Search NASA⌕ Search

SEARCH · Search NASA

Results for “Relational data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Advances in Bayesian Model Based Clustering Using Particle Learning

Recent work by Carvalho, Johannes, Lopes and Polson and Carvalho, Lopes, Polson and Taddy introduced a sequential Monte Carlo (SMC) alternative to traditional iterative Monte Carlo strategies (e.g. MCMC and EM) for Bayesian inference for a large class of dynamic models. The basis of SMC techniques involves representing the underlying inference problem as one of state space estimation, thus giving way to inference via particle filtering. The key insight of Carvalho et al was to construct the sequence of filtering distributions so as to make use of the posterior predictive distribution of the observable, a distribution usually only accessible in certain Bayesian settings. Access to this distribution allows a reversal of the usual propagate and resample steps characteristic of many SMC methods, thereby alleviating to a large extent many problems associated with particle degeneration. Furthermore, Carvalho et al point out that for many conjugate models the posterior distribution of the static variables can be parametrized in terms of [recursively defined] sufficient statistics of the previously observed data. For models where such sufficient statistics exist, particle learning as it is being called, is especially well suited for the analysis of streaming data do to the relative invariance of its algorithmic complexity with the number of data observations. Through a particle learning approach, a statistical model can be fit to data as the data is arriving, allowing at any instant during the observation process direct quantification of uncertainty surrounding underlying model parameters. Here we describe the use of a particle learning approach for fitting a standard Bayesian semiparametric mixture model as described in Carvalho, Lopes, Polson and Taddy. In Section 2 we briefly review the previously presented particle learning algorithm for the case of a Dirichlet process mixture of multivariate normals. In Section 3 we describe several novel extensions to the original implementation of Carvalho et al that allow us to retain the computational advantages of particle learning while improving the suitability of the methodology to the analysis of streaming data and simultaneously facilitating the real time discovery of latent cluster structures. Section 4 demonstrates our methodological enhancements in the context of several simulated and classical data sets, showcasing the use of particle learning methods for online anomaly detection, label generation, drift detection, and semi-supervised classification, none of which would be achievable through a standard MCMC approach. Section 5 concludes with a discussion of future directions for research.

99 GENERAL AND MISCELLANEOUS↗

Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report July 1 – September 30, 2008

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 – (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY 2008 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208), and for the Tropical Western Pacific (TWP) locale is 1,876.80 hours (0.85 x 2,208). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because the data have not yet been released from China to the DMF for processing. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter.

54 ENVIRONMENTAL SCIENCES↗

Atmospheric Radiation Measurement program climate research facility operations quarterly report July 1 - Sep. 30, 2009.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 ? 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 ? 2,208) and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 ? 2,208). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive result from downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1 - September 30, 2009, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. The fourth quarter comprises a total of 2,208 hours for the fixed and mobile sites. The average of the fixed sites well exceeded our goal this quarter. The AMF data statistic requires explanation. Since the AMF radar data ingest software is being modified, the data are being stored in the DMF for data processing. Hence, the data are not at the Archive; they are anticipated to become available by the next report.

54 ENVIRONMENTAL SCIENCES↗

Atmospheric Radiation Measurement program climate research facilities quarterly report April 1 - June 30, 2009.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,074.80 hours (0.95 x 2,184 hours this quarter); for the North Slope Alaska (NSA) locale it is 1,965.60 hours (0.90 x 2,184); and for the Tropical Western Pacific (TWP) locale it is 1,856.40 hours (0.85 x 2,184). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 1390.80 hours (0.95 x 1464). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 91 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for April 1 - June 30, 2009, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and are not included in the aggregate average with the fixed sites. The AMF statistics for this reporting period were not available at the time of this report. The third quarter comprises a total of 2,184 hours for the fixed sites. The average well exceeded our goal this quarter.

