Search NASA⌕ Search

SEARCH · Search NASA

Results for “Leak Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Reduction of Methane Leaks through Corrosion Mitigation Pre-treatments for Pipelines with Field Applied Coatings

Corrosion of buried, coated steel pipelines transporting natural gas is a significant source of methane emissions, from pipeline venting required for maintenance and repairs and from pipeline leaks and incidents. Corrosion of steel under field applied coatings is an important safety concern for the pipeline industry. This project investigates the application of a field applied alloy over girth welds to mitigate external corrosion of buried coated steel pipelines. Various metallic coating options were considered, which were required to meet several criteria: (1) it must resist corrosion under open-circuit or mild cathodic protection conditions, (2) it must protect the substrate steel, and (3) it must not negatively affect the adhesion of the field coating. Finite element models and lab testing were performed of alloy coating compositions to identify promising alloy types underneath disbonded coatings. Polarization curves of coating alloys were generated to provide the boundary conditions for the COMSOL model to compute potential and current distributions around coated areas. Sacrificial and corrosion-resistant metal alloy coatings were evaluated and optimized using corrosion modeling and laboratory electrochemical testing, where aluminum alloy 5356 (5% Mg) and steel alloy B9 (9% Cr) were selected. Corrosion test coupons were designed and fabricated using thermal spray aluminum 5356 and welded B9 steel overlays on API 5L grade X42 line pipe steel. The corrosion test coupons, with simulated pipe coating damage, were tested in a laboratory soil box and a field pipeline site in Texas for 3-months. Corrosion test coupons were then tested for 6-months at field pipeline sites in Texas and Tennessee to quantify corrosion rates and performance of the aluminum and steel alloys under polyethylene tape and 2-part epoxy coatings, various coating holidays, and with and without cathodic protection.

03 NATURAL GAS↗

Evaluation of the U.S. Department of Energy Challenge Home Program Certification of Production Builders - Chicago, IL and Devens, MA

TO4 Task 3.1 - K Hovnanian Chicago, IL DOE Challenge Home Program Certified Home Constructed and Verified Specifications DOE Challenge Home Building envelope Ceiling R-49 blown fiberglass, Grade I Walls 2x4 framing @ 16 o.c. with R-13 fiberglass batts, Grade I and 1"" R-5 extruded polystyrene (XPS) insulating sheathing Frame Floors R-38 blown fiberglass, Grade I Basement Walls R-19 fiberglass batts draped full height, Grade I Basement Slab uninsulated Windows Above Grade: ENERGY STAR certified, U=0.29, SHGC=0.28 Basement: Non ENERGY STAR certified, U=0.29, SHGC=0.24 Infiltration 2 ACH 50 Mechanical systems Heat 95% AFUE sealed combustion natural gas furnace in conditioned space Goodman GMH950703BXAF Cooling 13 SEER split system Goodman GSX130301BC DHW AO Smith Vertex 100 0.96 EF natural gas tank water heater in 2nd floor utility closet Hot Water Distribution Redesigned trunk and branch Compliant with EPA WaterSense Efficient Distribution Requirements Ducts Located 100% in conditioned space via floor joists leak free to outside (5% or less) Ventilation Central Fan Integrated Supply (CFIS) ventilation with 6"" insulated outside air duct Fan Controller: Air Cycler FRV, with 6"" motorized damper 50 CFM outside air flow, 33% duty cycle (10 minutes on, 20 minutes off); ASHRAE 62.2-2010 compliance via an exhaust fan - Panasonic FV-08VQ5 WhisperCeiling Rerturn Pathways Active Return at Master Bedroom Transfer Grilles in Secondary Bedrooms Appliances, Lighting, MELs Lights 80% ENERGY STAR certified CFL Appliances ENERGY STAR certified refrigerator, dishwasher, and clothes washer; Natural gas range/oven and clothes dryer" STRUCTURE - Test House Lot 145 - 2013 DOE Challenge Test House Task 3.1 Bolingbrook, IL 60490 House is constructed and is DOE Challenge Verified by Don Nelson, a local rater. The purpose of this project was to evaluate integrated packages of advanced measures in individual test homes to assess their performance with respect to Building America Program goals, specifically compliance with the DOE Challenge Home Program. To that end, Building Science Corporation (BSC) consulted on the construction of five test houses by three cold climate production builders in three separate U.S. cities. (1) K. Hovnanian Homes, Chicago, Illinois (2) David Weekley Homes, Denver, Colorado (3) Transformations, Inc., Devens, Massachusetts. Overall, the builders have concluded that the energy related upgrades (either through the prescriptive or performance path) represent reasonable upgrades. The builders commented that while not every improvement in specification was cost effective (as in a reasonable payback period), many were improvements that could improve the marketability of the homes and serve to attract more energy efficiency discerning prospective homeowners. However, the builders did express reservations about the associated checklists and added certifications. An increase in administrative time was observed with all builders. The checklists and certifications also inherently increase cost due to: (1) Adding services to the scope of work for various trades, such as HERS Rater and heating, ventilation, and air conditioning contractor. (2) Increased material costs related to the checklists, especially the U.S. Environmental Protection Agency Indoor airPLUS and WaterSense Efficient Hot Water Distribution requirement. Ceiling - 18" cellulose Walls - 12" open cell spray foam in double stud walls Foundation - R-10 under slab, 3 1/2" closed-cell spray foam at walls Windows - Harvey U=0.20, SHGC=0.22 Infiltration - 1.0 sq in per 100 sq ft Heating - Mini split heat pump, 10.6 HSPF, 23 SEER Cooling - Mini split heat pump, 10.6 HSPF, 23 SEER DHW - 0.97 EF instantaneous propane water heater Ventilation - bathroom exhaust fans as basic option, HRV upgrade option Adams Circle Devens MA 01434 Cavite Street Devens, MA 01434

