Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operating Experience”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Wind Turbines in the Built Environment: Summary of a Technical Report

Built-environment wind turbine (BEWT) projects are wind energy projects that are constructed on, in, or near buildings. These projects present an opportunity for distributed, low-carbon generation combined with highly visible statements on sustainability, but the BEWT niche of the wind industry is still developing and is relatively less mature than the utility-scale wind or conventional ground-based distributed wind sectors. The findings presented in this presentation cannot be extended to wind energy deployments in general because of the large difference in application and technology maturity. This presentation summarizes the results of a report investigating the current state of the BEWT industry by reviewing available literature on BEWT projects as well as interviewing project owners on their experiences deploying and operating the technology. The authors generated a series of case studies that outlines the pertinent project details, project outcomes, and lessons learned.

17 WIND ENERGY↗

Deployment of Wind Turbines in the Built Environment: Risks, Lessons, and Recommended Practices

Built-environment wind turbine (BEWT) projects are wind energy projects that are constructed on, in, or near buildings, as shown below. These projects present an opportunity for distributed, low-carbon generation combined with highly visible statements on sustainability, but the BEWT niche of the wind industry is still developing and is relatively less mature than the utility-scale wind or conventional ground-based distributed wind sectors. This poster investigates the current state of the BEWT industry by reviewing available literature on BEWT projects as well as interviewing project owners on their experiences deploying and operating the technology.

17 WIND ENERGY↗

Design of the LBNF Beamline

The Long Baseline Neutrino Facility (LBNF) will utilize a beamline located at Fermilab to provide and aim a neutrino beam of sufficient intensity and appropriate energy range toward DUNE detectors, placed deep underground at the Sanford Underground Research Facility (SURF) in South Dakota. The primary proton beam (60-120 GeV) will be extracted from the MI-10 section of Fermilab’s Main Injector and will be transported via a series of sixty-nine conventional magnets to a solid target. Neutrinos are produced after the protons hit the target and produce mesons which are subsequently focused by magnetic horns into a 194 m long decay pipe where they decay into muons and neutrinos. The hadron absorber, located directly downstream of the decay pipe is designed to absorb the residual energy from protons and secondary particles which have not decayed. Muon detectors placed downstream of the hadron absorber will provide important information about the neutrino beam properties such as the beam direction and intensity as well as the associated muon spectrum. The parameters of the facility were determined taking into account the physics goals, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The LBNF beamline facility is designed for initial operation at a proton-beam power of 1.2 MW, with the capability to support an upgrade to about 2.4 MW. LBNF/DUNE obtained CD-1 approval in November 2015. We discuss here the design status and the associated challenges as well as the R&D and plans for improvements before baselining the facility.

43 PARTICLE ACCELERATORS↗

Design Status of the LBNF / DUNE Beamline

The Long Baseline Neutrino Facility (LBNF) will utilize a beamline located at Fermilab to provide and aim a wide band beam of neutrinos of sufficient intensity and appropriate energy toward DUNE detectors, placed 4850 feet underground at SURF in South Dakota, about 1,300 km away. The primary proton beam (60-120 GeV) will be extracted from the MI-10 section of Fermilab's Main Injector. Neutrinos are produced after the protons hit a four-interaction length solid target and produce mesons which are subsequently focused by a set of three magnetic horns into a 194 m long helium-filled decay pipe where they decay into muons and neutrinos. The parameters of the facility were determined taking into account the physics goals, spatial and radiological constraints, extensive simulations and the experience gained by operating the NuMI facility at Fermilab. The Beamline facility is designed for initial operation at a proton-beam power of 1.2 MW, with the capability to support an upgrade to about 2.4 MW. LBNF/DUNE obtained CD-1 approval in November 2015 and CD-3a approval in September 2016. We discuss here the Beamline design status and the associated challenges.