54 ENVIRONMENTAL SCIENCES↗

Atmospheric Radiation Measurement program climate research facility operations quarterly report January 1 - March 31, 2009.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the second quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,052.00 hours (0.95 x 2,160 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,944.00 hours (0.90 x 2,160), and for the Tropical Western Pacific (TWP) locale is 1,836.00 hours (0.85 x 2,160). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because not all of the metadata have been acquired that are used to generate this metric. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 90 days for this quarter) the instruments were operating this quarter. Summary. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period January 1 - March 31, 2009, for the fixed sites. The AMF has completed its mission in China but not all of the data can be released to the public at the time of this report. The second quarter comprises a total of 2,160 hours. The average exceeded our goal this quarter.

54 ENVIRONMENTAL SCIENCES↗

Atmospheric Radiation Measurement program climate research facility operations quarterly report October 1 - December 31, 2008.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, they calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The US Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208), and for the Tropical Western Pacific (TWP) locale is 1,876.80 hours (0.85 x 2,208). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because the data have not yet been released from China to the DMF for processing. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period October 1-December 31, 2008, for the fixed sites. The AMF has been deployed to China, but the data have not yet been released. The first quarter comprises a total of 2,208 hours. The average exceeded their goal this quarter.

54 ENVIRONMENTAL SCIENCES↗

Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report. October 1 - December 31, 2009.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2010 for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208); for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208); and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 x 2,208). The ARM Mobile Facility (AMF) deployment in Graciosa Island, the Azores, Portugal, continues; its OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are the result of downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP locale has historically had a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. Beginning this quarter, the SGP began a transition to a smaller footprint (150 km x 150 km) by rearranging the original and new instrumentation made available through the American Recovery and Reinvestment Act (ARRA). The central facility and 4 extended facilities will remain, but there will be up to 16 surface new characterization facilities, 4 radar facilities, and 3 profiler facilities sited in the smaller domain. This new configuration will provide observations at scales more appropriate to current and future climate models. The TWP locale has the Manus, Nauru, and Darwin sites. These sites will also have expanded measurement capabilities with the addition of new instrumentation made available through ARRA funds. It is anticipated that the new instrumentation at all the fixed sites will be in place within the next 12 months. The AMF continues its 20-month deployment in Graciosa Island, Azores, Portugal, that started May 1, 2009. The AMF will also have additional observational capabilities within the next 12 months. Users can participate in field experiments at the sites and mobile facility, or they can participate remotely. Therefore, a variety of mechanisms are provided to users to access site information. Users who have immediate (real-time) needs for data access can request a research account on the local site data systems. This access is particularly useful to users for quick decisions in executing time-dependent activities associated with field campaigns at the fixed sites and mobile facility locations. The eight computers for the research accounts are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; the AMF; and the DMF at PNNL. However, users are warned that the data provided at the time of collection have not been fully screened for quality and therefore are not considered to be official ACRF data. Hence, these accounts are considered to be part of the facility activities associated with field campaign activities, and users are tracked. In addition, users who visit sites can connect their computer or instrument to an ACRF site data system network, which requires an on-site device account. Remote (off-site) users can also have remote access to any ACRF instrument or computer system at any ACRF site, which requires an off-site device account. These accounts are also managed and tracked.

54 ENVIRONMENTAL SCIENCES↗

Atmospheric Radiation Measurement Program Climate Research Facility Operation quarterly report July 1 - September 30, 2010.

Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 2208 hours this quarter). The OPSMAX for the North Slope of Alaska (NSA) locale is 1987.20 hours (0.90 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continues, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or datastream. Data availability reported here refers to the average of the individual, continuous datastreams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) that the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1-September 30, 2010, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. This fourth quarter comprises a total of 2208 possible hours for the fixed and mobile sites. The average of the fixed sites exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has historically had a Central Facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. Beginning in the second quarter of FY2010, the SGP began a transition to a smaller footprint (150 km x 150 km) by rearranging the original instrumentation and new instrumentation made available through the American Recovery and Reinvestment Act of 2009 (ARRA). The Central Facility and 4 extended facilities will remain, but there will be up to 12 new surface characterization facilities, 4 radar facilities, and 3 profiler facilities sited in the smaller domain. This new configuration will provide observations at scales more appropriate to current and future climate models. The transition to the smaller footprint is ongoing through this quarter. The TWP locale has the Manus, Nauru, and Darwin sites. These sites will also have expanded measurement capabilities with the addition of new instrumentation made available through ARRA funds. It is anticipated that the new instrumentation at all the fixed sites will be in place by the end of calendar year 2011. AMF1 continues its 20-month deployment in Graciosa Island, the Azores, Portugal, that began on May 1, 2009. The AMF will also have additional observational capabilities by the end of 2011. The second ARM Mobile Facility (AMF2) was deployed this quarter to Steamboat Springs, Colorado, in support of the Storm Peak Lab Cloud Property Validation Experiment (STORMVEX). The first field deployment of the second ARM Mobile Facility will be used to validate ARM-developed algorithms that convert the remote sensing measurements to cloud properties for liquid and mixed phase clouds. Although AMF2 is being set up this quarter, the official start date of the field campaign is not until November 1, 2010. This quarterly report provides the cumulative numbers of scientific user accounts by site for the period October 1, 2009-September 30, 2010.

54 ENVIRONMENTAL SCIENCES↗

Evaluating the Use of Foundational Chemical Language Models in Multimodal Graph Fusion

Rapid and accurate prediction of the physicochemical properties of molecules given their structures remains a key challenge in cheminformatics. Machine learning approaches offer high-throughput options, but the optimality of inductive biases and data representations are up for debate. For example, BERT-based masked language models (MLMs) can be trained in a self-supervised way on hundreds of millions to billions of readily available SMILES strings. Another option is graph neural networks (GNNs), which can operate directly on molecular structures. Yet, generating accurate molecular geometry is computationally expensive, leading to a relative scarcity in data compared to SMILES strings. It is attractive to combine these two paradigms by pre-training an LM on a large corpus of SMILES strings and embedding these representation into a geometric graph neural network. Despite the promise of such an approach, and contrary to previous studies, we find mixed results with the combination of the LMs and GNNs on several molecule datasets. In particular, we found evidence for improvement on the FreeSolv and QM7 benchmarks, but degraded performance on the ESOL, LIPO and QM9 datasets compared to a GNN baseline.

Francel, Collin [University of Alabama]↗

MindSynchro

This report presents the developments and results of MindSynchro project as part of DOE OE FOA 1861. DOE and Pacific Northwest National Laboratory (PNNL) have made available to FOA awardees datasets containing years of real historical data recorded from various phasor measurement units (PMUs) which are installed in three large US interconnections: Texas (IC A), Western (IC B), and Eastern (IC C). The main goal of the project, which was successfully achieved, was to develop methods for detection and identification of events which are relevant for power grid operation. Tasks performed for achieving the project goals included data exploration and pre-processing, the development and application of physics-based features, data analysis and labeling based on unsupervised learning approaches, training and testing of DSSL models for classification of events which are relevant for power grid operation, and deployment of solutions to cloud environments. The methods developed in the project can potentially provide relevant benefits to power grid asset owners/operators in general in terms of situational awareness. Two main types of outcomes can be provided by these tools: Identification of specific relevant power grid event types: Semi-supervised ML methods developed in the project can adequately employ not only the relatively scarce labeled data but also the large amount of available unlabeled data to train models for detection of specific event types. Such methods enable the application of trained models for the detection of events in a population of PMUs much larger than that associated to the labeled events. Support in data labeling / label validation: Labels are critical for training of models for identification of specific types of events. However, labeling large amounts of data is a manual and tedious process. This means that such process is error prone and is not scalable. Methods developed in the project, based on ensembles of clustering models, have been successfully employed for turning manual labeling into a scalable process. Accurate identification of specific relevant events can provide the operators with immediate situational awareness that could otherwise require hours or days of analysis from domain experts. We envision that such methods could be initially employed in support of post-mortem analysis of events and, as confidence is gained, they could be employed for online/real-time support, providing, among other benefits, insights for avoiding major events which could happen due to a combination of smaller ones. On the longer term, related methods could potentially be employed to improve protection and control.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ON THE EXPANSION RATE, AGE, AND DISTANCE OF THE SUPERNOVA REMNANT G266.2–1.2 (Vela Jr.)