Array↗

Nanoparticle Injection Technology for Remediating Leaks of CO 2 Storage Formation (Final Report)

Leakage of a well can occur through the wellbore, the annulus between well tubing and steel casing, or on the outside of the casing. The overall goal of the project is to develop a new technology that can repair or reduce the leakage of wellbore. The new technology is based on simultaneously injecting nanoparticles electrochemically and removing some of the harmful ions in the system so the distressed cement materials can be densified and the corrosion risk of steel casing can be reduced. There were two objectives. One is the development of the injection technology for leakage repair and the other is the development of new numerical simulation models that can simulate and predict the performance of the new repair technology. An electro-migration testing unit and a in-house wellbore testing system were developed; healing agents with nanoparticles were selected, numerical models were developed to simulate the electro-migration technology, and the effectiveness of the new technology were evaluated.

42 ENGINEERING↗

Nanoparticle Injection Technology for Remediating Leaks of CO 2 Storage Formation (Final Technical Report)

Leakage of a well can occur through the wellbore, the annulus between well tubing and steel casing, or on the outside of the casing. The overall goal of the project is to develop a new technology that can repair or reduce the leakage of wellbore. The new technology is based on simultaneously injecting nanoparticles electrochemically and removing some of the harmful ions in the system so the distressed cement materials can be densified and the corrosion risk of steel casing can be reduced. There were two objectives. One is the development of the injection technology for leakage repair and the other is the development of new numerical simulation models that can simulate and predict the performance of the new repair technology. An electro-migration testing unit and an in-house wellbore testing system were developed; healing agents with nanoparticles were selected, numerical models were developed to simulate the electro-migration technology, and the effectiveness of the new technology was evaluated.

42 ENGINEERING↗

Effective thermal conductivity of insulation materials for cryogenic LH 2 storage tanks: A review

An accurate estimation of the effective thermal conductivity of various insulation materials is essential in the evaluation of heat leak and boil-off rate from liquid hydrogen storage tanks. In this work, we review the existing experimental data and various proposed correlations for predicting the effective conductivity of insulation systems consisting of powders, foams, fibrous materials, and multilayer systems. We also propose a first principles-based correlation that may be used to estimate the dependence of the effective conductivity as a function of temperature, interstitial gas composition, pressure, and structural properties of the material. We validate the proposed correlation using available experimental data for some common insulation materials. Further improvements and testing of the proposed correlation using laboratory scale data obtained using potential LH 2 tank insulation materials are also discussed.

