Search NASA⌕ Search

SEARCH · Search NASA

Results for “Efficient Envelope”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,157 records · Page 65

Geomechanical Performance of Hydrate-Bearing Sediment in Offshore Environments

The objective of this multi-year, multi-institutional research project was to develop the knowledge base and quantitative predictive capability for the description of geomechanical performance of hydrate-bearing sediments (hereafter referred to as HBS) in oceanic environments. The focus was on the determination of the envelope of hydrate stability under conditions typical of those related to the construction and operation of offshore platforms. We have developed a robust numerical simulator of hydrate behavior in geologic media by coupling a reservoir model with a commercial geomechanical code. We also investigated the geomechanical behavior of oceanic HBS using pore-scale models (conceptual and mathematical) of fluid flow, stress analysis, and damage propagation. The objective of the UC Berkeley work was to develop a grain-scale model of hydrate-bearing sediments. Hydrate dissociation alters the strength of HBS. In particular, transformation of hydrate clusters into gas and liquid water weakens the skeleton and, simultaneously, reduces the effective stress by increasing the pore pressure. The large-scale objective of the study is evaluation of geomechanical stability of offshore oil and gas production infrastructure. At Lawrence Berkeley National Laboratory (LBNL), we have developed the numerical model TOUGH + Hydrate + FLAC3D to evaluate how the formation and disassociation of hydrates in seafloor sediments affects seafloor stability. Several technical papers were published using results from this model. LBNL also developed laboratory equipment and methods to produce realistic laboratory samples of sediments containing gas hydrates so that mechanical properties could be measured in the laboratory. These properties are required to run TOUGH + Hydrate + FLAC3D to evaluate seafloor stability issues. At Texas A&M University we performed a detailed literature review to determine what gas hydrate formation properties had been measured and reported in the literature. We then used TOUGH + Hydrate to simulate the observed gas production and reservoir pressure field data at Messoyakha. We simulated various scenarios that help to explain the field behavior. We have evaluated the effect of reservoir parameters on gas recovery from hydrates. Our work should be beneficial to others who are investigating how to produce gas from a hydrate capped gas reservoir. The results also can be used to better evaluate the process of producing gas from offshore hydrates. The Schlumberger PETREL model is used in industry to the description of geologic horizons and the special distribution of properties. An interface between FLAC3D and Petrel was built by Schlumberger to allow for efficient data entry into TOUGH + Hydrate + FLAC3D.

42 ENGINEERING↗

Observations and Lessons Learned From Installing Residential Roofing-Integrated Photovoltaics

Building-sited solar photovoltaics (PV) could play a key role in decarbonizing the building sector either through racked and mounted PV or through Building-integrated PV (BIPV). BIPV is installed into the building envelope itself, with solar cells and/or modules forming the outer layer of a building structure, thus transforming a single-purpose structure into one that serves the dual purposes of the building envelope and electricity. BIPV can be applied to building roofs, facades, awnings, pergolas, windows, skylights, balustrades, and other external surfaces. Given BIPV products vary widely, the focus of this research is residential roofing integrated PV (RIPV), where solar is incorporated into or otherwise replaces the roofing material. Previous research suggests that residential RIPV could reduce customer acquisition, labor, supply chain, and equipment costs. These products have yet to realize these cost savings and deployment remains significantly less than conventional rooftop PV as a relative share of the addressable market in the US. One potential barrier to broader residential roofing integrated PV deployment may be higher costs relative to conventional rooftop PV, primarily because the design and installation of these products is still evolving. Here, we explore residential RIPV cost-reduction opportunities by analyzing installation processes. Our study documents residential RIPV installations at 2 reroofing sites and the equivalent of 9 new construction sites in California through a methodology known as time and motion study. We also conducted interviews with subject-matter experts to identify barriers and solutions to maximize these products' market penetration. Our time and motion study breaks the RIPV installation process into four steps: 1) staging, unloading, and roof preparation; 2) fire resistant underlayment(s) (synthetic material laid between roof shingles and roof deck); 3) flashings and PV installation; and 4) wiring and monitoring. We measure the time required for each step in terms of worker-hours, representing an hour of labor from a single worker. We further normalize process time by dividing worker-hours by kilowatt (kW) of system capacity. The most time-intensive step was flashings and PV installation, taking around 2.4 worker-hours per kW on average and accounting for around 60% of the process time for an average installation. The total installation process took on average about 6.4 and 3.5 worker-hours per kW at the reroofing sites and new construction sites, respectively. For comparison, a previous time and motion study documented a time of 6.9 worker-hours per kW for conventional rooftop PV. The shorter RIPV installation times are consistent with previous studies suggesting that RIPV could be installed faster than conventional rooftop PV. The time and motion results and feedback from interviewees provide insights into potential residential RIPV cost reduction opportunities. Several interviewees suggested that these products would be more efficient if PV installation was more fully integrated into the roofing/construction industries, which currently use separate supply chains and skillsets. Further integration could reduce supply chain delays and labor force redundancies. Future research could explore specific ways to integrate these industries to help realize the cost savings potential of RIPV.

