Search NASA⌕ Search

SEARCH · Search NASA

Results for “Technology Qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

FRIT DEVELOPMENT FOR SLUDGE BATCH 6

The Savannah River National Laboratory (SRNL) evaluated a large number of Sludge Batch 6 (SB6) composition projections to support frit optimization for SB6 vitrification at the Defense Waste Processing Facility (DWPF). The evaluations discussed in this report occurred over a period of about 4 months, and included about 40 composition projections, developed by both Savannah River Remediation (SRR) and SRNL. Paper study assessments were used to evaluate the sludge composition projections with arrays of potential frit compositions using the predictive models in the DWPF Product Composition Control System (PCCS). Both nominal sludge compositions and sludge compositions with anticipated compositional variation were considered. The model predictions were used to identify candidate frit compositions for each SB6 projection and to provide some guidance to SRR on washing and blending strategies for SB6 preparation. This report presents a chronological review of this process and summarizes the findings at each stage. Following initial feedback from this work, the number of washes in Tank 51 was reduced to increase the projected sodium concentration in SB6. Analyses of predicted frit performance before and after a potential decant of Tank 40 showed that the post-decant SB6 composition would be difficult to process with any frit composition and that this scenario should be avoided. Based on the most recent SB6 projections (February 2010 SB6 composition projections developed at SRNL using the measured SB6 qualification sample composition and the revised Tank Farm washing plan), Frit 418 appears to be viable for SB6 processing at a target waste loading of 36%. A Nominal Stage PCCS Measurement Acceptability Region (MAR) assessment gave projected operating windows of 25-41% waste loading, limited by predictions of nepheline crystallization. The projected operating window is reduced to 25-38% waste loading when anticipated compositional variation is considered, again limited by predictions of nepheline crystallization. Blend points between 62 and 40 inches of Sludge Batch 5 (SB5) heel in Tank 40 had no practical impact on the projected performance of Frit 418. This assessment is made from a paper study approach only and assumes that no decant of Tank 40 will occur during SB6 processing. A decant of Tank 40 would reduce the Na2O concentration in Tank 40 to a point where it would be very difficult to target a waste loading of 36% for SB6 with Frit 418. The performance of Frit 418 with SB6 is limited by predictions of nepheline crystallization, which is a durability limiting constraint. Alternatives to Frit 418 are available that can provide equivalent projected operating windows and are limited by process related constraints (i.e., liquidus temperature predictions) rather than durability limiting constraints. A separate memorandum has recently been issued that discusses the use of Frit 418 for SB6 vitrification.1 potential differences in melt rate among these alternative frits will be discussed in a forthcoming technical report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TRUST Sensors in Environments: Fiber Optic Displacement (SE-FOD) Report, Release FY24

The objective of the Delivery Environments (DE) Testbeds to Reduce Uncertainty in Simulations and Tests (TRUST) project is to quantify and help increase confidence in specific areas of computational and experimental capabilities that are applicable to the development, on-target assessment, and qualification of current and future delivery environments. More complete quantification of confidence in experimental and computational capabilities and the sufficient increase of confidence in those capabilities is critical to improving weapons engineering design, qualification, and assessment efforts that are critical to the current and future stockpile. This work uses and provides feedback on analysis tools and experimental results databases for efficient and responsive engineering which are currently under development. Under the TRUST work package, there are five testbeds and their associated engineering analysis baseline models (EABMs): 1. Contact Thermal Conductivity (CTC), 2. Nonlinear Dynamics (ND), 3. Sensors in Environments: Accelerometers (SE-A), 4. Sensors in Environments: Fiber Optic Displacement Gauges (SE-FOD), and 5. Sensors in Environments: Thermocouples (SE-TC). The TRUST project uses single-feature testbeds to quantify uncertainties in specific models and experiments and to identify capability development needs that can help to reduce these uncertainties. Each testbed is designed, configured, and tested in collaboration with groups with design and experimental capability: E-14 and MPA-CINT. The complementary simulations are conducted using W-13 analysis tools and stored in model repositories with plans for incremental progress toward EABM requirements. W-13 extends and exercises the testbed simulations in collaboration with experimentalists for uncertainty quantification of current and future materials, geometries, and environments. Additionally, TRUST is intended to provide engineers in W-13 and E-14 with experience in both numerical simulations and experimental methods through cross-discipline collaborations. Following the introduction to the TRUST project, the remainder of this report focuses on experimental, modeling and simulation, and analysis efforts conducted in FY24 relevant to the TRUST Sensors in Environments: Fiber Optic Displacement (SE-FOD) testbed.