08 HYDROGEN↗

Methods for Finding Legacy Wells in Residential and Commercial Areas

In 1919, the enthusiasm surrounding a short-lived gas play in Versailles Borough, Pennsylvania resulted in the drilling of many needless wells. The legacy of this activity exists today in the form of abandoned, unplugged gas wells that are a continuing source of fugitive methane in the midst of a residential and commercial area. Flammable concentrations of methane have been detected near building foundations, which have forced people from their homes and businesses until methane concentrations decreased. Despite mitigation efforts, methane problems persist and have caused some buildings to be permanently abandoned and demolished. This paper describes the use of magnetic and methane sensing methods by the National Energy Technology Laboratory (NETL) to locate abandoned gas wells in Versailles Borough where site access is limited and existing infrastructure can interfere. Here, wells are located between closely spaced houses and beneath buildings and parking lots. Wells are seldom visible, often because wellheads and internal casing strings have been removed, and external casing has been cut off below ground level. The magnetic survey of Versailles Borough identified 53 strong, monopole magnetic anomalies that are presumed to indicate the locations of steel-cased wells. This hypothesis was tested by excavating the location of one strong, monopole magnetic anomaly that was within an area of anomalous methane concentrations. The excavation uncovered an unplugged gas well that was within 0.2 m of the location of the maximum magnetic signal. Truck-mounted methane surveys of Versailles Borough detected numerous methane anomalies that were useful for narrowing search areas. Methane sources identified during truck-mounted surveys included strong methane sources such as sewers and methane mitigation vents. However, inconsistent wind direction and speed, especially between buildings, made locating weaker methane sources (such as leaking wells) difficult. Walking surveys with the methane detector mounted on a cart or wagon were more effective for detecting leaking wells because the instrument’s air inlet was near the ground where: 1) the methane concentration from subsurface sources (including wells) was a maximum, and 2) there was less displacement of methane anomalies from methane sources by air currents. The Versailles Borough survey found 15 methane anomalies that coincided with the location of well-type magnetic anomalies; the methane sources for these anomalies were assumed to be leaking wells. For abandoned well locations where the wellhead and all casing strings have been removed and there is no magnetic anomaly, leaking wellbores can sometimes be detected by methane surveys. Unlike magnetic anomalies, methane anomalies can be: 1) ephemeral, 2) significantly displaced from the well location, and 3) from non-well sources that cannot be discriminated without isotopic analysis. If methane surveys are used for well location, the air inlet to the instrument should be kept as close to the ground as possible to minimize the likelihood of detecting methane from distant, wind-blown sources.

54 ENVIRONMENTAL SCIENCES↗

Waste Container Filtration To Minimize Microbial Escape During Long-Term Storage On Mars

In the search for life on Mars, keeping its surface pristine and free of microbes due to human presence is of utmost importance. Astronauts will use emptied logistics containers during their Martian stay to store waste. These containers will be left on the planet’s surface and are a potential source of microbial contamination. It is desired for these containers to be free from leaks for a minimum of 50 years. If leaks do occur a likely location will be at the port. At this location the mating surfaces will be sealed using a flexible gasket material like a thin metal or a polymer. Eventually these seals will fail. To mitigate these effects, a particulate filter can be employed to equilibrate the pressure between the Martin environment and inside the container. To meet planetary protection requirements, the filter can only allow particulates smaller than 0.2 um diameter to pass. This paper discusses why a particulate filter may be needed and how such a filter would be tested to survive and operate in the harsh Martian environment.

