Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

CleanStart DERMS: Modeling Effort Update

This document describes the model conversion approach taken to transform the Synergee distribution feeder models received from Riverside Public Utility (RPU) to GridLAB-D models. The document briefly introduces the tools and software applications used in this process. Then, the model validation results acquired from GridLAB-D simulations are shown. Finally, several test-cases are presented that the research teams are planning to implement with the GridLAB-D models. The document presents the current state of the project and the planned next steps.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Autonomous Science Restart for the Planned Europa Mission with Lightweight Planning and Execution

In this paper we present MEXEC - a lightweight on-board planning and execution system that monitors spacecraft state to robustly respond to current conditions. In addition it projects the remaining plan forward in time to detect conflicts and revise the plan. Most current planetary missions use sequence based commanding from the ground,which limits the ability to respond to on-board state varying from planned for state. This results in planning for worst-case execution time, power utilization, data volume and other resources and leads to under utilization of the spacecraft capability. It also limits the ability to respond to faults. Due to the high radiation environment at Jupiter the probability of flight software resets is high. Therefore, of particular interest to the planned Europa Mission is the capability to restart the science plan after flight software resets. In this paper we present results from running Europa flyby scenarios with flight software resets in the Europa flight software test environment. Preliminary results with the prototype scenario show MEXEC takes less than a tenth of a second to respond to resets. The development was done as part of Europa-focused flight software, but MEXEC was designed to be applicable to landers and rovers as well.

Joshi, Rajeev↗

Stormwater Pollution Prevention Plan (SWPPP) for Coal Storage Area Stabilization Project

The scope of this project is to stabilize the abandoned coal storage area and redirect the storm water runoff from sanitary sewer system to the storm drain system. Currently, the existing storm water runoff is directed to a perimeter concrete drainage swale and collected in a containment basin. The collected water is then pumped to a treatment facility and after treatment, is discharged to the Y-12 sanitary sewer system. The existing drainage swale and collection basin along with silt fencing will be used during aggregate placement and grading to provide erosion and sediment control. Inlet protection will also be installed around existing structures during the storm water diversion construction. This project scope will include the installation of a non-woven geotextile fabric and compacted mineral aggregate base (paving optional) to stabilize the site. The geotextile specifications are provided on the vendor cut sheets in Appendix B. The installation of a storm water collection/retention area will also be installed on the southern side of the site in accordance with EPA Technical Guidance on Implementing the Stormwater Runoff Requirements for federal Projects under Section 438 of the Energy Independence and Security Act. The total area to be disturbed is approximately 2.5 acres. The order of activities for this Stormwater Pollution Prevention Plan (SWPPP) will be: (1) post notice of coverage (NOC) in a prominent display near entrance of the site; (2) install rain gauge on site or contact Y-12 Plant Shift Superintendent daily for Met tower rain gauge readings; (3) install stabilized construction exit on site; (4) install silt fencing along perimeter as indicated on the attached site plan; (5) regrade site; (6) install geotextile fabric and compacted mineral aggregate base; (7) install catch basin inlet protection where required; (8) excavate and lower existing catch basin tops, re-grade and asphalt to drain; and (9) when all disturbed areas are re-stabilized, remove silt fencing and any other temporary erosion control.

01 COAL, LIGNITE, AND PEAT↗

ESM data downscaling: a comparison of super-resolution deep learning models

Abstract Climate projections at fine spatial resolutions are required to conduct accurate risk assessment for critical infrastructure and design adaptation planning. Generating these projections using advanced Earth system models (ESM) requires significant computational resources. To address this issue, various statistical downscaling techniques have been introduced to generate fine-resolution data from coarse-resolution simulations. In this study, we evaluate and compare five deep learning-based downscaling techniques, namely, super-resolution convolutional neural networks, fast super-resolution convolutional neural network ESM, efficient sub-pixel convolutional neural network, enhanced deep residual network (EDRN), and super-resolution generative adversarial network (SRGAN). These techniques are applied to a dataset generated by the Energy Exascale Earth System Model (E3SM), focusing on key surface variables such as surface temperature, shortwave heat flux, and longwave heat flux. Models are trained and validated using paired fine-resolution (0.25 $$^{\circ }$$ ∘ ) and coarse-resolution (1 $$^{\circ }$$ ∘ ) monthly data obtained from a 9-year simulation. Next, blind testing is performed using monthly data obtained from two different years outside of the training and validation set. To evaluate the efficiency of each technique, different statistical metrics are used, including mean squared error (MSE), peak signal-to-noise ratio (PSNR), structural similarity index measure (SSIM), and learned perceptual image patch similarity (LPIPS). The results show that EDRN outperforms other algorithms in terms of PSNR, SSIM, and MSE, but struggles to capture fine-scale features in the data. In contrast, SRGAN, a generative model that uses perceptual loss, excels in capturing fine details at boundaries and internal structures, resulting in lower LPIPS than other methods.

