Search NASA⌕ Search

SEARCH · Search NASA

Results for “procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Successful Implementation of Soil Segregation Technology at the Painesville FUSRAP Site - 12281

Typically the highest cost component of the radiological soils remediation of Formerly Utilized Sites Remedial Action Program (FUSRAP) sites is the cost to transport and dispose of the excavated soils, typically contaminated with naturally occurring isotopes of uranium, thorium and radium, at an appropriately permitted off-site disposal facility. The heterogeneous nature of the contamination encountered at these sites makes it difficult to accurately delineate the extent of contaminated soil using the limited, discrete sampling data collected during the investigation phases; and difficult to precisely excavate only the contaminated soil that is above the established cleanup limits using standard in-field scanning and guiding methodologies. This usually results in a conservative guided excavation to ensure cleanup criteria are met, with the attendant transportation and disposal costs for the larger volumes of soil excavated. To address this issue during the remediation of the Painesville FUSRAP Site, located in Painesville, Ohio, the Buffalo District of the U.S. Army Corps of Engineers, and its contractor, Safety and Ecology Corporation (SEC), employed automatic soil segregation technology provided by MACTEC (now AMEC) to reduce the potential for transportation and disposal of soils that met the cleanup limits. This waste minimization technology utilized gamma spectroscopy of conveyor-fed soils to automatically segregate the material into above and below criteria discharge piles. Use of the soil segregation system resulted in cost savings through the significant reduction of the volume of excavated soil that required off-site transportation and disposal, and the reduction of the amount of imported clean backfill required via reuse of 'below criteria' segregated soil as place back material in restoring the excavations. Measurements taken by the soil segregation system, as well as results of quality control sampling of segregated soils, confirmed that soils segregated as below criteria for reuse as site fill did meet the Record of Decision cleanup criteria for the site. Automatic soil segregation technology was successfully implemented as part of the 2010 - 2011 remediation effort at the Painesville FUSRAP Site. The Orion ScanSortSM system employed at the site demonstrated the ability to accurately determine the radioactivity concentrations in the processed soil and soil-like material and quickly segregate that material for appropriate final disposition. Data from the soil segregation system and confirmatory QC samples indicated that the segregated 'below criteria' soils met the cleanup criteria in the ROD, and was appropriate for reuse as fill in the excavations. The reduction of the total excavated soil volume requiring off-site disposal by 94% yielded significant project cost savings through reduction of transportation and disposal and backfill procurement costs. Use of automatic soil segregation technology was an efficient and cost-effective method for addressing the radiological contamination at the Painesville Site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modular Design of Processing and Storage Facilities for Small Volumes of Low and Intermediate Level Radioactive Waste including Disused Sealed Sources - 12372

There are a number of IAEA Member States generating relatively small quantities of radioactive waste and/or disused sealed sources in application of nuclear techniques in medicine, industry and research and in nuclear research centres having small research reactors. At present many of these Member States do not have facilities for processing and storing their radioactive wastes; notably in those countries with small quantities of generated radioactive wastes. In other Member States the existing waste processing and storage facilities (WPSF) are in need of varying degrees of upgrading in order to address new waste streams, incorporate new waste processing technologies, or expand interim storage capacities. The IAEA has developed a modular design approach for a WPSF that is based on a variety of modules for different waste stream treatment and conditioning processes. The modular WPSF design is elaborated in a substantial Design Engineering Package that will be published by IAEA as a technical report. The Design Engineering Package enables users to select the optimum waste processing and storage modules to meet their needs, and to specify the requirements for procurement of individual modules and their integration into a waste processing and storage facility. The Design Engineering Package is planned for publication by the IAEA in 2012 and is presented as: - A Design Engineering Package Summary document. - A supporting CD that contains: - Process module general specifications. - Process module interface specifications. - Design Engineering Package for process modules. - Sample technical specifications for design and construction of modular processing facility. - Design Engineering Package for storage modules. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of the FGMSP at Sellafield: The First Transfer of Bulk Sludge - 17133

