Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launching”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Launch Control Network Engineer

The Spaceport Command and Control System (SCCS) is being built at the Kennedy Space Center in order to successfully launch NASA’s revolutionary vehicle that allows humans to explore further into space than ever before. During my internship, I worked with the Network, Firewall, and Hardware teams that are all contributing to the huge SCCS network project effort. I learned the SCCS network design and the several concepts that are running in the background. I also updated and designed documentation for physical networks that are part of SCCS. This includes being able to assist and build physical installations as well as configurations. I worked with the network design for vehicle telemetry interfaces to the Launch Control System (LCS); this allows the interface to interact with other systems at other NASA locations. This network design includes the Space Launch System (SLS), Interim Cryogenic Propulsion Stage (ICPS), and the Orion Multipurpose Crew Vehicle (MPCV). I worked on the network design and implementation in the Customer Avionics Interface Development and Analysis (CAIDA) lab.

Medeiros, Samantha↗

JPSS-1 VIIRS Version 2 At-Launch Relative Spectral Response Characterization and Performance

The relative spectral response (RSR) characterization of the JPSS-1 VIIRS spectral bands has achieved at launch status in the VIIRS Data Analysis Working Group February 2016 Version 2 RSR release. The Version 2 release improves upon the June 2015 Version 1 release by including December 2014 NIST TSIRCUS spectral measurements of VIIRS VisNIR bands in the analysis plus correcting CO2 influence on the band M13 RSR. The T-SIRCUS based characterization is merged with the summer 2014 SpMA based characterization of VisNIR bands (Version 1 release) to yield a fused RSR for these bands, combining the strengths of the T-SIRCUS and the SpMA measurement systems. The M13 RSR is updated by applying a model-based correction to mitigate CO2 attenuation of the SpMA source signal that occurred during M13 spectral measurements. The Version 2 release carries forward the Version 1 RSR for those bands that were not updated (M8-M12, M14-M16AB, I3-I5, DNBMGS). The Version 2 release includes band average (overall detectors and subsamples) RSR plus supporting RSR for each detector and subsample. The at-launch band average RSR have been used to populate Look-Up Tables supporting the sensor data record and environmental data record at-launch science products. Spectral performance metrics show that JPSS-1VIIRS RSR are compliant on specifications with a few minor exceptions. The Version 2 release, which replaces the Version 1 release, is currently available on the password-protected NASA JPSS-1 eRooms under EAR99 control.

Chris Moeller↗

Launch Control System Software Development System Automation Testing

The Spaceport Command and Control System (SCCS) is the National Aeronautics and Space Administration's (NASA) launch control system for the Orion capsule and Space Launch System, the next generation manned rocket currently in development. This system requires high quality testing that will measure and test the capabilities of the system. For the past two years, the Exploration and Operations Division at Kennedy Space Center (KSC) has assigned a group including interns and full-time engineers to develop automated tests to save the project time and money. The team worked on automating the testing process for the SCCS GUI that would use streamed simulated data from the testing servers to produce data, plots, statuses, etc. to the GUI. The software used to develop automated tests included an automated testing framework and an automation library. The automated testing framework has a tabular-style syntax, which means the functionality of a line of code must have the appropriate number of tabs for the line to function as intended. The header section contains either paths to custom resources or the names of libraries being used. The automation library contains functionality to automate anything that appears on a desired screen with the use of image recognition software to detect and control GUI components. The data section contains any data values strictly created for the current testing file. The body section holds the tests that are being run. The function section can include any number of functions that may be used by the current testing file or any other file that resources it. The resources and body section are required for all test files; the data and function sections can be left empty if the data values and functions being used are from a resourced library or another file. To help equip the automation team with better tools, the Project Lead of the Automated Testing Team, Jason Kapusta, assigned the task to install and train an optical character recognition (OCR) tool to Brandon Echols, a fellow intern, and I. The purpose of the OCR tool is to analyze an image and find the coordinates of any group of text. Some issues that arose while installing the OCR tool included the absence of certain libraries needed to train the tool and an outdated software version. We eventually resolved the issues and successfully installed the OCR tool. Training the tool required many images and different fonts and sizes, but in the end the tool learned to accurately decipher the text in the images and their coordinates. The OCR tool produced a file that contained significant metadata for each section of text, but only the text and coordinates of the text was required for our purpose. The team made a script to parse the information we wanted from the OCR file to a different file that would be used by automation functions within the automated framework. Since a majority of development and testing for the automated test cases for the GUI in question has been done using live simulated data on the workstations at the Launch Control Center (LCC), a large amount of progress has been made. As of this writing, about 60% of all of automated testing has been implemented. Additionally, the OCR tool will help make our automated tests more robust due to the tool's text recognition being highly scalable to different text fonts and text sizes. Soon we will have the whole test system automated, allowing for more full-time engineers working on development projects.