Planetary Protection Waste Containment↗

Waste Container Filtration to Minimize Microbial Escape During Long-Term Storage on Mars

In the search for life on Mars, keeping its surface pristine and free of microbes due to human presence is of utmost importance. Astronauts will use emptied logistics containers during their Mars stay to store waste. These containers will be left on the planet’s surface and are a potential source of microorganism contamination. It is desired for these containers to be free from leaks for a minimum of 50 years. If leaks do occur, a likely location will be at any ports. At these locations the mating surfaces will be sealed using a flexible gasket material like a thin metal or a polymer. Eventually these seals will fail. To mitigate these effects, a particulate filter can be employed to equilibrate the pressure between the Martin environment and inside the container. To meet planetary protection requirements, the filter can only allow particulates smaller than 0.2 m diameter to pass. This paper discusses why a particulate filter may be needed and how such a filter could be tested to survive and operate in the harsh Martian environment.

planetary protection↗

Waste Container Filtration to Minimize Microbial Escape During Long-Term Storage on Mars

In the search for life on Mars, keeping its surface pristine and free of microbes due to human presence is of utmost importance. Astronauts will use emptied logistics containers during their Mars stay to store waste. These containers will be left on the planet’s surface and are a potential source of microorganism contamination. It is desired for these containers to be free from leaks for a minimum of 50 years. If leaks do occur, a likely location will be at any ports. At these locations the mating surfaces will be sealed using a flexible gasket material like a thin metal or a polymer. Eventually these seals will fail. To mitigate these effects, a particulate filter can be employed to equilibrate the pressure between the Martin environment and inside the container. To meet planetary protection requirements, the filter can only allow particulates smaller than 0.2 μm diameter to pass. This paper discusses why a particulate filter may be needed and how such a filter could be tested to survive and operate in the harsh Martian environment.

planetary protection↗

Methane, Ethane, and Propane Sensor for Real-time Leak Detection and Diagnostics

The Phase I effort demonstrated the technical viability of a fast, sensitive, mobile hydrocarbon monitor. The instrument will enable the oil and gas industry, researchers, and regulators to rapidly identify and chemically profile leaks from facilities. This capability will allow operators to quickly narrow down and mitigate probable leaking equipment, minimizing product loss and penalties due to regulatory non-compliance. During the initial development phase, we demonstrated operation of a prototype monitor that is capable of measuring methane, ethane, and propane at sub-part-per-billion sensitivities in 1 second, using direct absorption infrared spectroscopy. To our knowledge, this is the first instrument capable of fast propane measurements at atmospheric concentrations. In addition, the electrical requirements of the monitor have been reduced from the 1,200 W typical of a spectrometer, to <500 W, making it capable of being powered by a passenger vehicle, and easily deployed by the industry. The prototype monitor leverages recent advances in laser technology, using high-efficiency interband cascade lasers to access the 3 μm region of the mid-infrared, where the methane, ethane, and propane absorptions are strongest. Combined with established spectrometer technology, we have achieved precisions below 200 ppt for each compound. This allows the monitor to measure fast plumes from oil and gas facilities, as well as ambient background concentrations (typical ambient levels are 2 ppm, 1.5 ppb, and 0.7 ppb for methane, ethane and propane, respectively). Increases in instrument operating pressure were studied in order to allow for a smaller 125 W pump to be used, and passive cooling was explored to reduce the cooling load by almost 90% relative to active (refrigerated) cooling. In addition, the simulated infrared absorption profiles of ethane and propane were modified to minimize crosstalk between species, achieving <1% crosstalk between ethane and propane. Finally, a monitor was designed based upon the commercial compact mini-spectrometer capable of dual-laser operation. We intend to build and test this during phase II. Multiple opportunities for improvement were also identified. First, the reported ethane and propane concentrations are susceptible to external acceleration acting upon the instrument. During phase II we will address this “motion-sickness”. Second, significant software development will be needed operate the monitor at 1 second resolution in real time, and provide rapid, actionable data to a driver or passenger.

02 PETROLEUM↗

CH Packaging Program Guidance

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Program Guidance

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the pplication." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fatigue Crack Measurement in Composite Materials by Ultrasonic Methods