The very first bulk transfers of radioactive sludge have commenced from one of the most hazardous nuclear plants in Europe, using equipment and systems researched, designed, installed and commissioned by Jacobs as part of the ACKtiv alliance. Sellafield is a nuclear fuel reprocessing and decommissioning site, close to the village of Seascale on the coast of the Irish Sea in Cumbria, England. Sellafield incorporates the original nuclear reactor site at Windscale, which is currently undergoing decommissioning, and dismantling, and Calder Hall, the world's first nuclear power generating reactor. The first nuclear facilities were built in the 1940's.The First Generation Magnox Storage Pond (FGMSP) dates back to the 1950's as part of the UK's expanding nuclear programme and was constructed to store, cool and prepare used Magnox nuclear fuel for recycling into new fuel. It urgently needs to be emptied of 1500 cubic metres of radioactive sludge. In this paper we describe the work undertaken by Jacobs to deliver a very challenging programme of work to provide the capability to remove sludge from the pond. The FGMSP Retrievals Project was awarded in March 2007 to supply equipment and services for the removal of sludge and miscellaneous waste from the First Generation Magnox Storage Pond at Sellafield. The Project is being executed by ACKtiv Nuclear (Jacobs, Carillion and Atkins) of which Jacobs is a 40% stakeholder. ACKtiv Nuclear is a mature Joint Venture and has been operating continuously and successfully since 2002, the oldest JV still in operation on Sellafield Site. The roots of the JV can be traced back to the 1980's. The Project covers all project phases from front-end engineering through detailed design, procurement, installation and commissioning support. The Project places huge emphasis on off-Site testing and has several facilities for both installation and integrated testing. This proves equipment prior to installation in a radioactive environment. The Project has achieved success and recognition including winning the 2014 and 2015 Sellafield Business Excellence awards, as well as numerous internal Jacobs awards. The Project achieved a major decommissioning milestone in March 2016. Since the installation of a 31 m pipe-bridge in 2012, using a 1200 te mobile crane surrounded by several other facilities with nuclear inventory, the Project has successfully installed the sludge retrieval and effluent system into the FGMSP. This 4 year programme of work included 2 booster pump platforms, sludge recovery tooling, hoses, umbilicals and a deluge skip wash box which were all trialled and proven off-Site prior to installation in the pond. This milestone to commence transfer of sludge to modern stainless steel containment is a major step forward in the hazard reduction of the facility.The presentation will cover the installation of the pond de-sludging equipment, the innovations deployed that ensured that the milestone was achieved under budget and ahead of schedule, as well the benefits to the facility, the Site and the nuclear industry. It will also examine the challenges that needed to be overcome such as high dose, contamination, limited working times and space constraints. The presentation will describe why the work is of national Importance and conclude with the achievement of commencement of bulk sludge transfer to a modern facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field Implementation of Nuclear Safeguards: ENEA' s Capability Projection - 17174

The Non-Proliferation Treaty (NPT) for Italy entered into force on May 2, 1975, in the framework of the national political position to deal with the nuclear energy only for civilian medical and industrial uses, being the country included in the NNWS (Non-Nuclear Weapon States). It is recognized that for these scopes nuclear material is produced, used, shipped and disposed, but it is at the same time known that it is not like any other material. The signature of further international treaties like the Additional Protocol to NPT led the Italian Ministry for the Economic Development (MISE) to take advantage of the public Italian Agency for Energy Environment and the Economic Development (ENEA) by means of a three years basis renewable agreement that could support the Ministry in fulfilling the clauses and obligations rising from the treaty itself and then fostering R and D in the field of the safeguards. MISE supported the procurement of a mobile laboratory able to bring sophisticated analysis instruments on the field in case of suspected environmental contamination deriving from the presence of nuclear materials. The description of this mobile laboratory and its capabilities is illustrated in this paper. (authors)

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Implementing a Low Activity Waste Direct Feed Capability in the Hanford Waste Treatment Plant - 17277

