At least 1,171 records · Page 65

Brigham City Hydro Generation Project

Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction from Jerome, Idaho for the Upper Power Plant construction. A kickoff meeting was June 24, 2014 and demolition was immediately started on building. Because of a delivery delay of Turbine, Generator and Equipment from Canyon Brigham City had to request another extension for the final date of completion. DOE awarded modification (.007) to Brigham City with a new completion date of August 1, 2015. The Turbine has had a few adjustments to help with efficiency; but the Generator had a slight vibration when generator got hot so Canyon Industries had U S Motor’s that manufactured the generator come to check out the issue. The other Equipment seems to be running normal. Brigham City, Sunrise Engineering and Canyon Industries met to determine what the vibration in the generator was and how to solve the issue Us Motor’s found some welds that failed: they have been repaired. U S Motor’s delivered the repaired generator Feb. 17, 2015. Canyon Industries arranged for a crane to installed generator in Power Plant. U S Motor’s balanced and wired generator. Plant Operators put the generator back on line. Canyon Industries returned and gave their approval to keep Hydro online. After Hydro was put back into operations it kept going off line because of overheating issues. Canyon Industries returned and replaced sensors and adjusted them to the proper settings for normal operations. Brigham City added additional steel screens to windows to increase air flow in Power Plant Building. After construction phase of the Upper Hydro Plant some landscaping has been restored around the building additional gravel brought in and leveled out and the road that was cut through for conduits to run wires. A retaining wall was installed to protect penstock. The Upper Hydro Plant is complete and in full operations. The final reimbursement was submitted.

13 HYDRO ENERGY↗

MACCS (MELCOR Accident Consequence Code System) User Guide

The MELCOR Accident Consequence Code System (MACCS) is used by Nuclear Regulatory Commission (NRC) and various national and international organizations for probabilistic consequence analysis of nuclear power accidents. This User Guide is intended to assist analysts in understanding the MACCS/WinMACCS model and to provide information regarding the code. This user guide version describes MACCS Version 3.10.0. Features that have been added to MACCS in subsequent versions are described in separate documentation. This User Guide provides a brief description of the model history, explains how to set up and execute a problem, and informs the user of the definition of various input parameters and any constraints placed on those parameters. This report is part of a series of reports documenting MACCS. Other reports include the MACCS Theory Manual, MACCS Verification Report, Technical Bases for Consequence Analyses Using MACCS, as well as documentation for preprocessor codes including SecPop, MelMACCS, and COMIDA2. PAPERWORK REDUCTION ACT STATEMENT The NUREG does not contain information collection requirements and, therefore, is not subject to the requirements of the Paperwork Reduction Act of 1995 (44 USC 3501, et seq.). PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number. ACKNOWLEDGEMENTS Contributions to this User Guide were received from NRC and Sandia National Laboratories (SNL) project managers, technical experts, and code authors dedicated to the production of a valuable resource for the MACCS user community. Instructions and guidance included herein were developed over many years and include advancements in the code that provide users the ability to develop complex consequence modeling scenarios. WinMACCS and many of the early MACCS developments were due to vision of an earlier Project Manager, Jocelyn Mitchell. Jonathan Barr and AJ Nosek also contributed to the development of this report. The current NRC Project Manager, Salman Haq, provided the leadership to ensure this document was completed. Several other NRC and Sandia staff provided insights supporting development of the MACCS code and of this document.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Robotic Underwater Decontamination Services for Nuclear Applications-18464

Successful Underwater Robotic Decontamination Demonstrates Dose-Saving And Outage-Shortening Technology Diakont successfully provided underwater robotic decontamination services on a North American nuclear power plant's refueling cavity and dryer-separator pool in Spring 2017 using a new tool system. Historically, nuclear plant operators have conducted cleaning and decontamination of these surfaces manually, after draining water from the space. However manual decontamination is slow, and can result in excessive personnel dose exposure. The underwater robotic decontamination services present a vast improvement over manual decontamination because it reduces personnel dose exposure, reduces radwaste, doesn't impact plant chemistry, and doesn't risk inadvertently spreading contamination. Also the new decontamination method avoids the risk of personnel injury and component damage associated with hydrolasing. And by performing the decontamination robotically while the cavities are flooded, in many cases the critical path outage schedule can be shortened. Able to decontaminate horizontal, vertical, and curved surfaces, the decontamination tools easily navigate to areas within flooded cavities that are inaccessible to previous solutions, performing decontamination in parallel to other activities including fuel movement. Also, unlike other legacy solutions, the new tools do not require continuous use of an overhead crane or other method of suspension while performing the decontamination activities. The ROV-type decontamination tool attaches and drives along the cavity and component surfaces using a high-force, no-flow vortex generator, even in the presence of Residual Heat Removal (RHR) or shutdown cooling flow. Efficient, effective cleaning is performed using a rugged brushing action to detach the crud, while vacuuming it away at high flow rates to a submerged filter. At the Spring 2017 refueling outage, the decontamination services with the new methodology were so effective that no additional manual cavity decontamination was required after drain-down. Using the tool's ability to swim, attach, and crawl, field technicians decontaminated the majority of the surfaces designated by the plant operator. Preliminary surveys indicated that all contamination levels were reduced to <50 K dpm/100 cm{sup 2}, helping the utility meet their INPO/Industry collective radiation exposure goals. The new cleaning and decontamination services are ideal for servicing various underwater areas within nuclear power plants such as refueling cavities, BWR-6 drywell heads, spent fuel pools, cask loading pools and fuel transfer canals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Materials and Methods for Streamlined Laboratory Analysis of Environmental Samples, FY 2016 Report

