Search NASA⌕ Search

SEARCH · Search NASA

Results for “EVACUATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Management of HL deposits for the D and D of UP1 reprocessing plant - retrieval and treatment scenarios - 15295

Built in 1958 on the Marcoule CEA site, the UP1 facility, was the 1. French industrial (500 t U / year) reprocessing plant based on the PUREX process. The plant, which has stopped operation in 1997, constitutes with its auxiliary workshop (vitrification workshop, glass canister storage), one of the largest and most challenging decommissioning project in France. In about 40 years of operation, various type of fuels elements such as metallic uranium, U-Al fuel rods, Phenix breeder elements or PWR fuel have been reprocessed, thereby requiring several plant and process adaptations. Resulting from these complex process chemistry and operation history, significant fouling of the chemical plant circuits and components has occurred. The fission product (FP) concentration process is particularly concerned. Preliminary investigation performed in 2010 in the evaporator's feeding tanks revealed the presence of significant amounts of sludge and dose rates as high as 250 Gy/h. Therefore a thorough investigation campaign, including visual inspection, volume quantification, deposits sampling, and radiological characterization of the components of this workshop has been initiated in 2013. Chemical analysis performed so far show that the solids are mainly composed of zirconium phosphates, 'MoZr' compounds and nitrate salt precipitates. But the presence of insoluble fines arising from the dissolution workshop and organic residues resulting from the TBP decomposition has also been evidenced in some of the tanks. The numerous constraints associated with the management of such highly active sludge, with Cs-137 specific activity ranging from 1 to 10 GBq/g, and a complex physico-chemical composition, lead CEA to investigate the implementation of an in situ conditioning treatment able to produce a waste package complying with existing evacuation routes and/or on-site storage facilities. The full paper presents an overview of the UP1 D and D project and then focuses on the possible dismantling scenarios for the FP concentration workshop, including the evaluation of different strategies for the highly active deposits management. The investigations and deposits characterization program will be developed so as the sampling methodologies that has been specifically tuned. In the light of the best actual knowledge of the deposits properties, the recovery and conditioning treatment scenarios will be exposed, considering, as a case study, the development of a specific vitrification tool to be implemented In Situ and specifically designed to match the requirements and constraints of the D and D project: adequately dimensioned, compact, flexible with respect to the feed composition, for a limited duration of use and designed to be dismantled. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A novel approach to criticality accident detection for a legacy facility

For operations on the Sellafield site involving fissile material a Criticality Accident Alarm System (CAAS) has traditionally been installed unless an omission case can be made. An omission case would examine if, in the absence of all controls, a criticality could reasonably be expected or whether the potential dose to an operator would remain below a maximum acceptable dose. It is a UK legal requirement for adequate emergency arrangements to be in place for hazards on a nuclear licensed site. For facilities where criticality is credible there is a regulatory expectation that a -Criticality Warning System- should be in place. A -Criticality Warning System- is not necessarily a full CAAS and alternative means of criticality detection may be part of an adequate emergency plan. The Sellafield site has a Magnox fuel reprocessing facility which has been operated since the 1960's. Evaporation of the Medium Active (MA) liquid waste from this process is undertaken in an associated building. Following extensive review of the plant and process a number of maloperations which can route fissile material to the MA evaporator were identified. Adequate controls to prevent these scenarios were shown to be in place. In the unlikely event of a failure of controls leading to sustained loss of fissile material a criticality incident may occur and hence an emergency plan was determined to be necessary. The novel emergency arrangements which were developed utilized the existing gamma monitor network located across multiple building floors. These gamma monitors are present for radiological safety. This emergency arrangement would require rapid interpretation of the gamma alarms by an operator and the manual triggering of a criticality evacuation alarm. The gamma monitors were demonstrated to be able to detect the minimum incident of concern (10{sup 15} fissions) as well as being able to alarm during the ramp up in power of a large criticality incident (10{sup 18} fissions). It was shown that a criticality accident could readily be distinguished from a radiological event (e.g. loss of containment). To support this work, criticality excursion analysis was used to examine the likely characteristics of a criticality in the MA evaporator. This novel arrangement was justified due to a number of factors including: the limited remaining operational lifetime of this facility (<5 years), the low frequency of maloperation coupled with a failure of controls and the crucial risk reduction provided by the continued reprocessing of Magnox fuel. Furthermore, the time and cost involved with design and installation of a standard CAAS would be substantially greater than a plan based upon existing instrumentation. These arguments were accepted by the UK regulator the Office for Nuclear Regulation (ONR). (author)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Decontamination and Decommissioning Activities of a Radiopharmaceuticals Production Facility - 18067