The original design of the Waste Treatment and Immobilization Plant (WTP) requires that all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE) has developed a sequenced approach to completing the WTP Project, beginning with feeding some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. Sending low-activity waste from the tank farms to the LAW Facility is referred to as direct-feed LAW (DFLAW). Using this approach, low-activity waste will be pretreated in a Low-Activity Waste Pretreatment System (LAWPS) for cesium and solids separation to meet LAW Facility safety basis requirements and produce an acceptable low-activity waste product. The waste feed will then be transferred to the LAW Facility where it will be immobilized in glass, poured into stainless steel containers, and then transported by truck to the Integrated Disposal Facility, a mixed waste burial ground located in the Hanford 200-East Area. The primary driver for the DFLAW approach is to enable commissioning of the LAW Facility for low-activity waste processing prior to the completion and availability of the PT and High-Level Waste (HLW) facilities. As such, the functions intended to be provided to the LAW Facility by the PT Facility and the common functionality with the HLW Facility must be refined and modified to enable DFLAW operations. The DFLAW approach will provide necessary systems and facilities to replace these enabling PT Facility functions until the PT Facility is completed and commissioned. For example, liquid effluents from the LAW Facility, primarily melter offgas condensate, will be processed in a new effluent management facility (EMF) within the WTP footprint rather than sending the effluent back to the PT Facility for processing. During DFLAW operations approximately 3 785 m{sup 3} (1 million gallons) of double-shell tank (DST) waste will be delivered to WTP for treatment each year of operation, and nominally produce 21 metric tons of immobilized low-activity waste glass per day. The resultant freed space in the DSTs will support safe tank farm operation and staging of additional waste for treatment. In December 2016, DOE executed a contract modification and approved an incremental change to the project's performance baseline to complete the WTP facilities needed to allow direct feed of low-activity waste to the LAW Facility. The revised performance baseline supports completion and cold commissioning of the WTP facilities needed for DFLAW operations no later than August 2023. The design of modifications to WTP facilities needed to enable DFLAW operations is more that 60 percent complete. DOE approved the preliminary safety basis for DFLAW modifications to WTP based on the 30 percent design package in early 2016. Early construction work for DFLAW modifications to WTP began in mid-2015. Long-lead procurement actions for some of the more complex equipment needed for LAW Facility effluent treatment were initiated in early 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of Glycolic Acid Flowsheet in the Defense Waste Processing Facility (DWPF) - 17348

The disposition of high level waste (HLW) into canistered waste forms began at Savannah River Site (SRS) in 1996. For its entire processing history, DWPF has added formic acid as a pretreatment step in producing acceptable melter feed from incoming waste sludges sent from the HLW Tank Farms. While this process has been used to successfully produce more than 4,000 radioactive canisters, the addition of formic acid and its tendency to catalytically decompose in the presence of trace quantities of noble metals adds substantial process complexity in order to safely accommodate hydrogen generation and pH shifting during batch operations. Research efforts have been in progress for several years to identify a chemical surrogate for formic acid which performs the essential process functions without the associated negative consequences. The final analytical work to demonstrate the effectiveness of glycolic acid in the DWPF is nearly complete and a project team has been created to safely integrate the new acid into the chemical process. The project team is currently executing an implementation schedule which addresses safety basis development, revision to operations procedures and training, facility modifications, chemical procurement, and updated process monitoring. Introduction of glycolic acid into DWPF is currently scheduled to take place in early 2017, beginning with a blended flowsheet of glycolic and formic acid and ultimately transitioning to glycolic-only processing. This paper provides an overview of planned glycolic acid flowsheet implementation in the DWPF. This paper discusses several issues related to implementing such a significant change to the chemical process including: 1) Process chemistry differences between the two flowsheets with quantitative comparison for several properties of interest; 2) Technical approach to hazards analysis and safety basis development strategy; 3) Status of project execution for major deliverables; and 4) Path forward for facility modifications related to legacy formic acid support equipment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design, Fabrication and Start-up of Test Facilities for the LAWPS Full-Scale IX Column Test and Engineering Scale Test - 17418