43 PARTICLE ACCELERATORS↗

Assessment on the Practicality of Off-the-Shelf Valves for Use in Molten Salt

From the mid to late 1960s, the Molten Salt Reactor Experiment (MSRE) was operated at Oak Ridge National Laboratory (ORNL). The MSRE design is unique: instead of standard valves, freeze valves were used to isolate the fluid salt as needed. While standard valves were considered for use in the MSRE, key design challenges (leaking, corrosion, valve alignment, and cold-welding, etc.) were all avoided by choosing a freeze type valve. While the freeze valves were integral to the MSRE’s success, they do not respond quickly, and they are not capable of throttling flow: two key features important to commercial operation and test facilities. More than half a century after the MSRE’s inception, design and manufacturing capabilities have changed. There is a renewed interest in molten salts for energy storage in nuclear and concentrated solar power. Therefore, there is a strong desire to have a functioning valve that can be obtained off the shelf or with minimal modification to a custom valve. This research addresses the known challenges associated with valve selection in fluoride salts, provides guidelines as to potential options for selection of a valve, and uses these guidelines to select a valve for testing in ORNL’s Liquid Salt Test Loop (LSTL).

Howard, Trevor↗

NRIC Asset Suite Engineering and Operations Data Integration Plan

The National Reactor Innovation Center (NRIC), established by the U.S. Department of Energy (DOE) in August 2019, accelerates the demonstration and deployment of advanced nuclear energy through its mission to inspire stakeholders and the public, empower innovators, and deliver successful outcomes through efficient coordination of partners and resources. NRIC is a national program led by Idaho National Laboratory (INL), enabling collaborators to harness the world-class capabilities of the U.S. National Laboratory System. Committed to demonstrating advanced reactors by the end of 2025, NRIC is designed to bridge the gap between research, development, and the marketplace to help convert some of the Nation’s most promising advanced nuclear reactors into commercial applications by 2030. To meet these needs, NRIC is developing two reactor demonstration test beds at Idaho National Laboratory (INL), the Laboratory for Operation and Testing in the United States (LOTUS) and the Demonstration and Operation of Microreactor Experiments (DOME) test bed. Each test bed involves the modification of existing facilities at INL’s Materials and Fuels Complex (MFC). Retrofitting these facilities to accommodate novel reactors, as well as subsequent but similar NRIC projects, is a non-trivial engineering task and is expected to generate a significant amount of new and revised documentation. Leveraging digital engineering practices, this documentation will be managed in a purpose-built data management tool to facilitate origination, review, and approval while coordinating with the design contractor. The subsequent upload and review of documentation to INL’s existing document control system comprises a long and unnecessarily manual task. An opportunity exists to automate this upload process and save job-hours while continuing to adhere to INL/MFC document management procedures.

99 GENERAL AND MISCELLANEOUS↗

Measurement of the ionization yield from nuclear recoils in liquid xenon between 0.3 -- 6 keV with single-ionization-electron sensitivity

Dual-phase xenon TPC detectors are a highly scalable and widely used technology to search for low-energy nuclear recoil signals from WIMP dark matter or coherent nuclear scattering of ~MeV neutrinos. Such experiments expect to measure O(keV) ionization or scintillation signals from such sources. However, at ~ 1 keV and below, the signal calibrations in liquid xenon carry large uncertainties that directly impact the assumed sensitivity of existing and future experiments. In this work, we report a new measurement of the ionization yield of nuclear recoil signals in liquid xenon down to 0.3 keV – the lowest energy calibration reported to date – at which energy the average event produces just 1.1 ionized electrons. Between 2 and 6 keV, our measurements agree with existing measurements, but significantly improve the precision. At lower energies, we observe a decreasing trend that deviates from simple extrapolations of existing data. We also study the dependence of ionization yield on the applied drift field in liquid xenon between 220V/cm and 6240V/cm, allowing these measurements to apply to a broad range of current and proposed experiments with different operating parameters

Dark matter↗

Advanced Non-Destructive Assay Systems and Special Instrumentation Requirements for Spent Nuclear Fuel Recycling Facilities