Pawar, Nikhil M. (ORCID:0000000211613289)↗

Methodology Paper for Lower and Upper Cretaceous Characterization (SECARB Phase III Work Product 1.4.a)

This document serves as the SECARB Phase III work product 1.4.a “Methodology Paper for Lower and Upper Cretaceous Characterization.” The product summarizes the Project Team’s plans for Phase III assessment of the Upper and Lower Cretaceous Saline Reservoirs CO 2 storage capacity. The Project Team will concentrate on potential geologic CO 2 storage reservoirs of the Lower and Upper Cretaceous formations in the Southeast Regional Carbon Sequestration Partnership (SECARB) along the eastern Gulf Coast region. This work will involve assembly of regional geologic cross sections to better define the stratigraphic framework for this high priority, regionally significant geological formation in the SECARB region. Best available well log data and all available core data will be incorporated into the regional analysis to assess reservoir properties and the geologic framework for storage reservoir characteristics. Regional structure maps and reservoir thickness maps will be compiled. Detailed structure maps will be created to assess the suitability of specific storage sites and to assess the potential impact of significant structural features on storage reservoir and confining unit integrity. Of importance will be incorporating the new information being developed from the Phase II and Phase III CO2 storage field projects that will be assessing this formation for storage of CO 2 . The primary deliverable will be input into the next update of the “Regional Atlas”.

54 ENVIRONMENTAL SCIENCES↗

Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY 2015 First Quarterly Report

During the first quarter of FY 2015, the following technical progress has been made toward project milestones: 1) Autodesk delivered a new research version of ASMI to PNNL. This version includes the improved 3D fiber orientation solver, and the reduced order model (ROM) for fiber length distribution using the proper orthogonal decomposition (POD) implemented in the mid-plane, dual-domain and 3D solvers. 2) Autodesk coordinated a conference paper with PNNL reporting ASMI mid-plane fiber orientation predictions compared with the measured data for two PlastiComp plaques. This paper was accepted for presentation at the 2015 Society for Plastics Engineers (SPE) ANTEC conference. 3) The University of Illinois (Prof. Tucker) assisted team members from Purdue with fiber orientation measurement techniques, including interpretation of off-axis cross sections. 4) The University of Illinois assisted Autodesk team members with software implementation of the POD approach for fiber length modeling, and with fiber orientation modeling. 5) The University of Illinois co-authored in the SPE ANTEC paper, participated with the team in discussions of plaque data and model results, and participated in the definition of go/no-go experiments and data. 6) Purdue University (Purdue) conducted fiber orientation measurements for 3 PlastiComp plaques: fast-fill 30wt% LCF/PP center-gated, fast-fill 50wt% LCF/PA66 edge-gated and fast-fill 50wt% LCF/PA66 center-gated plaques, and delivered the fiber orientation data for these plaques at the selected locations (named A, B, and C) to PNNL. However, the data for the fast-fill 50wt% LCF/PA66 edge-gated plaque exhibited unusual variations and could not be used for the model validation. Purdue will re-measure fiber orientation for this plaque. 7) Based on discussions with the University of Illinois Purdue explained the ambiguity in the measurements of the fiber orientation components. 8) PNNL discussed with team members to establish a go/no-go decision plan for the project and submitted the established plan to DOE. 9) PNNL performed ASMI mid-plane analyses for the fast-fill center-gated 30wt% LCF/PP and 50wt% LCF/PA66 plaques and compared the predicted fiber orientations with the measured data provided by Purdue at Locations A, B, and C on these plaques. 10) Based on discussions with the University of Illinois and Autodesk, PNNL proposed a procedure to adjust fiber orientation data for Location A of the center-gated plaques so that the data can be expressed and interpreted in the flow/cross-flow direction coordinate system. 11) PNNL tested the new ASMI version received from Autodesk, examined and discussed 3D fiber orientation predictions for PlastiComp plaques. 12) PlastiComp, Inc. (PlastiComp), Toyota Research Institute North America (Toyota) and Magna Exteriors and Interiors Corp. (Magna) participated in discussions with team members on the go/no-go plan and the issues related to fiber length measurements. Toyota continued the discussion with Magna on tool modification for molding the complex part in order to achieve the target fiber length in the part.