The International Atomic Energy Agency (IAEA) relies upon laboratory analysis of environmental samples (typically referred to as “swipes”) collected during on-site inspections of safeguarded facilities to support the detection and deterrence of undeclared activities. Unfortunately, chemical processing and assay of the samples is slow and expensive. A rapid, effective, and simple extraction process and analysis method is needed to provide certified results with improved timeliness at reduced costs (principally in the form of reduced labor), while maintaining or improving sensitivity and efficacy. To address these safeguard needs the Pacific Northwest National Laboratory (PNNL) explored and demonstrated improved methods for environmental sample (ES) analysis. Improvements for both bulk and particle analysis were explored. To facilitate continuity and adoption, the new sampling materials and processing methods will be compatible with existing IAEA protocols for ES analysis. PNNL collaborated with Oak Ridge National Laboratory (ORNL), which performed independent validation of the new bulk analysis methods and compared performance to traditional IAEA’s Network of Analytical Laboratories (NWAL) protocol. ORNL efforts are reported separately. This report describes PNNL’s FY 2016 progress, which was focused on analytical application supporting environmental monitoring of uranium enrichment plants and nuclear fuel processing. In the future the technology could be applied to other safeguard applications and analytes related to fuel manufacturing, reprocessing, etc. PNNL’s FY 2016 efforts were broken into two tasks and a summary of progress, accomplishments and highlights are provided below. Principal progress and accomplishments on Task 1, Optimize Materials and Methods for ICP-MS Environmental Sample Analysis, are listed below. • Completed initial procedure for rapid uranium extraction from ES swipes based upon carbonate-peroxide chemistry (delivered to ORNL for evaluation). • Explored improvements to carbonate-peroxide rapid uranium extraction chemistry. • Evaluated new sampling materials and methods (in collaboration with ORNL). • Demonstrated successful ES extractions from standard and novel swipes for a wide range uranium compounds of interest including UO 2 F 2 and UO 2 (NO 3 ) 2 , U 3 O 8 and uranium ore concentrate. • Completed initial discussions with commercial suppliers of PTFE swipe materials. • Submitted one manuscript for publication. Two additional drafts are being prepared. Principal progress and accomplishments on Task 2, Optimize Materials and Methods for Direct SIMS Environmental Sample Analysis, are listed below. • Designed a SIMS swipe sample holder that retrofits into existing equipment and provides simple, effective, and rapid mounting of ES samples for direct assay while enabling automation and laboratory integration. • Identified preferred conductive sampling materials with better performance characteristics. • Ran samples on the new PNNL NWAL equivalent Cameca 1280 SIMS system. • Obtained excellent agreement between isotopic ratios for certified materials and direct SIMS assay of very low levels of LEU and HEU UO 2 F 2 particles on carbon fiber sampling material. Sample activities range from 1 to 500 CPM (uranium mass on sample is dependent upon specific isotope ratio but is frequently in the subnanogram range). • Found that the presence of the UF molecular ions, as measured by SIMS, provides chemical information about the particle that is separate from the uranium isotopics and strongly suggests that those particles originated from an UF6 enrichment activity. • Submitted one manuscript for publication. Another manuscript is in preparation.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

SU-F-T-187: Quantifying Normal Tissue Sparing with 4D Robust Optimization of Intensity Modulated Proton Therapy

Purpose: To report an approach to quantify the normal tissue sparing for 4D robustly-optimized versus PTV-optimized IMPT plans. Methods: We generated two sets of 90 DVHs from a patient’s 10-phase 4D CT set; one by conventional PTV-based optimization done in the Eclipse treatment planning system, and the other by an in-house robust optimization algorithm. The 90 DVHs were created for the following scenarios in each of the ten phases of the 4DCT: ± 5mm shift along x, y, z; ± 3.5% range uncertainty and a nominal scenario. A Matlab function written by Gay and Niemierko was modified to calculate EUD for each DVH for the following structures: esophagus, heart, ipsilateral lung and spinal cord. An F-test determined whether or not the variances of each structure’s DVHs were statistically different. Then a t-test determined if the average EUDs for each optimization algorithm were statistically significantly different. Results: T-test results showed each structure had a statistically significant difference in average EUD when comparing robust optimization versus PTV-based optimization. Under robust optimization all structures except the spinal cord received lower EUDs than PTV-based optimization. Using robust optimization the average EUDs decreased 1.45% for the esophagus, 1.54% for the heart and 5.45% for the ipsilateral lung. The average EUD to the spinal cord increased 24.86% but was still well below tolerance. Conclusion: This work has helped quantify a qualitative relationship noted earlier in our work: that robust optimization leads to plans with greater normal tissue sparing compared to PTV-based optimization. Except in the case of the spinal cord all structures received a lower EUD under robust optimization and these results are statistically significant. While the average EUD to the spinal cord increased to 25.06 Gy under robust optimization it is still well under the TD50 value of 66.5 Gy from Emami et al. Supported in part by the NCI U19 CA021239.

60 APPLIED LIFE SCIENCES↗

Project Independence: Construction of an Integrated Biorefinery for Production of Renewable Biofuels at an Existing Pulp and Paper Mill