Automation↗

NASA's Space Launch System: SmallSat Deployment to Deep Space

Leveraging the significant capability it offers for human exploration and flagship science missions, NASA's Space Launch System (SLS) also provides a unique opportunity for lower-cost deep-space science in the form of small-satellite secondary payloads. Current plans call for such opportunities to begin with the rocket's first flight; a launch of the vehicle's Block 1 configuration, capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO), which will send the Orion crew vehicle around the moon and return it to Earth. On that flight, SLS will also deploy 13 CubeSat-class payloads to deep-space destinations. These secondary payloads will include not only NASA research, but also spacecraft from industry and international partners and academia. The payloads also represent a variety of disciplines including, but not limited to, studies of the moon, Earth, sun, and asteroids. While the SLS Program is making significant progress toward that first launch, preparations are already under way for the second, which will see the booster evolve to its more-capable Block 1B configuration, able to deliver 105t to LEO. That configuration will have the capability to carry large payloads co-manifested with the Orion spacecraft, or to utilize an 8.4-meter (m) fairing to carry payloads several times larger than are currently possible. The Block 1B vehicle will be the workhorse of the Proving Ground phase of NASA's deep-space exploration plans, developing and testing the systems and capabilities necessary for human missions into deep space and ultimately to Mars. Ultimately, the vehicle will evolve to its full Block 2 configuration, with a LEO capability of 130 metric tons. Both the Block 1B and Block 2 versions of the vehicle will be able to carry larger secondary payloads than the Block 1 configuration, creating even more opportunities for affordable scientific exploration of deep space. This paper will outline the progress being made toward flying smallsats on the first flight of SLS, and discuss future opportunities for smallsats on subsequent flights.

Robinson, Kimberly F.↗

An Estimate of the Vertical Variability of Temperature at KSC Launch Complex 39-B

The purpose of this analysis is to determine the vertical variability of the air temperature below 500 feet at Launch Complex (LC) 39-B at Kennedy Space Center (KSC). This analysis utilizes data from the LC39-B Lightning Protection System (LPS) Towers and the 500 foot Tower 313. The results of this analysis will be used to help evaluate the ambient air temperature Launch Commit Criteria (LCC) for the Exploration Mission 1 launch.

Brenton, James↗

NASA's Space Launch System: Systems Engineering Approach for Affordability and Mission Success

NASA is working toward the first launch of the Space Launch System, a new, unmatched capability for deep space exploration with launch readiness planned for 2019. Since program start in 2011, SLS has passed several major formal design milestones, and every major element of the vehicle has produced test and flight hardware. The SLS approach to systems engineering has been key to the program's success. Key aspects of the SLS SE&I approach include: 1) minimizing the number of requirements, 2) elimination of explicit verification requirements, 3) use of certified models of subsystem capability in lieu of requirements when appropriate and 4) certification of capability beyond minimum required capability.

