Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Nontargeted vs. Targeted vs. Smart Load Shifting Using Heat Pump Water Heaters

Deployment of CTA-2045–enabled devices is increasing in the U.S. market. These devices allow utilities or third-party aggregators to control appliance energy use in homes, and could also be applied to end uses in small commercial buildings. This study focuses on a field study using CTA-2045–enabled water heaters to shift electric load off the peak and toward periods when renewable resources are more prevalent (e.g., near noon for solar resources and near midnight for wind resources). The following load shifting strategies were compared to understand effects on the aggregate load-shifting capabilities of Heat Pump Water Heaters (HPWHs) and on consumer hot water supply: non-targeted (traditional), targeted (grouped, with different shifting schedules) and “smart” (adaptive control commands). The results of this study show that targeted and smart control strategies yield significantly more load-shifting potential from a population of water heaters than the non-targeted approach without sacrificing hot water supply to occupants. However, as control commands become more aggressive, aggregators may face challenges in meeting consumer hot water demand. Furthermore, the findings and lessons learned can benefit electric utilities and inform updates to manufacturer controls and communications standards. The data collected may also be useful for developing and validating HPWH models.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Simulations suggest offshore wind farms modify low-level jets

Abstract. Offshore wind farms are scheduled to be constructed along the East Coast of the US in the coming years. Low-level jets (LLJs) – layers of relatively fast winds at low altitudes – also occur frequently in this region. Because LLJs provide considerable wind resources, it is important to understand how LLJs might change with turbine construction. LLJs also influence moisture and pollution transport; thus, the effects of wind farms on LLJs could also affect the region’s meteorology. In the absence of observations or significant wind farm construction as yet, we compare 1 year of simulations from the Weather Research and Forecasting (WRF) model with and without wind farms incorporated, focusing on locations chosen by their proximity to future wind development areas. We develop and present an algorithm to detect LLJs at each hour of the year at each of these locations. We validate the algorithm to the extent possible by comparing LLJs identified by lidar, constrained to the lowest 200 m, to WRF simulations of these very low LLJs (vLLJs). In the NOW-WAKES simulation data set, we find offshore LLJs in this region occur about 25 % of the time, most frequently at night, in the spring and summer months, in stably stratified conditions, and when a southwesterly wind is blowing. LLJ wind speed maxima range from 10 m s−1 to over 40 m s−1. The altitude of maximum wind speed, or the jet “nose”, is typically 300 m above the surface, above the height of most profiling lidars, although several hours of vLLJs occur in each month in the data set. The diurnal cycle for vLLJs is less pronounced than for all LLJs. Wind farms erode LLJs, as LLJs occur less frequently (19 %–20 % of hours) in the wind farm simulations than in the no-wind-farm (NWF) simulation (25 % of hours). When LLJs do occur in the simulation with wind farms, their noses are higher than in the NWF simulation: the LLJ nose has a mean altitude near 300 m for the NWF jets, but that nose height moves higher in the presence of wind farms, to a mean altitude near 400 m. Rotor region (30–250 m) wind veer is reduced across almost all months of the year in the wind farm simulations, while rotor region wind shear is similar in both simulations.

17 WIND ENERGY↗

Sources of unbounded priority inversions in real-time systems and a comparative study of possible solutions

In the design of real-time systems, tasks are often assigned priorities. Preemptive priority driven schedulers are used to schedule tasks to meet the timing requirements. Priority inversion is the term used to describe the situation when a higher priority task's execution is delayed by lower priority tasks. Priority inversion can occur when there is contention for resources among tasks of different priorities. The duration of priority inversion could be long enough to cause tasks to miss their dead lines. Priority inversion cannot be completely eliminated. However, it is important to identify sources of priority inversion and minimize the duration of priority inversion. In this paper, a comprehensive review of the problem of and solutions to unbounded priority inversion is presented.