On May 2012, Best Medical Belgium S.A. (BMB), a manufacturer of pharmaceutical products located on the nuclear site of Fleurus, was declared bankrupt. According to the Belgian law, ONDRAF/NIRAS (Belgian Radioactive Waste Management Agency) was entrusted with the clean-up and decommissioning operations of the former BMB facilities, nowadays known as 'ONDRAF Site Fleurus' (ONSF). In June 2015, ONSF launched a Decontamination and Decommissioning (D and D) program, for which Tractebel: - Supports the definition of the clean-up and decommissioning strategies; - Drafts the Final Decommissioning Plan (FDP) and Safety Analysis Report (SAR) that will be submitted to FANC/AFCN (Belgian Federal Agency for Nuclear Control) in order to get the License for decommissioning; - Drafts the technical specifications of the public tendering process related to the D and D program; - Ensures the day to-day follow-up of the D and D activities on site. Four nuclear buildings are part of the D and D activities. One of them, building 14 (B14), represents the most challenging and extensive task with the clean-up of highly contaminated areas and its further decommissioning up to the final state. This building features two cyclotrons (CGR and IBA cyclotrons) successively used to produce radioisotopes, as well as hot cells and glove boxes used for their purification and the conditioning of the final pharmaceutical product. The present paper aims at presenting the most recent development steps of the clean-up phase regarding the adaptations of existing facilities and the upcoming activities in preparation of the decommissioning activities. To allow the sorting and the treatment of the radioactive material identified in the physical and radiological inventory, several workshops have been implemented within the B14 building in order to deal with radioactive materials arising from the clean-up and D and D activities. Following the conceptual design phase, Tractebel has actively monitored the on-site activities for the construction of those workshops such as: - The modification of the civil works; - The revamping of the ventilation system; - The installation of dedicated lifting equipment and workstations equipped with cutting devices; - The assembly of a docking station for filling the radioactive packages. The removal of the activated concrete surrounding the IBA cyclotron requires the erection of a containment structure and an extension structure. The containment structure, composed of light metallic beams, is located above the cyclotron and its irradiation zones. For operational security reasons and working efficiency, the cutting process of the concrete ceilings and walls will be performed from the top inside the containment structure by means of an eight tons overhead bridge crane. Concrete blocks resulting from the cutting process will then be lifted, without any loss of containment, towards the extension zone of the nuclear zone of the IBA cyclotron for further resizing, sorting and evacuation towards the identified waste routes. To prepare this task which will be performed during the decommissioning phase, Tractebel sets up the necessary technical specifications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3-D Gamma-ray Mapping from Unmanned Aerial Systems for Nuclear Decommissioning - 18439

Advanced gamma-ray detection technologies integrated with sophisticated robotic platforms will enable safer and more cost and time-efficient capabilities in support of nuclear decommissioning, waste management, and environmental remediation activities within the United States Department of Energy (U.S. DOE) complex and in the global nuclear power industry. In the Applied Nuclear Physics program at Lawrence Berkeley National Laboratory, we have developed the Nuclear Scene Data Fusion (SDF) capability to map gamma-ray emitting sources in large-scale, 3-D environments in real-time. This powerful capability has been successfully deployed in real-world environments, from a test-bed in Berkeley, CA to the exclusion zone in Fukushima Prefecture, Japan to support environmental remediation and contamination mapping efforts within evacuated communities, and is also currently being further developed in support of decommissioning efforts at the Fukushima Dai-ichi Nuclear Power Plant (FDNPP) in collaboration with the Japan Atomic Energy Agency (JAEA). In this work, we will provide an overview of SDF adapted for gamma-ray mapping onboard an UAS, as well as results from measurements demonstrating point and distributed source mapping. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3-D Radiation Mapping and Data Fusion for Environmental Remediation and Cleanup - 18449

