Search NASA⌕ Search

SEARCH · Search NASA

Results for “appendix”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Federal Workplace Charging Program Guide

The 2015 Fixing America's Surface Transportation (FAST) Act authorizes the installation, operation, and maintenance of electric vehicle supply equipment (EVSE) for the purpose of recharging employees' privately owned vehicles (POVs) under the custody or control of the General Services Administration (GSA) or a Federal agency. It requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment and imposes reporting requirements. This program guide reviews those requirements, excerpts the relevant language in Appendix A, and describes when and how fees may be required to cover costs of electricity, network costs, EVSE units, and installations in various scenarios. This program guide is designed to support Federal agencies developing and refining workplace charging programs for employee POVs. While it provides guidance and best practices, it does not replace agencywide policies or agency-specific legal counsel. It contains a roadmap for agency workplace charging programs and defines roles and responsibilities. This guide explains how to determine the number of POVs likely to charge at a given site and contains a sample employee survey in Appendix B. It reviews EVSE planning, including unit selection and acquisition, charger location(s), accounting for available power capacity, using existing infrastructure, and funding an incentive program. It also discusses the costs associated with EVSE acquisition, installation, and network management. These costs inform the subsequently provided information, which describes how to amortize costs to determine appropriate fees for each charging session. The final two sections of this guide address aspects of ongoing program management that the facility coordinator should consider and the reporting requirements associated with the FAST Act. The insights in this guide are applicable to all agency-owned and GSA-leased buildings or facilities offering the use of EVSE or a 120-volt receptacle for the purpose of recharging an employee's POV. However, the FAST Act requirements typically do not apply to any building or facility operated and maintained by a third-party vendor offering the use of EVSE as part of a commercial building lease unless the agency is managing the station and/or energy on behalf of the building and collecting POV fees.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of the Well-to-Wake Life Cycle Assessment Model for Marine Fuels in R&D GREET 2025

The Marine analysis capabilities in the 2025 Research and Development Greenhouse gases, Regulated Emissions, and Energy use in Technologies (R&D GREET) have been updated to incorporate the latest findings from the Fourth International Maritime Organization (IMO) GHG Study.1 To support these updates and enhance user flexibility, the former single marine module used in previous R&D GREET versions has been split into two workbook tabs: The Marine_Fuel tab, which covers the fuel-cycle, and the Marine_Trip tab, which covers the trip-cycle. In the Marine_Fuel tab, fuel cycle results for 39 marine fuels are available—assuming a slow speed diesel engine—and can be seen in Appendix A. However, there are options for changing feedstocks for multiple fuels, ability to view results with or without pilot fuels for fuels such as methanol and ammonia, and carbon capture options. All these combinations make the number of total possible pathways over one hundred. For each pathway, life cycle emission results are divided into feedstock, conversion, and combustion categories, along with pilot fuel supply chain emissions for fuels used in dual fuel engines. In the newly created Marine_Trip tab, users can view the life cycle emissions of using these fuels from a trip perspective. Compared to R&D GREET 2024, 16 new types of vessels are added in R&D GREET 2025. Examples of results assuming the default size for each vessel type are available in Appendix A. Additional information categories on vessels are included such as vessel size, main propulsion type, engine power rating, combustion cycle, etc. based on the Fourth IMO GHG Study. Operational mode of the trip, fuel consumption, and load calculation were updated based on the report. The fuel consumption calculation also incorporates low-load adjustment, speed–power correction, weather correction, and fouling correction factors. Furthermore, fuel consumption in boilers or steam turbines is also added for the first time, besides fuel use in main propulsion engines and auxiliary engines. This effort makes the R&D GREET Marine capabilities more robust than before. Users will be able to estimate fuel consumption more accurately for more diverse choices of vessel categories, vessel sizes, and energy converters.

09 BIOMASS FUELS↗

Engineered Solutions Group's SMR Containment Cable and Electrical Penetration Assembly System