The safe and efficient operation of the next generation of Spent Nuclear Fuel (SNF) recycling / reprocessing facilities is dependent upon the availability of high performance real time Non- Destructive Assay (NDA) systems at key in-line points. A diverse variety of such special instrument systems have been developed and commissioned at reprocessing plants worldwide over the past fifty years.. The measurement purpose, technique and plant performance for selected key systems have been reviewed. Obsolescence issues and areas for development are identified in the context of the measurements needs of future recycling facilities and their associated waste treatment plants. Areas of concern include (i) Materials Accountancy and Safeguards, (ii) Head End process control and feed envelope verification, (iii) Real-time monitoring at the Product Finishing Stages, (iv) Criticality safety and (v) Radioactive waste characterization. Common characteristics of the traditional NDA systems in historical recycling facilities are (i) In-house development of bespoke instruments resulting in equipment that if often unique to a given facility and generally not commercially available, (ii) Use of 'novel' techniques - not widely deployed in other applications, (iii) Design features that are tailored to the specific plant requirements of the facility operator, (iv) Systems and software implementation that was not always carried out to modern industry standards and (v) A tendency to be overly complex - refined by on-plant operational usage and experience. Although these systems were 'validated in use' and are generally fit for purpose, there are a number of potential problems in transferring technology that was developed ten or more years ago to the new build SNF recycling facilities of the future. These issues include (i) Obsolescence of components - particularly with respect to computer hardware and data acquisition electronics, (ii) Availability of Intellectual Property and design drawings and documentation (iii) Lack of compatibility with modern computers, software, data transfer networks, digital protocols and electrical code standards, (iv) Non-compliance with current and future mandatory standards and regulations for nuclear facilities (v) Design focused on measurement and control points that may be specific to the facility process (vi) Lack of utilization of recent technological advances where better performing, less complex and more cost-effective options are now available. Key radiometric measurement drivers and control points for future recycling facilities have been determined and a review of the adequacy of existing instrumentation has been performed. Areas where recent technology improvements may be more effectively deployed and future technology development may be appropriate are identified. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

D and D (System Closure) Mockup Testing Demonstration. Remediation of Legacy Radioactive Piping and Tank Systems at the Reactor Technology Complex (RTC) (2007)

This paper presents the results of an integrated mockup demonstration of technologies and equipment designed to remove radioactively contaminated piping systems from underground vaults and pipe trenches at the Idaho National Laboratory. The integrated mockup demonstration included performing a bench scale wax fixative study and field demonstrations of the remotely operated equipment that will be used to remove radioactively contaminated pipe systems. The bench-scale wax fixative study involved defining optimum temperature and moisture conditions for effectively filling pipe sections containing residual wastes with a wax based fixative. The field demonstrations involved dismantling underground vault and trench piping systems, including pipe sections filled with the wax fixative. The purpose of the demonstration was to ensure the selected technologies and equipment would be effective prior to field deployment. The demonstration was conducted as a joint effort by MSE Technology Applications, Inc., and CWI on behalf of the U.S. Department of Energy at the Mike Mansfield Advanced Technology Center in Butte Montana. In summary: The mockup included two main tests at the MSE facility: 1) a vault mockup that included stainless and carbon steel pipe cutting and removal; and 2) a trench mockup that included cutting and removing buried Duriron and ductile iron piping. Both mockups included cutting and removing a pipe filled with the WAXFIX stabilizing material. Based on the MSE moisture tests, project personnel concluded that the WAXFIX product would be effective when used on wastes with different moisture contents that may be encountered in piping systems during the closure of the TRA-630 Catch Tank System at INL. A section of stainless steel pipe was also used to test a number of leak stop alternatives for wax leaks that may be encountered in a degraded piping system. Both the vault and the trench mockup demonstration proved successful for ICP, DOE, and MSE. The ICP operators received valuable hands-on training using the selected equipment and tooling in situations very similar to what they will encounter at INL. Proper tool selection and tool change procedures were defined as situations requiring these operations were encountered. Methodologies for approaching similar trench and vault situations (including safety concerns) were identified and experienced, and wax filled pipes were successfully cut and removed without spilling the surrogate materials within the pipes. All of the tools performed well except the band saw tool. The band saw was specifically designed to cut pipe; however, it was not robust enough and generally the shear was used in its place. Mockups are essential in gaining actual hands on training before going to the field. Mockups improve efficiency and safety that results in cost effective remediation. The MSE facility provides a valuable resource for demonstration of mockups. The facility has several acres of available space and a highly qualified support staff. The integrated mockup demonstration was considered a great success by all involved parties. ICP operators received valuable experience using the equipment selected for catch tank system closure before field deployment in a radiological contaminated environment. The selected equipment proved to be applicable to the safe and effective closure of the catch tank systems, and MSE demonstrated the ability to provide facility and services necessary to support closure mockup demonstrations. (authors)

