Search NASA⌕ Search

SEARCH · Search NASA

Results for “Requirements development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Using an Integrated Distributed Test Architecture to Develop an Architecture for Mars

The creation of a crew-rated spacecraft architecture capable of sending humans to Mars requires the development and integration of multiple vehicle systems and subsystems. Important new technologies will be identified and matured within each technical discipline to support the mission. Architecture maturity also requires coordination with mission operations elements and ground infrastructure. During early architecture formulation, many of these assets will not be co-located and will required integrated, distributed test to show that the technologies and systems are being developed in a coordinated way. When complete, technologies must be shown to function together to achieve mission goals. In this presentation, an architecture will be described that promotes and advances integration of disparate systems within JSC and across NASA centers.

Othon, William L.↗

The High Power Electric Propulsion (HiPEP) Ion Thruster

Practical implementation of the proposed Jupiter Icy Moon Orbiter (JIMO) mission, which would require a total delta V of approximately 38 km/s, will require the development of a high power, high specific impulse propulsion system. Initial analyses show that high power gridded ion thrusters could satisfy JIMO mission requirements. A NASA GRC-led team is developing a large area, high specific impulse, nominally 25 kW ion thruster to satisfy both the performance and the lifetime requirements for this proposed mission. The design philosophy and development status as well as a thruster performance assessment are presented.

Foster, John E.↗

Design, Development and Testing of the GMI Reflector Deployment Assembly

The GMI Reflector Deployment Assembly (RDA) is an articulating structure that accurately positions and supports the main reflector of the Global Microwave Imager (GMI) throughout the 3 year mission life. The GMI instrument will fly on the core Global Precipitation Measurement (GPM) spacecraft and will be used to make calibrated radiometric measurements at multiple microwave frequencies and polarizations. The GPM mission is an international effort managed by the National Aeronautics and Space Administration (NASA) to improve climate, weather, and hydrometeorological predictions through more accurate and frequent precipitation measurements1. Ball Aerospace and Technologies Corporation (BATC) was selected by NASA Goddard to design, build, and test the GMI instrument. The RDA was designed and manufactured by ATK Aerospace Systems Group to meet a number of challenging packaging and performance requirements. ATK developed a flight-like engineering development unit (EDU) and two flight mechanisms that have been delivered to BATC. This paper will focus on driving GMI instrument system requirements, the RDA design, development, and test activities performed to demonstrate that requirements have been met.

Guy, Larry↗

1-G Human Factors for Optimal Processing and Operability of Ground Systems Up to CxP GOP PDR

This slide presentation reviews the development and use of a process and tool for developing these requirements and improve the design for ground operations. A Human Factors Engineering Analysis (HFEA) Tool was developed to create a dedicated subset of requirements from the FAA requirements for each subsystem. As an example the use of the human interface with an actuator motor is considered.

Stambolian, Damon B.↗

Remote Monitoring System Design Requirements for Accountable Nuclear Materials at the Nevada National Security Site

The Nevada National Security Site (NNSS) worked with other sites within the Department of Energy National Nuclear Security Administration weapons complex to develop design requirements for a Remote Monitoring System. System objectives included: Continuous monitoring of packaging (containers) within a Facility's buildings to meet Material Control and Accountability (MC&A) inventory requirements. Remotely access and receive monitoring data for tamper detection/alarm, tracking information, environmental conditions, equipment metadata (serial number, date of manufacture, etc.), and assessment video feeds. All data processing, storage/retrieval, and communications will be protected in a manner commensurate with its trust level and classification. Remotely collected and processed data will be securely stored, backed up, and archived. Current and historical data will accessible within and outside of a Building (location). Automated creation of reports and data visualization. Design features to facilitate the potential future integration with the Facility's physical security alarm and display system. The requirements may be used to develop an integrated conceptual design or may be used in a modular fashion to inform separate designs. The guiding principles in developing the system objectives include: For MC&A needs, remotely perform the physical inventory and evidence collection of tamper for Security Category I and II packaged material within a facility and be capable of satisfying guidelines establish by DOE M 470.4-6, “Nuclear Material Control and Accountability.” For personnel safety needs: Meet/satisfy Nuclear Explosive Safety requirements. Minimize the exposure of personnel to radiation to be as low as reasonably achievable (ALARA) in accordance with NSTec Radiological Controls Manual. For DOE nuclear materials, Building environment shall be controlled to meet requirements for packaged nuclear materials specified in weapons laboratory literature.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Monitoring System Design Requirements for Accountable Nuclear Materials at the Nevada National Security Site