Davari, Sadegh↗

Computing the Envelope for Stepwise-Constant Resource Allocations

Computing tight resource-level bounds is a fundamental problem in the construction of flexible plans with resource utilization. In this paper we describe an efficient algorithm that builds a resource envelope, the tightest possible such bound. The algorithm is based on transforming the temporal network of resource consuming and producing events into a flow network with nodes equal to the events and edges equal to the necessary predecessor links between events. A staged maximum flow problem on the network is then used to compute the time of occurrence and the height of each step of the resource envelope profile. Each stage has the same computational complexity of solving a maximum flow problem on the entire flow network. This makes this method computationally feasible and promising for use in the inner loop of flexible-time scheduling algorithms.

Muscettola, Nicola↗

Mission and Implementation of an Affordable Lunar Return

We present an architecture that establishes the infrastructure for routine space travel by taking advantage of the Moon's resources, proximity and accessibility. We use robotic assets on the Moon that are teleoperated from Earth to prospect, test, demonstrate and produce water from lunar resources before human arrival. This plan is affordable, flexible and not tied to any specific launch vehicle solution. Individual surface pieces are small, permitting them to be deployed separately on small launchers or combined together on single large launchers. Schedule is our free variable; even under highly constrained budgets, the architecture permits this program to be continuously pursued using small, incremental, cumulative steps. The end stage is a fully functional, human-tended lunar outpost capable of producing 150 metric tonnes of water per year enough to export water from the Moon and create a transportation system that allows routine access to all of cislunar space. This cost-effective lunar architecture advances technology and builds a sustainable transportation infrastructure. By eliminating the need to launch everything from the surface of the Earth, we fundamentally change the paradigm of spaceflight.

Spudis, Paul↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Contracting Quality Early in the Lifecycle Using AS9145 Data Deliverables

Development schedules and a highly dynamic supply chain are a challenge to developers of complex systems produced at low volume. Flaws in designs, parts and materials availability problems, poor manufacturability, and a lack of knowledge about critical items and key process attributes can be realized well before traditional second-party quality assurance activities begin. Supplier audits and product inspections may have little mitigating effect once these foundational problems have been realized. Their impacts can be significant lifecycle disruption, cost overruns, inability to deliver to plan, and even project cancellation. AS9145, Requirements for Advanced Product Quality Planning and Production Part Approval Process, can be used to drive quality engineering practices into early development lifecycles to significantly reduce this late-cycle risk and to reduce the cost of quality overall. Since its initial publication in 2016, it has had very limited adoption by the DoD, no adoption by NASA, and sparse adoption in the aerospace and defense supply chain. A task group within the Aerospace Industries Association's (AIA) Joint Strategic Quality Council (JSQC) identified that both acquirers and suppliers see as AS9145 as a cost-adder and are hesitant to use it as an alternative to late-stage-heavy quality assurance approaches. A lack of prior use creates large capability gaps in request-for-proposal (RFP) teams, proposal teams, suppliers’ quality management systems (QMS), and in experienced personnel executing the early lifecycle approach. To create a more realizable on-ramp for using AS9145 in the space and defense sectors, the AIA JSQC task team created five deliverable requirements descriptions (DRDs) that can be used in a contract to begin to engage both parties in early lifecycle quality engineering and quality assurance activities, that reduce exposure to late-stage cost and schedule collapse due to unidentified risks in design, supply chain, and manufacturability. These DRDs drive the parties to engage in planning and analysis discussions early on to understand what production risks can be known and how they will focus resources based on safety criticality and the key elements of design and construction. The suppliers and acquirers who will produce the data and information required by the DRD will be able to incrementally evolve their QMS and the acquirer will incrementally be able to track and understand the benefits of cost shifting from late to early development phases. A white paper describing this approach and the five recommended DRDs will be published by the AIA in late 2024 or early 2025.