42 ENGINEERING↗

TRUST Contact Thermal Conductance (TRUST-CTC) Report: FY24

The objective of the Delivery Environments (DE) Testbeds to Reduce Uncertainties in Simulations and Tests (TRUST) project is to quantify and help increase confidence in specific areas of computational and experimental capabilities that are applicable to current and future delivery environments. More complete quantification of confidence in experimental and computational capabilities and the sufficient increase of confidence in those capabilities is critical to improving weapons engineering design, qualification, and assessment efforts that are critical to the current and future stockpile. Staff development will include cross-discipline collaboration to provide engineers with experience in both numerical simulations and experimental methods. This work uses and provides feedback on analysis tools and experimental results databases for efficient and responsive engineering which are currently under development. TRUST currently includes five testbeds and their associated engineering analysis baseline models (EABMs): 1. contact thermal conductivity, (CTC) 2. nonlinear dynamics, (ND) 3. sensors in environments for accelerometers, (SEA) 4. sensors in environments for fiber optic displacement gages, and (SEFOD) 5. sensors in environments for thermocouples (SETC). The TRUST project uses single-feature testbeds to quantify uncertainties in specific models and experiments and to identify capability development needs that can help to reduce these uncertainties. Each testbed is designed, configured, and tested in collaboration with groups with design and experimental capability: E-14 and MPA-CINT. The complementary simulations are conducted using W-13 analysis tools and stored in model repositories with plans for incremental progress toward EABM requirements. W-13 extends and exercises the testbed simulations in collaboration with experimentalists for uncertainty quantification of current and future materials, geometries, and environments. Additionally, TRUST is intended to provide engineers in W-13 and E-14 with experience in both numerical simulations and experimental methods through cross-discipline collaborations. Following the introduction to the TRUST project, the remainder of this report focuses on experimental and analytical efforts conducted in Fiscal Year (FY) 2024 relevant to the TRUST Contact Thermal Conductance (CTC) testbed.