Project Independence proposed to construct a demonstration biomass-to-liquids (BTL) biorefinery in Wisconsin Rapids, isconsin. The biorefinery was to be co-located at the existing pulp and paper mill, NewPage Wisconsin System Incorporated’s Wisconsin Rapids Mill, and when in full operation would both generate renewable energy for Wisconsin Rapids Mill and produce liquid fuels from abundant and renewable lignocellulosic biomass. The biorefinery would serve to validate the thermochemical pathway and economic models for BTL production using forest residuals and wood waste, providing a basis for proliferating BTL conversion technologies throughout the United States. It was a project goal to create a compelling new business model for the pulp and paper industry, and support the nation’s goal for increasing renewable fuels production and reducing its dependence on foreign oil. NewPage Corporation planned to replicate this facility at other NewPage Corporation mills after this first demonstration scale plant was operational and had proven technical and economic feasibility. An overview of the process begins with biomass being harvested, sized, conditioned and fed into a ThermoChem Recovery International (TRI) steam reformer where it is converted to high quality synthetic gas (syngas). The syngas is then cleaned, compressed, scrubbed, polished and fed into the Fischer-Tropsch (F-T) catalytic reactors where the gas is converted into two, sulfur-free, clean crude products which will be marketed as revenue generating streams. Additionally, the Fischer-Tropsch products could be upgraded for use in automotive, aviation and chemical industries as valuable products, if desired. As the Project Independence project set out to prove forest products could be used to commercially produce biofuels, they planned to address and mitigate issues as they arose. In the early days of the Project Independence project, the plant was sized to process 500 dry tons of biomass per day but would generate a blend of synthesis gas for the lime kiln and a minimum of Fischer-Tropsch liquids for sale. This was to be done using a single stage of Fischer-Tropsch reaction at roughly a 70% yield. The capability of the Wisconsin Rapids Mill lime kiln to run on the relatively low heating value of the product synthesis gas was problematic. The design was then changed to maximize Fischer-Tropsch liquids production using a two stage Fischer-Tropsch process. Project Independence progressed with the design of the mill as ThermoChem Recovery International worked on the technical details of the project as well as develop information from their pilot plant. The pilot plant work uncovered several problems with the synthesis gas clean-up that solutions. ThermoChem Recovery International found these solutions and developed a very good path forward on the technical side. The technical solutions were demonstrated in the pilot plant to everyone’s satisfaction. In July 2010, NewPage Corporation had been severely affected by the downturn in the economy and actively went to find a strategic partner. By April 2011 the Abell Foundation entered the picture as this strategic partner. The Abell Foundation would join forces as Project Independence Inc. to build the 500 dry ton per day Project Independence plant. The design of this facility progress even after NewPage Corporation declared Chapter 11 Bankruptcy protection in September, 2011. This continued until April 2012 when NewPage Corporation determined that continued work on Project Independence Inc. presented too much risk with little reward for NewPage Corporation. The project was terminated at this point.

09 BIOMASS FUELS↗

Advanced High-Level Waste Glass Research and Development Plan

The U.S. Department of Energy Office of River Protection (ORP) has implemented an integrated program to increase the loading of Hanford tank wastes in glass while meeting melter lifetime expectancies and process, regulatory, and product quality requirements. The integrated ORP program is focused on providing a technical, science-based foundation from which key decisions can be made regarding the successful operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) facilities. The fundamental data stemming from this program will support development of advanced glass formulations, key process control models, and tactical processing strategies to ensure safe and successful operations for both the low-activity waste (LAW) and high-level waste (HLW) vitrification facilities with an appreciation toward reducing overall mission life. The purpose of this advanced HLW glass research and development plan is to identify the near-, mid-, and longer-term research and development activities required to develop and validate advanced HLW glasses and their associated models to support facility operations at WTP, including both direct feed and full pretreatment flowsheets. This plan also integrates technical support of facility operations and waste qualification activities to show the interdependence of these activities with the advanced waste glass (AWG) program to support the full WTP mission. Figure ES-1 shows these key ORP programmatic activities and their interfaces with both WTP facility operations and qualification needs. The plan is a living document that will be updated to reflect key advancements and mission strategy changes. The research outlined here is motivated by the potential for substantial economic benefits (e.g., significant increases in waste throughput and reductions in glass volumes) that will be realized when advancements in glass formulation continue and models supporting facility operations are implemented. Developing and applying advanced glass formulations will reduce the cost of Hanford tank waste management by reducing the schedule for tank waste treatment and reducing the amount of HLW glass for storage, transportation, and disposal. Additional benefits will be realized if advanced glasses are developed that demonstrate more tolerance for key components in the waste (such as Al 2 O 3 , Cr 2 O 3 , SO 3 and Na 2 O) above the currently defined WTP constraints. Tolerating these higher concentrations of key waste loading limiters may reduce the burden on (or even eliminate the need for) leaching to remove Cr and Al and washing to remove excess S and Na from the HLW fraction. Advanced glass formulations may also make direct vitrification of the HLW fraction without significant pretreatment more cost effective. Finally, the advanced glass formulation efforts seek not only to increase waste loading in glass, but also to increase glass production rate. When coupled with higher waste loading, ensuring that all of the advanced glass formulations are processable at or above the current contract processing rate leads to significant improvements in waste throughput (the amount of waste being processed per unit time),which could significantly reduce the overall WTP mission life. The integration of increased waste loading, reduced leaching/washing requirements, and improved melting rates provides a system-wide approach to improve the effectiveness of the WTP process.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modification of the Decontamination Facility at the Kruemmel NPP - 13451

In February 2009, Siempelkamp Nukleartechnik GmbH was awarded the contract for the design, manufacture, delivery and construction of a new Decontamination Facility in the controlled area for Kruemmel NPP. The new decontamination equipment has been installed according to the state of art of Kruemmel NPP. The existing space required the following modification, retrofitting and reconstruction works: - Demounting of the existing installation: to create space for the new facility it was necessary to dismantle the old facility. The concrete walls and ceilings were cut into sizes of no more than 400 kg for ease of handling. This enabled decontamination so largest possible amount could be released for recycling. All steel parts were cut into sizes fitting for iron-barred boxes, respecting the requirement to render the parts decontaminable and releasable. - Reconstructing a decontamination facility: Reconstruction of a decontamination box with separate air lock as access area for the decontamination of components and assemblies was conducted using pressurized air with abrasives (glass beads or steel shots). The walls were equipped with sound protection, the inner walls were welded gap-free to prevent the emergence of interstices and were equipped with changeable wear and tear curtains. Abrasive processing unit positioned underneath the dry blasting box adjacent to the two discharge hoppers. A switch has been installed for the separation of the glass beads and the steel shot. The glass beads are directed into a 200 l drum for the disposal. The steel shot was cleaned using a separator. The cleaned steel shot was routed via transportation devices to the storage container, making it available for further blasting operations. A decontamination box with separate air lock as access area for the decontamination of components and assemblies using high pressure water technology was provided by new construction. Water pressures between 160 bar and 800 bar can be selected. The inner walls are welded gap-free and all rough edges are rounded off. All wetted parts are steel grade 1.4301 or higher. In an extension to the high pressure water decontamination box, 2 ultrasonic ponds and one washing station for small components as provide by new construction. A long pond with 3.25 m length for the decontamination of large components (e.g. turbine blades, pump rotors, driving rods) was installed. For the handling heavy components, a 2 t crane was installed. New construction of a mechanical effluent treatment facility including oil separator was connected to the existing effluent storage tank provided by the customer. One exhaust air filtration system is provided for each decontamination box, with the following requirements. The exhaust air is sent back to the room (recirculated air system). Dry blasting box including raw separator with dust collection in 200 l drum, filter for suspended particles; High pressure water decontamination box and wet area with water separator, pre-separator, filter for suspended particles. Installation of a steel platform at building height +12.85 above the decontamination boxes + 8.50 m for the erection of the high pressure water facilities, the recirculating air filter system, the air compressor and the respiratory air supply unit. The aforementioned components are placed on the steel platform and have been encased in a sound-lowering and accessible manner. New construction of the entire E and C technology for the TU system including modification of the supply lines from the switch gear. All devices are to be operated automatically. Dry blasting box, high pressure water decontamination box and wet area are designed to guarantee a unitary 'exterior view' of the decontamination facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Evaluation of THOR TM Mineralized Waste Forms (Granular and Monolith) for the DOE Advanced Remediation Technologies (ART) Phase 2 Project