Recent developments in radiation detection and imaging in combination with the enormous advances in computer vision and data processing enable new and improved means in the assessment of radiological contamination relevant for environmental remediation. We have developed a new concept called 3-D Scene Data Fusion (SDF) that allows us to map scenes in three dimensions and fuse this scene data with nuclear radiation data in near real time while the instrument is freely moving through the scene. This new technology provides more accurate radio-isotopic mapping at higher speed than currently possible. SDF is designed to be independent of the deployment platform and can be implemented with gamma-ray imaging and non-imaging instruments. We have demonstrated this concept in a large range of configurations on unmanned aerial and ground-based systems, in hand-portable configurations or mounted on cars or manned helicopters. While it can be utilized in a wide range of applications, this paper focuses on the mapping of radiological and nuclear materials in the context of environmental remediation and clean-up specifically in urban environments. We show results from measurements in the evacuated areas in the Fukushima Prefecture to demonstrate the new concept in the mapping of contamination and hot spots and the verification of decontamination activities in urban environments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhanced Evaluation Criteria to Meet the WIPP Waste Acceptance Criteria - 18655

The Waste Isolation Pilot Plant (WIPP) is a deep geologic repository for the disposal of Transuranic (TRU) waste and the only such disposal facility of its kind. TRU waste is radioactive mixed waste generated by the U. S. Department of Energy in support of National Defense. In 2014, the WIPP facility was shut down when two separate accidents occurred in the repository. The two accidents were a fire on a large underground haul truck that prompted evacuation and filled the mine with smoke and soot, and a radiation release that contaminated the exhaust ventilation and disposal areas of the mine. DOE performed two accident investigations in 2014 that resulted in many corrective actions. Some of the corrective actions resulted in significant changes in the WIPP Waste Acceptance Criteria (WAC) and are required to be applied to all TRU waste upon the resumption of shipments to WIPP. WIPP re-opened and began taking shipments again in 2017 and a large backlog of over 25,000 TRU waste containers that were certified prior to the new WAC have been undergoing re-evaluation since the re-opening. This paper will focus on the new WAC criteria that TRU waste must meet above-and-beyond previous WAC criteria and the implementation of new processes for approval. The primary area for these changes is in the area of waste characterization using Acceptable Knowledge (AK) and new detailed analyses required for chemical compatibility. The accident investigation revealed that the radiation release was due to a thermal runaway and bursting of the waste container due to inadvertent mixtures of nitrates and combustibles resulting in ignitable waste forms. In other words, the TRU waste container had incompatible contents that went undiscovered and created a hazard characteristic that was prohibited at WIPP. Through detailed chemical compatibility evaluations and new oversight, the DOE should be able to prevent a similar accident (see Figure 1). The new chemical compatibility evaluations and evaluations of oxidizing chemicals combined with combustibles are complex and detailed. Chemical compatibility is not a new requirement, but a much more detailed evaluation is a new requirement. And, obtaining historical information about the generation of the final waste form for legacy packaged waste can be very challenging. Specifically, determining possible amounts of chemicals in the waste can be extremely challenging. This paper does not explore in depth, the details of oxidizing chemicals. Other papers presented will discuss oxidizing chemicals. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Can Melter for Vitrification of Waste Coming from Decommissioning and Dismantling Operations - 19020