Hutt, John J.↗

NASA's Space Launch System: SmallSat Deployment to Deep Space

Leveraging the significant capability it offers for human exploration and flagship science missions, NASA's Space Launch System (SLS) also provides a unique opportunity for lower-cost deep-space science in the form of small-satellite secondary payloads. Current plans call for such opportunities to begin with the rocket's first flight; a launch of the vehicle's Block 1 configuration, capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO), which will send the Orion crew vehicle around the moon and return it to Earth. On that flight, SLS will also deploy 13 CubeSat-class payloads to deep-space destinations. These secondary payloads will include not only NASA research, but also spacecraft from industry and international partners and academia. The payloads also represent a variety of disciplines including, but not limited to, studies of the moon, Earth, sun, and asteroids. While the SLS Program is making significant progress toward that first launch, preparations are already under way for the second, which will see the booster evolve to its more-capable Block 1B configuration, able to deliver 105t to LEO. That configuration will have the capability to carry large payloads co-manifested with the Orion spacecraft, or to utilize an 8.4-meter (m) fairing to carry payloads several times larger than are currently possible. The Block 1B vehicle will be the workhorse of the Proving Ground phase of NASA's deep-space exploration plans, developing and testing the systems and capabilities necessary for human missions into deep space and ultimately to Mars. Ultimately, the vehicle will evolve to its full Block 2 configuration, with a LEO capability of 130 metric tons. Both the Block 1B and Block 2 versions of the vehicle will be able to carry larger secondary payloads than the Block 1 configuration, creating even more opportunities for affordable scientific exploration of deep space. This paper will outline the progress being made toward flying smallsats on the first flight of SLS, and discuss future opportunities for smallsats on subsequent flights.

Robinson, Kimberly F.↗

NASA's Space Launch System: Progress Report

NASA and its commercial industry team achieved significant progress in 2016 in manufacturing and testing of the Block 1 vehicle for the first launch of the Space Launch System (SLS). Test and flight article hardware for the liquid hydrogen fuel tank as well as the engine section for the core stage were completed at Michoud Assembly Facility (MAF) in New Orleans. Test stands neared completion at Marshall Space Flight Center for the propellant tanks, engine section, intertank and payload section. Stennis Space Center completed major structural renovations on the B2 test stand, where the core stage "green run" test program will be conducted. The SLS team completed a hotfire test series at Stennis to successfully demonstrate the ability of the RS-25 engine to operate under SLS environments and performance conditions. The team also test fired the second qualification five-segment solid rocket motor and cast the first six motor segments for the first SLS mission. The Interim Cryogenic Propulsion Stage (ICPS) test article was delivered to Marshall for structural tests, and work is nearly finished on the flight stage. Flight software testing completed at Marshall included power quality and command and data handling. In 2017, that work continues. SLS completed Preliminary Design Review (PDR) on the Exploration Upper Stage (EUS), a powerful, human-rated spacecraft that will propel explorers to cis-lunar space. In 2017, hardware will continue to be integrated at MAF for core stage structural test articles and the first two operational flights. RS-25 hotfire testing will continue to explore engine performance, as well as test flight-like software and four new Engine Controller Units (ECUs) for the first mission. Production of development components for a more affordable RS-25 design is underway. Core stage structural test articles have begun arriving at Marshall. While engineering challenges typical of a new development are possible, SLS is working toward launch readiness in late 2018. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before first flight

Cook, Jerry↗

Bird Strike Risk for Space Launch Vehicles

Within seconds after liftoff of the Space Shuttle during mission STS-114, a turkey vulture impacted the vehicle's external tank. The contact caused no apparent damage to the shuttle, but the incident led NASA to consider the potential consequences of bird strikes during a shuttle launch. The environment at Kennedy Space Center provides unique bird strike challenges due to the Merritt Island National Wildlife Refuge and the Atlantic Flyway bird migration routes. This presentation will outline an approach for estimating risk resulting from bird strikes to space launch vehicles. The migration routes, types of birds present, altitudes of those birds, exposed area of the launch vehicle, and its capability to withstand impacts all affect the risk due to bird strike. Lessons learned, challenges over lack of data, and significant risk contributors will be discussed.

