Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Crew Activity Report/Flight Day 6 Highlights

On this sixth day of the STS-92 mission, the flight crew, Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur continue working on the exterior of the International Space Station (ISS) to prepare the station for its first resident crew. Lopez-Alegria and Wisoff perform the second of four spacewalks to maneuver the third pressurized mating adapter (PMA-3) into its new location on the Unity module.

Source record↗

STS-114: Discovery Mission Status Briefing (incl. Statement from Cmdr. Collins and Crew)

Commander Eileen Collins and crew briefly thanked everyone who worked hard to get the Shuttle back in space, and dedicated the mission to the Columbia crew as she bids their first "good night" to the Mission Control Room in Houston. Video continues with the Mission Status Briefing by Phil Engelauf, STS-114 Mission Operations Representative, and John Shannon, Manager of the Space Shuttle Operations and Integration. Phil noted that launching and ascent had gone extremely well, the crews and the flight control team performed well and the vehicle performed exceptionally as well. The launch is the beginning of a 12 day mission period. John details the tasks of the Engineering team processing the radar data taken during ascent and checking frame by frame the imagery from both on vehicle imagery and ground imagery. John further detailed the two debris event from ascent video clips of tile loss and an unidentified material falling off from the external tank; the release of TYVEK covers, and bird impact on the external tank nose cone. Tile shearing, tile damage, tile repair, landing gear door seals, repair capabilities, debris assessment, safety, inspections criteria, data acquisitions and data analysis were topics covered with the News media.

Source record↗

Habitability in Advanced Space Mission Design: Evaluation of Habitation Elements - Part 2

Habitability is a fundamental component of any long-duration human habitat. Due to the pressures on the crew and the criticality of their performance, this is particularly true of habitats or vehicles proposed for use in any human space mission of duration over 30 days. This paper, the second of three on this subject, will focus on evaluating all the vehicles currently under consideration for the Mars Design Reference Mission through application of metrics for habitability (proposed in a previous paper, see references Adams/McCurdy 1999).

Adams, Constance M.↗

Evaluation of Cable Harness Post-Installation Testing

The Cable Harness Post-Installation Testing Report was written in response to an action issued by the Ares Project Control Board (PCB). The action for the Ares I Avionics & Software Chief Engineer and the Avionics Integration and Vehicle Systems Test Work Breakdown Structure (WBS) Manager in the Vehicle Integration Office was to develop a set of guidelines for electrical cable harnesses. Research showed that post-installation tests have been done since the Apollo era. For Ares I-X, the requirement for post-installation testing was removed to make it consistent with the avionics processes used on the Atlas V expendable launch vehicle. Further research for the report involved surveying government and private sector launch vehicle developers, military and commercial aircraft, spacecraft developers, and harness vendors. Responses indicated crewed launch vehicles and military aircraft perform post-installation tests. Key findings in the report were as follows: Test requirements identify damage, human-rated vehicles should be tested despite the identification of statistically few failures, data does not support the claim that post-installation testing damages the harness insulation system, and proper planning can reduce overhead associated with testing. The primary recommendation of the report is for the Ares projects to retain the practice of post-fabrication and post-installation cable harness testing.

King, M. S.↗

Delivering New Ultrasound System to International Space Station

Ultrasound has been used for medical purposes and experiments. The previous ultrasound, HDI 5000, was delivered to the ISS in 2001 and had expected its service life in February, 2012. Due to on-orbit ultrasound failure in February 2011, the delivery date of new ultrasound was moved to July 8, 2011, which is 7 months earlier than original delivery date. This report shows how the Ultrasound 2 team including myself worked to make new delivery date. Four-step approach, (1) understanding the project (literature search), (2) learning different documents, (3) performing certification tests and (4) participating crew trainings, were used to succeed my internship at NASA JSC. In addition, the participation in Summer Institution and other contributions are explained. i