14 SOLAR ENERGY↗

Field Evaluation of Highly Insulating Windows in the Lab Homes: Winter Experiment

This field evaluation of highly insulating windows was undertaken in a matched pair of 'Lab Homes' located on the Pacific Northwest National Laboratory (PNNL) campus during the 2012 winter heating season. Improving the insulation and solar heat gain characteristics of a home's windows has the potential to significantly improve the home's building envelope and overall thermal performance by reducing heat loss (in the winter), and cooling loss and solar heat gain (in the summer) through the windows. A high quality installation and/or window retrofit will also minimize or reduce air leakage through the window cavity and thus also contribute to reduced heat loss in the winter and cooling loss in the summer. These improvements all contribute to decreasing overall annual home energy use. Occupant comfort (non-quantifiable) can also be increased by minimizing or eliminating the cold 'draft' (temperature) many residents experience at or near window surfaces that are at a noticeably lower temperature than the room air temperature. Lastly, although not measured in this experiment, highly insulating windows (triple-pane in this experiment) also have the potential to significantly reduce the noise transmittance through windows compared to standard double-pane windows. The metered data taken in the Lab Homes and data analysis presented here represent 70 days of data taken during the 2012 heating season. As such, the savings from highly insulating windows in the experimental home (Lab Home B) compared to the standard double-pane clear glass windows in the baseline home (Lab Home A) are only a portion of the energy savings expected from a year-long experiment that would include a cooling season. The cooling season experiment will take place in the homes in the summer of 2012, and results of that experiment will be reported in a subsequent report available to all stakeholders.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced sorbents for modular oxygen production for REMS gasifiers

Under a DOE funded effort, Thermosolv LLC has been developing a sorbent-based oxygen production technology for gasification and oxy-combustion applications. The sorbents utilize oxygen-storage properties of certain perovskites to (1) selectively adsorb oxygen at moderate temperature from compressed air and (2) release the adsorbed oxygen into a vacuum or a sweep gas such as CO2 and/or steam. Through cyclic operations of multiple sorbent beds such a process can be made continuous. Pressure drop across the sorbent bed and other similar design considerations dictate that the sorbent be in the form of a high surface-area-to-volume pellet and yet still possess sufficient crush strength and integrity. Process efficiency is determined by the sorption and desorption kinetics and sorbent capacity. Typical process involves cycle times in the order of 100 seconds, a time too short to fully utilize the full volume of the sorbent and the sorption capacity of the sorbent pellets. As a part of this project, Thermosolv LLC undertook the development of oxygen sorbents as a high-surface area supported sorbent on a light-weight inert support to (1) reduce the cost, (2) increase the productivity, and (3) reduce the overall weight of the reactor. Using a previously developed perovskite (LSCF 1991) with its well-characterized performance, composite sorbent pellets each consisting of an inert core coated by a thin layer of the functional perovskite material were produced. Several low-density, inexpensive inert solids supports in the 1/8”-1/4” size were selected to keep the pressure drop across the sorbent bed in the acceptable range. A number of commercial technologies including spray coating, dip coating, incipient impregnation of porous substrate followed by thermal annealing at various temperatures and duration were employed and tested to produce robust composite supported sorbent pellets. A sense of optimum coating thickness was developed by testing sorbent pellets of various increasing diameter pellets. LSCF-1991extrudates ranging in size from 1/32” to 3/16” were tested in a TGA and in a fixed-bed pressure swing test set-up for sorption/desorption cycles of interest. The data show that for the operational conditions of interest the coating thickness for a supported sorbent pellet needs to be approximately 1/32” (about 0.8 mm). Subsequent work thereby concentrated on developing composite pellets of various substrates, shapes and sizes with coating layer of about this size range. Candidate support materials were chosen based on cost, inertness, mechanical strength, thermal expansion and chemical stability with sorbent material, and in a size range to give an acceptable pressure drop in fixed-bad reactor configurations. Coating application methods used for application of the sorbent onto the support included precipitation, spray coating and dip coating from sorbent slurries and sol gels. For all coated supports where we could successfully apply a uniform coating of desired thickness with an acceptable handling performance in terms of exfoliation, TGA-based cyclic sorption/desorption testing was performed to determine cycling capacity of oxygen. Among nearly twenty different support materials tested, best adhesion performance was obtained from stainless saddle supports. In the bench-scale fixed-bad tests stainless steel saddle support composite pellets with a coating thickness in the 0.6 mm or so range, the composite sorbent pellet performance approached up to 95% of that of the 2 mm parent material pellets. In a parallel approach to reducing the cost of the sorbent, alternate sorbent formulations replacing/reducing the amount of cobalt in the LSCF family were also investigated. Successful formulations that could match the performance of LSCF 1991 were identified based on TGA cyclic tests as LSCF 1919 and LSF 1910. In the range of operational envelop of cycle times and other relevant process operating conditions, the reduced Co formulations showed comparable performance in the bench-scale fixed-bad cyclic operations. As a part of this project, we also attempted substitution of La and Sr with Ca and Ba, and Co with Mn, Ni and Cu with little success, but the overall project goal of reducing sorbent cost in terms of raw material and manufacturing expenses was successful.