42 ENGINEERING↗

Upgrade of Gamma Spectrometry Systems for ORNL TRISO Fuel PIE

Gamma spectrometry is a key element in much of the post-irradiation examination (PIE) work performed under the Advanced Gas Reactor Fuel Development and Qualification (AGR) Program (Demkowicz et al. 2015; Stempien et al. 2021). Gamma spectrometers are integrated into three major capabilities used at the Oak Ridge National Laboratory (ORNL) Irradiated Fuels Examination Laboratory (IFEL) for PIE of tristructural-isotropic (TRISO) coated particles and fuel compacts: the Core Conduction Cooldown Test Facility (CCCTF), the Vertical Counting System (VCS), and the Irradiated Microsphere Gamma Analyzer (IMGA). The CCCTF includes liquid-nitrogen-cooled traps to extract 85 Kr out of the He sweep gas that passes through the furnace in which the fuel compacts are heated during safety testing. Analysis of the 85 Kr activity in the traps is the primary indicator for TRISO failure during safety testing. The VCS is a system used to accurately measure gamma emission from components placed in a lead-shielded chamber. It is used to count the CCCTF deposition cups after removal from furnace. Each cup resides in the CCCTF furnace for typically 12–24 h and is periodically replaced with a fresh cup throughout the safety test. Metallic fission products collect on the water-cooled cups and several gamma-emitting isotopes ( 110 mAg, 134 Cs, 137 Cs, 154 Eu, and 155 Eu) are often measured and provide indication of the retention performance of the TRISO coatings. The VCS is also used to measure the presence of these isotopes on the CCCTF tantalum liner and sweep gas inlet tube for the determination of cup collection efficiency, as well as support other gamma spectrometry needs related to calibration of the 85 Kr fission gas traps and various other special PIE tasks. The IMGA uses gamma spectrometry to measure the inventory of gamma-emitting isotopes in individual TRISO particles. An automated particle handling system within the IMGA hot cell removes each particle from a source vial and positions it in front of a gamma detector, and output from the gamma spectrometer is used by the IMGA software to determine a destination vial such that particles are sorted according to their inventory and retention characteristics. At the conclusion of the AGR-1 and AGR-2 PIE campaigns, the gamma spectrometer systems used at ORNL to support that PIE had reached the end of its life cycle due to gradual obsolescence of the hardware and software. Upgrade of the Canberra Genie 2000 software used by these systems to a Windows 10 version was not a viable option, because the newest Windows 10 version offered by Mirion (the new owner of the Canberra technology) did not include the dynamic-link libraries (DLLs) needed for integration with the custom PIE software used with the CCCTF and IMGA, and Mirion had no current plans for development and release of Windows 10 versions of these DLLs with the Model S560 Genie 2000 Programming Library. Ultimately a switch was made to ORTEC gamma spectrometry systems, which appeared to be a more sustainable solution due to more proactive vendor support. The ORTEC conversion involved replacing the aging detector preamplifier and multichannel analyzer (MCA) hardware, upgrading the obsolete Windows 7 computers to Windows 10 compatible models, adopting ORTEC GammaVision software, and extensive modification of the ORNL-developed Visual Basic .NET (VB.NET) programs that provide the CCCTF and IMGA user interfaces.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design and Validation of Control Room Upgrades Using a Research Simulator Facility

Since 1981, the United States (U.S.) Nuclear Regulatory Commission (NRC) [1] requires a plant- specific simulator facility for use in training at U.S. nuclear power plants (NPPs). These training simulators are in near constant use for training and qualification of licensed NPP operators. In the early 1980s, the Halden Man-Machine Laboratory (HAMMLab) at the Halden Reactor Project (HRP) in Norway first built perhaps the most well known set of research simulators. The HRP offered a high- fidelity simulator facility in which the simulator is functionally linked to a specific plant but in which the human-machine interface (HMI) may differ from that found in the plant. As such, HAMMLab incorporated more advanced digital instrumentation and controls (I&C) than the plant, thereby giving it considerable interface flexibility that researchers took full advantage of when designing and validating different ways to upgrade NPP control rooms. Several U.S. partners—the U.S. NRC, the Electrical Power Research Institute (EPRI), Sandia National Laboratories, and Idaho National Laboratory (INL) – as well as international members of the HRP, have been working with HRP to run control room simulator studies. These studies, which use crews from Scandinavian plants, are used to determine crew behavior in a variety of normal and off-normal plant operations. The findings have ultimately been used to guide safety considerations at plants and to inform advanced HMI design—both for the regulator and in industry. Given the desire to use U.S. crews of licensed operators on a simulator of a U.S. NPP, there is a clear need for a research simulator facility in the U.S. There is no general-purpose reconfigurable research oriented control room simulator facility in the U.S. that can be used for a variety of studies, including the design and validation of control room upgrades.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The MAJORANA DEMONSTRATOR for 0νββ: Current Status and Future Plans

The Majorana Demonstrator will search for neutrinoless-double-beta decay in 76Ge, while establishing the feasibility of a future tonne-scale germanium-based neutrinoless-double-beta decay experiment, and performing searches for new physics beyond the Standard Model. The experiment, currently under construction at the Sanford Underground Research Facility in Lead, SD, will consist of a pair of modular high-purity germanium detector arrays housed inside of a compact copper, lead, and polyethylene shield. Through a combination of strict materials qualifications and assay, low-background design, and powerful background rejection techniques, the Demonstrator aims to achieve a background rate in the neutrinoless-double-beta decay region of interest (ROI) of no more than 3cnts/(ROI-t-y). The current status of the Demonstrator is discussed, as are plans for its completion.