42 ENGINEERING↗

Performance of a full-scale ITER metal hydride storage bed in comparison with requirements

The storage of hydrogen isotopes as metal hydride is the technique chosen for the ITER Tritium Plant Storage and Delivery System (SDS). A prototype storage bed of a full-scale has been designed, manufactured and intensively tested at the Tritium Laboratory, addressing main performance parameters specified for the ITER application. The main requirements for the hydrogen storage bed are a strict physical limitation of the tritium storage capacity (currently 70 g T{sub 2}), a high supply flow rate of hydrogen isotopes, in-situ calorimetry capabilities with an accuracy of 1 g and a fully tritium compatible design. The pressure composition isotherm of the ZrCo hydrogen system, as a reference material for ITER, is characterised by significant slope. As a result technical implementation of the ZrCo hydride bed in the SDS system requires further considerations. The paper presents the experience from the operation of ZrCo getter bed including loading/de-loading operation, calorimetric loop performance, and active gas cooling of the bed for fast absorption operation. The implications of hydride material characteristics on the SDS system configuration and design are discussed. (authors)

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Sellafield Plan - 12458

The Sellafield Performance Plan represents the start of a new era for the Sellafield site. It is a key driver in the Nuclear Management Partners mission to make Sellafield safer, cleaner, more productive, more cost effective and a better neighbour. When published in summer 2011, the Sellafield Performance Plan set out exactly what work would be completed at Sellafield between 2010/11 and 2025/26, how all of the facilities on the site interact, and what new facilities would be needed in order to deliver the risk and hazard reduction mission. The plan is the first credible and underpinned lifetime plan for the Sellafield site - the most complex part of the UK's civil nuclear estate. Under the Sellafield Performance Plan there are projected to be more jobs longer creating opportunities for the site, its workforce and the economic stability of West Cumbria. The Sellafield Ltd performance plan sets out how NMP will apply their global experience to improve operations, generate efficiencies and deliver detailed programmes of work with the aim of accelerating decommissioning and providing value for money. Successful delivery of the plan will also ensure the site continues to effectively operate critical national infrastructure that supports the UK's energy programme, and maintains the safe and secure management and storage of nuclear materials. The NDA and UK Government have demonstrated their confidence in NMP and Sellafield Ltd's capability to deliver this plan by providing the highest-ever Annual Site Funding Limit for the site in 2011/12. The Sellafield Performance Plan also creates both the foundation and the environment for a vibrant West Cumbrian economy through significant opportunities for the local supply chain and real prospects for further inward investment. By working flexibly and accelerating the decommissioning programme, the plan provides the opportunity for significant retraining to adapt to future challenges on the site and for other potential new nuclear missions in West Cumbria. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Top Fuel 2016 Proceedings