Jeannette Plante↗

Pursuing Cost Effective Tank Waste Characterization at the Savannah River Site - 16172

The U. S. Department of Energy Office of Environmental Management has tasked the Savannah River National Laboratory (SRNL) with developing strategies and technologies to understand, optimize, scale, and speed up tank waste characterization. This scope is part of a multi-year project with the end goal of implementing programmatic changes that accelerate tank waste processing and tank closure schedules, and at the same time reduce characterization costs, while maintaining data integrity. The project is currently in its second year. During the first year of the project, SRNL completed a series of activities focused on understanding the range of current characterization practices, needs, gaps, risks, and potential alternative approaches. Based on the results, conclusions were drawn regarding aspects of the programs that are most costly and time consuming; particular waste constituents that drive costs, schedule, and program risks; alternative characterization approaches (other than sampling and analysis) that are less expensive and more rapid; new laboratory methods holding the greatest promise for reducing characterization costs and schedule; and in whole, the primary areas where current characterization practices can be improved. SRNL's current scope is focusing on three primary activities: 1) development of a technical basis/strategy for improving the cost effectiveness and schedule of SRNL's tank closure characterization program; 2) design/assembly of hardware, plumbing, and software for automating select radiochemical separation and waste removal processes; and 3) development and testing of alternative radiochemical separation protocols most likely to improve high resource demand/time consuming analysis methods (such as Ra-226, Pa-231, Tc-99/I-129, and/or Y/trivalent actinide separations). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Medical Risk Estimates and Clinical Capability Needs for Artemis IV

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in- mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. METHODOLOGY: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for the Artemis IV mission. Artemis IV is currently scheduled for 2026 and will visit the Gateway space station in lunar orbit prior to the second lunar landing of the Artemis program. The baseline Artemis IV mission that was modeled was 28 days in duration with phases including Orion outbound, 4 days on the Gateway space station in lunar orbit, 2 crew on the surface of the Moon for approximately one week, an additional 5 days on Gateway, and then return to Earth. This baseline was compared to two alternative 34-day design reference missions (DRMs) that shifted the lunar sortie earlier or later in the mission profile. Assumptions included 2 female and 2 male crew and a notional medical system mass of 25 kg. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk. RESULTS: All three DRMs had very low probability of LOCL from medical conditions, primarily due to short duration. RTDC was also similar across the DRMs. In contrast, TTL was higher in the early lunar sortie DRM due to earlier occurrence of EVA-related medical conditions. Taken as a whole, there was no clinically significant difference in medical risk across the three missions. Results for clinical capabilities and an example medical equipment list will be discussed but were similar across DRMs.

D Hilmers↗

Preliminary Medical Risk Estimates and Clinical Capability Needs for Late Artemis Missions

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in- mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. METHODOLOGY: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for the Artemis IV mission. Artemis IV is currently scheduled for 2026 and will visit the Gateway space station in lunar orbit prior to the second lunar landing of the Artemis program. The baseline Artemis IV mission that was modeled was 28 days in duration with phases including Orion outbound, 4 days on the Gateway space station in lunar orbit, 2 crew on the surface of the Moon for approximately one week, an additional 5 days on Gateway, and then return to Earth. This baseline was compared to two alternative 34-day design reference missions (DRMs) that shifted the lunar sortie earlier or later in the mission profile. Assumptions included 2 female and 2 male crew and a notional medical system mass of 25 kg. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk. RESULTS: All three DRMs had very low probability of LOCL from medical conditions, primarily due to short duration. RTDC was also similar across the DRMs. In contrast, TTL was higher in the early lunar sortie DRM due to earlier occurrence of EVA-related medical conditions. Taken as a whole, there was no clinically significant difference in medical risk across the three missions. Results for clinical capabilities and an example medical equipment list will be discussed but were similar across DRMs.

D. Hilmers↗

Secure Distributed Energy Resource Communications (sDERC)

The slides will be presented at a DOE CESER Peer Review for the Risk Management Tools and Technology (RMT) that provide an overview of the sDERC project. The slides discuss the project plan for this new project and how the results will be demonstrated at the conclusion of this project. The peer review is scheduled for August 27-29.