Green, M. P.↗

MINING PROCESS AND PRODUCT INFORMATION FROM PRESSURE FLUCTUATIONS WITHIN A FUEL PARTICLE COATER

The Next Generation Nuclear Power (NGNP) Fuel Development and Qualification Program included the design, installation, and testing of a 6-inch diameter nuclear fuel particle coater to demonstrate quality TRISO fuel production on a small industrial scale. Scale-up from the laboratory-scale coater faced challenges associated with an increase in the kernel charge mass, kernel diameter, and a redesign of the gas distributor to achieve adequate fluidization throughout the deposition of the four TRISO coating layers. TRISO coatings are applied at very high temperatures in atmospheres of dense particulate clouds, corrosive gases, and hydrogen concentrations over 45% by volume. The severe environment, stringent product and process requirements, and the fragility of partially-formed coatings limit the insertion of probes or instruments into the coater vessel during operation. Pressure instrumentation were installed on the gas inlet line and exhaust line of the 6-inch coater to monitor the bed differential pressure and internal pressure fluctuations emanating from the fuel bed as a result of bed and gas “bubble” movement. These instruments are external to the particle bed and provide a glimpse into the dynamics of fuel particle bed during the coating process and data that could be used to help ascertain the adequacy of fluidization and, potentially, the dominant fluidization regimes. Pressure fluctuation and differential pressure data are not presently useful as process control instruments, but data suggest a link between the pressure signal structure and some measurable product attributes that could be exploited to get an early estimate of the attribute values.

42 ENGINEERING↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

RESULTS OF TESTS TO DEMONSTRATE A SIX-INCH-DIAMETER COATER FOR PRODUCTION OF TRISO-COATED PARTICLES FOR ADVANCED GAS REACTOR EXPERIMENTS

The Next Generation Nuclear Plant (NGNP)/Advanced Gas Reactor (AGR) Fuel Development and Qualification Program includes a series of irradiation experiments in Idaho National Laboratory’s (INL’s) Advanced Test Reactor. TRISOcoated particles for the first AGR experiment, AGR-1, were produced at Oak Ridge National Laboratory (ORNL) in a two inch diameter coater. A requirement of the NGNP/AGR Program is to produce coated particles for later experiments in coaters more representative of industrial scale. Toward this end, tests have been performed by Babcock and Wilcox (B&W) in a six-inch diameter coater. These tests are expected to lead to successful fabrication of particles for the second AGR experiment, AGR-2. While a thorough study of how coating parameters affect particle properties was not the goal of these tests, the test data obtained provides insight into process parameter/coated particle property relationships. Most relationships for the six-inch diameter coater followed trends found with the ORNL two-inch coater, in spite of differences in coater design and bed hydrodynamics. For example the key coating parameters affecting pyrocarbon anisotropy were coater temperature, coating gas fraction, total gas flow rate and kernel charge size. Anisotropy of the outer pyrolytic carbon (OPyC) layer also strongly correlates with coater differential pressure. In an effort to reduce the total particle fabrication run time, silicon carbide (SiC) was deposited with methyltrichlorosilane (MTS) concentrations up to 3 mol %. Using only hydrogen as the fluidizing gas, the high concentration MTS tests resulted in particles with lower than desired SiC densities. However when hydrogen was partially replaced with argon, high SiC densities were achieved with the high MTS gas fraction.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Neutron irradiation and electrical characterisation of the first 8” silicon pad sensor prototypes for the CMS calorimeter endcap upgrade