The U.S. Department of Energy (DOE), Office of River Protection's (ORP) primary mission is to retrieve and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River. Mixed radioactive waste is stored in 177 underground tanks at the Hanford Site as reported in DOE/ORP 2003-02, Environmental Impact Statement for Retrieval, Treatment, and Disposal of Tank Waste and Closure of the Single Shell Tanks at the Hanford Site, Richland WA, Inventory and Source Term Data Package. The 177 underground tanks are estimated to contain about 56 million gallons of waste. The Low Activity Waste Pretreatment System (LAWPS) Project provides for the early production of immobilized low activity waste (ILAW) by feeding LAW directly from Tank Farms to the Hanford Waste Treatment Plant's (WTP's) LAW Facility, bypassing the Pretreatment Facility. Prior to the transfer of feed to the WTP LAW Vitrification Facility, tank supernatant waste will be pretreated in the LAWPS to meet the WTP LAW waste acceptance criteria. The LAWPS will also facilitate the return of secondary liquid wastes from the WTP LAW Vitrification Facility to the Tank Farms. In November of 2015 DOE's Tank Operations Contractor, Washington River Protection Solutions (WRPS), awarded a contract to the AECOM Team to design, fabricate and operate two test platforms to generate performance data at two different scales and demonstrate technology maturation. The first platform models the ion exchange (IX) columns at full scale, and the second platform models the integrated flowsheet (cross flow filter (CFF) and IX) at 1/9. scale. Both test platforms underwent shakedown and start-up testing in August 2016 and moved into actual testing and NQA-1 data generation shortly thereafter. This paper covers the engineering design, procurement, construction, installation, and acceptance testing of the test platforms (which are now operational) under an aggressive fast track schedule, and initial test data as available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Basis for Savannah River Tank Closure Cesium Removal Project - 17448

Westinghouse is currently executing a contract, awarded in June 2016 from Savannah River Remediation LLC, to deliver a system capable of removing solids and up to 100,000 curies of Cesium-137 from tank 10H, located in the Savannah River 'tank farm'. Savannah River Remediation currently has the responsibility to perform work for the Savannah River Site Liquid Waste Operations Program at the Savannah River Site for the US government, represented by the US DOE under their Principal contract. The scope of work covers the detailed design, procurement, fabrication, and delivery of the system to the Savannah River Site. It also includes the factory acceptance testing of the system, prior to delivery to site. Before leaving the site, Westinghouse will perform an evaluation of the system assembly and operations training for the incumbent operator. The basis for the technology chosen to accomplish the solids and Cesium-137 removal is unique to the specific feed stream, but is based on well-known and successful technology, Toshiba SARRY water cleanup system. Toshiba is Westinghouse's parent company, allowing us to reach back and incorporate the lessons learned during the water cleanup at Fukushima Daiichi and the integration of various technologies. Another key to the technology basis was the ion exchange media selection. A number of possible ion exchange media for the cesium removal were considered with the final choice being inorganic CST resin. Several criteria were considered and compared, such as the radiation sensitivity of the CST and the cesium specific ion preference. This paper will present the conceptual design of the modular system, noting the key benefits of specific components in the overall technology basis. Along with the design, a look at key technology improvements carried into the design through the Toshiba SARRY system will be incorporated. A first feedback on the implementation of the overall project will be provided. Since this system is a first-of-a-kind in this specific application, interesting lessons learned will be provided for future tank closure activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Legacy Sludge Removal and Treatment From Y-12 Storage Tank - 17585

