Search NASA⌕ Search

SEARCH · Search NASA

Results for “Data Management Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Information needs: Perceived and real for state decisionmakers

Remote sensing techniques provide important information for land and water use planning organizations in order to assess coastal developments and their impact on water resources, sediment transport, erosion, and marine biology. Political expediency requires pertinent data acquisition and data dissemination to local populations for coastal zone management decision making.

Schwartz, A. R.↗

L-band and SHF multiple access schemes for the MSAT system

The first generation of the Canadian Mobile Satellite (MSAT) system, planned to be operational in the early 1990s, will provide voice and data services to land, aeronautical, and maritime mobile terminals within the Canadian land mass and its territorial waters. The system will be managed by a centralized Demand Assignment Multiple Access (DAMA) control system. Users will request a communication channel by communicating with the DAMA Control System (DCS) via the appropriate signalling channels. Several access techniques for both L-band and SHF signalling channels have been investigated. For the L-band, Slotted Aloha (SA) and Reservation Aloha (RA), combined with a token scheme, are discussed here. The results of Telesat studies to date indicate that SA, when combined with token scheme, provides the most efficient access and resource management tool in a mobile propagation environment. For SHF signalling channels, slim time division multiple access (TDMA) and SA have been considered as the most suitable candidate schemes. In view of the operational environment of the SHF links, provision of a very short channel access delay and a relatively high packet success rate are highly desirable. Studies carried out generally favor slim-TDMA as the most suitable approach for SHF signalling channels.

Razi, Michael↗

Systems aspects of COBE science data compression

A general approach to compression of diverse data from large scientific projects has been developed and this paper addresses the appropriate system and scientific constraints together with the algorithm development and test strategy. This framework has been implemented for the COsmic Background Explorer spacecraft (COBE) by retrofitting the existing VAS-based data management system with high-performance compression software permitting random access to the data. Algorithms which incorporate scientific knowledge and consume relatively few system resources are preferred over ad hoc methods. COBE exceeded its planned storage by a large and growing factor and the retrieval of data significantly affects the processing, delaying the availability of data for scientific usage and software test. Embedded compression software is planned to make the project tractable by reducing the data storage volume to an acceptable level during normal processing.

Freedman, I.↗

Overview of the System of Experts for Intelligent Data Management (SEIDAM)

Viewgraphs on the system of experts for intelligent data management (SEIDAM) are presented. Topics covered include: multiple data sources integration; SEIDAM structure; machine learning; user interface; spatial knowledge expert system; digital terrain model (DTM) and segmentation expert systems; system validation; and tasks and plans.

Goodenough, David G.↗

Continuous Risk Management: An Overview

Software risk management is important because it helps avoid disasters, rework, and overkill, but more importantly because it stimulates win-win situations. The objectives of software risk management are to identify, address, and eliminate software risk items before they become threats to success or major sources of rework. In general, good project managers are also good managers of risk. It makes good business sense for all software development projects to incorporate risk management as part of project management. The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to implement risk management. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This is an introductory tutorial to continuous risk management based on this course. The rational for continuous risk management and how it is incorporated into project management are discussed. The risk management structure of six functions is discussed in sufficient depth for managers to understand what is involved in risk management and how it is implemented. These functions include: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

Rosenberg, Linda↗

Integrated Workforce Planning Model: A Proof of Concept

Recently, the Workforce and Diversity Management Office at KSC have launched a major initiative to develop and implement a competency/skill approach to Human Resource management. As the competency/skill dictionary is being elaborated, the need for a competency-based workforce-planning model is recognized. A proof of concept for such a model is presented using a multidimensional data model that can provide the data infrastructure necessary to drive intelligent decision support systems for workforce planing. The components of competency-driven workforce planning model are explained. The data model is presented and several schemes that would support the workforce-planning model are presented. Some directions and recommendations for future work are given.

Guruvadoo, Eranna K.↗

Lessons Learned: Using UTM Paradigm for Urban Air Mobility

Urban Air Mobility (UAM) aims to reduce congestion on the roads and highways by offering air taxi as an alternative to driving on surface roads. Integration of UAM operations in the National Airspace System (NAS) has been the focus of the research conducted at NASA Ames Research Center. A simulation was performed in collaboration with Uber Technologies Inc to investigate if NASA’s UTM architecture and its implementation as demonstrated in the 2019 UTM field tests were extensible for UAM operations, and if the data exchange between multiple operators as planned under UTM were adequate for UAM operations in the shared airspace. In order to explore these research questions, three Use Cases were defined to investigate different airspace management challenges. This paper will describe the lessons learned from exercising the uses cases and the airspace management services including scheduling and separation developed to facilitate initial UAM operations.