GAIN Project CRADA Number NFE-21-08839, entitled “SMR Containment Cable and EPA System” was initiated by the partnership of Oak Ridge National Laboratory (ORNL) and Engineered Solutions Group (ESG) to test an ESG-designed Electrical Penetration Assembly and Containment Cabling System Qualified for not only legacy LWR designs, but also Small Modular Reactors designs currently being designed by several different suppliers. This project was undertaken to fill the equipment gap of EPA and Cabling Systems that require much more severe environmental requirements than legacy plant applications present due to their smaller containment volumes that result in high energy densities compared to legacy designs. This high energy density results in severe accident environments and more severe normal operating conditions as well. We developed two approaches to qualify Electrical Penetration Assembly (EPA) and Containment Cabling Systems for SMRs and Advanced Reactors. We take into consideration the more severe environmental parameters found with SMR designs. The system will need to meet a qualification test program addressing wear/cyclic aging, potential radiation exposure, thermal aging, vibration aging, thermal cycling, seismic qualification, electrical fault testing (per IEEE 317) and accident simulation. The equipment must meet the requirements of 10CFR50.49, GDC 50 in 10CFR50 Appendix A, and 10CFR50 Appendix J. NRC Regulatory Guides (RGs) identify an acceptable way of meeting regulatory requirements. RGs frequently endorse a standard for meeting these requirements. Specific to this review, equipment would be qualified in accordance with the following IEEE Standards. • IEEE 317-2013 (Electrical Penetration Assemblies), which is endorsed by RG 1.63, Rev. 3, • IEEE 323-2003 and the more current IEC/IEEE 60780-323 (Environmental Qualification of 1E Equipment) which is endorsed by RG 1.89. IEEE 323-2003 is endorsed by RG 1.209, • IEEE 344-2020 (Seismic Qualification. The 2013 version endorsed by RG 1.100, Rev. 4, with exceptions), • IEEE 383-2015 (Electrical Cables) (which is endorsed by RG 1.189 Rev. 4 and the -2003 version endorsed by RG 1.211 rev. 0), • IEEE 572-2019 (Electrical Connectors and Assemblies), which is endorsed by 1.156 Rev 1, and • [IEEE 1202 (endorsed by RG 1.189) would normally be applicable but the advanced cable designs are impervious to this cable flame test.] The primary goal of such a program is to provide an EPA design that can meet the qualification requirements for all legacy light water reactor plants currently operating as well as new plant designs including light water Small Modular Reactors. Thus, these requirements are applicable to plants licensed under 10CFR50 and 10CFR52. Other reactor designs may be evaluated, and this test system and qualification method applied to those applications if the requirements would satisfy the requirements of the intended plant. A secondary benefit of this work is to document some of the history and background in these requirements as there have been recent delays in an SMR licensing process due to NRC Requests for Additional Information in this subject matter area.

42 ENGINEERING↗

Software Quality Assurance Plan ANSYS LSDYNA Version 2023R1

ANSYS Inc. develops and markets engineering simulation software and services used in the aerospace, automotive, manufacturing, electronics, biomedical, energy, defense, and many other industries. ANSYS is dedicated to engineering simulation and is the world’s leading software provider. ANSYS was founded in 1970 and is headquartered in Canonsburg, Pennsylvania. ANSYS provides an engineering analysis tool combining structural, thermal, computational fluid dynamics, acoustic and electromagnetic simulation capabilities. ANSYS LS-DYNA is the most used explicit simulation program capable of simulating the response of materials to short periods of severe loading. Its many elements, contact formulations, material models, and other controls can be used to simulate complex models with control over all the details of the problem. ANSYS LS-DYNA has a vast array of capabilities to simulate extreme deformation problems using its explicit solver. Engineers can tackle simulations involving material failure and look at how the failure progresses through a part or through a system. Models with large amounts of parts or surfaces interacting with each other are also easily handled, and the interactions and load passing between complex behaviors are modeled accurately. Using computers with higher numbers of CPU cores can drastically reduce solution times. In addition, many consulting firms and hundreds of universities use ANSYS for analysis, research, and educational purposes. ANSYS is recognized worldwide as one of the most widely used and capable programs of its type. ANSYS has successfully passed over 100 customer quality system audits against American Society of Mechanical Engineers (ASME) NQA-1 and 10 CFR Part 50, Appendix B, since the company was founded, over 60 of which have been since 1997. ANSYS has successfully passed over 100 International Organization for Standardization (ISO) 9001 assessments. ANSYS design analysis software is the first created within a quality system with ISO 9001 certification, which is the internationally accepted quality standard. Product development, testing, maintenance, and support processes also meet the US Nuclear Regulatory Commission’s (NRC’s) quality requirements, as they have for nearly four decades. ANSYS staff perform more than 60,000 software verification tests before releasing each new product. ASME NQA-1-2012 (Subpart 2.7 is specific to software) is the industry- and NRC-accepted approach (consensus standard) for meeting 10 CFR Part 50, Appendix B, requirements.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Y-12 National Security Complex Biological Monitoring and Abatement Program—2024 Calendar Year Report