Sugita, Yoshino↗

Rocket Engine Innovations Advance Clean Energy

During launch countdown, at approximately T-7 seconds, the Space Shuttle Main Engines (SSMEs) roar to life. When the controllers indicate normal operation, the solid rocket boosters ignite and the shuttle blasts off. Initially, the SSMEs throttle down to reduce stress during the period of maximum dynamic pressure, but soon after, they throttle up to propel the orbiter to 17,500 miles per hour. In just under 9 minutes, the three SSMEs burn over 1.6 million pounds of propellant, and temperatures inside the main combustion chamber reach 6,000 F. To cool the engines, liquid hydrogen circulates through miles of tubing at -423 F. From 1981to 2011, the Space Shuttle fleet carried crew and cargo into orbit to perform a myriad of unprecedented tasks. After 30 years and 135 missions, the feat of engineering known as the SSME boasted a 100-percent flight success rate.

Source record↗

Cryogenic Propellant Storage and Transfer Technology Demonstration For Long Duration In-Space Missions

The high specific impulse of cryogenic propellants can provide a significant performance advantage for in-space transfer vehicles. The upper stages of the Saturn V and various commercial expendable launch vehicles have used liquid oxygen and liquid hydrogen propellants; however, the application of cryogenic propellants has been limited to relatively short duration missions due to the propensity of cryogens to absorb environmental heat resulting in fluid losses. Utilizing advanced cryogenic propellant technologies can enable the efficient use of high performance propellants for long duration missions. Crewed mission architectures for beyond low Earth orbit exploration can significantly benefit from this capability by developing realistic launch spacing for multiple launch missions, by prepositioning stages and by staging propellants at an in-space depot. The National Aeronautics and Space Administration through the Office of the Chief Technologist is formulating a Cryogenic Propellant Storage and Transfer Technology Demonstration Mission to mitigate the technical and programmatic risks of infusing these advanced technologies into the development of future cryogenic propellant stages or in-space propellant depots. NASA is seeking an innovative path for human space exploration, which strengthens the capability to extend human and robotic presence throughout the solar system. This mission will test and validate key cryogenic technological capabilities and has the objectives of demonstrating advanced thermal control technologies to minimize propellant loss during loiter, demonstrating robust operation in a microgravity environment, and demonstrating efficient propellant transfer on orbit. The status of the demonstration mission concept development, technology demonstration planning and technology maturation activities in preparation for flight system development are described.

Meyer, Michael L.↗

Mars Sample Return Using Commercial Capabilities: ERV Trajectory and Capture Requirements

Mars Sample Return was presented as the highest priority planetary science mission of the next decade [1]. Lemke et al. [2] present a Mars Sample Return mission concept in which the sample is returned directly from the surface of Mars to an Earth orbit. The sample is recovered in Earth Orbit instead of being transferred between spacecraft in Mars Orbit. This paper provides the details of this sample recovery in Earth orbit and presents as such a sub-element of the overall Mars sample return concept given in [2]. We start from the assumption that a Mars Ascent Vehicle (MAV), initially landed on Mars using a modified SpaceX Dragon capsule, has successfully delivered the sample, already contained within an Earth Return Vehicle (ERV), to a parking orbit around Mars. From the parking orbit, the ERV imparts sufficient Delta-V to inject itself into an earthbound trajectory and to be captured into an Earth orbit eventually. We take into account launch window and Delta-V considerations as well as the additional constraint of increased safety margins imposed by planetary protection regulations. We focus on how to overcome two distinct challenges of the sample return that are driven by the issues of planetary protection: (1) the design of an ERV trajectory meeting all the requirements including the need to avoid contamination of Earth's atmosphere; (2) the concept of operations for retrieving the Martian samples in Earth orbit in a safe way. We present an approach to retrieve the samples through a rendezvous between the ERV and a second SpaceX Dragon capsule. The ERV executes a trajectory that brings it from low Mars orbit (LMO) to a Moon-trailing Earth orbit at high inclination with respect to the Earth-Moon plane. After a first burn at Trans-Earth Injection (TEI), the trajectory uses a second burn at perigee during an Earth flyby maneuver to capture the ERV in Earth orbit. The ERV then uses a non-propulsive Moon flyby to come to a near-circular Moon-trailing orbit. To perform the Earth Orbit Rendezvous (EOR), a second Dragon capsule is then launched from Earth and a similar lunar flyby is performed to rendezvous with the ERV. The requirements for rendezvous, close proximity operations and capture of the sample canister are described. A concept of operations for sample retrieval is presented along with design specifications of the ERV, the required modifications to the Dragon capsule, as well as the hardware, software, sensors, actuators, and capture mechanisms used. In our concept, a container is mounted to the front hatch of Dragon, capable of accommodating the sample canister and sealing it from the rest of the capsule. The sample canister is captured using a robotic arm with a magnetic grappling mechanism. Dragon then performs a propulsive maneuver to return to Earth for a controlled re-entry while the ERV (sans sample container) is left in the Moon trailing orbit. Contingency cases and related mitigation strategies are also discussed, including the advantages and disadvantages of performing the ERV rendezvous with a crew.