42 ENGINEERING↗

Z Facility Sustainment Status (September FY2023) [Slides]

FY23 Sustainment, performed from 1 March through 30 September, completed with Cumulative Costs at 69% and combined Costs plus Commitments at 87%. Nineteen projects were completed in FY23. Eleven projects continue to close out purchasing activities or will roll over into FY24 projects. Two projects have been placed on hold and will be reevaluated for potential future consideration. Diagnostics projects issued all planned FY23 purchases and finished FY23 with 78% cumulative costs and combined costs and commitments at 102%. FY24 Sustainment Project identification, definition and prioritization was completed. Once the budget is finalized, project selection will quickly be set and projects kicked off.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Budget estimates: Fiscal year 1994. Volume 2: Construction of facilities

The Construction of Facilities (CoF) appropriation provides contractual services for the repair, rehabilitation, and modification of existing facilities; the construction of new facilities and the acquisition of related collateral equipment; the acquisition or condemnation of real property; environmental compliance and restoration activities; the design of facilities projects; and advanced planning related to future facilities needs. Fiscal year 1994 budget estimates are broken down according to facility location of project and by purpose.

Source record↗

Latest Developments in PM Systems and Methods and their Application to WM Projects - 20364

How do you improve on an industry that is well established yet often misses the mark on key metrics demonstrating effective planning and execution of project scope, schedule and budget? With the increased complexity of DOE projects relative to either poorly kept records of what wastes are stored or the lack of specific knowledge relative to the waste concentrations/quantities, this is a question continually asked and investigated by many. In fact, in 2017, the GAO's report to Congress indicated that although the DOE has made some progress on its monitoring effectiveness and demonstrating progress criteria, these goals were not met and there needs to be more improvement and monitoring. This paper will offer some insights into the latest developments in project management methodologies and the possible application of these to waste management projects. Traditional data generated via a project schedule that utilizes critical path methodology (CPM) and additional earned value management (EVM) data needs to be accurate and enable the project manager to better understand the probability of project success. Although this data has readily been available on most large-scale projects, success as measured by various stakeholder groups including the client, project team, regulators, etc. is less than optimal. Therefore, an urgent need exists to explore how traditional project data (CPM and EVM) coupled with new methodologies allows for better planning and execution by the project team. Many new approaches/methodologies can even be used to predict the success of options prior to full implementation on the actual project. Three approaches/methodologies will be discussed: - Artificial Intelligence; - Change Management; - Blend of Traditional Management (Gantt chart) and Agile Methodologies. As market forces change, so will the direction of project management. The days of 'one size fits all' are no longer valid. A combination of predictive and adaptive approaches in the management of projects is essential to enable execution of project deliverables on time, under budget, and within the contractual scope. This paper is intended to provide the reader with insight to the close relationship of project management trends and business management trends, and to provoke critical thinking about what it means to align project management strategy with an environment of non-stop innovation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Direct Solid-State Conversion of Recyclable Metals and Alloys

This project is to develop and demonstrate the concept feasibility of a highly energy-efficient solid-state material synthesis process, friction stir extrusion (FSE) technology. Specifically, the project seeks to explore and demonstrate the feasibility to recycle metals, produce nano-particle dispersion strengthened bulk materials and/or nano-composite materials from powders, chips or other recyclable feedstock metals or scraps through mechanical alloying and thermo-mechanical processing in a single-step. In this study, we focused on metal recycling, producing nano-engineered wires and evaluating their potential use in future generation long-distance electric power delivery infrastructure. More comprehensive R&D on the technology fundamentals and system scale-up toward early-stage applications in two targeted “showcase” fields of use: nano engineered bulk materials and Al recycling will be considered and planned as part of Project Continuation Plan.