Some waste streams from decommissioning and dismantling operations are identified as an issue in terms of handling, transportation, adapted conditioning matrix or evacuation outlet within the existing regulations. In this context, the consortium of the DEM and MELT project which gathers Orano, the CEA and ECM technologies are currently developing and qualifying a specific vitrification tool designed to match the requirements and constraints of D and D projects. The main characteristics of this In-Can vitrification process are presented hereafter: - Suitable for high or medium level waste; - Flexible enough to accommodate uncertainties on waste composition; - Adequately dimensioned and compact to be implemented and operated inside an existing cell or close to the waste to be treated; - Designed for a short duration of use, as a decommissioning tool, aimed to be dismantled just after the treatment operation; - Designed in order to produce a small amount of secondary waste; - Requiring low investment and operation costs. The In-Can melting process has already been developed by the CEA for an internal application (defense waste vitrification) and can be rated TRL 7. That means it has been tested at full scale at a prototypical demonstration level with a range of simulants in an operational environment. This paper presents the In-Can vitrification process and its performances for a typical D and D waste highly loaded with Cs. The vitrification tests results will be in particular discussed in terms of process parameters, glass properties and cesium volatility. This paper also highlights the methodology and the organization (material, process, technological and long term behavior teams) deployed in order to adapt and qualify the In-Can process for all kind of wastes (liquid, solid, highly loaded with Tc and Cs, waste with no route, ...) from the matrix design definition to the full qualification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2D Dam-Break Analysis of L Lake and PAR Pond Dams Using HEC-RAS

In 1991 a dam-break study was conducted for the high hazard dams located at L Lake and PAR Pond on the Savannah River Site. Two scenarios were considered, over topping from a Probable Maximum Flood (PMF), and a fair weather dam-break for either or both dams. Unfortunately, no inundation map was developed from the study. The purpose of this project was to redo the original dam-break study with improved data and methodology to generate Inundation maps to assist with emergency response and evacuation plans. The Hydrologic Engineering Center's River Analysis System (HEC-RAS) is a free to download river analysis modeling program developed by the US Army Corps of Engineers capable of 1D and 2D hydraulic calculations. Version 5.0.7 (released March 2019) was used for this project. Digital elevation models for the area were retrieved from the US Geological Survey database and converted to a .hdf file within the program. Then the 2D flood area was identified from the contours. Both L Lake and PAR Pond were inputted as 1D storage areas because DEM data does not contain elevation values under water bodies. An elevation vs volume curve was available for both storage areas. Initial elevations were set for both scenarios. Both dams are earthen dams. The Steel Creek dam at L Lake has 6 ft diameter conduit with an upper and lower sluice gate. PAR pond dam consist of a weir and sluice gate connected to an 8 x 8 ft channel. Both outlets were modeled with a pool elevation vs discharge curve. The steel creek dam sluice gates were assumed to be fully open in all cases. As in the previous study, the dams were set to breach when they were overtopped by 1.5 ft during PMF conditions (Figure 1). A fair weather breach was set to be due to a piping failure (Figure 1). In the dual dam break during fair weather conditions the PAR pond dam fails 3 hours after Steel Creek to achieve maximum flooding in the down stream reaches. Simulation was run 3 days for each case and with a 1 minute computational interval. Maximum flooding occurs under PMF conditions with the failure of both dams. PAR pond dam fails first 16 hours and 32 minutes after the start of the simulation with the Steel creek dam failing 6 minutes later. In all cases, the bridges and roads spanning Steel Creek and Lower Three Runs will be inundated and potentially washed away. The Burtons Ferry Highway south of the storage areas will be partially flooded during PMF failure, dual fair weather failure, and PAR pond failure under fair weather conditions.

54 ENVIRONMENTAL SCIENCES↗

Optimization of the Post-Operational Phase on Two Belgian Multi-Unit Nuclear Power Plants: the Case of the Non-Fissile Irradiated Core Items - 20156