Atkins Nuclear is a subcontractor to Consolidated Nuclear Security LLC (CNS) to perform Operations and Maintenance Services for the Liquid Waste Management Services (LWMS) subcontract at the Y-12 site located in Oak Ridge, TN. The largest of the LWMS treatment facilities is the West End Treatment Facility (WETF). During the water treatment process sludge is accumulated in storage tanks, before final disposal. Approximately 30,000 gallons of legacy sludge was segregated and staged in one of the large tanks and had the potential to be characterized as a mixed waste. Atkins was assigned a lump-sum sub-project and the responsibility to characterize, remove, treat, transport and dispose of the legacy sludge. A removal and treatment system was designed and installed which successfully treated the sludge to meet Land Disposal restrictions (LDR) for disposal at the Nevada Nuclear Security Site disposal facility. This paper discusses the work planning, system design and procurement, sludge removal and treatment process and final disposal including challenges in completing the sub-project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Machining of Alloy 709 Creep-fatigue Specimens from G. O. Carlson Heat

Alloy 709 has been selected as the next candidate material for Section III, Division 5 qualification in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC) for elevated-temperature nuclear construction. The qualification data package requires an assortment of information and material data including tensile, creep, and creep-fatigue performance at elevated temperatures from different material heats. The goal of the project is to generate a dataset to support qualification of Alloy 709 material for ASME BPVC design code. Working towards the project goal, Idaho National Laboratory needs to conduct a series of tests on three different heats to support the A709 code case development. At present, there is a gap in the data package for one of the heats: Heat number 58776 manufactured by G.O. Carlson. To address this data gap, Argonne National Laboratory transmitted five plates of A709 heat 58776 manufactured by G.O. Carlson to Idaho National Laboratory. These plates were solution annealed at 1150°C and heat treated at 775°C for 10 hours. The objective of this specification is to procure a series of creep-fatigue specimens to support the qualification data package. The creep-fatigue specimen design captures the cyclic material performance at elevated temperature. The material performance data generated from specimens machined herein will support the ASME BPVC code case development and establish design limits, and design life curves for Alloy 709 material.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Control room consolidation at Hanford tank farms for improved conduct of operation - 15345

Washington River Protection Solutions (WRPS) manages the underground waste storage tanks at the Hanford site in Washington State on behalf of the DOE Office of River Protection. There are 177 tanks distributed among 18 tank farms spread across an area of desert scrub covering about 20 square miles. A single evaporator facility supports the tanks to provide waste reduction activities. Farms and associated equipment, including exhausters, have been operated locally since installation. Upgrades over time introduced limited automation, but using inconsistent platforms, and providing isolated control locations around the farms. However, as the Tank Farms move from maintenance operations to production operations, with increased numbers of waste transfers and evaporator campaigns, and also prepare for integration with the adjacent Hanford Waste Treatment Plant, then operational improvements were planned and are being implemented. Infrastructure improvement projects included upgrades of control systems to a common platform, and installation of a fiber optic based local area network to the majority of farms, which together provided a distributed control system supporting tank farms. This new infrastructure provided the basis to propose consolidation of control and monitoring operations to a single location. More than a single location, the new Central Control Room was to increase effectiveness of operations by providing full status of all activities being performed across the Tank Farms and the Evaporator. The recent addition of productivity e-tools also would provide capability for management, supervisors and operators to make informed decisions regarding facility operations, through custom online applications designed to provide real time information derived from operational data. For example, tracking turnover activities between shifts, and maintaining compliance with limited conditions for operations. The Central Control Room would also have a single supervisor able to effectively manage the status of all assets and processes. The expected benefits of this arrangement include increased operator utility, increased situational awareness, improved response time for upset conditions, improvement in operator environment, and reductions in operating costs. The projected ROI for the Central Control Room when fully operational was projected to be about two years based on reduced costs from freeing up operations staff to perform other work plus the time and material savings realized by operations being performed with increased situational awareness. So the Central Control Room would become a hub for monitoring and controlling facility operations while responding to real time information affecting productivity and performance, from a centralized location customized to a fresh working environment. Over a 14-month period, WRPS developed the concept and engineering, procured over 500 items, modified and installed in renovated building, and completed transition and testing of this new Central Control Room, turning over the initial phase to Operations for 24/7 use in April 2014. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A 'Method Based Survey' Succeeds in a Spanish Scrap Clearance Project - 15664