The nondestructive detection of intra-ply microcracking in unlined pressure vessels fabricated from composite materials is critical to ensuring mission success. Microcracking in composite structures due to combined fatigue and cryogenic thermal loading can be very troublesome to detect in-service and when it begins to link through the thickness can cause leakage and failure of the structure. These leaks may lead to loss of pressure/propellant, increased risk of explosion and possible cryo-pumping. The work presented herein develops a method and an instrument to locate and measure intraply fatigue cracking through the thickness of laminated composite material by means of correlation with ultrasonic resonance. Resonant ultrasound spectroscopy provides measurements which are, sensitive to both the microscopic and macroscopic properties of an object. Elastic moduli, acoustic attenuation, and geometry can all be probed. The approach is based on the premise of half-wavelength resonance. The method injects a broadband ultrasonic wave into the test structure using a swept frequency technique. This method provides dramatically increased energy input into the test article, as compared to conventional spike pulsed ultrasonics. This relative energy increase improves the ability to measure finer details in the materials character, such as micro-cracking and porosity. As the micro-crack density increases, more interactions occur with the higher frequency (small wavelength) components of the signal train causing the spectrum to shift toward lower frequencies. Preliminary experiments have verified a measurable effect on the resonance spectrum of the ultrasonic data to detect microcracking. Methods involving self organizing neural networks and other clustering algorithms show that the resonance ultrasound signatures from composites vary with the degree of microcracking and can be separated and identified.

Walker, James L.↗

Hanford's Double-Shell Tank AY-102 Recovery Project - 17416

Since at least August 2012, Hanford Tank 241-AY-102 (AY-102) has been leaking from its primary tank into its secondary containment. A pumping plan was developed in 2013 to provide a path forward for recommended remediation actions to be implemented as part of the AY-102 Recovery Project. On March 21, 2014, the Washington State Department of Ecology issued Administrative Order No. 10618 requiring Washington River Protection Solutions and the United States Department of Energy to conduct actions related to and including the removal of waste from AY-102. The three parties agreed to resolve the appeal of the Administrative Order through a Settlement Agreement which addresses the remaining requirements and implements enforceable milestone dates, including initiation of waste retrieval by March 4, 2016 and completion of waste retrieval operations by March 4, 2017. The AY-102 Recovery Project was developed to address the Settlement Agreement requirements. While retrieval of waste from Single-Shell Tanks has been performed at Hanford for decades, retrieval from Double-Shell Tank AY-102 required adaptation of the existing technologies to a new environment on a larger scale than previously encountered. A significant number of obstructions and in-tank equipment limit accessibility to the high source term AY-102 waste and the location of the selected receiver tank required installation of an extensive, heavily-shielded above-ground transfer line. Despite countless challenges and obstacles encountered throughout, the project successfully completed system design, fabrication, installation, testing, and the first phase of operations within a highly compressed, aggressive schedule. Waste retrieval operations in AY-102 commenced on March 3, 2016 and the initial operating phase concluded on April 30. Additional sluicing capability was required to complete the mission and four Extended Reach Sluicers were installed to support the second operating phase, which began on December 8, 2016. As of December 31, 2016, approximately 97% of the original waste volume had been removed, resulting in an estimated remaining waste volume of about 75,000 liters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ISS External Microorganisms: A Planetary Protection Experiment to Inform Requirements for Crewed Missions to Mars