The U.S. Department of Energy's (DOE) Office of River Protection (ORP) is responsible for the retrieval, treatment, immobilization, and disposal of Hanford's tank waste. Currently there are approximately 56 million gallons of highly radioactive mixed wastes awaiting treatment. A key aspect of the River Protection Project (RPP) cleanup mission is to construct and operate the Waste Treatment and Immobilization Plant (WTP). The WTP will separate the tank waste into high-level and low-activity waste (LAW) fractions, both of which will subsequently be vitrified. The projected throughput capacity of the WTP LAW Vitrification Facility is insufficient to complete the RPP mission in the time frame required by the Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement (TPA), i.e. December 31, 2047. Therefore, Supplemental Treatment is required both to meet the TPA treatment requirements as well as to more cost effectively complete the tank waste treatment mission. The Supplemental Treatment chosen will immobilize that portion of the retrieved LAW that is not sent to the WTP's LAW Vitrification facility into a solidified waste form. The solidified waste will then be disposed on the Hanford site in the Integrated Disposal Facility (IDF). In addition, the WTP LAW Vitrification facility off-gas condensate known as WTP Secondary Waste (WTP-SW) will be generated and enriched in volatile components such as Cs-137, I-129, Tc-99, Cl, F, and SO 4 that volatilize at the vitrification temperature of 1150°C in the absence of a continuous cold cap. The current waste disposal path for the WTP-SW is to recycle it to the supplemental LAW treatment to avoid a large steady state accumulation in the pretreatment-vitrification loop. Fluidized Bed Steam Reforming (FBSR) offers a moderate temperature (700-750°C) continuous method by which LAW and/or WTP-SW wastes can be processed irrespective of whether they contain organics, nitrates, sulfates/sulfides, chlorides, fluorides, volatile radionuclides or other aqueous components. The FBSR technology can process these wastes into a crystalline ceramic (mineral) waste form. The mineral waste form that is produced by co-processing waste with kaolin clay in an FBSR process has been shown to be as durable as LAW glass. Monolithing of the granular FBSR product, which is one of the objectives of this current study, is being investigated to prevent dispersion during transport or burial/storage but is not necessary for performance. FBSR testing of a Hanford LAW simulant and a WTP-SW simulant at the pilot scale was performed by THOR Treatment Technologies, LLC at Hazen Research Inc. in April/May 2008. The Hanford LAW simulant was the Rassat 68 tank blend and the target concentrations for the LAW was increased by a factor of 10 for Sb, As, Ag, Cd, and Tl; 100 for Ba and Re (Tc surrogate); 1,000 for I; and 254,902 for Cs based on discussions with the DOE field office and the environmental regulators and an evaluation of the Hanford Tank Waste Envelopes A, B, and C. It was determined through the evaluation of the actual tank waste metals concentrations that some metal levels were not sufficient to achieve reliable detection in the off-gas sampling. Therefore, the identified metals concentrations were increased in the Rassat simulant processed by TTT at HRI to ensure detection and enable calculation of system removal efficiencies, product retention efficiencies, and mass balance closure without regard to potential results of those determinations or impacts on product durability response such as Toxicity Characteristic Leach Procedure (TCLP). A WTP-SW simulant based on melter off-gas analyses from Vitreous State Laboratory (VSL) was also tested at HRI in the 15-inch diameter Engineering Scale Test Demonstration (ESTD) dual reformer at HRI in 2008. The target concentrations for the Resource Conservation and Recovery Act (RCRA) metals were increased by 16X for Se, 29X for Tl, 42X for Ba, 48X for Sb, by 100X for Pb and Ni, 1000X for Ag, and 1297X for Cd to ensure detection by the analytic laboratory used for the demonstration and, as with the LAW simulant, without regard to potential impacts on product durability response such as TCLP. Details of the ESTD testing that was performed in April and May of 2008 are shown in Table 1 as the Operational Summary. The first eight tests were performed on LAW using a Denitration and Mineralization Reformer (DMR) temperature of 725°C and different ratios of clay:simulant of 675 g or 640 g of OptiKast clay per liter of simulant. The last four tests were performed on WTP-SW (originally referred to as LAW-Recycle) using a DMR temperature in the range of 680°C to 700°C with a mixture of 45/55 Sagger/OptiKast clay with 307 g clay/L simulant. The coal feed rates used in the FBSR processing are also shown as noted at the bottom of Table 1. It should be noted that the carbon feed rates are averaged over those periods.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Materials and Modules for Low Cost, High Performance Fuel Cell Humidifiers