An analysis of Chandra ACIS data for two relatively bright and narrow portions of the northwestern rim of G266.2–1.2 (a.k.a. RX J0852.0-4622 or Vela Jr.) reveal evidence of a radial displacement of 2.40 ± 0.56 arcsec between 2003 and 2008. The corresponding expansion rate (0.42 ± 0.10 arcsec yr{sup –1} or 13.6% ± 4.2% kyr{sup –1}) is about half the rate reported for an analysis of XMM-Newton data from a similar, but not identical, portion of the rim over a similar, but not identical, time interval (0.84 ± 0.23 arcsec yr{sup –1}). If the Chandra rate is representative of the remnant as a whole, then the results of a hydrodynamic analysis suggest that G266.2–1.2 is between 2.4 and 5.1 kyr old if it is expanding into a uniform ambient medium (whether or not it was produced by a Type Ia or Type II event). If the remnant is expanding into the material shed by a steady stellar wind, then the age could be as much as 50% higher. The Chandra expansion rate and a requirement that the shock speed be greater than or equal to 1000 km s{sup –1} yields a lower limit on the distance of 0.5 kpc. An analysis of previously published distance estimates and constraints suggests G266.2–1.2 is no further than 1.0 kpc. This range of distances is consistent with the distance to the nearer of two groups of material in the Vela Molecular Ridge (0.7 ± 0.2 kpc) and to the Vel OB1 association (0.8 kpc)

79 ASTRONOMY AND ASTROPHYSICS↗

Interpolating moving least-squares methods for fitting potential energy surfaces : improving efficiency via local approximants.

The local interpolating moving least-squares (IMLS) method for constructing potential energy surfaces is investigated. The method retains the advantageous features of the IMLS approach in that the ab initio derivatives are not required and high degree polynomials can be used to provide accurate fits, while at the same time it is much more efficient than the standard IMLS approach because the least-squares solutions need to be calculated only once at the data points. Issues related to the implementation of the local IMLS method are investigated and the accuracy is assessed using HOOH as a test case. It is shown that the local IMLS method is at the same level of accuracy as the standard IMLS method. In addition, the scaling of the method is found to be a power law as a function of number of data points N,N{sup -q}. The results suggest that when fitting only to the energy values for a d-dimensional system by using a Qth degree polynomial the power law exponent q {approx} Q/d when the energy range fitted is large (e.g., E<100 kcal/mol for HOOH), and q>Q/d when the energy range fitted is smaller (E<30 kcal/mol) and the density of data points is higher. This study demonstrates that the local IMLS method provides an efficient and accurate means for constructing potential energy surfaces.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Bayesian Monte-Carlo Evaluation Framework of Differential and Integral Data [Slides]

This presentation discusses the Bayesian Monte Carlo evaluation framework of differential and integral data, specifically in relation to two methods that are based on Bayes theorem, which assumes that all PDFs are normal (Gaussian) and that they use a linear approximation for IBEs. The presentation states that basic components of the MC evaluation framework include the computation of random MC ensemble from ENDF File 32, the simulation of IBEs and R-matrix cross section compared to experimental data, and the computation of weighted averages. It also states that the application to U-233 indicates deviation from the conventional linear approximation. In conclusion, evaluation framework will require MCMC method e.g., Metropolis-Hastings (M.-H.).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Event-by-Event Evaluation of the Prompt Fission Neutron Spectrum From 239 Pu(n,f)