36 MATERIALS SCIENCE↗

ACTS for distance education in developing countries

The need for electrical energy supply in the rural communities of developing countries has been well documented. Equally well known is the potential for photovoltaic in cost effectively meeting this need. A major impediment to fulfilling the need is the lack of indigenous personnel with a knowledgeof photovoltaic systems, and the associated infrastructure required to implement project. Various delivery schemes for providing the needed training to developing countries personnel have been investigated. Various train methods and programs that have been employed to remedy the problem have had significant drawbacks in terms of cost, consistency, impact, reach, and sustainability. The hypothesis to be tested in this project posits that satellite-based distance education using ACTS technologies can overcome these impediments. The purpose of the project is to investigate the applicability of the ACTS satellite in providing distance education in photovoltaic systems to developing countries and rural communities. An evaluation of the cost effectiveness of using ACTS unique technologies to overcome identified problems shall be done. The limitations of ACTS in surmounting distance education problems in developing countries shall be investigated. This project will, furthermore, provide training to Savannah State College faculty in photovoltaic (PV) systems and in distance education configurations and models. It will also produce training materials adequate for use in PV training programs via distance education. Savannah State College will, as a consequence become well equipped to play a leading role in the training of minority populations in photovoltaic systems and other renewables through its Center for Advanced Water Technology and Energy Systems. This communication provides the project outline including the specific issues that will be investigated during the project. Also presented i the project design which covers the participations of the various components of a network of institutions that is formed for optimal project execution. The expected results and project output, including plans for potential leverages and linkages to be derived, are also discussed. Finally, we point out possible extensions from this project and other related projects that could be initiated based on the experiences gained from the project.

Kalu, A↗

License Structure for Multi-Module Facilities

The Next Generation Nuclear Plant (NGNP) Project is intended to be the prototype for multi-module commercial high temperature gas reactors (HTGRs) for process heat and/or electricity generation. Part of the objectives of the project are to establish the conditions that would govern or enhance the design, licensing, construction and operation of numerous, modular nuclear plants, particularly suited for industrial applications or that could reduce the risk of such projects. A determination is desired regarding whether a multi-module reactor plant can be licensed with a single Nuclear Regulatory Commission (NRC) review, hearing, and safety evaluation report. If it is determined that a multi-modular reactor plant can be licensed under a single review/hearing process, the structure and the duration of the license for each module will also need to be determined. The purpose of this paper is to describe for the NRC the NGNP position on these two issues and obtain either NRC general concurrence or comments on the approach to these issues. While the current NGNP planning provides for only a single reactor module, the project is intended to provide the basis and establish a licensing framework that can be used by future commercial HTGRs and other reactor designs, including a variety of small modular reactor technologies, with configurations reflecting design standardization of multi-module plants. Therefore, it is important to identify a path for addressing these modular reactor plant issues so that the resolution can be factored into the NGNP Project planning. The NGNP position is that a single combined license (COL) application can be submitted for a multi-modular reactor facility, the COL application can undergo a single NRC review/hearing process, and each module should be issued a separate license.

99 GENERAL AND MISCELLANEOUS↗

SESAME/Environmental Research Laboratories

The Environmental Research Laboratories (ERL) have been designated as the basic research group of the National Oceanic and Atmospheric Administration (NOAA). ERL performs an integrated program of research and research services directed toward understanding the geophysical environment, protecting the environment, and improving the forecasting ability of NOAA. Twenty-four laboratories located throughout the United States comprise ERL. The Project SESAME (Severe Environmental Storms and Mesoscale Experiment) Planning Office is a project office within ERL. SESAME is conceived as a joint effort involving NOAA, NASA, NSF, and the atmospheric science community to lay the foundation for improved prediction of severe convective storms. The scientific plan for SESAME includes a phased buildup of analysis, modeling, instrumentation development and procurement, and limited-scale observational activities.