Urban Air Mobility↗

Lessons Learned: Using UTM paradigm for Urban Air Mobility Operations

Urban Air Mobility (UAM) aims to reduce congestion on the roads and highways by offering air taxi as an alternative to driving on surface roads. Integration of UAM operations in the National Airspace System (NAS) has been the focus of the research conducted at NASA Ames Research Center. A simulation was performed in collaboration with Uber Technologies Inc to investigate if NASA’s UTM architecture and its implementation as demonstrated in the 2019 UTM field tests were extensible for UAM operations, and if the data exchange between multiple operators as planned under UTM were adequate for UAM operations in the shared airspace. In order to explore these research questions, three Use Cases were defined to investigate different airspace management challenges. This paper will describe the lessons learned from exercising the uses cases and the airspace management services including scheduling and separation developed to facilitate initial UAM operations.

Urban Air Mobility↗

Sensitive Resources Assessment and Forest Analysis for the Proposed Versatile Test Reactor, Oak Ridge, Tennessee

The US Department of Energy’s (DOE’s) Oak Ridge National Laboratory (ORNL) is a leading institution in advanced materials, supercomputing, neutrons, and nuclear science. As a research laboratory managed by UT-Battelle, LLC for DOE, ORNL has national priorities in energy, security, and scientific discovery that necessitate facility improvements and expansions. DOE is also committed to environmental stewardship. The laboratory is located on the ~32,000-acre (~13,000-ha) Oak Ridge Reservation (ORR), much of which is categorized as a National Environmental Research Park (NERP) and a state Wildlife Management Area. DOE works with the Tennessee Wildlife Resources Agency (TWRA), Tennessee Department of Environment and Conservation (TDEC), US Fish and Wildlife Service (USFWS), US Department of Agriculture, and other agencies to serve as an effective steward of the ORR. Accordingly, project managers must conform to environmental regulations, agreements, and policies at the federal, state, and institutional levels. Per 40 CFR (Code of Federal Regulations) 1508.14, potential effects on research and science education also represent potential effects of federal actions on the NERP, and impacts on, e.g., deer harvest, must be considered on the Oak Ridge Wildlife Management Area when other aspects of the human environment are affected. The United States currently has no fast neutron testing capability to support advanced nuclear research and development. The proposed Versatile Test Reactor (VTR) will take advantage of current investments by the US government and private industry in nuclear reactors to expedite the design and construction process, using proven technology to create a world-class scientific infrastructure. The VTR will take advantage of fast neutrons provided by this proven technology, along with a capability to rapidly insert, conduct, and remove state-of-the-art experiments. An advantage of the VTR is that it can support future innovations in experimental capabilities without modifying the facility. The VTR will support progress in a variety of science and technology areas, including testing and qualification of advanced reactor fuels; testing and qualification of innovative structural materials; testing of innovative components and instruments; validation of advanced modeling and simulation tools; and versatility for future technical missions. Through proven technology, the VTR can take advantage of existing reactor designs and operating experience to reduce the risk, cost, and time for design and construction. The top available resources of DOE laboratories, industry, and universities will be used to expedite reactor design and construction toward developing the scientific infrastructure that affords a strong testing capability that can be sustained over many years. This report summarizes current knowledge of natural and cultural resources primarily within the VTR construction area. At the time of this report, the proposed VTR site design includes a construction area of ~150.4 acres (~69.9 ha), which contains an ~51.3-acre (~20.8-ha) operations area, located within forested natural areas of the ORR. The primary goal of the work presented here was to evaluate potential effects on sensitive resources that might result from development and construction activities associated with VTR. In addition to on-the-ground surveys during spring and summer 2020 by the ORNL Natural Resources Management Program and Aquatic Ecology Group staff, this report makes use of historical (pre-1995) and contemporary (1995 to present) data from additional confirmed sources (e.g., TDEC). Likewise, forest conditions were compiled from a 2011 forest inventory and supplemented with limited ground observations in 2020. The individuals who obtained and compiled the data presented here are familiar with and routinely assess sensitive resources on the ORR. Anyone who references this report must consider that the timing of surveys did not permit a complete delineation of the resources that will be affected. If the VTR project proceeds, additional surveys will be required to account for the seasonal patterns of various threatened and endangered species. Data deficiencies and potential resources that likely went undetected are indicated where possible. Accordingly, this report should facilitate more environmentally sound decisions during planning and 2 development of the VTR site, provide a foundation for further assessment of sensitive and cultural resources, and help project managers better address regulatory guidance and DOE policies on sustainable development in compliance with, for example, the US Endangered Species Act (ESA), Migratory Bird Treaty Act (MBTA), Tennessee Rare Plant Protection and Conservation Act of 1985, Tennessee Nongame and Endangered or Threatened Wildlife Species Conservation Act of 1974, several federal and state regulations regarding aquatic resource protection, and site-specific policies as outlined in various ORR management plans developed by ORNL and TWRA for DOE.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Building Supply Chain Visibility for Risk Management: Illuminating the COVID-19 Pandemic Impact Upon NASA Suppliers

