Endpoint Evaluation for 200-PW-1 Operable Unit Soil Vapor Extraction, Hanford Site, Washington - 16478
On the Central Plateau of the Hanford Site in semi-arid southeast Washington State, the 216-Z-9 Trench, 216-Z-1A Tile Field, and 216-Z-18 Crib were used from 1955 to 1973 for soil column disposal of liquid wastes containing carbon tetrachloride. The geological setting underneath these disposal areas consists of an approximately 70 m thick vadose zone with a nominally 5 m thick low-permeability layer at a depth of 30 m. Infiltration of the liquid waste through the vadose zone to the groundwater was driven by the liquid volume introduced during disposal. Carbon tetrachloride readily volatilises in the vadose zone, making soil vapor extraction (SVE) the preferred remediation technology. Between 1992 and 2012, SVE recovered 80,107 kg of carbon tetrachloride from the vadose zone below the three waste sites. Of this total recovery, 93 percent was removed during the first 5 years of operations. The last 7 percent was recovered in the last 16 years of operation. In 2011, a final cleanup level of 100 ppmv for carbon tetrachloride in soil vapor was established in the record of decision for the 200-PW-1 Operable Unit, which includes the three carbon tetrachloride waste sites. The final cleanup decision specified that soil vapor concentrations and the cleanup level would be further refined and assessed in the future to ensure groundwater protection. A subsequent treatability test was conducted and the results were used to further refine the definition of vadose zone source conditions that are protective of groundwater. Based on this treatability test, predictions indicate that current and future vadose zone conditions will meet groundwater protection objectives. SVE operations were not performed in 2013, 2014, and 2015, and soil vapor concentrations in all SVE wells (and all but two monitoring probes installed using direct-push technology) remained below the 100 ppmv cleanup level during this time. SVE endpoint guidance was prepared in 2013 as a joint effort between Pacific Northwest National Laboratory, U.S. Army Corps of Engineers, and U.S. Environmental Protection Agency. This SVE guidance was used to develop a path forward for the 200-PW-1 Operable Unit SVE remedy. The guidance asks the following questions: 1. Are data collected to date adequate to support a well-defined conceptual site model? 2. Have remediation goals (cleanup levels) been defined? 3. Are environmental pathways and risk understood well enough to support site closeout? 4. Will remaining contamination in the vadose zone cause groundwater cleanup levels to be exceeded? If the answer to the first three questions is 'Yes', and the answer to the fourth question is 'No', then the site is ready for closure. At this time, the site has compiled appropriate information to answer these questions to support a remedy decision to terminate SVE operations. The U.S. Environmental Protection Agency recently provided concurrence that termination of SVE operations within the 200-PW-1 Operable Unit is appropriate. (authors)