Top Fuel, also called Light Water Reactor (LWR) Fuel Performance Meeting, is an annual topical meeting whose primary objective is to bring together leading specialists in LWR fuel from around the world to analyze advances in nuclear fuel technology and to use the findings of the latest cutting-edge research to help manufacture high performance nuclear fuels of today and tomorrow. The conference hosts 2 plenary sessions, 2 special sessions, and numerous technical sessions organized into 5 technical track ares: Track 1 - Fuel performance reliability, operations and maintenance experience; Track 2 - Advances in fuel technologies (e.g., enhanced accident tolerant fuel); Track 3 - Transient and off-normal fuel behavior; Track 4 - Used fuel storage, transportation, and reuse/recovery; and Track 5 - Fuel modeling and analysis. These proceedings gather 169 papers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NDMAS: Data storage, visualization, analysis, delivery, and more

Slides representing Nuclear Data Management and Analysis System (NDMAS) Data for properly preserving our publicly funded data, including DOE Public Access Plan and the users of NDMAS. From Capture, Storage, Delivery & Analysis, Archival, and Qualification of Fuel fabrication, PIE, ART Experiment monitoring and operations, and processes for recording work and for looking ahead.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cleaning Up Large Groundwater Plumes to Drinking Water Standards: Dynamic Groundwater Recirculation at Reese Air Force Base - 17248

Overall cleanup of large plumes is perceived as being impossible because of issues of scale, contaminant mass accessibility, time to achieve cleanup, and cost. As a result, when a groundwater pump and treat (P and T) remedy is applied to larger plumes, the focus is usually hydraulic containment of contaminated groundwater to prevent further plume migration, rather than a total restoration objective. Recent experience with dynamic operation of groundwater extraction, treatment, and strategic reinjection (collectively referred to as dynamic groundwater recirculation [DGR]) demonstrates that large plume remediation can be accomplished cost effectively and in a timely manner. The insight from operating DGR remedies at multiple sites has demonstrated that contaminant mass residing in a complex aquifer setting is most appropriately described by a three-compartment model, which is a new revelation in contaminant hydrogeology redefining what is possible in restoration. A large-scale application of DGR was implemented under a firm fixed price contract at former Reese Air Force Base (AFB) located in Lubbock, Texas. The strategy was successful in restoration of a sole-source drinking water aquifer affected by a 3-mile long trichloroethene (TCE) plume. DGR allowed groundwater P and T rates to be decreased from over 3,400 liters per minute (lpm) to less than 1,500 lpm through initial optimization efforts. The DGR strategy focused extraction and reinjection on two key objectives: 1) maximizing contaminant mass recovery and 2) maintaining hydraulic control of the plume. Extraction and injection wells were dynamically operated and cycled to maintain a remediation pace that restored 0.8 to 1.2 hectares of the plume per week over a 6-year period. Plume cleanup to drinking water standards was achieved in 9 years of optimized operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Groundwater Monitoring Guidance for Decommissioning Planning - 16228

The Electric Power Research Institute (EPRI) is preparing a document called Groundwater Monitoring Guidance for Decommissioning Planning. This guidance is the first part of a multi-year EPRI project which summarizes experiences with both operational and decommissioning groundwater protection programs and compares the two in order to identify data gaps. The EPRI guidance will show how to address these data gaps and provide recommended decommissioning preparatory actions. The second part of this project will addresses the long term stewardship of a groundwater protection program after the permanent shutdown of the plant during the SAFSTOR period and/or during the active decommissioning of the plant. This paper will discuss the content of the first EPRI guidance document that is focused on decommissioning planning. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Beginnings: Optimising Waste and End-state at UK Nuclear Sites to Enable Environmental Permit surrender (the GRR) - 20193