Faber, Nicolas F.↗

Iodine Tagging Velocimetry and Mechanism in the Hypersonic Near Wake of a MultiPurpose Crew Vehicle

This study demonstrates a new molecular tagging velocimetry (MTV) method for velocity measurements of high speed flow. It demonstrates offbody Iodine Tagging Velocimetry (ITV) in the hypersonic near wake of a MultiPurpose Crew Vehicle (MPCV) model. Experiments are performed in the NASA-Langley 31-inch Mach 10 air wind tunnel. A 0.5% I2 / N2 mixture is seeded on the leeward backshell of the model using a pressure tap. I2 laser-induced fluorescence is excited along a 5.5 mm line using an ArF excimer laser near 193 nm. Results indicate I2 absorbs at least 2 photons to produce iodine ions and electrons. These recombine as the tagged region is displaced downstream to produce I (2P3/2) whose emission is monitored at 206 nm. Results at P0 = 2.41 MPa (350 psi), T0 = 990K, and 10 micro-sec transit times produce velocities from 630-820 m/sec across the I2 seeded jet at a distance of 38.2 mm (25.5 jet diameters) downstream from the jet orifice. Maximum wake jet velocities near the shear layer are 59% of freestream velocity.

Balla, R. Jeffrey↗

Deploying a Route Optimization EFB Application for Commercial Airline Operational Trials

The Traffic Aware Planner (TAP), developed for NASA Langley Research Center to support the Traffic Aware Strategic Aircrew Requests (TASAR) project, is a flight-efficiency software application developed for an Electronic Flight Bag (EFB). Tested in two flight trials and planned for operational testing by two commercial airlines, TAP is a real-time trajectory optimization application that leverages connectivity with onboard avionics and broadband Internet sources to compute and recommend route modifications to flight crews to improve fuel and time performance. The application utilizes a wide range of data, including Automatic Dependent Surveillance Broadcast (ADS-B) traffic, Flight Management System (FMS) guidance and intent, on-board sensors, published winds and weather, and Special Use Airspace (SUA) schedules. This paper discusses the challenges of developing and deploying TAP to various EFB platforms, our solutions to some of these challenges, and lessons learned, to assist commercial software developers and hardware manufacturers in their efforts to implement and extend TAP functionality in their environments. EFB applications (such as TAP) typically access avionics data via an ARINC 834 Simple Text Avionics Protocol (STAP) server hosted by an Aircraft Interface Device (AID) or other installed hardware. While the protocol is standardized, the data sources, content, and transmission rates can vary from aircraft to aircraft. Additionally, the method of communicating with the AID may vary depending on EFB hardware and/or the availability of onboard networking services, such as Ethernet, WIFI, Bluetooth, or other mechanisms. EFBs with portable and installed components can be implemented using a variety of operating systems, and cockpits are increasingly incorporating tablet-based technologies, further expanding the number of platforms the application may need to support. Supporting multiple EFB platforms, AIDs, avionics datasets, and user interfaces presents a challenge for software developers and the management of their code baselines. Maintaining multiple baselines to support all deployment targets can be extremely cumbersome and expensive. Certification also needs to be considered when developing the application. Regardless of whether the software is itself destined to be certified, data requirements in support of the application and user interface elements may introduce certification requirements for EFB manufacturers and the airlines. The example of TAP, the challenges faced, solutions implemented, and lessons learned will give EFB application and hardware developers insight into future potential requirements in deploying TAP or similar flight-deck EFB applications.