Source record↗

Final Report: Technical Support for Innovative Energy Systems the U.S. Chemical Industry -- Innovative Energy Systems Pilot Project - Chemicals Project Integrator

The University of Illinois at Chicago Energy Resources Center (UIC/ERC) was originally selected to carry out the role of project integrator for a planned solicitation calling for proposals for innovative concepts for energy efficient systems in the chemical industry. The selection was made as a result of a DOE Announcement of Funding Opportunity issued by the DOE Golden Field Office. The U.S. DOE, due to funding constraints, decided to change the role of project integrator into one of technical support to DOE and the Vision 2020 Steering Committee in carrying out the oversight and management of the projects selected from the planned innovative concepts solicitation. This project, initiated in April, 2005, was established to provide that technical support to the U.S. DOE Innovative Energy Systems Pilot Project for the US Chemical Industry. In the late summer of 2006, and as a continuation of the baseline technology analysis conducted by UIC/ERC under this project, DOE requested that UIC/ERC assist in the development of “technology briefs” in support of the DOE Save Energy Now program. The 100 technology briefs developed under this contract were utilized by the Energy Experts as part of their Energy Saving Assessments (ESA).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

“A System for Automatically Maintaining Pressure in a Commercial Truck Tire”

Under-inflated tires significantly reduce a vehicle’s fuel efficiency by increasing rolling resistance (drag force). The Air Maintenance Technology (“AMT”) system developed through this project replenishes lost air and maintains optimal tire cavity pressure whenever the tire is rolling in service, thus improving overall fuel economy by reducing the tire’s rolling resistance. The system consists of an inlet air filter, an air pump driven by tire deformation during rotation, and a pressure regulating device. Pressurized air in the tire cavity naturally escapes by diffusion through the tire and wheel, leaks in tire seating, and through the filler valve and its seating. As a result, tires require constant maintenance to replenish lost air. Since manual tire inflation maintenance is both labor intensive and time consuming, it is frequently overlooked or ignored. By automating the maintenance of optimal tire pressure, the tire’s contribution to the vehicle’s overall fuel economy can be maximized. The work was divided into three phases. The objectives of Phase 1, Planning and Initial Design, resulted in an effective project plan and to create a baseline design. The objectives for Phase 2, Design and Process Optimization, were: to identify finalized design for the pump, regulator and filter components; identify a process to build prototype tires; assemble prototype tires; test prototype tires and document results. The objectives of Phase 3, Design Release and Industrialization, were to finalize system tire assembly, perform release testing and industrialize the assembly process.

42 ENGINEERING↗

The Electron-Ion Collider

The future Electron-Ion Collider (EIC) is a proposed new facility to collide high-energy electrons with beams of polarized protons/light nuclei and unpolarized nuclei. We overview the goals of the project and key measurements at the EIC. We also briefly comment on recent developments of the project.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Summary of Carbon Storage Project Public Information Meeting and Open House

The Kentucky Geological Survey (KGS) completed a second phase of carbon dioxide (CO 2 ) injection and seismic imaging in the Knox Group, a Cambrian Ordovician dolomite and sandstone sequence in September 2010. This work completed 2 years of activity at the KGS No. 1 Marvin Blan well in Hancock County, Kentucky. The well was drilled in 2009 by a consortium of State and industry partners (Kentucky Consortium for Carbon Storage). An initial phase of CO 2 injection occurred immediately after completion of the well in 2009. The second phase of injection and seismic work was completed in September 2010 as part of a U.S. DOE funded project, after which the Blan well was plugged and abandoned. Following completion of research at the Blan well, a final public meeting and open house was held in Hancock County on October 28, 2010. This meeting followed one public meeting held prior to drilling of the well, and two on site visits during drilling (one for news media, and one for school teachers). The goal of the final public meeting was to present the results of the project to the public, answer questions, and address any concerns. Despite diligent efforts to publicize the final meeting, it was poorly attended by the general public. Several local county officials and members of the news media attended, but only one person from the general public showed up. We attribute the lack of interest in the results of the project to several factors. First, the project went as planned, with no problems or incidents that affected the local residents. The fact that KGS fulfilled the promises it made at the beginning of the project satisfied residents, and they felt no need to attend the meeting. Second, Hancock County is largely rural, and the technical details of carbon sequestration were not of interest to many people. The county officials attending were an exception; they clearly realized the importance of the project in future economic development for the county.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