Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Project Plan Remote Target Fabrication Refurbishment Project

In early FY2009, the DOE Office of Science - Nuclear Physics Program reinstated a program for continued production of {sup 252}Cf and other transcurium isotopes at the Radiochemical Engineering Development Center (REDC) at Oak Ridge National Laboratory (ORNL). The FY2009 major elements of the workscope are as follows: (1) Recovery and processing of seven transuranium element targets undergoing irradiation at the High Flux Isotope Reactor (HFIR) at ORNL; (2) Development of a plan to manufacture new targets for irradiation beginning in early- to mid-FY10 to supply irradiated targets for processing Campaign 75 (TRU75); and (3) Refurbishment of the target manufacturing equipment to allow new target manufacture in early FY10 The {sup 252}Cf product from processing Campaign 74 (recently processed and currently shipping to customers) is expected to supply the domestic demands for a period of approximately two years. Therefore it is essential that new targets be introduced for irradiation by the second quarter of FY10 (HFIR cycle 427) to maintain supply of {sup 252}Cf; the average irradiation period is {approx}10 HFIR cycles, requiring about 1.5 calendar years. The strategy for continued production of {sup 252}Cf depends upon repairing and refurbishing the existing pellet and target fabrication equipment for one additional target production campaign. This equipment dates from the mid-1960s to the late 1980s, and during the last target fabrication campaign in 2005- 2006, a number of component failures and operations difficulties were encountered. It is expected that following the target fabrication and acceptance testing of the targets that will supply material for processing Campaign 75 a comprehensive upgrade and replacement of the remote hot-cell equipment will be required prior to subsequent campaigns. Such a major refit could start in early FY 2011 and would take about 2 years to complete. Scope and cost estimates for the repairs described herein were developed, and authorization for the work was received in July 2009 under the Remote Target Fabrication Refurbishment Task of the Enhanced Utilization of Isotope Facilities project (Project Identification Code 2005230) funded by the American Recovery and Reinvestment Act of 2009. The goal of this project is to recover the capability to produce 4-5 curium targets for the irradiation period starting with HFIR cycle 427, currently scheduled to begin 2/17/10. Assuming success, the equipment would then be used to fabricate 6-7 additional targets to hold for the next irradiation campaign specified by the program. Specific objectives are the return to functionality of the Cubicle 3 Pellet Fabrication Line; Cubicle 2 Target Assembly equipment; and Cubicle 1 Target Inspection and Final Assembly system.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Waste Isolation Pilot Plant Groundwater Protection Program Plan (Rev. 1)

This plan provides a framework inclusive of current and future groundwater protection, monitoring, and (potentially) remediation activities. Within this framework, detailed investigation plans will be prepared to provide specific scopes of work, milestones, schedules, and cost estimates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Proposal for a Ton Scale Bubble Chamber for Dark Matter Detection

The nature of non-baryonic dark matter is one of the most intriguing questions for particle physics at the start of the 21st century. There is ample evidence for its existence, but almost nothing is known of its properties. WIMPs are a very appealing candidate particle and several experimental campaigns are underway around the world to search for these particles via the nuclear recoils that they should induce. The COUPP series of bubble chambers has played a significant role in the WIMP search. Through a sequence of detectors of increasing size, a number of R&D issues have arisen and been solved, and the technology has now been advanced to the point where the construction of large chambers requires a modest research effort, some development, but mostly just engineering. It is within this context that we propose to build the next COUPP detector - COUPP-500, a ton scale device to be built over the next three years at Fermilab and then deployed deep underground at SNOLAB. The primary advantages of the COUPP approach over other technologies are: (1) The ability to reject electron and gamma backgrounds by arranging the chamber thermodynamics such that these particles do not even trigger the detector. (2) The ability to suppress neutron backgrounds by having the radioactively impure detection elements far from the active volume and by using the self-shielding of a large device and the high granularity to identify multiple bubbles. (3) The ability to build large chambers cheaply and with a choice of target fluids. (4) The ability to increase the size of the chambers without changing the size or complexity of the data acquisition. (5) Sensitivity to spin-dependent and spin-independent WIMP couplings. These key advantages should enable the goal of one background event in a ton-year of exposure to be achieved. The conceptual design of COUPP-500 is scaled from the preceding devices. In many cases all that is needed is a simple scaling up of components previously used. Calibration and R&D are still needed on some aspects of the system. We know we have the ability to distinguish alpha-induced events from nuclear recoils, but we do not yet know whether the combination of material purity and rejection are good enough to run for a year with no alpha background. We also need to have more detailed measurements of the detector threshold and a better understanding of its high gamma rejection. In addition, there are important checks to make on the longevity of the detector components in the hydraulic fluid and on the chemistry of the active fluid. The 2009 PASAG report explicitly supported the construction of the COUPP-500 device in all funding scenarios. The NSF has shown similar enthusiasm. It awarded one of its DUSEL S4 grants to assist in the engineering needed to build COUPP-500. The currently estimated cost of COUPP-500 is $8M, about half the $15M-$20M price tag expected by the PASAG report for a next generation dark matter search experiment. The COUPP-500 device will have a spin independent WIMP-nucleus cross-section sensitivity of 6 x 10{sup -47} cm{sup 2} after a background-free year of running. This device should then provide the benchmark against which all other WIMP searches are measured.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Novel Low-Cost Process for the Gasification of Biomass and Low-Rank Coals