During the last years, a Waste Minimization Project has been implemented in Cofrentes NPP in a collaborative effort performed by IBERDROLA and ENRESA. The final result has been more than 760 t of metallic scrap including containerised materials but also massive surface contaminated objects have been managed and finally cleared. The initial project scope included 10 spent fuel pool racks weighting 130 tones but limited testing demonstrated they presented high contamination levels and were managed as radwaste including down-sizing and conditioning in ENRESA standard radwaste containers for metallic scrap (CMT's). This project started in 2008 and finished just in the summer of 2014. During these years planning and licensing, procurement, execution, including, a huge effort in decontamination and clearance measurement, was developed. The project closure is developing actually. The residual materials were stored and initially characterized previously its down-sizing and decontamination using chemical baths (warm diluted sulfuric acid and ultrasounds) , blasting (water jetting with iron grit) and in special cases mopping using industrial cleaners). Some big items were decontaminated previously its down-sizing. The materials were cleared using an approach similar to MARSAME approach based in MARSSIM guidelines. The 160 containers needed six in situ gamma spectrometry measurements each and 115 massive (from 0.45 t to 13.7 t) items need at least so many measurements as total surface in square meters. In total 763 t were cleared with only 0.6 t rejected and treated as radwaste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status of Electronics Upgrades to the LANL Green is Clean Phoswich Detector Systems - 16419

Los Alamos National Laboratory radiological facilities produce low-density room trash that, in many cases, is not contaminated with radioactivity. It has been estimated that 50 to 90% of low-density room trash is free of radioactive contamination and eligible for inclusion in LANL's Green is Clean (GIC) program. The GIC program is a verification program for non-regulated waste from radiation controlled areas that has been actively segregated as nonradioactive through the use of the waste generator's acceptable knowledge. The GIC program has employed two large area Phoswich gamma ray detector systems (HERCULES and ZEUS) to assay and verify that GIC candidate waste meets free release disposal requirements. The large area (127 cm{sup 2}) Phoswich detectors consist of a thin NaI front crystal (3 mm thick) that is optically coupled to a thick CsI back crystal (50 mm thick). The crystals are set in an oxygen-free high-conductivity copper housing with a very thin (0.025 mm) aluminum entrance window. The scintillation properties of the two crystals are different enough to allow the system's electronic components to identify the origin of any pulse. The original systems utilize Nuclear Instrumentation Module (NIM) electronics to process the detector signals. These electronic modules provide the buffering, amplification, and pulse shape analyzer needed for the proper presentation of signals to the custom Phosmux router module. The router module separates the sodium iodide and cesium iodide signals by their rise times and transfers this information into the computer-mounted multichannel analyzer, a Canberra Model S-100 system. While these NIM Bin counting electronics configurations have been effective for approximately 20 years of operation, they are bulky requiring numerous modules per detector and the important Phosmux module is no longer manufactured by LANL. Modern advancement of commercial counting electronics now offer more compact options for equivalent detector signal processing. A pulse shape discriminator module, the DGF Pixie-4, made by XIA LLC, has been identified that can replace the majority of the original NIM bin electronics in a much more compact chassis - one Pixie-4 replaces four NIM amplifiers and four NIM PSAs and fits in a small National Instruments{sup TM} chassis. Thus, LANL has initiated a system upgrade project to replace the historic NIM electronics with the XIA Pixie4 and associated configuration software. The hardware for one Phoswich systems has been procured for the project and the configuration software, customized for the LANL Phoswich detector application, has been written by the manufacturer. Initial setup and optimization of the Pixie-4 configuration has been performed. Qualitative and quantitative baseline comparisons to the NIM electronics has been performed. Good agreement of key low energy gamma lines between the systems has allowed 'Proof of Concept' to be concluded. Further optimization and performance evaluations are in progress. Modifications to the LabVIEW{sup TM} based operating software (originally written by VI Control Systems Ltd.) are being performed by a LANL LabVIEW{sup TM} programmer to accommodate the electronics upgrade. A new LabVIEW{sup TM} interface to control the Pixie-4 has already been developed. Final optimization and testing, formal software QA, and revisions to operating procedures are in progress to achieve completion of the GIC system upgrade project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Protecting the Columbia River through Removal and Packaging of Radioactive Sludge in Hanford's K Area - 16572