The current legal framework in Belgium foresees the progressive phase out of nuclear power between October 2022 (Doel 3) and December 2025 (Doel 2). Upon its definitive shutdown, each unit of the Tihange and Doel sites will enter a Post-Operational Phase (POP) and be prepared for its Decontamination and Decommissioning (D and D). Prior to obtaining the D and D license, the Operator Electrabel is legally required to remove any non-fissile irradiated core items stored in the deactivation pools. The non-fissile irradiated core items consist essentially of control rods, poison rods and source thimbles as well as thimble plugs and foreign materials irradiated during operation: - Their significant content in highly radiant radionuclides (up to 6 TBq of Co-60 per kg of irradiated material) renders all existing operational waste management processes inadequate due to insufficient biological shielding; - Their high concentrations in long-lived radionuclides call for their disposal in a geological repository for which no final design nor waste acceptance criteria are expected prior to 2050. Uncertainties in the Belgian energy supply and security, however, require the Operator to be prepared for a partial nuclear phase out, where one or more units would benefit from lifetime extension while the remaining units would undergo decommissioning. The present paper aims at presenting how Electrabel, in partnership with Tractebel, addressed this challenge by maximizing the use of synergies within the respective sites as well as between both sites themselves, all the while accounting for site specificities. The most recent results and state of progress of the project will be detailed and the first lessons learned will be shared. The project has been split in multiple tasks and phased as follows: - An inventory phase aimed at mapping the contents, origin, composition and history of the non-fissile irradiated core items; - A pre-characterization phase based on neutron activation models; - A waste sorting phase aimed at separating waste forms for which an evacuation route exists from those for which such route does not exist; - A feasibility phase aimed at exploring all possible scenarios for the management of non-fissile irradiated core items and identifying the optimal feasible solution for each site; - A preparation phase (currently ongoing), developing further the optimal solution and ensuring that back-up solutions are available for any foreseeable change of context (licensing issue, modification in the nuclear phase-out program, etc.) and initiating early contacts with potential subcontractors for segmentation works and cask manufacturers, as well as the Belgian regulatory body and waste management agency. This phase also foresees the investigation of destructive and non-destructive radiological measurements to support the detailed characterization of the waste forms; - A realization phase (future work). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chernobyl, the HBO miniseries: Fact and fiction (Part II)

Several considerations arose immediately after the accident, including whether to evacuate people living in Pripyat, a purpose-built city (atomic city) only four kilometers from the NPF and how to deal with injured emergency response personnel. Readers may wonder why there was a city of almost 50,000 people near a NPF.The answer lies in the poor infrastructure of the Soviet Union. In the U.S. and Europe, there is no need to build a city near a NPF, because it is easy and efficient to transport workers and materials to the site over considerable distances. This was not so in the Soviet Union, such that planners built a new city near each of nine NPFs where workers could live and materials needed for plant repairs could be fabricated.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Radiological Shielding Design for the Neutron Backscattering Spectrometer EMU