Farm Energy envisaged a phased demonstration program, in which a pilot-scale straw gasifier will be installed on a farm. The synthesis gas product will be used to initially (i) generate electricity in a 300 kW diesel generator, and subsequently (ii) used as a feedstock to produce ethanol or mixed alcohols. They were seeking straw gasification and alcohol synthesis technologies that may be implemented on farm-scale. The consortium, along with the USDA ARS station in Corvallis, OR, expressed interest in the dual-bed gasification concept promoted by WRI and Taylor Energy, LLC. This process operated at atmospheric pressure and employed a solids-circulation type oxidation/reduction cycle significantly different from traditional fluidized-bed or up-draft type gasification reactors. The objectives of this project were to perform bench-scale testing to determine technical feasibility of gasifier concept, to characterize the syngas product, and to determine the optimal operating conditions and configuration. We used the bench-scale test data to complete a preliminary design and cost estimate for a 1-2 ton per hour pilot-scale unit that is also appropriate for on-farm scale applications. The gasifier configuration with the 0.375-inch stainless steel balls recirculating media worked consistently and for periods up to six hours of grass feed. The other principle systems like the boiler, the air pump, and feeder device also worked consistently during all feeding operations. Minor hiccups during operation tended to come from secondary systems like the flare or flammable material buildup in the exit piping. Although we did not complete the extended hour tests to 24 or 48 hours due to time and budget constraints, we developed the confidence that the gasifier in its current configuration could handle those tests. At the modest temperatures we operated the gasifier, slagging was not a problem. The solid wastes were dry and low density. The majority of the fixed carbon from the grass ended up in the solid waste collected in the external cyclone. The volatiles were almost all removed in the gasifier. While the average gas heating value of the collected gas products was 50 BTUs/scf or less, addition a of the second gas exit for combustion gases would increase that value by a factor of two or three. Other changes to the current design such as shortening the gasifier body and draft tube would lead to lower air use and shorter heating times. There was no evidence of steam reforming at the current operating temperature. Likewise there was no indication of significant tar production. Reconfiguration of the gasifier at the on farm site may yet yield more significant results that would better qualify this gasifier for small scale biomass operations.

09 BIOMASS FUELS↗

Agrivoltaic Decision Tools for Perennial and Field Crop Farmers

This article describes a series of spreadsheet-based tools to help farmers estimate costs, revenues, and yields from agricultural production under different configurations of agrivoltaic installations for field and perennial crops. Crop-specific log books allow farmers to project changes in activity-level costs from the field due to agrivoltaic installations. The whole-farm tool helps farmers aggregate activity-level net returns up to the farm level to calculate projections of trade-offs between crop production with or without agrivoltaic installations. We present tools for lettuce and cranberries, but the tools are comprehensive and inclusive and so can be modified for other perennial and field crops.

14 SOLAR ENERGY↗

Conceptual Design Report for the MATHUSLA Long-Lived Particle Detector near CMS

We present the Conceptual Design Report (CDR) for the MATHUSLA (MAssive Timing Hodoscope for Ultra-Stable neutraL pArticles) long-lived particle detector at the HL-LHC, covering the design, fabrication and installation at CERN Point 5. MATHUSLA is a 40 m-scale detector with an air-filled decay volume that is instrumented with scintillator tracking detectors, to be located near CMS. Its large size, close proximity to the CMS interaction point and about 100 m of rock shielding from HL-LHC backgrounds allows it to detect LLP production rates and lifetimes that are one to two orders of magnitude beyond the ultimate sensitivity of the HL-LHC main detectors for many highly motivated LLP signals. Data taking is projected to commence with the start of HL-LHC operations. We present a new 40m design for the detector: its individual scintillator bars and wavelength-shifting fibers, their organization into tracking layers, tracking modules, tower modules and the veto detector; define a high-level design for the supporting electronics, DAQ and trigger system, including supplying a hardware trigger signal to CMS to record the LLP production event; outline computing systems, civil engineering and safety considerations; and present preliminary cost estimates and timelines for the project. We also conduct detailed simulation studies of the important cosmic ray and HL-LHC muon backgrounds, implementing full track/vertex reconstruction and background rejection, to ultimately demonstrate high signal efficiency and $\ll 1$ background event in realistic LLP searches for the main physics targets at MATHUSLA. This sensitivity is robust with respect to detector design or background simulation details. Appendices provide various supplemental information.

Aitken, Branden [Victoria U.]↗

Status of the International Linear Collider

This paper is not a proposal for a CERN future project but provides information on the International Linear Collider (ILC) considered for Japan in order to facilitate the European Strategy discussion in a global context. It describes progress to date, ongoing engineering studies, updated cost estimate for the machine at $\sqrt{s}=250~\rm GeV$ and the situation in Japan. The physics of the ILC is not presented here, but jointly for all Linear Collider projects in a separate document ``A Linear Collider Vision for the Future of Particle Physics'' submitted for the forthcoming European Strategy deliberations.

Abe, Y. [KEK, Tsukuba]↗

Battery Energy Storage System (BESS) End-of-Performance and Decommissioning Considerations [Slides]

This presentation provides a comprehensive overview of end-of-performance and decommissioning considerations for large-scale Battery Energy Storage Systems (BESS). It outlines expected system lifespans, midterm assessment needs, and pathways for extending operational life through augmentation or repowering. The presentation details regulatory requirements that govern decommissioning plans, cost estimates, financial assurance mechanisms, and performance obligations across multiple jurisdictions. It further examines end-of-life equipment management, including recycling, waste handling, transportation, and environmental compliance. Designed to support Malawi's electricity-sector institutions, the presentation highlights how planning for decommissioning and environmental stewardship can be integrated early in project development to ensure safe, financially accountable, and environmentally responsible BESS system retirement.

24 POWER TRANSMISSION AND DISTRIBUTION↗