We have developed, tested, and flown a caddy capable of collecting aseptic samples from external surfaces of the ISS (International Space Station). The sampling caddy is certified for use during US EVA (extra vehicular activity) and was launched to ISS in the summer of 2023. We are scheduled to collect samples from 6 locations outside ISS during an EVA in May of 2024. We will freeze these samples at -80°C on orbit and return them to Earth. We will then extract and sequence any DNA collected during the EVA using next generation sequencing technologies to characterize the community composition and function of each sample. Measuring the type and quantity of microbes present on the exterior of ISS will allow us to address knowledge gap 2B, “Acceptable levels of microbial/organic releases from humans and support systems” described in a 2019 COSPAR report. Collecting data about microbial release from current crewed vehicles will inform requirements for acceptable leak rates for future crewed missions to Mars. The sampling kit consists of eight commercially available, sterile, DNA free, macrofoam swabs ( 23 mm. diameter ) installed in custom aluminum end effectors. Each end effector is housed in and individual aluminum canister. Each canister contains a 0.2 μm Teflon filter to allow the interior volume to accommodate pressure changes without permitting microbial contaminants to enter the sterile interior volume. A handle repurposed from the space shuttle tile repair kit is used to remove the end effector from the sample canister, collect a sample by swabbing a surface and then replace the end effector in its canister. The canisters and end effectors were cleaned and assembled on Earth. Prior to installing the sterile swab the canisters and end effectors were sterilized in an autoclave at 134°C, 215 kPA, for 7 min.. The final assembly occurred in a sterilized class II biosafety cabinet. We will collect six samples from the 1) airlock vestibule, 2) airlock thermal cover, 3) a gap in the micrometeorite shielding near the airlock, 4) a handrail near the airlock, 5) the CDRA (Carbon Dioxide Removal Assembly) vent, and 6) the VES (Vacuum Exhaust System) vent. The remaining two swabs will be reserved as controls. One swab will be exposed during the EVA without touching any surfaces to act as a blank. The final swab will remain sealed until the entire sampling kit is returned to earth. Based on previously published results from the Russian segment, we hypothesize that there will be detectable microbes at some or all of these locations. Ground-based testing of this sampling caddy confirms that the swabs remain sterile as the canisters transition in and out of vacuum. We were able to retrieve, viable bacterial and fungal cells as well as DNA from samples collected from US space suits during vacuum chamber tests lasting as long as seven hours. Based on these results and feedback from the test subjects the sampling caddy was modified to improve ergonomics and meet US EVA safety requirements. Bayonet probes were added to the sides of the sample kit as alternate mounting points. Additional locking features were added to the end effector and the filter stack to prevent inadvertent release during use. The opening mechanism was changed from one where the end effector was rocked laterally to defeat a ball detent to a twist-to-open threaded closure for similar reasons. Demonstrating, this sampling caddy’s effectiveness during a US EVA will allow us to address knowledge gaps identified in COSPAR reports and begin to define planetary protection requirements for life support systems on crewed missions to mars. This kit could also be used to collect contamination control samples during Artemis missions to verify requirements and could be easily modified for robotic sample collection.

Planetary Protection↗

ISS External Microorganisms: Collecting Planetary Protection Samples During Extravehicular Activity

We have developed, tested, and flown a caddy capable of collecting aseptic samples from external surfaces of the ISS (International Space Station). The sampling caddy is certified for use during US EVA (extra vehicular activity) and was launched to ISS in the summer of 2023. We are scheduled to collect samples from 6 locations outside ISS during an EVA in May of 2024. We will freeze these samples at -80°C on orbit and return them to Earth. We will then extract and sequence any DNA collected during the EVA using next generation sequencing technologies to characterize the community composition and function of each sample. Measuring the type and quantity of microbes present on the exterior of ISS will allow us to address knowledge gap 2B, “Acceptable levels of microbial/organic releases from humans and support systems” described in a 2019 COSPAR report. Collecting data about microbial release from current crewed vehicles will inform requirements for acceptable leak rates for future crewed missions to Mars. The sampling kit consists of eight commercially available, sterile, DNA free, macrofoam swabs ( 23 mm. diameter ) installed in custom aluminum end effectors. Each end effector is housed in and individual aluminum canister. Each canister contains a 0.2 μm Teflon filter to allow the interior volume to accommodate pressure changes without permitting microbial contaminants to enter the sterile interior volume. A handle repurposed from the space shuttle tile repair kit is used to remove the end effector from the sample canister, collect a sample by swabbing a surface and then replace the end effector in its canister. The canisters and end effectors were cleaned and assembled on Earth. Prior to installing the sterile swab the canisters and end effectors were sterilized in an autoclave at 134°C, 215 kPA, for 7 min.. The final assembly occurred in a sterilized class II biosafety cabinet. We will collect six samples from the 1) airlock vestibule, 2) airlock thermal cover, 3) a gap in the micrometeorite shielding near the airlock, 4) a handrail near the airlock, 5) the CDRA (Carbon Dioxide Removal Assembly) vent, and 6) the VES (Vacuum Exhaust System) vent. The remaining two swabs will be reserved as controls. One swab will be exposed during the EVA without touching any surfaces to act as a blank. The final swab will remain sealed until the entire sampling kit is returned to earth. Based on previously published results from the Russian segment, we hypothesize that there will be detectable microbes at some or all of these locations. Ground-based testing of this sampling caddy confirms that the swabs remain sterile as the canisters transition in and out of vacuum. We were able to retrieve, viable bacterial and fungal cells as well as DNA from samples collected from US space suits during vacuum chamber tests lasting as long as seven hours. Based on these results and feedback from the test subjects the sampling caddy was modified to improve ergonomics and meet US EVA safety requirements. Bayonet probes were added to the sides of the sample kit as alternate mounting points. Additional locking features were added to the end effector and the filter stack to prevent inadvertent release during use. The opening mechanism was changed from one where the end effector was rocked laterally to defeat a ball detent to a twist-to-open threaded closure for similar reasons. Demonstrating, this sampling caddy’s effectiveness during a US EVA will allow us to address knowledge gaps identified in COSPAR reports and begin to define planetary protection requirements for life support systems on crewed missions to mars. This kit could also be used to collect contamination control samples during Artemis missions to verify requirements and could be easily modified for robotic sample collection.