As part of its HL-LHC upgrade program, the CMS collaboration is replacing its existing endcap calorimeters with a high-granularity calorimeter (CE). The new calorimeter is a sampling calorimeter with unprecedented transverse and longitudinal readout for both electromagnetic and hadronic compartments. Due to its compactness, intrinsic time resolution, and radiation hardness, silicon has been chosen as active material for the regions exposed to higher radiation levels. The silicon sensors are fabricated as 20 cm (8”) wide hexagonal wafers and are segmented into several hundred pads which are read out individually. As part of the sensor qualification strategy, 8” sensor irradiation with neutrons has been conducted at the Rhode Island Nuclear Science Center (RINSC) and followed by their electrical characterisation in 2020-21. The completion of this important milestone in the CE's R&D program is documented in this paper and it provides detailed account of the associated infrastructure and procedures.The results on the electrical properties of the irradiated CE silicon sensors are presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

RESULTS OF TESTS TO DEMONSTRATE A SIX-INCH DIAMETER COATER FOR PRODUCTION OF TRISO-COATED PARTICLES FOR ADVANCED GAS REACTOR EXPERIMENTS

The Next Generation Nuclear Plant (NGNP)/Advanced Gas Reactor (AGR) Fuel Development and Qualification Program includes a series of irradiation experiments in Idaho National Laboratory's (INL's) Advanced Test Reactor. TRISOcoated particles for the first AGR experiment, AGR-1, were produced at Oak Ridge National Laboratory (ORNL) in a twoinch diameter coater. A requirement of the NGNP/AGR Program is to produce coated particles for later experiments in coaters more representative of industrial scale. Toward this end, tests have been performed by Babcock and Wilcox (B&W) in a six-inch diameter coater. These tests are expected to lead to successful fabrication of particles for the second AGR experiment, AGR-2. While a thorough study of how coating parameters affect particle properties was not the goal of these tests, the test data obtained provides insight into process parameter/coated particle property relationships. Most relationships for the six-inch diameter coater followed trends found with the ORNL two-inch coater, in spite of differences in coater design and bed hydrodynamics. For example the key coating parameters affecting pyrocarbon anisotropy were coater temperature, coating gas fraction, total gas flow rate and kernel charge size. Anisotropy of the outer pyrolytic carbon (OPyC) layer also strongly correlates with coater differential pressure. In an effort to reduce the total particle fabrication run time, silicon carbide (SiC) was deposited with methyltrichlorosilane (MTS) concentrations up to 3 mol %. Using only hydrogen as the fluidizing gas, the high concentration MTS tests resulted in particles with lower than desired SiC densities. However when hydrogen was partially replaced with argon, high SiC densities were achieved with the high MTS gas fraction.

08 HYDROGEN↗

Metal additive manufacturing simulation across length, time, and computing scales

Metal additive manufacturing (AM) offers a unique opportunity for production of advanced materials and complex geometries. However, variability in microstructure and properties challenges conventional approaches to design, process optimization, qualification, and materials selection. Modeling and simulation can improve understanding of AM processing and materials, but also poses major challenges for existing computational methods. Simultaneously, modern scientific computing hardware has become increasingly complex, most notably with the adoption of hybrid architectures such as Graphical Processing Units (GPUs). If appropriately utilized, emerging computational capabilities provide an opportunity to reveal new insight into AM processing and the resulting material structure and properties. In this review we describe the computational AM landscape, identify critical gaps, and highlight opportunities to impact the development and application of AM. First, the requirements and challenges of representative AM problem statements will be defined. Here, these problems range from scientific studies to industrial applications and are designed to capture the breadth of challenges facing the AM community. Next, the current state of AM modeling and simulation is evaluated, broken down by enabling hardware and software, process simulation, microstructure simulation, and property simulation. Each section describes the diversity of simulation approaches and associated trade-offs in physical fidelity and computational expense. Each area is then assessed based on their suitability and readiness for current and developing computational architectures. Lastly, the greatest opportunities for future research and application are highlighted, including gaps in modeling capabilities, opportunities for near-term application, and key scientific challenges.

