW) and in DWPF recycle simulant (3).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimating Return on Investment for Energy Technical Assistance Programs

The U.S. Department of Energy's Office of State and Community Energy Programs engaged the National Laboratory of the Rockies to assess the return on investment (ROI) of technical assistance (TA) programs that support state, local, and Tribal energy planning. Although TA delivers value through capacity building, stakeholder engagement, and knowledge transfer, these benefits are often intangible and challenging to monetize. This study reviews existing ROI frameworks and synthesizes the most relevant elements into a hybrid approach tailored to energy TA programs. The proposed framework integrates monetary and non-monetary outcomes through early logic model development, baseline data collection, and the use of proxies for intangible benefits. As a case study, this paper applies this approach to the Communities Local Energy Action Program (Communities LEAP), demonstrating how ROI can inform program design, data strategy, and performance assessment. Findings underscore that ROI should be applied selectively and planned from the outset to ensure data alignment and attribution accuracy. The framework offers TA practitioners a structured approach that can be leveraged for future programs to evaluate and communicate the multifaceted value of TA investments.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated simulations of CO 2 spreading and pressure response in the multilayer saline aquifer of South Scania Site, Sweden

In this paper, an integrated modeling approach/workflow, in which a series of mathematical models of different levels of complexity are applied to evaluate the geological storage capacity of the Scania Site, southwest Sweden, is presented. The storage formation at the site is a layered formation limited by bounding fault zones, and injection is assumed to take place from one existing deep borehole into all layers. A semi-analytical model for two-phase flow is first used to evaluate the pressure response and related parameter sensitivity, as well as the first estimates of acceptable injection rates. These results are then used to guide the more detailed numerical simulations that address both pressure response and plume migration. The vertical equilibrium (VE) model is used to obtain a preliminary understanding of the plume migration with a larger number of simulations. Finally the full TOUGH2/ECO2N simulations are performed for the most detailed analyses of pressure responses and plume migration. Throughout, the results of the different modeling approaches are compared to each other. It is concluded that the key limiting factor for the storage capacity at the site in the injection scenario considered is the fast CO 2 migration within the high permeability layer. Finally, future studies can address alternative injection scenarios, including using horizontal injection wells and injection to other layers than the high permeability layer.

54 ENVIRONMENTAL SCIENCES↗

Understanding Solar Photovoltaic System Performance: An Assessment of 75 Federal Photovoltaic Systems

This report presents a performance analysis of 75 photovoltaic systems based on PV system production data collected as part of a FEMP Federal PV Performance Assessment project combined with co-incident insolation, and ambient temperature to analyze how actual performance compares with a performance model. FEMP collaborated with 17 Federal agencies and sub-agencies to collect the information required to analyze the performance of each system. The systems represent a total capacity of 30,714 kW and range in size from 1 kW to 4,043 kW, with an average size of 410 kW, and were installed between 2011 and 2020. The data is analyzed for Key Performance Indicators, Availability, Performance Ratio and Energy Ratio by comparing the measured production data to model production data. The System Advisor Model (SAM) combines a description of the system (such as inverter capacity, de-rating for temperature, balance-of-system efficiency) with environmental parameters (coincident solar and temperature data) to calculate predicted performance. The performance metrics are calculated by lining up the measured production data with the model estimate on an hour-by-hour, day-by-day, or month-by-month basis (depending on the interval resolution of the production data). A report with system description, photo of the system, special assumptions made for the site, graph of measured production and model production, table of key performance indicators, and links to O&M resources that might improve performance was produced and delivered to site and agency staff with a short on-line briefing.

14 SOLAR ENERGY↗

Techno-Economic Analysis for a Potential Geothermal District Heating System in Tuttle, Oklahoma: Preprint