In this paper we present modelling and design of compact radiation shielding required for operation of the EMU instrument, located at Australia's OPAL nuclear reactor. The acceptance criteria for the shielding design were (i) safety - dose rate ≤ 3 μSv/h at external surfaces of the instrument's experimental area, (ii) floor load limit < 20 tons/m{sup 2}, (iii) low cost and (iv) for maintenance purposes 'easy access' to components of the instruments. The EMU instrument is a cold neutron backscattering spectrometer designed to measure inelastic neutron scattering. Its distinctive feature is that it has a tight elastic energy transfer resolution, of about 1 μeV. The instrument provides unique opportunities to study diffusion in complex materials, e.g. water molecules in confinement, polymers or biological molecules, particularly in the Asia-Oceania region. EMU is the first instrument located on the CG3 neutron beam line of the OPAL Neutron Guide Hall (NGH). A pre-existing evacuated neutron guide of dimensions 200 mm (height) x 50 mm (width) feeds into the shared EMU/KOOKABURRA pre-monochromator bunker shielding assembly, and its bottom cross section will be intercepted ∼200 mm further in air by the highly orientated pyrolytic graphite (HOPG) EMU pre-monochromator (take-off angles from 125.4 deg. to 148 deg.). The bunker shielding assembly for EMU also contains a beryllium filter and Focusing Guide Section D (FGD, 170 mm (height) x 50 mm (width)). To accommodate the range of take-off angles Pb cylindrical shielding blocks of radius 140 mm and 500 mm height have been designed. These blocks will be located at the section of the bunker where the neutron beam will exit towards the experimental area and they will reside on top of a hollow steel base (sides 10 mm thick), on which they move by sliding and are integrated with the tertiary shutter. The experimental area is enclosed by a concrete wall of 2.5 m height and 300 mm thickness, shared with the KOOKABURRA instrument, Gyprock Plasterboard panels with viewing windows, a wall from the Out-of-Pile Bunker and the CG3 shielding. The neutron beam enters the experimental area via the tertiary shutter, into the Focusing Guide Section C (FGC), which has an entrance guide cross-section of 158 mm (height) x 79 mm (width) and exit guide cross-section of 149 mm (height) x 85 mm (width) and is of length 816 mm. The vacuum chamber of FGC will be connected to the vacuum chamber of the Background Chopper (BC, disc of outer radius 350 mm). Focusing Guide Section B (FGB) is aligned with FGC and its vacuum shared with the BC vacuum. The FGB has an exit guide cross section of 50 mm (height) x 49 mm (width) and is of length 4046 mm, which will focus the neutron beam vertically and horizontally towards the Al window entrance (0.82 mm thickness, labelled N16) of the Scattering Tank assembly (constructed from 20 mm - 40 mm thickness stainless steel and will be under vacuum < 1 x 10{sup -3} mbar). Inside the Scattering Tank there is another section of Focusing Guide (FGA), with an exit guide cross-section of 30 mm (height) 30 mm (width) and of length 417 mm. The neutron beam exiting the FGA will be reflected by the HOPG crystal pieces of the Graphite Chopper (GC) towards the Backscattering Monochromator (BM). The reflected neutron beam will first pass through the other Al window (0.82 mm thickness, labelled N17) of the Scattering Tank and then enter into a flight tube (steel of 10 mm thickness). The BM is formed in an 1800 mm spherical radius array of Si crystal elements (0.87 mm thickness) and is oscillated by the linear motor Doppler Drive. The neutron beam will be reflected back at 180 deg. from, and focussed by the BM to reenter the Scattering Tank through the N17 Al window. It will then pass through the GC (HOPG crystals are rotated out of the way) and will reach the scattering sample of interest to the instrument end user. Also, inside the Scattering Tank there will be {sup 3}He linear position-sensitive detectors, and Analyser Arrays formed in an 1800 mm radius spherical arrays of Si crystal elements (0.87 mm thickness) glued on aluminium support frames (10 mm thickness) and span ∼160 deg. arc.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Determining Reactor Operating Conditions to Prevent Xenon Walkaway Accident

The xenon walk-away is a postulated uncontrolled criticality that could occur if operators are forced to evacuate the control room in certain circumstances. This poster shows how previously held assumptions are not entirely valid and that less restrictions should be placed on operators and engineers than initially assumed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Emergency Use Respirators in TRA-670

The project was based on the research of the history of the emergency use air purifying respirators (APRs) in TRA-670. Interviews, inspections, and document reviews were conducted. The interviews, inspections, and documents revealed that there were no current documents as to why the emergency use APRs were placed into TRA-670. The APRs were placed into green emergency boxes and stashed around the plant. Though they are checked to ensure they are not messed with, they have not been cleaned or re-verified since 2016 (some since 2014). When interviewees were asked, in an emergency, when they would reach for an APR over an emergency use SCBA, the consensus was that they would not. They would evacuate the facility as quickly as possible. If emergency respiratory protection were needed, a SCBA would be used. This is because, in an emergency scenario, one would not know what is in the air, so the utilization of a SCBA would be the safest option. Overall, the recommendation would be for the removal of the emergency use APRs.