additive manufacturing↗

Development and experimental qualification of novel disruption prevention techniques on DIII-D

Novel disruption prevention solutions spanning a range of control regimes are being developed and tested on DIII-D to enable ITER success. First, a new real-time control algorithm has been developed and tested for regulating nearness to stability limits and maintaining safety-margins. Its first application has been for reliable prevention of vertical displacement events (VDEs) by adjusting plasma elongation (κ) and the inner-gap between the plasma and inner-wall in response to real- time open-loop VDE growth rate (γ) estimators. VDEs were robustly prevented up to average open-loop growth rates of 800 rad/s with initial tunings, with only applying shape modification when near safety limits. Second, the disruption risk during fast, emergency shutdown after large tearing and locked modes can be significantly improved by transitioning to a limited topology during shutdown. More than 50% of emergency limited shutdowns after locked modes reach a final normalized current I N < 0.3 before terminating, scaling to the 3 MA ITER requirement. This is in contrast to diverted shutdowns, the majority of which disrupt at I N > 0.8. Despite improvements, these results highlight the critical importance of early prevention. Third, a novel emergency shut down method has been developed which excites instabilities to form a warm, helical core post-thermal quench. The current quench extends to ~100ms and avoids VDEs and runaway electron generation. Novel real-time machine learning disruption prediction has been integrated with the DIII-D proximity controller, and a real- time compatible multi-mode MHD spectroscopy technique has been developed. Results presented here were enabled by a focused effort, the Disruption Free Protocol, in DIII-D’s 2019-20 campaign to complement disruption prevention experiments with a large piggy-back program. In addition to testing novel techniques, it is estimated to have helped avoid 32 potential disruptions in piggyback operations with rapid, early shutdowns after large rotating n=1 or locked modes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Qualification of the U.S. Conductors for ITER TF Magnet System

The U.S. Domestic Agency is one of the six suppliers of the toroidal field (TF) conductor for ITER. To qualify conductors per ITER requirements, we prepared or provided to the Swiss Plasma Center (SPC) eight test articles, sixteen conductors total, that were tested in the SULTAN facility at SPC in the ITER relevant conditions. The strands that were used in these SULTAN samples were fully characterized in the laboratories. In this paper, we report both test results and analysis of the conductors' performance against expected strand performance. The U.S. TF conductors showed a slightly better than average current sharing temperature and a relatively low sensitivity to warm up-cooldown cycles in comparison with other suppliers' conductors. However, the trend in current sharing temperature versus cycles and warm ups did not saturate, which means a continuing slow degradation of the conductor performance if the number of warm up and cooldown cycles will be significantly higher than expected. The ac losses in the U.S. TF conductors are in line with losses in the other TF conductor suppliers.

Martovetsky, Nicolai↗

Development and experimental qualification of novel disruption prevention techniques on DIII-D