We have developed an improved evaluation method for the spectrum of neutrons emitted in fission of 239 Pu induced by incident neutrons with energies up to 20 MeV. The <v> covariance data, including incident energy correlations introduced by the <v> evaluation method, were used to fix the input parameters in our event-by-event model of fission, FREYA, by applying formal statistical methods. Formal estimates of uncertainties in the evaluation were developed by randomly sampling model inputs and calculating likelihood functions based on agreement with the evaluated <v>. Our approach is able to employ a greater variety of fission measurements than the relatively coarse spectral data alone. It also allows the study of numerous fission observables for more accurate model validation. The combination of an event-by-event Monte Carlo fission model with a statistical-likelihood analysis is thus a powerful tool for evaluation of fission-neutron data. Our empirical model FREYA follows the complete fission event from birth of the excited fragments through their decay via neutron emission until the fragment excitation energy is below the neutron separation energy when neutron emission can no longer occur. The most recent version of FREYA incorporates pre-equilibrium neutron emission, the emission of the first neutron before equilibrium is reached in the compound nucleus, and multi-chance fission, neutron evaporation prior to fission when the incident neutron energy is above the neutron separation energy. Energy, momentum, charge and mass number are conserved throughout the fission process. The best available values of fragment masses and total kinetic energies are used as inputs to FREYA. We fit three parameters that are not well under control from previous measurements: the shift in the total fragment kinetic energy; the energy scale of the asymptotic level density parameter, controlling the fragment 'temperature' for neutron evaporation; and the relative excitation of the light and heavy fragments, governing the number and energy of neutrons emitted from each fragment. The latter two parameters are assumed to be independent of the incident neutron energy while the first varies with incident energy. We describe our method and the subsequent spectral evaluation and present the results of several standard validation calculations that test our new evaluation. These benchmarks include critical assemblies, sensitive to criticality in fast systems; pulsed sphere measurements testing the spectra at incident neutron energies of 14 MeV; and other tests.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

TH-E-BRE-09: TrueBeam Monte Carlo Absolute Dose Calculations Using Monitor Chamber Backscatter Simulations and Linac-Logged Target Current

Purpose: To simulate and measure radiation backscattered into the monitor chamber of a TrueBeam linac; establish a rigorous framework for absolute dose calculations for TrueBeam Monte Carlo (MC) simulations through a novel approach, taking into account the backscattered radiation and the actual machine output during beam delivery; improve agreement between measured and simulated relative output factors. Methods: The ‘monitor backscatter factor’ is an essential ingredient of a well-established MC absolute dose formalism (the MC equivalent of the TG-51 protocol). This quantity was determined for the 6 MV, 6X FFF, and 10X FFF beams by two independent Methods: (1) MC simulations in the monitor chamber of the TrueBeam linac; (2) linac-generated beam record data for target current, logged for each beam delivery. Upper head MC simulations used a freelyavailable manufacturer-provided interface to a cloud-based platform, allowing use of the same head model as that used to generate the publicly-available TrueBeam phase spaces, without revealing the upper head design. The MC absolute dose formalism was expanded to allow direct use of target current data. Results: The relation between backscatter, number of electrons incident on the target for one monitor unit, and MC absolute dose was analyzed for open fields, as well as a jaw-tracking VMAT plan. The agreement between the two methods was better than 0.15%. It was demonstrated that the agreement between measured and simulated relative output factors improves across all field sizes when backscatter is taken into account. Conclusion: For the first time, simulated monitor chamber dose and measured target current for an actual TrueBeam linac were incorporated in the MC absolute dose formalism. In conjunction with the use of MC inputs generated from post-delivery trajectory-log files, the present method allows accurate MC dose calculations, without resorting to any of the simplifying assumptions previously made in the TrueBeam MC literature. This work has been partially funded by Varian Medical Systems.