This report provides the results of the CY 2024 sampling of East Fork Poplar Creek (EFPC) as part of the Y-12 National Security Complex (Y-12) Biological Monitoring and Abatement Program (BMAP). The results are presented in the context of historical trends. The Y-12 BMAP was developed in 1985 to demonstrate that the effluent limits established for Y-12 protected the classified uses of the receiving stream, particularly the growth and propagation of aquatic life (Loar et al. 1989). Over the years, the BMAP has become an important and valuable long-term measure of stream conditions resulting from actions and activities at the Y-12 Complex. The BMAP currently consists of three tasks: (1) bioaccumulation monitoring, (2) benthic macroinvertebrate community monitoring, and (3) fish community monitoring. The benthic macroinvertebrate community monitoring task includes studies to evaluate the receiving stream’s biological integrity annually in comparison with Tennessee Water Quality Criteria following Tennessee Department of Environment and Conservation (TDEC) protocols. In addition to presenting the EFPC biological monitoring results, this report includes results from Comprehensive Environmental Response, Compensation, and Liability Act–funded BMAP programs in Bear Creek and McCoy Branch (presented in Appendixes A and B, respectively), as required in the Y-12 National Pollutant Discharge Elimination System (NPDES) permit. Additional biological testing at the Y-12 Complex includes toxicity testing of select storm drains as required in the NPDES permit. Although toxicity testing is not formally part of the BMAP, toxicity testing results from 2024 are provided in Appendix C.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of New Additions to OLI Software in Predicting Mercuric and Mercurous Species in Liquid Waste Operations

Speciation of mercury during the pretreatment steps of tank waste processing is critical to successful mercury removal prior to vitrification during Liquid Waste Operations (LWO) at SRS. OLI software has been used to predict mercury speciation and activity throughout LWO. The OLI software operates based on a thermodynamic framework called the Mixed Solvent Electrolyte (MSE) framework. The MSE framework allows prediction in theoretically infinitely dilute to concentrated mixtures (e.g., purely solute solutions). Before modification to the MSE framework databanks, certain critical mercury species were missing in the MSE databank, and some thermodynamic data needed to be updated for the OLI software to accurately predict mercury chemical species in SRS waste tanks. To better reflect streams across LWO, new mercury species were integrated into the MSE database. To evaluate the changes to the OLI MSE framework per the Technical Task Request (TTR) and the Task Technical and Quality Assurance Plan (TTQAP), waste stream compositions from Tanks 38, 43, and Tank 50 decontaminated salt solution (DSS) were used as model inputs. Models were developed and executed using both the old and new databases. Compositional analyses from caustic Tank 50 DSS and caustic Tanks 38 and 43 were used as the input streams. These streams represent the most comprehensive chemical data sets where both mercury and tank constituents were measured together. Results for Tank 50 DSS predict HgO as the predominant species in both databases. Both methyl and dimethyl Hg species are present when the new database is ‘on’ and are not predicted with the new database turned ‘off’. The new database predicts a greater amount of HgO and a greater fraction of it in the solid phase. Pourbaix diagrams (potential vs. pH) generated for each Tank 50 DSS were identical regardless of which database was used. Elemental Hg and HgO were predicted in the water stable region under basic conditions. Tanks 38 and 43 follow similar trends as the Tank 50 DSS models. Unlike Tanks 38 and 50 DSS, the Tank 43 Pourbaix plot shows a region of stability for an aqueous HgOHCO3 - species between approximately pH 7-11. In all streams, when MeHg+ is included in the inputs, the new database predicts aqueous MeHgOH as the dominant species. If elemental or dimethyl mercury is in the waste stream, the new database model predicts they are unchanged and remain in those states and quantities. Additionally, the total mercury values are reported for both the measured input data and the OLI output data for all considered tanks. The summary indicates that the percentage error between the measured and calculated values is less than 1% in all cases The reconciliations and generation of the Pourbaix diagrams for Tank 50 DSS took approximately ten times longer with the new database ‘on’. In addition, over the course of that time, models with the new database ‘on’ were more likely to crash or display an error. Some modest performance improvements were noted when modeling with an i7 processor versus an i5. An example error is found in Appendix A. Furthermore, Appendix B provides V&V for two chemical systems analyzed with the OLI software, results were satisfactory. It is recommended to utilize the new databases (i.e., HCO.ddb and SR-Hg.ddb) in future Savannah River Mission Completion applications of OLI to represent pseudo steady-state. Furthermore, the integration and utilization of the new databases (i.e., HCO.ddb and SR-Hg.ddb) in modeling applications (e.g., Aspen) is also recommended.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Moving Beyond Drop-In Replacements: Performance-Advantaged Biobased Chemicals Workshop Summary Report