Novel disruption prevention solutions spanning a range of control regimes are being developed and tested on DIII-D to enable ITER success. First, a new real-time control algorithm has been developed and tested for regulating nearness to stability limits and maintaining safety-margins. Its first application has been for reliable prevention of vertical displacement events (VDEs) by adjusting plasma elongation (κ) and the inner-gap between the plasma and inner-wall in response to real- time open-loop VDE growth rate (γ) estimators. VDEs were robustly prevented up to average open-loop growth rates of 800 rad/s with initial tunings, with only applying shape modification when near safety limits. Second, the disruption risk during fast, emergency shutdown after large tearing and locked modes can be significantly improved by transitioning to a limited topology during shutdown. More than 50% of emergency limited shutdowns after locked modes reach a final normalized current I_N < 0.3 before terminating, scaling to the 3 MA ITER requirement. Furthermore, this is in contrast to diverted shutdowns, the majority of which disrupt at I_N > 0.8. Despite improvements, these results highlight the critical importance of early prevention. Third, a novel emergency shut down method has been developed which excites instabilities to form a warm, helical core post-thermal quench. The current quench extends to ~100ms and avoids VDEs and runaway electron generation. Novel real-time machine learning disruption prediction has been integrated with the DIII-D proximity controller, and a real- time compatible multi-mode MHD spectroscopy technique has been developed. Results presented here were enabled by a focused effort, the Disruption Free Protocol, in DIII-D’s 2019-20 campaign to complement disruption prevention experiments with a large piggy-back program. In addition to testing novel techniques, it is estimated to have helped avoid 32 potential disruptions in piggyback operations with rapid, early shutdowns after large rotating n=1 or locked modes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which were described in the March 2009 report, had adversely impacted the success of earlier Departmental projects. We concluded that consideration of these previously encountered internal control weaknesses was essential if the Department was to avoid the same or similar problems in executing the Recovery Act programs/projects. During the course of our audit we identified other internal control weakness indicators. When brought to their attention by the Office of Inspector General audit staff, program officials acted promptly to address these problems by modifying or improving their risk mitigation strategies. For instance, we found that the Office of Energy Efficiency and Renewable Energy, responsible for $16.8 billion in Recovery Act program activities, took steps to strengthen its merit review process to avoid potential conflict of interest concerns.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Purpose, Design, and Analysis of the NSTX-U Centerstack Casing Lateral Support Shims

The National Spherical Torus Experiment Upgrade (NSTX-U) centerstack casing surrounds the central magnet core of NSTXU. It provides the inner vacuum boundary of the plasma chamber and supports the radially inboard plasma facing components lining the plasma chamber. The casing is supported like a cantilever, fixed at the lower flange by a connection to the TF Bundle through a G-10 ring. It is flexibly supported at the top by bellows, and insulated shims intended to react the largest part of the inventory of the disruption loads at the upper support, thereby protecting the upper and lower connections from excessive loads. A large part of the qualification of the casing and tiles requires addressing and quantifying disruption loads. These have been estimated based on extensions of the behavior of NSTX during its run period roughly 15 years ago. Structural qualification of the Upgrade used these estimates of the loading as input to calculations to demonstrate adequacy for a “most probable” disruption. The estimates are included in a requirements document to guide conservative design of all components loaded by disruptions. However, the changes made for the upgrade made the extrapolation of disruption behavior uncertain. Disruptions include axisymmetric loading from axisymmetric currents induced in the vessel shells. In addition, more complex currents called Halo currents are a result of plasma poloidal currents impinging on the casing. The halo currents add another layer of uncertain behavior and net lateral loading to the casing. As a result, NSTX-U is equipped with a number of instruments intended to assess the nature and severity of disruptions. The casing shims are required for lateral support of the casing, but these have also been converted to load cells to provide another measure of the magnitude of symmetric and asymmetric loading. Some of the logic in the development of the requirements document are presented. Electromagnetic analysis of axisymmetric and halo loading is described. Global simulations of the casing transient dynamic response, and local analysis and testing of the shim/load cell are included. The shim load cells and other instrumentation will be an important guide in planning NSTX-U experiments beyond its next run period expected in late 2026 or early 2027.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Evaluating Age Effects on HEPA Filter Performance