NASA mission projects rely upon global supply chains subject to an array of risks that threaten to disrupt or deny the timely, affordable provision of products and services as required for mission success. Visibility into these supply chains is key to the management of risks, such as those stemming from the coronavirus pandemic and its associated effects upon suppliers. Accordingly, the Supplier Research and Analysis (SRA) Program within Goddard Space Flight Center’s Safety and Mission Assurance (SMA) Directorate produced the COVID-19 pandemic/NASA suppliers dashboard as part of the NASA Meta Information System. The dashboard provides visibility and situational awareness to aid risk assessment, planning and decision-making over the course of the pandemic recovery phase. The approach of integrating data and information into visual dashboard displays has also been employed by the SRA Program to focus on specific risks pertaining to foreign-based suppliers. This webinar is presented by the NASA Office of SMA and its Supply Chain Risk Management Program, in collaboration with the NASA Safety Center and Goddard’s SMA Directorate.

supplier research and analysis, supply chain risk ↗

GIS-Based Modeling of Contaminated Soil Volumes at Multiple Sites in the Formerly Utilized Sites Remedial Action Program - 20149

The remediation of hazardous, toxic, and radioactive waste (HTRW) sites produces cost-related risks associated with the estimation of contaminated soil or debris volumes. Historical risk-management techniques include cost contingencies to cover volume uncertainties that affect project budgeting and decision-making. The Buffalo District teamed with project partners to lessen volume uncertainty and reduce project risks at multiple HTRW sites managed under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Historical remedial investigations under FUSRAP commonly identified the presence of radiological material in site media, the associated human health risk, and then areas of remediation. To manage remedial execution and reduce risk, pre-design or remediation-phase sampling essentially 'chased' contamination, which was not conducive to efficient predictive budgeting derived from Feasibility Study (FS) cost analyses. The Buffalo District first optimized their approach to better understand volume uncertainty by utilizing the Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software [1]. BAASS processed soft data (e.g., gamma walk-over data) and spatial sampling data to estimate the lateral extent of contaminated soil irrespective of depth (i.e., gross contamination extent) and define areas of contaminant uncertainty. The software performed a binary transformation of contaminant concentrations at all sampling points based upon remedial action goals or a sum of ratios approach (i.e., clean, impacted, or range of impacts in soil). The model produced two-dimensional (horizontal) contaminant probability contours and statistical uncertainty in the sampling coverage and resulting contaminant extents. This method was translated vertically by partitioning the sampling data into depth brackets that produced a stacked representation of contaminant extents and uncertainty in the subsurface (i.e., similar to construction lifts). The results commonly led to a better understanding of project uncertainty and the need for sampling strategies that produce high-confidence soil volumes, which control costs. The BAASS-based delineations were eventually replaced by Empirical Bayesian Kriging (EBK) methods available in ArcGIS Spatial or 3D Analysts [2]. The EBK method calculates contaminant probability zones derived from user-controlled semivariograms of the spatial datasets. The resulting probability zones (e.g., 50% or 80% of contaminant probability) represent the two-dimensional surface delineation of the overall horizontal remedial area, similarly to BAASS. However, unlike BAASS, the vertical sampling data within these probability zones became vertical control points to contour a subterranean surface that connects subsurface points to the land-surface delineations of contamination. The resulting representation of horizontal and vertical impacts within an enclosed envelop (volume) of soil included uncertainty distributions that are used to plan uncertainty-reduction sampling. These data-driven and math-based models of three-dimensional sampling results produced well-bounded remedial volumes for project planning and better uncertainty predictions during project budgeting. The EBK method was applied to several FUSRAP sites managed by the Buffalo District and compared to less rigorously modeled sites previously remediated by the District. The comparison of modeled to actual remediated volumes provide a basis for validating the volume-estimation method. This comparison is important to ensure modeled volumes match physical boundaries of site remediation. FUSRAP sites with denser investigative sampling and lesser volume uncertainty proved useful in remedial planning and contracting. The Buffalo District noted that historical sites with sparser sampling arrays had greater disparity between estimated volumes and final remedial volumes. The benefit achieved over the cost of detailed soil sampling appears positive for FUSRAP projects, especially where impacts vary widely and appear unbounded by investigation-phase sampling. The subsequent Empirical Bayesian Kriging of contamination coupled with vertical contouring for soil estimations reduces uncertainty in soil volumes or indicates where sampling is required to reduce uncertainty, which together optimize remedial planning and budgeting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