60 APPLIED LIFE SCIENCES↗

Identifying Challenges in Safeguards for Metallic Fuel Fabrication Facilities

As new advanced reactors gain popularity, there is an increasing interest in metallic fuel fabrication for fast reactors. While metallic fuels themselves are not a new idea, as many of the first reactors employed metallic fuels, new designs, compositions, and fabrication methods are appearing throughout the nuclear community. As the interest grows and facilities are constructed, both domestic and international safeguards will need to be heavily involved to support safeguards-by-design (SBD) measures from the start. This work compiles a review of historical and modern fuel types and fabrication methods, fabrication processes, safeguards gaps, and potential safeguards solutions. Metallic nuclear fuel types have been around for many decades and were included in some of the first reactors including the Experimental Breeder Reactor (EBR)-I and -II, the Fermi 1 reactor, the Integral Fast Reactor (IFR), and the Dounreay Fast Reactor (DFR). These reactors used various compositions including pure uranium (U) metal, U-zirconium (Zr) alloys, plutonium (Pu)-aluminum (Al) alloys, U-fissium (Fs) alloys, U-Pu-Zr alloys, and U-molybdenum (Mo) alloys [1, 2, 3, 4, 5]. These small alloying additions are included to improve the material properties of the pure U metal. The alpha-phase U (stable below 661C) suffers elongation in one direction causing grain boundary cracking and increasing creep rate due to irradiation growth, thermal cycling, and preferential crystal orientation. It is ideal to utilize the gamma-phase U (typically stable above 769C) by adding small amounts of alloying elements such as Zr or Mo to stabilize this phase down to room temperature [3]. Additionally, some research has been focused on U with transuranic (TRU) elements present, typically coming from the used fuel recycling process. Including these elements in fast reactor fuel can aid in the reduction of nuclear waste by burning minor long-lived actinides. However, the additions of TRU elements can cause concerns to arise when trying to fabrication or safeguard metallic fuels. A typical metallic fuel element is shown in Figure 1. Sodium is added into the cladding to create a thermal bond between the fuel slug and cladding wall. The fuel slug is then inserted and the end plug is welded on to the top of the fuel element. A gas plenum is left to create a headspace for gaseous fission products to escape rather than continue to build in the fuel itself [1, 5]. Other fuel element geometries exist as well, such as the Lightbridge twisted cruciform geometry shown in Figure 2 [6]. This design allows for better cooling performance and provides room for fuel rod swelling without impacting the fuel rod diameter. There are many different fabrication methods for metallic fuels, which is one of the many benefits of these fuel types. Many of these fabrication methods are relatively easy and cost-efficient. The most popular fabrication method is injection casting, sometimes called vacuum induction melting (VIM), shown in Figure 3 [4, 8, 9, 7, 10]. This method was largely used for EBR-II fuel fabrication. The injection casting system is contained inside of a vessel consisting of a Y2O3-coated graphite crucible surrounded by an induction coil with ZrO2-coated quartz molds suspended above the crucible. The fuel feedstock is placed inside of the graphite crucible and melted using the induction furnace. The induction furnace utilizes a dual frequency with the high frequency melting the feedstock and the low frequency causing stirring of the melted feedstock to form a homogeneous mixture. The mixture is heated to approximately 1600C in an argon environment. The vessel is evacuated and then the quartz molds are lowered into the graphite crucible containing the molten metal and the vessel is repressurized to inject the metal fuel upwards into the molds. The molds are removed and then shattered to release the fuel slugs. This fabrication method was used to fabricate 39,000 metallic fuel pins for EBR-II. While injection casting has been the most common metallic fuel fabrication method throughout the decades, many other methods have been explored including low-pressure gravity casting, microwave casting, continuous casting, centrifugal casting, coextrusion, and many others [11, 12, 8, 13, 14, 15]. Some of these methods aim to mitigate challenges that arise with americium (Am) volatilization during the casting process for TRU-containing fuel feedstocks, an issue with injection casting. Coextrusion is one of the methods explored at the Idaho National Laboratory (INL) and has been utilized for the initial fabrication tests of Lightbridge's unique fuels, as well as other metallic fuels with cladding coextruded. In this process, large billets are formed and machined and then inserted into a molten salt bath for approximately 30 minutes. The billets are then loaded into the extrusion press and extruded. This process can be seen in Figure 4 [15].