The objective of this program was to demonstrate a durable, high performance water transport membrane; and a compact, low-cost, membrane-based module utilizing that membrane for use in an automotive, stationary and/or portable fuel cell water transport exchangers. Over the past 20 years, great technical progress has been made in improving power density and durability of fuel cell stacks. Yet, operating durably at high performance levels under very dry conditions, e.g., < 20% RH at 80°C or above, remains beyond even the best fuel cell membrane electrode assemblies. Thus, today it is essential to humidify the gases supplied to the fuel cell inlets. In this work, we have produced a new, inexpensive, composite membrane capable of very high water vapor transport and low air cross-over. The composite structure consists of a very thin ionomer layer (e.g., < 5 μm) sandwiched between two microporous polymer layers. The thin ionomer layer facilitates the rapid water transport and provides an impermeable layer to prevent gas cross-over. Such an approach reduces cost, but maintains performance. The microporous layer protects the thin ionomer layer from mechanical damage during handling; confers strength to the thin layer allowing it to be more durable during use; and allows it to withstand higher automotive pressures and temperatures. The composite structure will therefore allow lower total cost while still meeting automotive humidifier water transport and durability targets. Because the transport rates of these new materials are so high, existing planar membrane humidifier module designs available at the start of the program were incapable of efficiently utilizing the high rates. Therefore, the assembled team designed, tested and demonstrated an innovative, low-cost humidifier module with customized channel geometries that can take advantage of the high the water transport rates. The objectives of the program have been fully met. The optimized membrane produced in the program has very high transport rates, nearly twice that of the closest competitive option, a homogeneous perfluorosulfonic acid (PFSA) membrane. Furthermore, the composite structure imparts significant durability advantages, allowing the membrane to remain gas impermeable during 20,000 relative humidity (RH) cycles, unlike the closest competitive options that fail very rapidly. It does suffer from a loss of performance with time at temperature because of inherent properties of the PFSA polymer, but this degradation is manageable through relatively simple system design changes. The final membrane of this program has been produced on manufacturing level equipment in a roll to roll form in the scale of hundreds of square meters. The process is readily scalable to automotive level volumes to allow production of a low-cost membrane required for this application. A full scale automotive air-to-air humidifier module has been designed, tested and built. The final module meets the design specifications required for automotive fuel cell use, and exceeds all the DOE 2017 targets for a cathode humidification module as determined in independent testing at Ford Motor Company. It has a small volume, less than 5 liters; a high water transfer rate, significantly greater than 5 g/s at the DOE specified conditions; acceptably low pressure drop; and is projected to maintain these properties over 5000 hours. Additionally, high volume cost projections suggest that the module can be produced for less than $\$$100 per unit in a scale of 500,000 units per year.

08 HYDROGEN↗

Chemo-chromic Pd-V{sub 2}O{sub 5} Sensors for Passive Hydrogen Detection in Nuclear Containments - 18268

The ability to detect and monitor hydrogen gas efficiently in process and storage facilities, handling nuclear material, is crucial to ensuring their safety. The accumulation of hydrogen gas, above the lower flammable limit (LFL), in a nuclear waste containment is a concern since it creates the potential for a hydrogen-air explosion to occur, which could lead to a loss of containment and result in the uncontrolled release of radioactive material into the surrounding environment. The events that took place at Fukushima Daiichi Nuclear Power Plant highlighted the vulnerability of conventional hydrogen detection to extreme events, where power may be lost. In the present work, chemo-chromic hydrogen sensors have been fabricated, using transition metal oxide thin films, to provide eye-readable detection systems that would be resilient to plant power failure. Vanadium oxide (V{sub 2}O{sub 5}) films were prepared on quartz glass substrates by sol-gel deposition and sensitized with a palladium (Pd) catalyst, deposited by electron beam evaporation. When exposed to hydrogen, the Pd catalyst dissociates H{sub 2} to H atoms, which diffuse into the V{sup (V)}{sub 2}O{sub 5} forming a hydrogen-vanadium metal bronze, H{sub 2}V{sup (III)}{sub 2}O{sub 5}, resulting in a noticeable colour change from orange to dark green. To assess their viability for nuclear safety applications, these sensors have been irradiated to total doses between 5 and 250 kGy using a Co-60 gamma isotope irradiator. The results suggest that gamma irradiation, at the levels examined, has an effect on the initial colour of the V{sub 2}O{sub 5} and Pd-V{sub 2}O{sub 5} thin films with decreased transmittance above 540 nm. The orange starting colour darkened and developed a green tone, with the degree of colour change depending on the applied total dose. Changes in surface morphology and characteristics have been examined by using Scanning Electron Microscopy (SEM) and Raman spectroscopy. High level (250 kGy) gamma radiation exposure begins to produce surface degradation on V{sub 2}O{sub 5} thin films; however this behaviour is not observed for films that are also coated with palladium. Chemo-chromic properties of both un-irradiated and irradiated Pd-V{sub 2}O{sub 5} thin films were determined by examining their optical transmittance, using UV-vis spectroscopy, under exposure to a 4% H{sub 2}-N{sub 2} gas mixture. Exposure to gamma radiation has been found to have negligible effect upon colour change behaviour after 30 minutes exposure to hydrogen gas. The results suggest that the thin film V{sub 2}O{sub 5} sensitised with Pd is a plausible technique for application in the monitoring of hydrogen gas in low-level gamma radiation environments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TU-CD-303-03: Localized Radiation Can Induce Systemic Anti-Cancer Immune and Non-Immune Responses and How We Might Utilize It