Hales, Christy↗

Use of Shuttle Heritage Hardware in Space Launch System (SLS) Application-Structural Assessment

NASA is moving forward with the development of the next generation system of human spaceflight to meet the Nation's goals of human space exploration. To meet these goals, NASA is aggressively pursuing the development of an integrated architecture and capabilities for safe crewed and cargo missions beyond low-Earth orbit. Two important tenets critical to the achievement of NASA's strategic objectives are Affordability and Safety. The Space Launch System (SLS) is a heavy-lift launch vehicle being designed/developed to meet these goals. The SLS Block 1 configuration (Figure 1) will be used for the first Exploration Mission (EM-1). It utilizes existing hardware from the Space Shuttle inventory, as much as possible, to save cost and expedite the schedule. SLS Block 1 Elements include the Core Stage, "Heritage" Boosters, Heritage Engines, and the Integrated Spacecraft and Payload Element (ISPE) consisting of the Launch Vehicle Stage Adapter (LVSA), the Multi-Purpose Crew Vehicle (MPCV) Stage Adapter (MSA), and an Interim Cryogenic Propulsion Stage (ICPS) for Earth orbit escape and beyond-Earth orbit in-space propulsive maneuvers. When heritage hardware is used in a new application, it requires a systematic evaluation of its qualification. In addition, there are previously-documented Lessons Learned (Table -1) in this area cautioning the need of a rigorous evaluation in any new application. This paper will exemplify the systematic qualification/assessment efforts made to qualify the application of Heritage Solid Rocket Booster (SRB) hardware in SLS. This paper describes the testing and structural assessment performed to ensure the application is acceptable for intended use without having any adverse impact to Safety. It will further address elements such as Loads, Material Properties and Manufacturing, Testing, Analysis, Failure Criterion and Factor of Safety (FS) considerations made to reach the conclusion and recommendation.

Aggarwal, Pravin↗

Closed Loop Guidance Trade Study for Space Launch System Block-1B Vehicle

NASA is currently building the Space Launch System (SLS) Block-1 launch vehicle for the Exploration Mission 1 (EM-1) test flight. The design of the next evolution of SLS, Block-1B, is well underway. The Block-1B vehicle is more capable overall than Block-1; however, the relatively low thrust-to-weight ratio of the Exploration Upper Stage (EUS) presents a challenge to the Powered Explicit Guidance (PEG) algorithm used by Block-1. To handle the long burn durations (on the order of 1000 seconds) of EUS missions, two algorithms were examined. An alternative algorithm, OPGUID, was introduced, while modifications were made to PEG. A trade study was conducted to select the guidance algorithm for future SLS vehicles. The chosen algorithm needs to support a wide variety of mission operations: ascent burns to LEO, apogee raise burns, trans-lunar injection burns, hyperbolic Earth departure burns, and contingency disposal burns using the Reaction Control System (RCS). Additionally, the algorithm must be able to respond to a single engine failure scenario. Each algorithm was scored based on pre-selected criteria, including insertion accuracy, algorithmic complexity and robustness, extensibility for potential future missions, and flight heritage. Monte Carlo analysis was used to select the final algorithm. This paper covers the design criteria, approach, and results of this trade study, showing impacts and considerations when adapting launch vehicle guidance algorithms to a broader breadth of in-space operations.

Von der Porten, Paul↗

NASA's Space Launch System Gains Momentum Toward Integration and Testing

NASA's Space Launch System (SLS) entered a new phase in 2017, completing major structural manufacturing on the core stage and delivering the first flight hardware to NASA's Kennedy Space Center (KSC). The program is now transitioning to integration, assembly and testing in preparation for launch readiness in late 2019. Core stage prime contractor Boeing concluded welding of the major core stage components for Exploration Mission 1 (EM-1) with the liquid hydrogen flight tank, following completion of the engine section, liquid oxygen tank, and forward skirt. Technicians also completed assembly of the bolted intertank, and all sections are currently in hardware integration. The engine section structural test article was shipped to NASA's Marshall Space Flight Center (MSFC) and began testing in 2017. The core stage pathfinder shipped to NASA's Michoud Assembly Facility (MAF). Booster prime contractor Orbital ATK made significant progress casting motor segments for SLS, with several segments finishing processing and in storage. Forward and aft sections of the boosters are being refurbished at KSC. RS-25 prime contractor Aerojet Rocketdyne completed SLS adaptation testing and qualification of four new EM-1 controllers. The four EM-1 engines are ready and waiting for shipment from NASA's Stennis Space Center (SSC) to Michoud Assembly Facility (MAF) for core stage integration in preparation for green run testing at SSC. The EM-1 Interim Cryogenic Propulsion System (ICPS) became the first major piece of SLS to arrive at KSC. Welding is complete on the EM-1 Launch Vehicle Stage Adapter (LVSA) and the flight Orion Stage Adapter (OSA). SLS is critical to U.S. leadership in future human and robotic space exploration, including a presence on the moon in preparation for missions deeper into space. This paper will elaborate on 2017 SLS progress and progress envisioned for 2018.