Geothermal deep direct use (DDU) has potential across a wide swath of the United States but is underutilized due to challenging project economics associated with developing a deep geothermal resource for a large-scale and variable heat demand. The National Renewable Energy Laboratory (NREL) and University of Oklahoma evaluated the feasibility of a geothermal district heating (GDH) and cooling system in two schools and 250 houses by utilizing existing oil and gas (O&G) wells in Tuttle, Oklahoma. Heating and cooling demand in the two schools and a typical single-family house were modeled using EnergyPlus building energy simulation software. The modeling results indicated that annual heating demand in two schools and 250 houses is approximately 2.61 GWhth, and cooling demand in the two schools is approximately 2.65 GWhth. In this scope, the techno-economic analysis (TEA) was conducted using the GEOPHIRES tool combined with the TOUGH2 reservoir simulator. The reservoir performance, including geothermal heat production capacity, was modeled by the reservoir simulator TOUGH2. Then, levelized cost of heat (LCOH) was calculated using GEOPHIRES version 3.0, which includes new features such as hourly heat load optimization and peak performance evaluation. Geothermal reservoir temperature was estimated as 90.5 degrees C at a total depth of 3.3 km by the regional average temperature gradient of 22.8 degrees C/km and validated by cation geothermometer calculations. Four production scenarios with two different well configurations and two different heat load profiles have been developed for well flow rates ranging between 3.1 kg/s and 9.3 kg/s. The LCOH of the district heating and cooling system was calculated between $95 and $210/MWh ($28/MMBtu to $62/MMBtu) for four different production scenarios. Typical natural gas prices for residential customers in Oklahoma have ranged from 9 to 19 $/MMBtu over the past decade, which indicates a challenge for deployment of such a GDH system.

deep direct-use↗

Techno-Economic Analysis for a Potential Geothermal District Heating System in Tuttle, Oklahoma

Geothermal deep direct use (DDU) has potential across a wide swath of the United States but is underutilized due to challenging project economics associated with developing a deep geothermal resource for a large-scale and variable heat demand. The National Renewable Energy Laboratory (NREL) and University of Oklahoma evaluated the feasibility of a geothermal district heating (GDH) and cooling system in two schools and 250 houses by utilizing existing oil and gas (O&G) wells in Tuttle, Oklahoma. Heating and cooling demand in the two schools and a typical single-family house were modeled using EnergyPlus building energy simulation software. The modeling results indicated that annual heating demand in two schools and 250 houses is approximately 2.61 GWhth, and cooling demand in the two schools is approximately 2.65 GWhth. In this scope, the techno-economic analysis (TEA) was conducted using the GEOPHIRES tool combined with the TOUGH2 reservoir simulator. The reservoir performance, including geothermal heat production capacity, was modeled by the reservoir simulator TOUGH2. Then, levelized cost of heat (LCOH) was calculated using GEOPHIRES version 3.0, which includes new features such as hourly heat load optimization and peak performance evaluation. Geothermal reservoir temperature was estimated as 90.5 degrees C at a total depth of 3.3 km by the regional average temperature gradient of 22.8 degrees C/km and validated by cation geothermometer calculations. Four production scenarios with two different well configurations and two different heat load profiles have been developed for well flow rates ranging between 3.1 kg/s and 9.3 kg/s. The LCOH of the district heating and cooling system was calculated between $95 and $210/MWh ($28/MMBtu to $62/MMBtu) for four different production scenarios. Typical natural gas prices for residential customers in Oklahoma have ranged from 9 to 19 $/MMBtu over the past decade, which indicates a challenge for deployment of such a GDH system.

deep direct-use↗

Improvements in Measuring Sorption-Induced Strain and Permeability in Coal

Total worldwide CBM in-place reserves estimates are between 3500 Tcf and 9500 Tcf. Unminable coal beds have been recommended as good CO2 sequestration sites as the world prepares to sequester large amounts of greenhouse gases. In the U.S., these coal seams have the capacity to adsorb and sequester roughly 50 years of CO2 emissions from all the U.S. coal-fired power plants at today’s output rates. The amount and type of gas ad-sorbed in coal has a strong impact on the permeability of the coal seam. An improved mixed gas adsorption iso-therm model based on the extended-Langmuir theory is discussed and is applied to mixed gas sorption-induced strain based on pure gas strain data and a parameter accounting for gas-gas interactions that is independent of the coal substrate. Advantages and disadvantages of using freestanding versus constrained samples for sorption-induced strain measurements are also discussed. A permeability equation used to model laboratory was found to be very accurate when sorption-induced strain was small, but less accurate with higher strain gases.

01 COAL, LIGNITE, AND PEAT↗

Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative construction techniques. Special efforts were directed toward documenting the (largely original) interior of the plant and installing new equipment without modifying the power plant exterior in order to preserve the historical significance of the facility. In addition, a significant portion of the historical equipment within the power plant was preserved in place. The modernization project began with DOE grant award on January 1, 2010, and the project was completed on December 31, 2012. In addition to city engineering and hydroelectric staff, major project participants included AECOM (design/engineering) Canyon Industries (turbine/generator manufacture), Gracon Corporation (general construction contractor), Exponential Engineering Company (electrical engineering) and URS Corporation (historical documentation), as well as numerous other subcontractors and consultants.