Roscoe, David A.↗

European Service Module - Structural Test Article (E-STA) Building Block Test Approach and Model Correlation Observations

The Orion European Service Module - Structural Test Article (E-STA) underwent sine vibration testing in 2016 using the Mechanical Vibration Facility (MVF) multi-axis shaker system at NASA Glenn Research Center’s (GRC) Plum Brook Station (PBS) Space Power Facility (SPF). The main objective was to verify the structural integrity of the European Service Module (ESM) under sine sweep dynamic qualification vibration testing. A secondary objective was to perform a fixed-base modal survey, while E-STA was still mounted to MVF, in order to achieve a test correlate the finite element model (FEM). To facilitate the E-STA system level correlation effort, a building block test approach was implemented. Modal tests were performed on two major subassemblies, the crew module/launch abort structure (CM/LAS) and the crew module adapter (CMA) mass simulators. These subassembly FEMs were individually correlated and then integrated into the E-STA FEM prior to the start of the E-STA sine vibration test. This paper summarizes the modal testing and model correlation efforts of both of these subassemblies and how the building block approach assisted in the overall correlation of the E-STA FEM. This paper will also cover modeling practices that should be avoided, recommended instrumentation positioning on complex structures, and the importance of the FEM geometrically matching CAD in sufficient detail in order to adequately replicate internal load paths. The goal of this paper is to inform the reader of the hard earned lessons learned and pitfalls to avoid when applying a building block test approach.

Winkel, James P.↗

Perceived Similarity Predicts Viable Relationships and Team Performance

Conditions expected for future space exploration require an expanded understanding of interpersonal compatibility. Limited research has examined interpersonal perception at the dyadic level and how these perceptions shape relationships and team performance over time. We investigated the extent to which a novel approach for assessing interpersonal compatibility - focused on interpersonal perception and perceived similarity between dyads - predicts the viability of relationships and team performance over time in simulated space crews.

Jessica Chackoria↗

Analytical Framework for Rodent/NHP Data Set Utilization to Inform Human CNS Risk Estimation

Objectives Review and inform on tactics to analyze & communicate data from animal research (e.g., rodents, mini-pigs, NHPs, et al) exposed to single and combinations of spaceflight hazards, using NASA’s Human System Risk Board (HSRB) process for the Behavioral Medicine Risk - To quantitatively inform Behavioral Medicine Risk posture - i.e., likelihood (L) and consequence (C) - To help inform estimation of crew health standards for operational task performance (i.e., Fitness For Duty, Space Permissible Exposure Levels, Permissible Operational Limits).

Brain↗

NASA’s Space Launch System: Artemis I Results and the Path Forward

The Artemis era of human space exploration beyond low Earth orbit launched at 1:47 a.m. EST on November 16, 2022. Artemis I was the first integrated flight of the agency’s new super heavy-lift rocket, the Space Launch System (SLS), and the next-generation spacecraft for astronauts, Orion. The mission sent an uncrewed Orion spacecraft into a distant retrograde orbit about the Moon. During the 25-day mission, NASA collected valuable data on the performance of the launch vehicle and crew spacecraft and information on the deep space environment where crews will soon operate. Orion splashed down approximately 80 miles off the coast of Baja, California, at the conclusion of the mission December 11. This paper will provide a summary of the launch campaign from vehicle integration and testing through completion of the upper stage phase with primary emphasis on SLS. It will also discuss highlights of progress on manufacturing and testing of SLS hardware and software for upcoming Artemis missions.

John Honeycutt↗