Planetary Protection↗

Strong-Sludge Gas Retention and Release Mechanisms in Clay Simulants

The Hanford Site has 28 double-shell tanks (DSTs) and 149 single-shell tanks (SSTs) containing radioactive wastes that are complex mixes of radioactive and chemical products. The mission of the Department of Energy's River Protection Project is to retrieve and treat the Hanford tank waste for disposal and close the tank farms. A key aspect of the mission is to retrieve and transfer waste from the SSTs, which are at greater risk for leaking, into DSTs for interim storage until the waste is transferred to and treated in the Waste Treatment and Immobilization Plant. There is, however, limited space in the existing DSTs to accept waste transfers from the SSTs, and approaches to overcoming the limited DST space will benefit the overall mission. The purpose of this study is to summarize and analyze the key previous experiment that forms the basis for the relaxed controls and to summarize progress and results on new experiments focused on understanding the conditions that result in low gas retention. The previous large-scale test used about 50 m3 of sediment, which would be unwieldy for doing multiple parametric experiments. Accordingly, experiments began with smaller-scale tests to determine whether the desired mechanisms can be studied without the difficulty of conducting very large experiments. The most significant results from the current experiments are that progressively lower gas retention occurs in tests with progressively deeper sediment layers and that the method of gas generation also affects the maximum retention. Based on the results of this study, it is plausible that relatively low gas retention could occur in sufficiently deep tank waste in DSTs. The current studies and previous work, however, have not explored how gas retention and release will behave when two or more layers with different properties are present.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Film Growth Dynamics During Pulsed Sputter Deposition (LDRD Final Report)

Novel materials synthesis and development using physical vapor deposition require our fundamental understanding of plasma conditions and film growth dynamics. A central theme is to control materials microstructure. Over the last few decades, the difficulty of thick heavy metal coatings has been one of the major bottlenecks limiting our studies of the important family of inertial-confinement-fusion (ICF) designs with colliding-shell targets. Our previous attempts to fabricate such coatings by conventional DC magnetron sputtering (DCMS) has had limited success due to the inherent complexity and our limited understanding of the deposition process. In this project, we have investigated the physics of a novel and promising pulsed sputter deposition process. We expanded the scientific foundation of sputter deposition processes through a combination of well-posed experiments and state-of-the-art characterizations. The following important scientific milestones have been achieved: (1) Successfully installed and tested a high-power impulse magnetron sputtering (HiPIMS) system; (2) Deployed a novel set of in-situ diagnostics during pulsed deposition, including a multibeam optical stress sensor (MOSS) system for real-time stress measurement, and Langmuir probe for the measurements of plasma physical properties. This allows us to monitor dynamically plasma conditions, ion flux and energy distributions, and film stress; (3) Investigated and obtained a fundamental understanding of HIPIMS on microstructure and stress control; (4) Successfully synthesized and demonstrated record-breaking strength nanocrystalline-nanotwinned (nnt) metals; (5) Successfully obtained high-quality, leak-proof Cr metal shells via HiPIMS method. The outcomes of this project could have transformational scientific and programmatic impacts, enabling novel materials synthesis and an experimental campaign with colliding shell target designs. The basic understanding of the deposition process has important implications to a broad range of industrial applications.

36 MATERIALS SCIENCE↗