The Nevada National Security Site (NNSS) worked with other sites within the Department of Energy National Nuclear Security Administration weapons complex to develop design requirements for a Remote Monitoring System. System objectives include: • Continuous monitoring of packaging (containers) within a Facility's buildings to meet Material Control and Accountability (MC&A) inventory requirements. • Remotely access and receive monitoring data for tamper detection/alarm, tracking information, environmental conditions, equipment metadata (serial number, date of manufacturer, etc.), and assessment video feeds. • All data processing, storage/retrieval, and communications will be protected in a manner commensurate with its trust level and classification. • Remotely collected and processed data will be securely stored, backed up, and archived. • Current and historical data will accessible within and outside of a Building (location). • Automated creation of reports and data visualization. • Design features to facilitate the potential future integration with the Facility's physical security alarm and display system. The requirements may be used to develop an integrated conceptual design or may be used in a modular fashion to inform separate designs. The guiding principles in developing the system objectives include: • For MC&A needs, remotely perform the physical inventory and evidence collection of tamper for Security Category I and II packaged material within a facility and be capable of satisfying guidelines establish by DOE M 470.4-6, “Nuclear Material Control and Accountability.” • For personnel safety needs: o Meet/satisfy Nuclear Explosive Safety requirements. o Minimize the exposure of personnel to radiation to be as low as reasonably achievable (ALARA) in accordance with NSTec Radiological Controls Manual (Ref TBD). • For DOE nuclear materials, Building environment shall be controlled to meet requirements for packaged nuclear materials specified in weapons laboratory literature.

99 GENERAL AND MISCELLANEOUS↗

A Flight Deck Decision Support Tool for Autonomous Airborne Operations

NASA is developing a flight deck decision support tool to support research into autonomous operations in a future distributed air/ground traffic management environment. This interactive real-time decision aid, referred to as the Autonomous Operations Planner (AOP), will enable the flight crew to plan autonomously in the presence of dense traffic and complex flight management constraints. In assisting the flight crew, the AOP accounts for traffic flow management and airspace constraints, schedule requirements, weather hazards, aircraft operational limits, and crew or airline flight-planning goals. This paper describes the AOP and presents an overview of functional and implementation design considerations required for its development. Required AOP functionality is described, its application in autonomous operations research is discussed, and a prototype software architecture for the AOP is presented.

Ballin, Mark G.↗

The Use of a Satellite Communications System for Command and Control of the National Aeronautics and Space Administration Surrogate Unmanned Aerial System Research Aircraft

The NASA Langley Research Center has transformed a Cirrus Design SR22 general aviation (GA) aircraft into an Unmanned Aerial Systems (UAS) Surrogate research aircraft which has served for several years as a platform for unmanned systems research and development. The aircraft is manned with a Safety Pilot and a Research Systems Operator (RSO) that allows for flight operations almost any-where in the national airspace system (NAS) without the need for a Federal Aviation Administration (FAA) Certificate of Authorization (COA). The UAS Surrogate can be remotely controlled from a modular, transportable ground control station (GCS) like a true UAS. Ground control of the aircraft is accomplished by the use of data links that allow the two-way passage of the required data to control the aircraft and provide the GCS with situational awareness. The original UAS Surrogate data-link system was composed of redundant very high frequency (VHF) data radio modems with a maximum range of approximately 40 nautical miles. A new requirement was developed to extend this range beyond visual range (BVR). This new requirement led to the development of a satellite communications system that provided the means to command and control the UAS Surrogate at ranges beyond the limits of the VHF data links. The system makes use of the Globalstar low earth orbit (LEO) satellite communications system. This paper will provide details of the development, implementation, and flight testing of the satellite data communications system on the UAS Surrogate research aircraft.