Askins, Bruce R.↗

NASA's Space Launch System: Deep-Space Opportunities for Smallsats

Designed to provide the significant capability required for human deep-space exploration, NASA’s Space Launch System (SLS) also provides a unique opportunity for lower-cost deep-space science in the form of small-satellite secondary payloads. This opportunity will be leveraged beginning with the rocket’s first flight; a launch of the vehicle’s Block 1 configuration, capable of delivering 70 metric tons (70t - tonnes) to Low Earth Orbit (LEO), which will see the Orion crew vehicle travel around the moon and return to Earth. On that flight, SLS will also deploy 13 6U (6 Unit) CubeSat-class payloads to multiple destinations including deep space. These secondary payloads will include not only NASA research, but also spacecraft from international partners, industry and academia. The payloads represent a variety of disciplines including, but not limited to, studies of the moon, Earth, sun, and asteroids, along with technology demonstrations that could pave the way for even more ambitious smallsat missions in the future. As the SLS Program is making significant progress toward that first launch, preparations are already under way for future missions, which will see the booster evolve to its more-capable Block 1B configuration, able to deliver 105t to LEO. That configuration will have the capability to carry large payloads co-manifested with the Orion spacecraft, or to utilize an 8.4-meter (m) fairing to carry payloads several times larger than are currently possible. The Block 1B vehicle will be the workhorse of the Proving Ground phase of NASA’s deep-space exploration plans, developing and testing the systems and capabilities necessary for human missions into deep space and ultimately to Mars. Ultimately, the vehicle will evolve to its full Block 2 configuration, with a LEO capability of 130 metric tons. Both the Block 1B and Block 2 versions of the vehicle will be able to carry larger secondary payloads than the Block 1 configuration, creating even more opportunities for affordable scientific exploration of deep space. This paper will outline the progress being made toward flying smallsats on the first flight of SLS, and discuss future opportunities for smallsats on subsequent flights.

Robinson, Kimberly F.↗

System Value Model of a Launch Vehicle

System value provides a mathematical representation of stakeholder’s preferences for the system. System value represents the utility that the system provides to the stakeholders. For a launch vehicle, important values are revenue generated through successful payloads, mission reliability, and the ability to accommodate payloads without modification to the payload instruments or spacecraft bus. This paper considers the value provided by a heavy lift launch vehicle to the satellite industry and to human exploration. An estimate is developed for a generic launch vehicle value in terms of impact to the Gross Domestic Product. Thermo-economics are applied in the calculation of system value. Mission reliability considers both successful delivery and on time delivery (i.e., operational availability). Payload accommodation considers mainly the diameter of the payload fairing for various types of missions.

Barth, Andrew↗

NASA's Space Launch System Gains Momentum Toward Integration and Testing

NASA’s Space Launch System (SLS) (Fig. 1) entered a new phase in 2017, completing major structural manufacturing on the core stage and delivering for launch the first flight hardware of the world’s most capable launch vehicle. The program is now in a stage of hardware assembly, integration and testing in preparation for the first integrated flight of SLS and the Orion crew vehicle. SLS is critical to U.S. leadership in future human and robotic space exploration, including a presence on the Moon in preparation for missions deeper into space. This paper will elaborate on SLS accomplishments in 2017 and plans for progress in 2018.