The decommissioning of nuclear sites involves the management of large volumes of radioactive waste, other conventional waste, and the clean-up of land and groundwater contamination. In the UK, the disposal of radioactive waste from nuclear sites is regulated by the Environment Agency (England), Natural Resources Wales (Wales) and the Scottish Environment Protection Agency (Scotland). All three environment agencies seek to make sure that the generation and disposal of radioactive waste is optimised: ensuring impacts to people are 'as low as reasonably achievable' (ALARA). With a large proportion of UK nuclear sites embarking on decommissioning, the environment agencies have collaboratively developed new guidance: the 'Management of radioactive waste from the decommissioning of nuclear sites: Guidance on the Requirements for Release from radioactive substances regulation' (referred to as the GRR)[1]. The environment agencies worked in liaison with the Office for Nuclear Regulation (ONR), the UK nuclear safety regulator, and the UK government body responsible, the Nuclear Decommissioning Authority (NDA). Prior to finalising the guidance, a 12 month trial was completed at three of the NDA's nuclear sites, enabling the environment agencies to test their draft GRR guidance against 'real world scenarios' and the challenge of incorporating its requirements into decommissioning plans. Experience gained during the trial was incorporated into the current version of the GRR, published in July 2018. The GRR represents the 'new beginning' of this paper's title because for the first time, the UK environmental regulators have expressed in detail their requirements for surrender of environmental permits for nuclear sites. The GRR provides a framework for a UK nuclear site to plan, assess and justify its management of radioactive waste and deliver through decommissioning, an optimal, environmentally safe and sustainable end-state. This paper will describe the requirements and technical standards within the GRR, the establishment of defensible clean-up criteria and the production of a Waste Management Plan (WMP), supported by a Site-Wide Environmental Safety Case (SWESC). It will describe the experience gleaned by operators and regulators during the trial and it will highlight current work by regulators to implement the new approach proportionately. Finally, this paper will look forward and outline planned amendments to legislation in the UK affecting nuclear sites that should enable the full benefits of the GRR to be realised in the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Lobe Power Calculator and Indication System with Physics and Cycle Based Models

The Advanced Test Reactor (ATR) at INL measures reactor power through two methods, thermal and Nitrogen-16 (N-16) activity. Water power calculator (WPC) is a thermal power system that measures flow and temperature to determine the thermal quadrant powers. The N-16 system utilizes a beta chamber detector that outputs reactivity levels to calculate lobe power through an algorithm called lobe power calculation and indication system (LPCIS). The LPCIS utilizes the N-16 system and the WPC system to determine reactor core power levels. The WPC provides accurate calculations of quadrant and total reactor thermal power. With the use of WPC measurements, thermal-to-N-16 (T2N) power ratios are produced to determine if the two indication systems agree on core power. Relative magnitude equations are used to utilize N-16 coefficients and multipliers to improve the indications of the LPCIS. This is crucial for maintaining safety limits. Currently, the LPCIS system uses linear equations and matrices to calculate lobe power through multipliers and coefficients. Advancements in technology and system upgrades have assisted system engineers at INL with the objective to reach a more dynamic system. In return the system demonstrates an increase in the accuracy of power reading while maintaining safety margins. The new proposed coefficient and multiple method implements a cycle specific, and a physics-based model intended for changing coefficients during operation. This calibration experiment focuses on power splitting, outer shim and neck shim, as well as fuel burning into the RDAS weighting factors. Results show that the Physics learning method yields a smaller error margin inside of the desired power range for the data set 166-A. This proved true for both constrained and unconstrained testing. This is most likely due to the physics data fitting approach that resulted in favorable coefficients and multipliers for 166-A. Continuing to improve the physics-based model will help improve the power accuracy of the LPCIS system.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

CMS Data Processing Workflows during an Extended Cosmic Ray Run

The CMS Collaboration conducted a month-long data taking exercise, the Cosmic Run At Four Tesla, during October-November 2008, with the goal of commissioning the experiment for extended operation. With all installed detector systems participating, CMS recorded 270 million cosmic ray events with the solenoid at a magnetic field strength of 3.8 T. This paper describes the data flow from the detector through the various online and offline computing systems, as well as the workflows used for recording the data, for aligning and calibrating the detector, and for analysis of the data.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