01 COAL, LIGNITE, AND PEAT↗

New Accessory for Cleaning the Inside of the Machine Tool Cavity

The best way to extend the life of a metalworking fluid (MWF) is to make sure the machine tool and MWF delivery system are properly cleaned at least once per year. The dilemma the MWF manager is faced with is: How does one clean the machine tool and the MWF system on a large machine tool with an enclosure in a timely manner without impacting production schedules? Remember the walls and roof of the machine enclosure are coated with a film of dried contaminated MWF that must also be removed. If not removed, the deposits on these surfaces can recontaminate the fresh charge of MWF. I have found a product that with this revised procedure helps to shorten the machine tool down time involved with machine cleaning. (1) Discuss with your MWF supplier if they have a machine cleaning product that can be used with your current water based MWF during normal machining operations. Most MWF manufacturers have a machine cleaner that can be used at a lower concentration (1-2% vs. 5%) and can be used while still making production parts for a short period of time (usually 24-48 hours). (2) Make sure this machine cleaner is compatible with the work-piece material you are machining into product. Most cleaners are compatible with ferrous alloys. Because of the increased alkalinity of the fluid you might experience staining if you are machining copper or aluminum alloys. (3) Remove the chips from the chips pans and fluid channels. (4) During off shift hours circulate the MWF using a new product marketed by Rego-Fix called a 'Hydroball'. This device has a 5/8 inch diameter straight shank which allows it to be installed in any collet or solid quick change tool holder. It has multiple nozzles so that the user can control the spray pattern generated when the MWF is circulated. It allows the user to utilize the high pressure, through spindle MWF delivery capability of your machine tool for cleaning purposes. The high pressure MWF system can now be effectively used for cleaning purposes. This will also work with standard pressure system but you must reduce the number of nozzles utilized. By combining the movement of the machine axis around the operating envelope and the MWF circulation you can do a reasonably effective job of washing the inside of the machine tool operating cavity. Way covers will be moved and surfaces exposed because of axis movement. Spray direction will change to better wash fixtures and machine tool components. Deposits will start to breakdown and be washed into the machine tool sump. Since the cycle will run four or more hours it can be done with a weaker cleaning solution. The distributor states that the unit can be rotated up to 50 RPM. When running it has the same effect as the washing rotor inside of your home dishwasher. Inside the cavity on a machining center there is a lot of splash. During normal operations, MWF deposits buildup on the walls and roof of the enclosures. If these deposits (containing bacteria, mold and other contaminants) are not removed they will inoculate the fresh charge of MWF when they are resaturated. When you clean the inside of machine tool cavity, time is spent removing these deposits on the walls and roof of the enclosure. Getting to these surfaces is very difficult usually requiring that a member of the cleaning crew get inside the machine tool to reach them. The Hydro ball is effective in distributing the cleaning solution on all surfaces of the enclosure under high pressure. The only negative we have found is you get to find all the gaps and leaks in your machine tool enclosure. By running the hydro ball with the machine cleaner enriched MWF during off shift (4-8 hours) you can effectively remove these deposits and buildups on the internal surfaces of the cavity of the machine tool and wash them down into the sump. You also clean the internal components of the MWF system without interrupting normal scheduled work. (5) Pump out the spent MWF. You will have found that most of the deposits have been washed from the internal surfaces of the enclosure. For extremely dirty machines you might have to refill the machine tool with the normal machine cleaner mix. You will find that even heavy deposits will break down quicker because of this pre-wash cycle. (6) Rinse the machine cavity. (7) Clean the walls, bottom and screens in the MWF reservoir. The use of this tool and the dilute machine cleaner reduced the cleaning time considerately without affecting production schedules. (8) Refill with MWF and resume normal operations. What we like about this system is we can schedule these light cleanings just before a scheduled fluid change. Add the cleaner to the mix and run the Hydroball on second shift. The spent fluid is pumped out on third shift and the machine refilled. The machine tool with a fresh charge of MWF is ready for first shift without interrupting production schedules. We get better life from our MWFs and the machinists are happier about the condition of their machines.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