Askins, Bruce R.↗

Utilizing Testing Frameworks for Launch Control Systems Continuous Integration

Command and control software is an integral part of the launch procedure. The most important part of this type of software is its ability to communicate well with the user and relay information in a correctly formatted way such that the user can understand the data. There is a tool that aides the communication between the different parts of the system, and effectively, the user. This instrument is capable of taking several complex values and ensuring that they are correctly sorted into their distinctive message values and distributed properly among the different facets of the system. This tool will easily translate and publish the data inside of messages in the system to something that is readable and understandable. The tool also allows for transmission of the recorded data to the user, effectively ensuring the communication between different components of the system. As well as keeping track of messages and ensuring that the information contained within each of them reaches the correct location, this tool has the ability to keep track of its own statistics and determine how many messages passed in were erroneous and how many were successfully transmitted. It is able to check and see what the total message failure count is when an invalid message is given, as well as the number of different messages and their respective types passed into the tool. This tool is of great value to the new Space Launch System (SLS). As such, the tool must be thoroughly tested with test cases that, although improbable, are possible, where the tool may not function properly. Testing an interface this complex is necessary to ensure mission safety and create unlikely scenarios where the tool would work as intended, and stretch its limits to test that even under the most uncommon conditions it would still continue to function. This software will be an important part of the control system for the newest spacecraft which will fly deeper into space than humans have ever travelled. It will fly beyond the moon, into deep space to Mars and perhaps set the groundwork for a manned mission even further to create more opportunities for interplanetary and even interstellar travel by humans. This mission relies heavily on software and hardware to ensure the safety of the humans that will be on board and therefore must be checked, exhausting each and every different situation, such that there is not a doubt surrounding the well-being of the humans aboard the rocket. That is why testing is such an important part of the mission. It provides evidence that the systems aboard the rocket and on the launch pad are safe.

Unit Testing↗

Buckling Imperfection Sensitivity of Conical Sandwich Composite Structures for Launch-Vehicles

Structural stability can be an important consideration in the design of large composite shell structures and therefore it is important to understand the buckling response of such structures. It is well known that geometric imperfections can significantly influence the buckling response of such structures by causing the buckling loads to be significantly lower than the theoretical buckling load of a geometrically perfect shell structure. Results are presented of an analytical study on the buckling imperfection sensitivity of large-scale conical sandwich structures for launch vehicles. In particular, representative structures from the Space Launch System launch-vehicle development activities will be considered. The study considered composite sandwich conical structures with multiple sandwich core thicknesses and facesheet layups consisting of tape and fabric composite layups. The results of this analytical study indicate that there is conservatism in the NASA current buckling knockdown factor of 0.33 for conical shell structures. Therefore, it is suggested that the buckling response of composite sandwich cones be further investigated through buckling tests and analytical predictions to potentially revise the buckling design recommendations for conical composite structures.

Sleight, David W.↗

NASA's Space Launch System: Secondary Payload Accommodations in Block 1 and Beyond

Launching from pad 39B at Kennedy Space Center no earlier than December 2019, NASA's Space Launch System (SLS) will send the Orion crew vehicle to a distant retrograde lunar orbit in order to test and validate the new systems developed for SLS, Orion and Kennedy Space Center's Exploration Ground Systems (EGS). In addition to these primary mission objectives, the first integrated fight of NASA's new deep space exploration system, Exploration Mission-1 (EM-1), offers accommodations for 13 6U CubeSats, which will be deployed in deep space after Orion separates from the SLS Interim Cryogenic Propulsion Stage (ICPS). In 2017, the SLS Program, managed by NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama, completed the ICPS and delivered it to the EGS Program, which has responsibility for stacking and launch operations. The 13 EM-1 secondary payloads will reside in the Orion Stage Adapter (OSA), which connects the ICPS to Orion's spacecraft adapter. The OSA is essentially complete with preparations being made for transporting the hardware to Kennedy Space Center with accommodations for secondary payload dispensers and with the secondary payload avionics unit installed.

Robinson, Kimberly F.↗