Howell, Charles T.↗

THE COMPONENT TEST FACILITY – A NATIONAL USER FACILITY FOR TESTING OF HIGH TEMPERATURE GAS-COOLED REACTOR (HTGR) COMPONENTS AND SYSTEMS

The Next Generation Nuclear Plant (NGNP) and other High-Temperature Gas-cooled Reactor (HTGR) Projects require research, development, design, construction, and operation of a nuclear plant intended for both high-efficiency electricity production and high-temperature industrial applications, including hydrogen production. During the life cycle stages of an HTGR, plant systems, structures and components (SSCs) will be developed to support this reactor technology. To mitigate technical, schedule, and project risk associated with development of these SSCs, a large-scale test facility is required to support design verification and qualification prior to operational implementation. As a full-scale helium test facility, the Component Test facility (CTF) will provide prototype testing and qualification of heat transfer system components (e.g., Intermediate Heat Exchanger, valves, hot gas ducts), reactor internals, and hydrogen generation processing. It will perform confirmation tests for large-scale effects, validate component performance requirements, perform transient effects tests, and provide production demonstration of hydrogen and other high-temperature applications. Sponsored wholly or in part by the U.S. Department of Energy, the CTF will support NGNP and will also act as a National User Facility to support worldwide development of High-Temperature Gas-cooled Reactor technologies.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Automated Derivation of Complex System Constraints from User Requirements

International Space Station (ISS) payload developers submit their payload science requirements for the development of on-board execution timelines. The ISS systems required to execute the payload science operations must be represented as constraints for the execution timeline. Payload developers use a software application, User Requirements Collection (URC), to submit their requirements by selecting a simplified representation of ISS system constraints. To fully represent the complex ISS systems, the constraints require a level of detail that is beyond the insight of the payload developer. To provide the complex representation of the ISS system constraints, HOSC operations personnel, specifically the Payload Activity Requirements Coordinators (PARC), manually translate the payload developers simplified constraints into detailed ISS system constraints used for scheduling the payload activities in the Consolidated Planning System (CPS). This paper describes the implementation for a software application, User Requirements Integration (URI), developed to automate the manual ISS constraint translation process.

Muery, Kim↗

Nuclear Propulsion Project Workshop summary

NASA-Lewis has undertaken the planning and coordination of a joint NASA/DOE/DOD Nuclear Propulsion Project which will investigate both nuclear electric and nuclear thermal concepts. The three-agency team has been tasked with the development of an Interagency Agreement and Memorandum of Understanding, as well as the drafting of a statement as to astronaut crew guidelines and values, the assessment of human-rating requirements, the development of an interagency safety and environmental assessment plan, and the development of test facility requirements. Attention is to be given to the role of SP-100 for nuclear-electric propulsion applications.

Miller, Thomas J.↗

Extension of the Generic Multi-Frequency Modelling Method for Type 3 Wind Turbines

Reflecting potential non-linearities of converter-based systems, especially frequency and sequence couplings, is an ongoing challenge for linearized multi-frequency models. Besides, design details are required to develop such models, which either are the intellectual property of manufacturers or require experimental tests. The generic multi-frequency modelling method has been proposed to fill this gap; however, it is only developed for converter-connected systems, e.g., Type 4 Wind Turbines (WT). This paper proposes to extend the application of the generic multi-frequency modelling method for Type 3 WTs. In this way, a theory for patterns of the couplings in Type 3 WTs is proposed. Accordingly, a group of emissions and couplings are Rotor-Speed-Dependent (RSD). The RSD emissions and couplings are particular characteristics of Type 3 WTs, which should be addressed in the generic multi-frequency models. Additionally, the proposed theory is verified by unique-worldwide experimental perturbation tests on a 2 MVA Type 3 WT using a 7 MVA grid emulator. Accordingly, a limited number of RSD couplings and emissions are observed in the test results, mainly in low frequencies (below 1 kHz). Therefore, addressing the RSD couplings is practical and important to extend the generic multi-frequency modelling for Type 3 WTs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Middlesex South FUSRAP Site: Collaboration Towards Beneficial Reuse - 20338