The Columbia River once provided power and cooling water to operations on the Hanford Site; today, more than a million people downstream from Hanford rely on the river for agriculture, fishing and recreation. The Department of Energy and contractor CH2M HILL Plateau Remediation Company (CH2M) is making significant progress in protecting that vital resource. Eight of nine reactors along the river have been cocooned and soil and groundwater remediation is successfully reducing the concentration of contaminants in groundwater. The 100-K area is the last area where significant work remains to protect the river. CH2M has accomplished much in the past ten years, including demolishing the K East reactor fuel storage basin in 2009. Prior to demolition of the basin, highly radioactive sludge from that basin was transferred into containers located in the nearby K West reactor fuel storage basin. Today, the K East reactor is in interim surveillance mode, and work is underway in the K West basin to remove the sludge, which is a mixture of tiny fuel corrosion particles, fuel rod and metal fragments and soil and sand less than 1/4-inch in diameter. CH2M has designed a sludge removal system that will safely and efficiently remove the sludge from the K West basin and deposit it into specially designed containers which will be relocated to a storage facility on Hanford's Central Plateau. Procurement, fabrication and delivery of the sludge removal system is underway, with extensive testing and training planned for 2016 and 2017 ahead of the goal of removing sludge from the river by September 30, 2018. This project must account for many technical and safety considerations that render the project very challenging. Several safety measures have been incorporated as a result of safety evaluations. This paper will describe the issues facing the project team in developing the safety basis requirements and incorporating them into the design of the process equipment and construction of the facility to house the repackaging operations. This paper will allow CH2M and DOE-RL to share lessons learned and progress to date with other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Magnox Clean-Up Programme - Integrating and Making Best Use of the Supply Chain - 16603

In 2010, the UK Nuclear Decommissioning Authority (NDA) secured a funding settlement of British Pounds 2.5 Bn from the Government for the period to 2015 for the Magnox Care and Maintenance programme. This settlement was a reflection of the importance placed on discharging the decommissioning liability associated with the UK's first generation Magnox reactors. It also reflected the NDA's confidence in the Magnox Optimised Decommissioning Plan (MODP), which aimed to accelerate entry into Care and Maintenance and reduce the Magnox decommissioning liability by British Pounds 1.2 Bn. Despite the settlement, huge challenges remained if the MODP was to be delivered within the funding envelope. Essentially, the supply chain had to be able to participate in the delivery of the MODP and make the investment in skills and techniques required to minimise the threats and uncertainties remaining in the Programme. The Magnox Commercial and Supply Chain Strategy was, therefore, an integral part of the MODP. At the highest level, the Strategy involved: - Classifying and segregating procurements by risk and value - Moving the contracting philosophy from risk transfer to risk management - Focusing on relationships and results rather than activities and processes By aligning the supply chain to the MODP, Magnox was able to better organise itself to deliver against the MODP, to act on feedback from suppliers and enable a culture of 'Lead and Learn' to take root. Using feedback and learning from other organisations and applying these to contract management approaches improved project outcomes. In particular, learning from previous experience of dealing with Programme 'unknowns' increased the company's ability to control and improve on the overall Programme cost and schedule. The impact of the MODP was to reduce the Magnox baseline by over British Pounds 1.5 Bn and remove 34 reactor-years from the Care and Maintenance preparations period. This huge gain resulted from a range of technical, process and commercial improvements across the organisation. Perhaps the greatest achievement of the MODP and its supply chain strategy was to quantify and stabilise the Magnox Life-cycle scope and cost and enable the successful competition and transfer of the Management and Operating (M and O) contract in 2014 and lay the foundations for further cost-savings to the UK taxpayer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Realization of the National Disposal Facility for Radioactive Waste in Bulgaria - 16611