Nuclear grade high efficiency particulate air (HEPA) filters are routinely employed as the final control element in confinement ventilation systems. The traditional HEPA filter utilizes a pleated filter medium of fibrous glass that has been produced in a manner analogous to manufacturing paper. These filters are the physically weakest element in a containment ventilation system. Containment ventilation systems are designed to condition the air-stream (temperature, relative humidity, moisture, particle size distribution of aerosols, and aerosol concentration) to levels/conditions that fibrous glass HEPA filters can handle. Approximately 6000 nuclear grade HEPA filters are purchased each year for use in the DOE/NNSA complex. Additional filters are purchased for use in commercial nuclear power generation and ventilation systems of other nuclear applications. These filters are designed and tested in accordance with the American Society of Mechanical Engineers (ASME) AG-1 Code Nuclear Air and Gas Treatment. This code establishes design requirements and qualification procedures. Qualification testing of axial flow filters is described in paragraphs 5000 and following of AG-1. The series of qualification tests are intended to describe the operating envelope of HEPA filters and verify the reliability of a filter design. AG-1 qualification also confirms the pedigree of components used in manufacture for that filter design. The collective set of qualification tests establishes the assumed operating envelope for AG-1 filters. The effects of age on HEPA filter performance have been a concern for at least two decades. A combination of physical evaluation of aged filter media and a review of filter failure records resulted in Appendix C of the Nuclear Air Cleaning Handbook (NACH), Determination of HEPA Filter Life. This states that HEPA filters are not to be used beyond 10 years from the date of manufacture. Additionally, filters put into service in locations where they may become wet are to be taken out of service five years from date of manufacture. Filters that have become wet are to be taken out of service immediately. Finally, it should also be pointed out that filters held in Level B storage are subject to the same 10-year service life. Very limited bench-scale testing in the 1990's raised concern that aging HEPA filters do not have the strength to withstand an accident scenario. In May of 1999, the DNFSB released a Technical Report 23 entitled HEPA Filters Used in the Department of Energy's Hazardous Facilities. This report expressed concerns for the potential vulnerability of HEPA filters in vital safety systems. Concerns and uncertainty associated with degradation of HEPA filter performance over time led the DOE sites to limit HEPA filter service life to 10 years from the date of manufacture or five years in cases where filters may become wet. Establishment of a conservative service life needs to be based on data from a structured series of tests comparing the performance envelope of new and aged full-scale filters. A service life that is insufficiently conservative endangers workers and the public. One that is excessively conservative costs can cause hundreds of otherwise unnecessary filter changes. This increases exposure of employees, disrupts facility operations, and increase disposal costs by millions of dollars annually. Conclusive data are needed to resolve uncertainty associated with the damaging effects of aging on durability of HEPA filters. Therefore, this study needs to provide a sufficient body of evidence to allow DOE and site professionals to make prudent decisions. An updated version of ASME AG-1 Section FC included a non-mandatory appendix that would include the DOE guidance for service life of HEPA filters. Balloting of this revision generated significant resistance to inclusion of any kind of service life language citing the lack of supporting experimental data. Efforts to resolve negative votes failed and resistance to acceptance of the language increased. The result has been to not include service language in Section FC and requests to remove it from sections that already include such language. The recent activity of the ASME AG-1 Committee on Nuclear Air and Gas Treatment effectively de-emphasizes following DoE's service life guidelines. The DOE Office of Nuclear Safety under its NSR and D program provided the Mississippi State University Institute for Clean Energy Technology (ICET) finding to initiate a study to determine the effects of aging on AG-1 axial flow filters just prior to actions taken within the AG-1 committee regarding service life. The NSR and D funding facilitated timely development of a national technical working group comprised of members from the regulatory community, DOE complex, and commercial power to resolve uncertainty associated with effects of aging. The Department of Energy Office of Environmental Management (DOE-EM) has been funding the ICET to evaluate the performance envelope for AG-1 HEPA filters. ICET is one of DOE-EM's qualified suppliers. Synergy has been achieved by associating the NSR and D aged filter activities to testing activities evaluating the performance envelopes of separator and separator-less AG-1 HEPA filters funded by DOE-EM. The DOE-EM funded activities establish baseline data for the aged filter study and future EM funding will provide long term support for testing additional aged filters. EM funding of new filters includes analytical evaluation of media tensile strength by thermal analysis to establish baseline values and determine mass loss of moisture resistance and acrylic binders due to use. All of these values can be used for comparison of test results for aged filters. (authors)

07 ISOTOPE AND RADIATION SOURCES↗