In 2007 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organizations to find ways to reduce the cost of operations for supporting the International Space Station (ISS) in the Mission Control Center (MCC). Each MOD organization was asked to define and execute projects that would help them attain cost reductions by 2012. The MOD Operations Division Flight Planning Branch responded to this challenge by launching several software automation projects that would allow them to greatly improve console operations and reduce ISS console staffing and intern reduce operating costs. These tasks ranged from improving the management and integration mission plan changes, to automating the uploading and downloading of information to and from the ISS and the associated ground complex tasks that required multiple decision points. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture; as well as engaging a previously TRL 4-5 technology developed by Ames Research Center (ARC) that utilized an intelligent agent-based system to manage and automate file traffic flow, archive data, and generate console logs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the goal of eliminating a second full time ISS console support position by 2012. The team will also reduce one long range planning console position by 2014. When complete, these Flight Planning Branch projects will account for the elimination of 3 console positions and a reduction in staffing of 11 engineering personnel (EP) for ISS.

Hall, Timothy A.↗

Data Validation Package, June 2016 Groundwater Sampling at the Hallam, Nebraska, Decommissioned Reactor Site, August 2016

The 2008 Long-Term Surveillance Plan [LTSP] for the Decommissioned Hallam Nuclear Power Facility, Hallam, Nebraska (http://www.lm.doe.gov/Hallam/Documents.aspx) requires groundwater monitoring once every 2 years. Seventeen monitoring wells at the Hallam site were sampled during this event as specified in the plan. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Water levels were measured at all sampled wells and at two additional wells (6A and 6B) prior to the start of sampling. Additionally, water levels of each sampled well were measured at the beginning of sampling. See Attachment 2, Trip Report, for additional details. Sampling and analysis were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and-analysis-plan-us-department- energy-office-legacy-management-sites). Gross alpha and gross beta are the only parameters that were detected at statistically significant concentrations. Time/concentration graphs of the gross alpha and gross beta data are included in Attachment 3, Data Presentation. The gross alpha and gross beta activity concentrations observed are consistent with values previously observed and are attributed to naturally occurring radionuclides (e.g., uranium and uranium decay chain products) in the groundwater.

2016 Groundwater Sampling↗

Distributed Energy Resource Cybersecurity Framework and Cyber Range Integration

Distributed energy resource (DER) systems feature complex, data-driven communications networks that require careful system coordination and constant vigilance to ensure that grid assets are secure. Because DERs are an important component of the decarbonization strategy, agencies need to secure energy data that could implicate issues of national security if compromised. To help federal energy managers assess, monitor, and manage cybersecurity while achieving decarbonization, the National Renewable Energy Laboratory's (NREL's) Distributed Energy Resource Cybersecurity Framework (DER-CF) offers a comprehensive, web-based assessment tool focusing on cyber governance or policies, technical management, and physical security. The DER-CF currently presents users with a series of pertinent cybersecurity questions that are used to generate a site-specific report and recommendations. This paper outlines a plan to integrate the DER-CF with another key asset-NREL's cyber range-to visualize cybersecurity resilience and compliance and to enhance the usability and accessibility of the DER-CF for federal facility energy managers and planners. This integration will result in a visualization environment to interpret and interact with compliance data. Its development will include regular conversations with stakeholders to assess the effectiveness of these efforts, refine the visualization capability, and ensure its value to our partners.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Center Master Plan For NASA Glenn Research Center