07 ISOTOPE AND RADIATION SOURCES↗

A study of industrial relative water use efficiency of Beijing: An application of Data Envelopment Analysis

Evaluating and improving water use efficiency is considered one of the main ways of tackling water shortage challenges in water-scarce cities. A useful indicator for evaluating industrial water use efficiency is the relative water use efficiency (RWUE). In this paper, an industrial RWUE evaluation scheme is proposed based on data envelopment analysis (DEA) theory. In this scheme, the RWUE is divided into overall efficiency (OE), pure technical efficiency (PTE), and scale efficiency (SE). In order to help decision-makers specify the focal industry of efficiency improvement, direct water use is distinguished from indirect water use. By employing this industrial RWUE evaluation scheme, this research calculated the industrial RWUEs for 25 representative industries of Beijing (1990–2010). Results show that the OE, PTE, and SE of Beijing have improved significantly. In the primary industry, the scale adjustment fundamentally lifted OE. For the secondary industries, there still exists much room for water use efficiency improvement in technical innovation. Some emerging tertiary industries replaced traditional tertiary industries as the most efficient water users. This study serves as a valuable reference for the implementation of the Strictest Administration of Water Resources (SAWR) of China, and provides policy-makers worldwide with a useful framework of understating industrial water use efficiency.

Beijing↗

THE MID-INFRARED PERIOD-LUMINOSITY RELATIONS FOR THE SMALL MAGELLANIC CLOUD CEPHEIDS DERIVED FROM SPITZER ARCHIVAL DATA

In this paper, we derive the Spitzer IRAC band period-luminosity (P-L) relations for the Small Magellanic Cloud (SMC) Cepheids, by matching the Spitzer archival SAGE-SMC data with the OGLE-III SMC Cepheids. We find that the 3.6 {mu}m and 4.5 {mu}m band P-L relations can be better described using two P-L relations with a break period at log(P) = 0.4: this is consistent with similar results at optical wavelengths for SMC P-L relations. The 5.8 {mu}m and 8.0 {mu}m band P-L relations do not extend to sufficiently short periods to enable a similar detection of a slope change at log(P) = 0.4. The slopes of the SMC P-L relations, for log(P) > 0.4, are consistent with their Large Magellanic Cloud counterparts that were derived from a similar data set. They are also in agreement with those obtained from a small sample of Galactic Cepheids with parallax measurements.

79 ASTRONOMY AND ASTROPHYSICS↗

Improved joint X-ray and neutron refinement procedure in Phenix

Neutron diffraction is one of the three crystallographic techniques (X-ray, neutron and electron diffraction) used to determine the atomic structures of molecules. Its particular strengths derive from the fact that H (and D) atoms are strong neutron scatterers, meaning that their positions, and thus protonation states, can be derived from crystallographic maps. However, because of technical limitations and experimental obstacles, the quality of neutron diffraction data is typically much poorer (completeness, resolution and signal to noise) than that of X-ray diffraction data for the same sample. Further, refinement is more complex as it usually requires additional parameters to describe the H (and D) atoms. The increase in the number of parameters may be mitigated by using the `riding hydrogen' refinement strategy, in which the positions of H atoms without a rotational degree of freedom are inferred from their neighboring heavy atoms. However, this does not address the issues related to poor data quality. Therefore, neutron structure determination often relies on the presence of an X-ray data set for joint X-ray and neutron (XN) refinement. In this approach, the X-ray data serve to compensate for the deficiencies of the neutron diffraction data by refining one model simultaneously against the X-ray and neutron data sets. To be applicable, it is assumed that both data sets are highly isomorphous, and preferably collected from the same crystals and at the same temperature. However, the approach has a number of limitations that are discussed in this work by comparing four separately re-refined neutron models. To address the limitations, a new method for joint XN refinement is introduced that optimizes two different models against the different data sets. This approach is tested using neutron models and data deposited in the Protein Data Bank. The efficacy of refining models with H atoms as riding or as individual atoms is also investigated.

36 MATERIALS SCIENCE↗