Radioactive waste is generated in the Republic of Bulgaria from the operation and decommissioning of the country's nuclear power plants and from other sources in research, medical applications, and the industry. The need for building a National Disposal Facility (NDF) is recognized by the Bulgarian government and described and justified in its Environment Impact Assessment Decision. The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is endeavoring to build a near-surface repository for short-lived low- and intermediate-level radioactive waste (SL-LILW) to discharge its statutory responsibilities in waste management is. The European Union (EU) finances the establishment of the NDF through the Kozloduy International Decommissioning Support Fund (KIDSF). After an international tendering procedure, SERAW placed a contract for the development of the design of the NDF to the Consortium of Westinghouse Electric Spain S.A.R and DBE Technology GmbH of Germany, with ENRESA, the Spanish National Waste Management Agency providing technical review and support. Two Bulgarian companies participate also in the project as subcontractors - EQE Bulgaria and to a lesser extent KK-Project. The repository project official name is 'Technical Design and ISAR Preparation for the National Disposal Facility at Bulgaria', usually abbreviated as 'R-Project 5'. After obtaining SERAW's approval for the preferred repository conceptual design variant, the R Project 5 focused on developing the Technical Design on the one hand, and on preparing the Intermediate Safety Analysis Report (ISAR) to demonstrate the safety and suitability of the proposed NDF design on the other. These documents were handed over to the Bulgarian Nuclear Regulatory Authority (BNRA) as well as to the different authorities involved in the comprehensive licensing process required for nuclear facilities in the country. The corresponding permits have mostly been received or are expected for early 2016. In the last quarter of 2015 the procurement procedure for repository construction as turn-key project was started with the pre-qualification of possible constructors for the Phase I repository realization on a lump sum contract basis. Repository construction is now expected to start in 2016, with the start of waste disposal now scheduled for around 2020. With the realization of the Bulgarian National Disposal Facility an important milestone for waste disposal in the European Union is about to be achieved. This paper is a sequel of previously presented papers on the NDF construction, now including details of the complex licensing process that this disposal facility underwent, now in its final stages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

UPGrants LCA Overview

Presentation providing an overview of the LCA requirements and tools for potential vendors in the Utilization Procurement Grants (UPGrants) program.

Krynock, Michelle↗

Testing and Deployment of Remote Systems to Remove Highly Radioactive Soil at Hanford's 324 Building - 18043

U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CHPRC) is in the process of procuring, testing and deploying remotely operated tools to safely remove highly contaminated soil from beneath the 324 Building on the Hanford Site in southeastern Washington State. The 324 Building operated for more than 40 years, completing a variety of high-dose engineering development and demonstration activities inside six hot cells that shielded the workers from the highly radioactive materials. Activities to decommission, decontaminate and demolish the facility began in 2008. In 2010, soil contamination was found in the soil under one of the hot cells, and building deactivation was paused to evaluate the soil contamination. Sampling efforts, using borehole technology, revealed significant under-building contamination with dose rates measuring has high as 130 Sv/hr (13,000 R/hr). The highly-contaminated soil has to be removed before traditional open air deactivation activities can continue. CHPRC completed proof of concept testing and built a full-scale test facility to demonstrate the effectiveness of three primary tools that will accomplish the floor and soil removal. The tools include a commercially available concrete saw, and a commercially available excavator arm that have been modified to operate remotely in the high-radiation environment within the hot-cell. In order to reduce the wear on the hot-cell overhead cranes, a remote operated rail and cart system has been designed to transport soil and debris out of the hot-cell to an airlock area where the waste will be separated, according to its level of radioactivity. A camera and light system has been designed to provide visual and audio coverage of the hot-cell area that will allow the operations to proceed from remote control stations. This paper will describe the primary remote operated equipment designed for the project and the challenges and processes for developing, testing and deploying the equipment necessary to excavate the soil from below the 324 Building. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