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Experimental and Computational Study of Weld Drop-Through Hydraulic Effects in Multi-Layer Concentric Pipes Servicing Cryogenic Liquid Hydrogen

The Cryogenic Moderator System (CMS) at the Oak Ridge National Laboratory (ORNL)-Spallation Neutron Source (SNS) supplies liquid hydrogen, through vacuum insulated transfer lines to the moderators. The welding process used to make the transfer lines produces weld drop-through, which can constrict the flow of hydrogen and/or cause thermal bridges between adjacent layers. To ensure proper operation of the CMS it is therefore necessary to conduct a flow test to verify the pressure drop caused by the welds. Measurements in as-built piping sections intended to provide liquid hydrogen service to the SNS-CMS system were performed to test the effect of weld penetrations into the fluid flow area focusing on pressure drop effects. The reference test sections were designed using prototypical piping dimensions, materials and expected penetration welds. A numerical study using Computational Fluid Dynamics (CFD) tools in the transfer lines provided a conversion factor from the pressure drop measured in the lines with water to the expected pressure drop using liquid cryogenic hydrogen. The results show evidence of a maximum pressure drop modification in water of 78 KPa in the tested parts, which scales to liquid hydrogen as PHydrogen = 5.2 KPa. The maximum measured equivalent blockage area percentage was found in the as-built TDM transfer line spool 2 with a value of 31%. The measured values obtained in the as-built transfer lines provided accurate values to estimate the expected total pressure drop in the CMS system providing operational limits for the current recirculatory capacity. The effect of the weld drop-through in hydrogen evacuation capacity scenarios was better evaluated as a result of this study.

Dominguez-Ontiveros, Elvis [ORNL] (ORCID:000000018↗

Methods for coating conduit interior surfaces utilizing a thermal spray gun with extension arm

Systems and methods for applying a coating to an interior surface of a conduit. In one embodiment, a spray gun configured to apply a coating is attached to an extension arm which may be inserted into the bore of a pipe. The spray gun may be a thermal spray gun adapted to apply a powder coating. An evacuation system may be used to provide a volume area of reduced air pressure for drawing overspray out of the pipe interior during coating. The extension arm as well as the spray gun may be cooled to maintain a consistent temperature in the system, allowing for more consistent coating.

47 OTHER INSTRUMENTATION↗

AGN-Induced Cavities in NGC 1399 And NGC 4649

We present an analysis of archival Chandra and VLA observations of the E0 galaxy NGC1399 and the E2 galaxy NGC4649 in which we investigate cavities in the surrounding X-ray emitting medium caused by the central AGN. We calculate the jet power required for the AGN to evacuate these cavities and find values of {approx} 8x10{sup 41} erg s-1 and {approx} 14x10{sup 41} erg s{sup -1} for the lobes of NGC1399 and {approx} 7x10{sup 41} erg s{sup -1} and {approx} 6x1041 erg s{sup -1} for those of NGC4649. We also calculate the k/f values for each cavity, where k is the ratio of the total particle energy to that of electrons radiating in the range of 10 MHz to 10 GHz, and f is the volume filling factor of the plasma in the cavity. We find that the values of k/f for the lobes of NGC1399 are {approx} 93 and {approx} 190, and those of the lobes of NGC4649 are {approx} 15000 and {approx} 12000. We conclude that the assumed spectrum describes the electron distribution in the lobes of NGC1399 reasonably well, and that there are few entrained particles. For NGC4649, either there are many entrained particles or the model spectrum does not accurately describe the population of electrons.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Reducing the Consequences of a Nuclear Detonation.

The 2002 National Strategy to Combat Weapons of Mass Destruction states that 'the United States must be prepared to respond to the use of WMD against our citizens, our military forces, and those of friends and allies'. Scenario No.1 of the 15 Department of Homeland Security national planning scenarios is an improvised nuclear detonation in the national capitol region. An effective response involves managing large-scale incident response, mass casualty, mass evacuation, and mass decontamination issues. Preparedness planning activities based on this scenario provided difficult challenges in time critical decision making and managing a large number of casualties within the hazard area. Perhaps even more challenging is the need to coordinate a large scale response across multiple jurisdictions and effectively responding with limited infrastructure and resources. Federal response planning continues to make improvements in coordination and recommending protective actions, but much work remains. The most critical life-saving activity depends on actions taken in the first few minutes and hours of an event. The most effective way to reduce the enormous national and international social and economic disruptions from a domestic nuclear explosion is through planning and rapid action, from the individual to the federal response. Anticipating response resources for survivors based on predicted types and distributions of injuries needs to be addressed.

61 RADIATION PROTECTION AND DOSIMETRY↗