The US Department of Energy (DOE) Office of Legacy Management (LM) manages DoE's post-closure responsibilities and ensures the future protection of human health and the environment with respect to sites that have no continuing DOE mission after undergoing remediation. LM's beneficial reuse program promotes the LM strategic goal to sustainably manage and optimize use of public lands. The beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. Benefits from the reuse of a site may increase the local tax base, facilitate job growth, utilize existing infrastructure, and enhance or protect natural resources. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment, as well as by retaining good stewardship of natural resources. LM actively participates in promoting the economic development vision of the surrounding communities by collaborating with local communities to promote regional or municipal initiatives. The Borough of Middlesex, New Jersey, has prepared the Lincoln Boulevard Redevelopment Plan, which will reinvent a once-viable downtown and enhance the quality of life for the community. The Middlesex South, New Jersey, Formerly Utilized Sites Remedial Action Program (FUSRAP) site lies within the boundaries of this redevelopment area. In support of this development plan, the Borough is interested in acquiring the site for its Department of Public Works and to increase street access in the future commercial district to be built near adjacent properties. The opportunity to put the FUSRAP site into productive use aligns with LM's mission and strategic goals. In support of beneficial reuse activities, DOE can dispose of excess real property using several mechanisms. The two disposal options applicable to the Middlesex south site include (1) utilizing the US General Services Administration (GSA) or (2) using the Title 10 Code of Federal Regulations Section 770, 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development' (known as a '770 transfer') process. Using the 770 transfer requires economic development as the primary driver, and a specific redevelopment proposal must be submitted. If there is no interest in specific economic development, the GSA option becomes the default mechanism for disposal of the property. In the case of the Middlesex south site, the 770 transfer process is being utilized and the Borough has submitted its economic development proposal to LM. Although LM is encouraged by the opportunity to put the site into productive use, the Middlesex south site is currently on the US Environmental Protection Agency (EPA) National Priorities List and remediation is being performed by the US Army Corp of Engineers (USACE) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consequently, any property transfer must meet the requirements under CERCLA Section 120(h), 'Property Transferred by Federal Agencies.' As the groundwater remedy will not be in place for several years, approval would be required from the US EPA administrator and the governor of the state of New Jersey to perform an early transfer of the site (before all response actions have been completed). The time frame for these approvals to occur under the normal process conflicts with the proposed redevelopment schedule; therefore, various options for expedited sale, transfer, or lease of portions of the site to the Borough were evaluated. The subsequent decision on a mutually beneficial path forward was the result of a collaborative effort between LM, USACE, the Borough and its redevelopment team, EPA, and the New Jersey Department of Environmental Protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Small image laser range finder for planetary rover

A variety of technical subjects need to be solved before planetary rover navigation could be a part of future missions. The sensors which will perceive terrain environment around the rover will require critical development efforts. The image laser range finder (ILRF) discussed here is one of the candidate sensors because of its advantage in providing range data required for its navigation. The authors developed a new compact-sized ILRF which is a quarter of the size of conventional ones. Instead of the current two directional scanning system which is comprised of nodding and polygon mirrors, the new ILRF is equipped with the new concept of a direct polygon mirror driving system, which successfully made its size compact to accommodate the design requirements. The paper reports on the design concept and preliminary technical specifications established in the current development phase.

Wakabayashi, Yasufumi↗

Utility company views of geothermal development

The views of geothermal development from a utility company standpoint are presented. The impediments associated with such developments as required reliability and identification of risks are discussed. The utility industry historically is not a risk-taking industry. Support of rapid geothermal development by the utility industry requires identification and elimination of risks or absorption of the risks by other agencies. Suggestions as to the identification and minimization of risks are made.

Hinrichs, T. C.↗

Glass Formulation and Testing with RPP-WTP HLW Simulants (Final Report)

This report presents the results from HLW glass formulation work that was conducted at the Vitreous State Laboratory of The Catholic University of America during Part B1 of the RPP-WTP Project (formally known as TWRS-P) in support of the Privatization contractor, BNFL, Inc. Glass formulation development is required to provide data that are essential for design of the vitrification facility in the near term and for safe and reliable operation of that facility in the longer-term. These data also form the bases from which contractually and technically acceptable immobilized high-level waste (IHLW) products will be devised. Glass formulation therefore impacts many aspects of the vitrification facility design, overall process economics, and contractual compliance. As an integral part of the overall system design, development of glass formulations requires input from many sources including tank waste characterization, pretreatment process definition, flow sheet development, and processing schedules. Accordingly, the glass formulation effort must be responsive to new information as the facility design basis evolves.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