Recent advances in cancer research have shed new light on the complex processes of how therapeutic radiation initiates changes at cellular, tissue, and system levels that may lead to clinical effects. These new advances may transform the way we use radiation to combat certain types of cancers. For the past two decades many technological advancements in radiation therapy have been largely based on the hypothesis that direct radiation-induced DNA double strand breaks cause cell death and thus tumor control and normal tissue damage. However, new insights have elucidated that in addition to causing cellular DNA damage, localized therapeutic radiation also initiates cascades of complex downstream biological responses in tissue that extend far beyond where therapeutic radiation dose is directly deposited. For instance, studies show that irradiated dying tumor cells release tumor antigens that can lead the immune system to a systemic anti-cancer attack throughout the body of cancer patient; targeted irradiation to solid tumor also increases the migration of tumor cells already in bloodstream, the seeds of potential metastasis. Some of the new insights may explain the long ago discovered but still unexplained non-localized radiation effects (bystander effect and abscopal effect) and the efficacy of spatially fractionated radiation therapy (microbeam radiation therapy and GRID therapy) where many “hot” and “cold” spots are intentionally created throughout the treatment volume. Better understanding of the mechanisms behind the non-localized radiation effects creates tremendous opportunities to develop new and integrated cancer treatment strategies that are based on radiotherapy, immunology, and chemotherapy. However, in the multidisciplinary effort to advance new radiobiology, there are also tremendous challenges including a lack of multidisciplinary researchers and imaging technologies for the microscopic radiation-induced responses. A better grasp of the essence of these advances in cancer biology research will give medical physicists a new perspective in daily clinical physics practice and in future radiation therapy technological development. Furthermore, academic medical physics should continue to be an integral part of the multidisciplinary cancer research community, harnessing our newly acquired understanding of radiation effects, and developing novel cost-effective treatment strategies to better combat cancer. Learning Objectives: Understand that localized radiation can lead to non-localized secondary effects such as radiation-induced immune response, bystander effect, and abscopal effect. Understand that the non-localized radiation effects may be harnessed to improve cancer treatment. Learn examples of physics participation in multidisciplinary research to advance cancer biology. Recognize the challenges and possibilities of physics applications in cancer research. Chang: NIH 5RC2CA148487-02 and 1U54CA151652-01 Graves: IDEA award (19IB-0106) from the California Breast Cancer Research Program (CBCRP), and by NIH P01 CA67166.

60 APPLIED LIFE SCIENCES↗

Identifying Challenges in Safeguards for Metallic Fuel Fabrication Facilities

As new advanced reactors gain popularity, there is an increasing interest in metallic fuel fabrication for fast reactors. While metallic fuels themselves are not a new idea, as many of the first reactors employed metallic fuels, new designs, compositions, and fabrication methods are appearing throughout the nuclear community. As the interest grows and facilities are constructed, both domestic and international safeguards will need to be heavily involved to support safeguards-by-design (SBD) measures from the start. This work compiles a review of historical and modern fuel types and fabrication methods, fabrication processes, safeguards gaps, and potential safeguards solutions. Metallic nuclear fuel types have been around for many decades and were included in some of the first reactors including the Experimental Breeder Reactor (EBR)-I and -II, the Fermi 1 reactor, the Integral Fast Reactor (IFR), and the Dounreay Fast Reactor (DFR). These reactors used various compositions including pure uranium (U) metal, U-zirconium (Zr) alloys, plutonium (Pu)-aluminum (Al) alloys, U-fissium (Fs) alloys, U-Pu-Zr alloys, and U-molybdenum (Mo) alloys [1, 2, 3, 4, 5]. These small alloying additions are included to improve the material properties of the pure U metal. The alpha-phase U (stable below 661C) suffers elongation in one direction causing grain boundary cracking and increasing creep rate due to irradiation growth, thermal cycling, and preferential crystal orientation. It is ideal to utilize the gamma-phase U (typically stable above 769C) by adding small amounts of alloying elements such as Zr or Mo to stabilize this phase down to room temperature [3]. Additionally, some research has been focused on U with transuranic (TRU) elements present, typically coming from the used fuel recycling process. Including these elements in fast reactor fuel can aid in the reduction of nuclear waste by burning minor long-lived actinides. However, the additions of TRU elements can cause concerns to arise when trying to fabrication or safeguard metallic fuels. A typical metallic fuel element is shown in Figure 1. Sodium is added into the cladding to create a thermal bond between the fuel slug and cladding wall. The fuel slug is then inserted and the end plug is welded on to the top of the fuel element. A gas plenum is left to create a headspace for gaseous fission products to escape rather than continue to build in the fuel itself [1, 5]. Other fuel element geometries exist as well, such as the Lightbridge twisted cruciform geometry shown in Figure 2 [6]. This design allows for better cooling performance and provides room for fuel rod swelling without impacting the fuel rod diameter. There are many different fabrication methods for metallic fuels, which is one of the many benefits of these fuel types. Many of these fabrication methods are relatively easy and cost-efficient. The most popular fabrication method is injection casting, sometimes called vacuum induction melting (VIM), shown in Figure 3 [4, 8, 9, 7, 10]. This method was largely used for EBR-II fuel fabrication. The injection casting system is contained inside of a vessel consisting of a Y2O3-coated graphite crucible surrounded by an induction coil with ZrO2-coated quartz molds suspended above the crucible. The fuel feedstock is placed inside of the graphite crucible and melted using the induction furnace. The induction furnace utilizes a dual frequency with the high frequency melting the feedstock and the low frequency causing stirring of the melted feedstock to form a homogeneous mixture. The mixture is heated to approximately 1600C in an argon environment. The vessel is evacuated and then the quartz molds are lowered into the graphite crucible containing the molten metal and the vessel is repressurized to inject the metal fuel upwards into the molds. The molds are removed and then shattered to release the fuel slugs. This fabrication method was used to fabricate 39,000 metallic fuel pins for EBR-II. While injection casting has been the most common metallic fuel fabrication method throughout the decades, many other methods have been explored including low-pressure gravity casting, microwave casting, continuous casting, centrifugal casting, coextrusion, and many others [11, 12, 8, 13, 14, 15]. Some of these methods aim to mitigate challenges that arise with americium (Am) volatilization during the casting process for TRU-containing fuel feedstocks, an issue with injection casting. Coextrusion is one of the methods explored at the Idaho National Laboratory (INL) and has been utilized for the initial fabrication tests of Lightbridge's unique fuels, as well as other metallic fuels with cladding coextruded. In this process, large billets are formed and machined and then inserted into a molten salt bath for approximately 30 minutes. The billets are then loaded into the extrusion press and extruded. This process can be seen in Figure 4 [15].