Chavez, Adrian R.↗

GPS Navigation for the Magnetospheric Multi-Scale Mission

In 2014. NASA is scheduled to launch the Magnetospheric Multiscale Mission (MMS), a four-satellite formation designed to monitor fluctuations in the Earth's magnetosphere. This mission has two planned phases with different orbits (1? x 12Re and 1.2 x 25Re) to allow for varying science regions of interest. To minimize ground resources and to mitigate the probability of collisions between formation members, an on-board orbit determination system consisting of a Global Positioning System (GPS) receiver and crosslink transceiver was desired. Candidate sensors would be required to acquire GPS signals both below and above the constellation while spinning at three revolutions-per-minute (RPM) and exchanging state and science information among the constellation. The Intersatellite Ranging and Alarm System (IRAS), developed by Goddard Space Flight Center (GSFC) was selected to meet this challenge. IRAS leverages the eight years of development GSFC has invested in the Navigator GPS receiver and its spacecraft communication expertise, culminating in a sensor capable of absolute and relative navigation as well as intersatellite communication. The Navigator is a state-of-the-art receiver designed to acquire and track weak GPS signals down to -147dBm. This innovation allows the receiver to track both the main lobe and the much weaker side lobe signals. The Navigator's four antenna inputs and 24 tracking channels, together with customized hardware and software, allow it to seamlessly maintain visibility while rotating. Additionally, an extended Kalman filter provides autonomous, near real-time, absolute state and time estimates. The Navigator made its maiden voyage on the Space Shuttle during the Hubble Servicing Mission, and is scheduled to fly on MMS as well as the Global Precipitation Measurement Mission (GPM). Additionally, Navigator's acquisition engine will be featured in the receiver being developed for the Orion vehicle. The crosslink transceiver is a 1/4 Watt transmitter utilizing a TDMA schedule to distribute a science quality message to all constellation members every ten seconds. Additionally the system generates one-way range measurements between formation members which is used as input to the Kalman filter. In preparation for the MMS Preliminary Design Review (PDR), the Navigator was required to pass a series of Technology Readiness Level (TRL) tests to earn the necessary TRL-6 classification. The TRL-6 level is achieved by demonstrating a prototype unit in a relevant end-to-end environment. The IRAS unit was able to meet all requirements during the testing phase, and has thus been TRL-6 qualified

Bamford, William↗

Evaluating commercial feasibility of a new tall wind tower design concept using a stochastic levelized cost of energy model

Wind power generation has seen a dramatic increase in the 21st century and the Department of Energy (DOE) envisions that wind energy will become a much larger part of overall power generation in the U.S. by 2050. Wind turbines have continued to grow in size during the last few decades with towers commonly built at a height of 80 m for typical utility-scale turbines in the Unites States, and this is accompanied by certain transportation and logistics challenges. The newly proposed tall tower technology has been designed to be cost-effective in assembling towers as high as 140 m from precast concrete module components that are capable of transport on the U.S. road system. This paper presents an alternative wind tower design with potential for reducing the overall levelized cost of energy (LCOE); it evaluates a hexagonal precast concrete wind tower solution that facilitates use of a taller wind turbine generator for harvesting stronger, steadier, and more frequent wind resources to increase wind energy production and lower the overall LCOE. An integrated team of industry experts was consulted to support development of a stochastic life cycle cost model using a parametric estimate of the cost and fabrication and assembly schedules of this new wind tower design concept as well as forecasting the projected revenue to be created by the new technology. The study concludes that this new design concept is a commercially viable solution, with an estimated LCOE savings ranging from 2% to 4% compared with the typical 80 m turbine deployed in the United States, and it also provides wind power potential to previously untapped regions in the country. This article helps to inform energy developers, manufacturers, and policy makers, both regionally and nationally, of a possible economically feasible wind tower design solution.