13 HYDRO ENERGY↗

Testing of Strategies for the Acceleration of the Cost Optimization

The general problem addressed in the Nuclear-Renewable Hybrid Energy System (N-R HES) project is finding the optimum economical dispatch (ED) and capacity planning solutions for the hybrid energy systems. In the present test-problem configuration, the N-R HES unit is composed of three electrical power-generating components, i.e. the Balance of Plant (BOP), the Secondary Energy Source (SES), and the Energy Storage (ES). In addition, there is an Industrial Process (IP), which is devoted to hydrogen generation. At this preliminary stage, the goal is to find the power outputs of each one of the N-R HES unit components (BOP, SES, ES) and the IP hydrogen production level that maximizes the unit profit by simultaneously satisfying individual component operational constraints. The optimization problem is meant to be solved in the Risk Analysis Virtual Environment (RAVEN) framework. The dynamic response of the N-R HES unit components is simulated by using dedicated object-oriented models written in the Modelica modeling language. Though this code coupling provides for very accurate predictions, the ensuing optimization problem is characterized by a very large number of solution variables. To ease the computational burden and to improve the path to a converged solution, a method to better estimate the initial guess for the optimization problem solution was developed. The proposed approach led to the definition of a suitable Monte Carlo-based optimization algorithm (called the preconditioner), which provides an initial guess for the optimal N-R HES power dispatch and the optimal installed capacity for each one of the unit components. The preconditioner samples a set of stochastic power scenarios for each one of the N-R HES unit components, and then for each of them the corresponding value of a suitably defined cost function is evaluated. After having simulated a sufficient number of power histories, the configuration which ensures the highest profit is selected as the optimal one. The component physical dynamics are represented through suitable ramp constraints, which considerably simplify the numerical solving. In order to test the capabilities of the proposed approach, in the present report, the dispatch problem only is tackled, i.e. a reference unit configuration is assumed, and each one of the N-R HES unit components is assumed to have a fixed installed capacity. As for the next steps, the main improvement will concern the operation strategy of the ES facility. In particular, in order to describe a more realistic battery commitment strategy, the ES operation will be regulated according to the electricity price forecasts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Estimating the Impacts of Direct Load Control Programs Using GridPIQ, a Web-Based Screening Tool

In direct load control (DLC) programs, utilities can curtail the demand of participating loads to contractually agreed-upon levels during periods of critical peak load, thereby reducing stress on the system, generation cost, and required transmission and generation capacity. Participating customers receive financial incentives. The impacts of implementing DLC programs extend well beyond peak shaving. There may be a shift of load proportional to the interrupted load to the times before or after a DLC event, and different load shifts have different consequences. Tools that can quantify the impacts of such programs on load curves, peak demand, emissions, and fossil fuel costs are currently lacking. The Grid Project Impact Quantification (GridPIQ) screening tool includes a Direct Load Control module, which takes into account project-specific inputs as well as the larger system context in order to quantify the impacts of a given DLC program. This allows users (utilities, researchers, etc.) to test and compare different program specifications and their impacts.

Demand Reponse↗

Projected impacts of climate change on hydropower potential in China

Hydropower is an important renewable energy source in China, but it is sensitive to climate change, because the changing climate may alter hydrological conditions (e.g., river flow and reservoir storage). Future changes and associated uncertainties in China's gross hydropower potential (GHP) and developed hydropower potential (DHP) are projected using simulations from eight global hydrological models (GHMs), including a large-scale reservoir regulation model, forced by five general circulation models (GCMs) with climate data under two representative concentration pathways (RCP2.6 and RCP8.5). Results show that the estimation of the present GHP of China is comparable to other studies; overall, the annual GHP is projected to change by -1.7 to 2 % in the near future (2020–2050) and increase by 3 to 6 % in the late 21st century (2070–2099). The annual DHP is projected to change by -2.2 to -5.4 % (0.7–1.7 % of the total installed hydropower capacity (IHC)) and -1.3 to -4 % (0.4–1.3 % of total IHC) for 2020–2050 and 2070–2099, respectively. Regional variations emerge: GHP will increase in northern China but decrease in southern China – mostly in south central China and eastern China – where numerous reservoirs and large IHCs currently are located. The area with the highest GHP in southwest China will have more GHP, while DHP will reduce in the regions with high IHC (e.g., Sichuan and Hubei) in the future. The largest decrease in DHP (in %) will occur in autumn or winter, when streamflow is relatively low and water use is competitive. Large ranges in hydropower estimates across GHMs and GCMs highlight the necessity of using multimodel assessments under climate change conditions. This study prompts the consideration of climate change in planning for hydropower development and operations in China, to be further combined with a socioeconomic analysis for strategic expansion.

13 HYDRO ENERGY↗