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nuclear Safety [Vol. 33, No. 4, October-December 1992]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 499 Technical Note: Nuclear Regulatory Commission’s Examination Question Bank System, C. L Jensen and N. L. Skinner; 506 Report on the Specialists’ Meeting on Passive and Active Safety Features of Liquid-Metal Fast Breeder Reactors Organized by the International Atomic Energy Agency at Oarai Engineering Centre of Power Reactor and Nuclear Development Corporation, Japan, November 5-7,1991, S. R. Paranjpe; ACCIDENT ANALYSIS: 514 A Review of Hydrogen Production During Melt/Water Interaction in LWRs, D. F. Fletcher, B. D. Turland, and S. P. A. Lawrence; 535 A Review of the U 3 0 8 -Al Reaction as a Potential Heat Source in Research and Test Reactor Accidents, J. L. Snelgrove; CONTROL AND INSTRUMENTATION: 543 Multilevel Interfaces for Power Plant Control Rooms II: A Preliminary Design Space, K. J. Vicente; DESIGN FEATURES: 549 Twenty-Second DOE/NRC Nuclear Air Cleaning and Treatment Conference, R. R. Bellamy, D. W. Moeller, and M. W. First; 562 Book Review: Safety Assessment of Unit 5 (WWER-440/W-213) of the Greifswald Nuclear Power Station, M. H. Fontana; WASTE AND SPENT FUEL MANAGEMENT: 576 Activities Related to Waste and Spent Fuel Management, M. D. Muhlheim and E. G. Silver; OPERATING EXPERIENCES: 586 Analysis of Corrective Actions Applied to Nuclear Power Plant Operations, A. E. Cross; 593 Reactor Shutdown Experience, Compiled by J. W. Cletcher; 596 Operating U.S. Power Reactors, Compiled by M. D. Muhlheim and E. G. Silver; 609 Non-Commercial Power Operating Experience; 614 World Nuclear Performance, Compiled by M. D. Muhlheim; RECENT DEVELOPMENTS: 623 General Administrative Activities, Compiled by M. D. Muhlheim and E. G. Silver; 635 Reports, Standards, and Safety Guides, D. S. Queener; 639 Proposed Rule Changes as of June 30, 1992; ANNOUNCEMENTS: 513 Fourth International Conference on Nuclear Fuel Reprocessing and Waste Management RECOD '94; 585 International Topical Meeting on Advanced Reactors Safety; 622 International Workshop on Implementation of ALARA at Nuclear Power Plants; 648 Short Course on Nuclear Criticality Safety; 648 8th Topical Meeting on Problems in Reactor Physics MEPhi-VOLGA-93; 643 The Authors; 646 Reviewers of Nuclear Safety, Vol. 33

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Stocking of Offsite Waters for Hungry Horse Dam Mitigation Creston National Fish Hatchery, FY 2006 Annual Report.

A total of 350,000, M012 strain, westslope cutthroat trout (WCT) eggs were received from Montana Fish Wildlife & Parks (MFWP), Washoe Park State Fish Hatchery in June of 2005 to accomplish this fishery management objective. These eggs were incubated, hatched and reared entirely inside the hatchery nursery building using a protected well water supply. Fish grew according to schedule and survival was excellent. The hatchery achieved a 0.78 feed fed to pounds gained conversion ratio for this group of WCT. Not all of the progenies from this fish lot were used for Hungry Horse Dam Fishery Mitigation Implementation. Some were used for other regional fishery management projects. Westslope cutthroat trout were reared using approved fish culture techniques as recommended in the USFWS Fish Hatchery Management Handbook and also utilizing a regimen adapted for hatchery specific site conditions. The fish health for these WCT was very good. Survival from first feeding fry stage to stocking was 79%. The hatchery had an annual fish health inspection performed by the USFWS Bozeman Fish Health Center in mid March of 2006. This inspection found all fish lots at Creston to be disease free. The Montana State Fish Health Board has placed the hatchery under a limited quarantine since May of 2005 due to an epizootic of Furunculosis. This classification has allowed the Creston NFH to stock disease free fish in locations approved by regional fish managers. The hatchery has been working with the State Fish Pathologist to remove the limited quarantine classification from the facility. Although fish health for all station fish lots remains disease free, MFWP has asserted it will not remove the limited quarantine until the new influent water treatment system, including the ultraviolet disinfection unit, is running full time, year round. The USFWS is working to secure the additional funding necessary to operate the treatment building year round. Distribution of the WCT took place from March through June. The stocking locations on the Flathead Reservation and State managed waters were identified by Confederated Salish and Kootenai Tribe (CSKT) and MFWP fishery biologists. Post release survival and angler success is monitored routinely by CSKT and MFWP fishery technicians. Stocking numbers and locations vary annually based on the results of biological monitoring, creel evaluations and adaptive management decisions. A total of 99,126 WCT were stocked during nine distribution trips in management approved waters (see Table 1). The average size of WCT at stocking was 3.91-inches. A total of 101,600, Arlee strain, rainbow trout (RBT) eggs were received from the Ennis National Fish Hatchery, Ennis, Montana, in December of 2005 and 35,000 Kamloops strain eggs were received from Murray Springs SFH, Eureka, Montana, in March of 2006 to accomplish this fishery management objective. The RBT were reared using approved fish culture techniques as recommended in the USFWS Fish Hatchery Management Handbook. There was no fish health related problems associated with this lot of fish. Survival from swim up fry stage to stocking was 93% for the Arlee's and 79% for the Kamloops. The hatchery achieved a 0.68 feed fed to pounds gained conversion ratio for the Arlee and 0.97 for the Kamloops RBT. The excellent feed conversion ratio can be attributed to refined feeding techniques and the use of an extruded high performance fry feed made with premium fish meal and marine fish oil. The Arlee strain of rainbow trout is requested for this fishery mitigation objective because the chosen stocking locations are terminal basin reservoirs or lakes, habitat conditions prevent natural spawning runs and returns to the creel are more favorable then for native westslope cutthroat trout. MFWP also requested a fall plant of Kamloops strain RBT and they will be evaluated for performance and future fall stockings in Echo Lake. Post release survival and angler success is monitored routinely by the Confederated Salish and Kootenai Tribe (CSKT) and Montana Fish Wildlife & Parks (MFWP) fishery technicians. Stocking numbers and locations vary annually based on the results of biological monitoring, creel evaluations and habitat conditions. The RBT were stocked in six distribution trips from June through September. The number of fish stocked and the receiving waters are identified below (see Table 2).