The Center Master Plan for NASA Glenn Research Center is a comprehensive survey of NASA Glenn's current facility assets and a vision of how we see the facilities will change over the next 20 years in order to support the changing NASA Mission. This Center Master Plan is a vital management tool used by all organizations for making near term decisions and in future planning. During the summer of 2004, I worked with Joseph Morris, the Chief Architect in the Facilities Division, on beginning this Center Master Planning Process. The previous Master Plan was completed by the Center in 1985 and contained general information on the background of the facility as well as maps detailing environmental and historic records, land use, utilities, etc. The new Master Plan is required for the Center by NASA headquarters and will include similar types of information as used in the past. The new study will provide additional features including showing how individual buildings are linked to the programs and missions that they serve. The Master Plan will show practical future options for the facility s assets with a twenty year look ahead. The Plan will be electronically retrievable so that it becomes a communications tool for Center personnel. A Center Master Plan, although required, is very beneficial to NASA Glenn Research Center in aiding management with the future direction of the campus. Keeping up-to-date information and future plans readily available to all of NASA Glenn will insure that future real property development efficiently and effectively supports the missions camed out and supported by the Center. A Center Master Plan will also facilitate coordination with Center supported programs, stakeholders, and customers. In addition, it will provide a basis for cooperative planning with local and other governmental organizations and ultimately ensure that future budgets include the Center program needs described in the plan. This will ensure that development plans are safe, practical, and cost effective. To properly formulate any future plans, background information and research are required. Before bringing in a consultant to tackle the three year process anticipated to prepare a Center Master Plan, my job was to gather information on different organizations contributions to the NASA mission, their facility needs, consistent trends they observe, etc. I conducted numerous interviews with personnel such as Directorate Representatives, Division Chiefs, Branch Chiefs, System Managers and Building Managers. I documented the information I received from them for future use. I used the information to create various color-coded maps layering the different data. This was done with the ending objective being to collect the information and place it in a database that will be linked with Aperture (a computer program that generates color-coded map layers from database information) and made electronically retrievable to the Planning Consultant, NASA personnel, program stakeholders, and other governmental agencies. My goal this summer was to gather information and ideas appropriate for use in NASA Glenn Research Center s Master Plan and organize them for future application by the Planning Consultant. By the end of the summer, after completion of my goal, I will utilize my knowledge and create an array of preliminary future plans for the facility that can be passed along as a guidance tool.

Bigach, Kristin M.↗

NIF ICCS Test Controller for Automated & Manual Testing

The National Ignition Facility (NIF) Integrated Computer Control System (ICCS) is a large (1.5 MSLOC), hierarchical, distributed system that controls all aspects of the NIF laser [1]. The ICCS team delivers software updates to the NIF facility throughout the year to support shot operations and commissioning activities. In 2006, there were 48 releases of ICCS: 29 full releases, 19 patches. To ensure the quality of each delivery, thousands of manual and automated tests are performed using the ICCS Test Controller test infrastructure. The TestController system provides test inventory management, test planning, automated test execution and manual test logging, release testing summaries and test results search, all through a web browser interface. Automated tests include command line based frameworks server tests and Graphical User Interface (GUI) based Java tests. Manual tests are presented as a checklist-style web form to be completed by the tester. The results of all tests, automated and manual, are kept in a common repository that provides data to dynamic status reports. As part of the 3-stage ICCS release testing strategy, the TestController system helps plan, evaluate and track the readiness of each release to the NIF facility.

42 ENGINEERING↗

Design of automation tools for management of descent traffic

The design of an automated air traffic control system based on a hierarchy of advisory tools for controllers is described. Compatibility of the tools with the human controller, a key objective of the design, is achieved by a judicious selection of tasks to be automated and careful attention to the design of the controller system interface. The design comprises three interconnected subsystems referred to as the Traffic Management Advisor, the Descent Advisor, and the Final Approach Spacing Tool. Each of these subsystems provides a collection of tools for specific controller positions and tasks. This paper focuses primarily on the Descent Advisor which provides automation tools for managing descent traffic. The algorithms, automation modes, and graphical interfaces incorporated in the design are described. Information generated by the Descent Advisor tools is integrated into a plan view traffic display consisting of a high-resolution color monitor. Estimated arrival times of aircraft are presented graphically on a time line, which is also used interactively in combination with a mouse input device to select and schedule arrival times. Other graphical markers indicate the location of the fuel-optimum top-of-descent point and the predicted separation distances of aircraft at a designated time-control point. Computer generated advisories provide speed and descent clearances which the controller can issue to aircraft to help them arrive at the feeder gate at the scheduled times or with specified separation distances. Two types of horizontal guidance modes, selectable by the controller, provide markers for managing the horizontal flightpaths of aircraft under various conditions. The entire system consisting of descent advisor algorithm, a library of aircraft performance models, national airspace system data bases, and interactive display software has been implemented on a workstation made by Sun Microsystems, Inc. It is planned to use this configuration in operational evaluations at an en route center.

Erzberger, Heinz↗