17 WIND ENERGY↗

High Performance Computing Facility Operational Assessment, FY 2011 Oak Ridge Leadership Computing Facility

Oak Ridge National Laboratory's Leadership Computing Facility (OLCF) continues to deliver the most powerful resources in the U.S. for open science. At 2.33 petaflops peak performance, the Cray XT Jaguar delivered more than 1.5 billion core hours in calendar year (CY) 2010 to researchers around the world for computational simulations relevant to national and energy security; advancing the frontiers of knowledge in physical sciences and areas of biological, medical, environmental, and computer sciences; and providing world-class research facilities for the nation's science enterprise. Scientific achievements by OLCF users range from collaboration with university experimentalists to produce a working supercapacitor that uses atom-thick sheets of carbon materials to finely determining the resolution requirements for simulations of coal gasifiers and their components, thus laying the foundation for development of commercial-scale gasifiers. OLCF users are pushing the boundaries with software applications sustaining more than one petaflop of performance in the quest to illuminate the fundamental nature of electronic devices. Other teams of researchers are working to resolve predictive capabilities of climate models, to refine and validate genome sequencing, and to explore the most fundamental materials in nature - quarks and gluons - and their unique properties. Details of these scientific endeavors - not possible without access to leadership-class computing resources - are detailed in Section 4 of this report and in the INCITE in Review. Effective operations of the OLCF play a key role in the scientific missions and accomplishments of its users. This Operational Assessment Report (OAR) will delineate the policies, procedures, and innovations implemented by the OLCF to continue delivering a petaflop-scale resource for cutting-edge research. The 2010 operational assessment of the OLCF yielded recommendations that have been addressed (Reference Section 1) and where appropriate, changes in Center metrics were introduced. This report covers CY 2010 and CY 2011 Year to Date (YTD) that unless otherwise specified, denotes January 1, 2011 through June 30, 2011. User Support remains an important element of the OLCF operations, with the philosophy 'whatever it takes' to enable successful research. Impact of this center-wide activity is reflected by the user survey results that show users are 'very satisfied.' The OLCF continues to aggressively pursue outreach and training activities to promote awareness - and effective use - of U.S. leadership-class resources (Reference Section 2). The OLCF continues to meet and in many cases exceed DOE metrics for capability usage (35% target in CY 2010, delivered 39%; 40% target in CY 2011, 54% January 1, 2011 through June 30, 2011). The Schedule Availability (SA) and Overall Availability (OA) for Jaguar were exceeded in CY2010. Given the solution to the VRM problem the SA and OA for Jaguar in CY 2011 are expected to exceed the target metrics of 95% and 90%, respectively (Reference Section 3). Numerous and wide-ranging research accomplishments, scientific support, and technological innovations are more fully described in Sections 4 and 6 and reflect OLCF leadership in enabling high-impact science solutions and vision in creating an exascale-ready center. Financial Management (Section 5) and Risk Management (Section 7) are carried out using best practices approved of by DOE. The OLCF has a valid cyber security plan and Authority to Operate (Section 8). The proposed metrics for 2012 are reflected in Section 9.

99 GENERAL AND MISCELLANEOUS↗

MAN-004 Design Standards Manual

At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates.

42 ENGINEERING↗

Sandia National Laboratories Facilities Management and Operations Center Design Standards Manual

At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates. You must convey all documents describing work to the SNL/NM Project Manager in both hard copy and in an electronic format compatible with the SNL/NM-prescribed CADD and other software packages, and in accordance with a SNL/NM approved standard format. Print all hard copy versions of submitted documents (excluding drawings and renderings) double-sided when practical.

42 ENGINEERING↗

SNL/CA Facilities Management Design Standards Manual

At Sandia National Laboratories in California (SNL/CA), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/CA applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule.

42 ENGINEERING↗

Achieving spectrum conservation for the minimum-span and minimum-order frequency assignment problems

Effective and efficient solutions of frequency assignment problems assumes increasing importance as the radiofrequency spectrum experiences ever increasing utilization by diverse communications services, requiring that the most efficient use of this resource be achieved. The research presented explores a general approach to the frequency assignment problem, in which such problems are categorized by the appropriate spectrum conserving objective function, and are each treated as an N-job, M-machine scheduling problem appropriate for the objective. Results obtained and presented illustrate that such an approach presents an effective means of achieving spectrum conserving frequency assignments for communications systems in a variety of environments.

Heyward, Ann O.↗