13 HYDRO ENERGY↗

A Case Study Correlating Innovative Gamma Ray Scanning Detection Systems Data to Surface Soil Gamma Spectrometry Results - 13580

HydroGeoLogic (HGL), Inc. completed a United States Environmental Protection Agency (USEPA) study to characterize radiological contamination at a site near Canoga Park, California. The characterized area contained 470 acres including the site of a prototype commercial nuclear reactor and other nuclear design, testing, and support operations from the 1950's until 1988 [1]. The site history included radiological releases during operation followed by D and D activities. The characterization was conducted under an accelerated schedule and the results will support the project remediation. The project has a rigorous cleanup to background agenda and does not allow for comparison to risk-based guidelines. To target soil sample locations, multiple lines of evidence were evaluated including a gamma radiation survey, geophysical surveys, historical site assessment, aerial photographs, and former worker interviews. Due to the time since production and decay, the primary gamma emitting radionuclide remaining is cesium-137 (Cs-137). The gamma ray survey covered diverse, rugged terrain using custom designed sodium iodide thallium-activated (NaI(Tl)) scintillation detection systems. The survey goals included attaining 100% ground surface coverage and detecting gamma radiation as sensitively as possible. The effectiveness of innovative gamma ray detection systems was tested by correlating field Cs-137 static count ratios to Cs-137 laboratory gamma spectrometry results. As a case study, the area encompassing the former location of the first nuclear power station in the U. S. was scanned, and second by second global positioning system (GPS)-linked gamma spectral data were evaluated by examining total count rate and nuclide-specific regions of interest. To compensate for Compton scattering from higher energy naturally occurring radionuclides (U-238, Th-232 and their progeny, and K-40), count rate ratios of anthropogenic nuclide-specific regions of interest to the total count rate were calculated. From the scanning data, locations with observed Cs-137 ratios exceeding six standard deviations above the mean ratio were mapped in high resolution [2]. Field teams returned to those locations to collect static count measurements using the same detection systems. Soil surface samples were collected at 30 locations and analyzed for Cs-137. An exponential correlation was identified between Cs-137 concentrations in surface soil and field-scanned Cs-137 ratios. The data indicate field minimum detectable concentration (MDC) of Cs-137 at 0.02 Bq/g (0.5 pCi/g) or lower depending on contaminant distribution in soil. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bradwell - The first UK Nuclear Site to Enter Care and Maintenance - 18152

Magnox Ltd, a Cavendish Fluor company, is currently decommissioning twelve nuclear sites on behalf of the UK Nuclear Decommissioning Authority (NDA). Ten of these sites are former Power Stations; the other two are closed Research and Development facilities. An overall strategy for decommissioning the Magnox sites has been agreed between Magnox and the NDA. For all but one of these sites the decommissioning strategy involves an extended quiescent period, known as Care and Maintenance (C and M), during which remaining radiological hazards reduce naturally through radioactive decay. After this quiescent period the sites will be restored to an agreed end state through further decommissioning and clearance work. Sites in C and M will not be permanently manned. They will be passively safe such that prompt action will not be required in response to an alarm or fault. Preparing a nuclear site for C and M involves several inter-related strands of work including definition of the intended physical configuration of the site during C and M (the C and M entry state), establishing a safety case to support that configuration, carrying out the physical works needed to deliver the C and M entry state, preparing arrangements and a team to manage the site during C and M and consolidating the knowledge and information needed to support C and M and final clearance of the site. To enter C and M there needs to be a carefully controlled transition of site, personnel and management system into the agreed C and M configuration. Bradwell, a site on the east coast of England, was selected as part of the overall decommissioning strategy for 'early' entry into C and M; Bradwell is scheduled to enter C and M in late 2018, several years in advance of the next scheduled site, with the intent of carrying learning forward from Bradwell to the subsequent sites. Bradwell is now in the final stages of preparation for C and M. Decommissioning commenced on completion of defueling in 2005. A clearly defined C and M entry state was established early in decommissioning and, through interaction with Regulators and internal and external stakeholders, developed as a shared target, thus providing certainty to the scope of the overall decommissioning project. The site has subsequently been systematically decommissioned to meet this target C and M entry state. All legacy waste has been retrieved and packaged into robust disposal containers, the reactor buildings have a new weather envelope, and much of the site is empty space with concrete hardstanding where facilities used to exist and bare rooms where plant used to operate. The remaining radiological and environmental hazards are not significant. During C and M, which is anticipated to last for 70 years, Bradwell will be managed remotely without the requirement for personnel to be present on site, with the possible exception of an ongoing security presence when the site first enters C and M. In terms of UK decommissioning, many of the projects undertaken at Bradwell were first of a kind. The company operates under a programmed organisational and delivery model, which will enable innovation and learning from Bradwell to be carried forward across the whole Magnox fleet. In addition to decommissioning tools and techniques, processes to manage decommissioning, optimise the C and M entry state to reduce the burden on the UK taxpayer and to transition a site into C and M have been developed. This, in addition to taking people from Bradwell and seeding them into Magnox and the broader UK nuclear industry, should help to provide long term cost savings and delivery efficiencies across the entire NDA estate. This paper describes the journey of Bradwell Site through decommissioning and into C and M, highlighting the innovation and challenges that have contributed to the success of delivering the first UK nuclear site into Care and Maintenance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