BETO held the Moving beyond Drop-In Replacements: Performance-Advantaged Biobased Chemicals Workshop on June 1, 2017, in Denver, Colorado. Approximately 90 stakeholders attended, representing companies, national laboratories, government agencies, and academic institutions. A list of workshop attendees who agreed to share their contact information can be found in Appendix A. The breakdown of stakeholders is shown in Figure 3 below. The day began with a keynote presentation from Nichole Fitzgerald of BETO to give participants an overview of the Office’s current work on functional replacements, as well as to outline the goals of the workshop. This was followed by two keynote presentations from industry representatives—Dale McIntyre (Behr Masco) and Michael Saltzberg (DuPont Industrial Biosciences)—on their current work with performance-enhanced biobased chemicals. Participants then attended two breakout sessions in smaller groups to provide feedback. In the afternoon, a third and final keynote—given by Dr. Brent Shanks (Center for Biorenewable Chemicals, Iowa State University)— covered potential strategies for targeting future research in this area, followed by a final breakout session on the same topic. A detailed agenda can be found in Appendix B.

09 BIOMASS FUELS↗

PPPL Report on Reduced Modeling of Fusion Alpha Transport in ARC Burning Plasmas

We are reporting on the modeling of fusion alpha particle transport in the planned ARC fusion device being designed by the CFS (Commonwealth Fusion Systems: https://cfs.energy). The ARC tokamak is designed to operate in a burning-plasma regime characterized by a substantial population of fusion-born alpha particles. Alfvén eigenmode (AE) stability is assessed both analytically and numerically, incorporating alpha-particle drive, ion Landau, and radiative damping from thermal species and collisional damping from trapped electrons. Regions of unstable and near-threshold AE activity are mapped across ARC’s operational parameter space. Linear stability analysis with NOVA indicates multiple, often marginally unstable AEs, extending to toroidal mode numbers up to n= 30. The present report focuses on the ARC flat-top operating point prior to the sawtooth event. Alpha-particle transport on timescales exceeding the neoclassical slowing-down time is assessed using the NUBEAM module [1][2] of the TRANSP code [3], employing transport coefficients derived from the RBQ quasilinear modeling (cf. Appendix B). These global simulations identify favorable and unfavorable operating regimes with respect to alpha confinement, pressure redistribution, and overall alpha-heating efficiency. We also evaluate additional transport mechanisms—including neoclassical tearing mode (TM)–induced stochasticity, sawtooth-driven redistribution, and toroidal-field ripple using the kick model (cf. Appendix C) which makes use of the guiding-center code ORBIT, see Section 5. The kick model is integrated into TRANSP to enable self-consistent predictions of alpha-driven current formation and sustainment within the ARC scenario. Sensitivity scans are performed over the mode frequency, rational-surface alignment, island width, mode amplitude, and proximity of the limiter to the plasma. Our study provides an initial, physics-based guidance for machine design, operational planning, and equilibrium control, ensuring adequate alpha confinement and robust self-heating performance in ARC. Our simulations mostly targeted worst case scenarios, e.g. for TMs and sawteeth. Overall, we expect benign effects for the ARC scenario investigated in this work on fusion alpha confinement and losses in the presence of AEs, tearing modes and sawteeth. This report addresses three thrusts identified at the outset. The first thrust focuses on analytic estimates of the parametric dependencies of EP relaxation based on local AE stability simulations (Section 3). The second thrust involves global evaluations of AE stability using the NOVA, RBQ, and NUBEAM codes (Section 4). Finally, we investigate alpha-particle transport driven by low-frequency instabilities associated with sawteeth and tearing modes (Section 5).

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 546: Injection Well and Surface Releases Nevada Test Site, Nevada, Revision 0, with ROTCs 1-2

This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 546, Injection Well and Surface Releases, at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended February 2008). Corrective Action Unit (CAU) 546 is comprised of two corrective action sites (CASs): • 06-23-02, U-6a/Russet Testing Area • 09-20-01, Injection Well The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation for closure of CAU 546. To achieve this, corrective action investigation (CAI) activities were performed from May 5 through May 28, 2008, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 546: Injection Well and Surface Releases, Nevada Test Site, Nevada (NNSA/NSO, 2008). The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether a contaminant of concern is present at a given CAS. • Determine whether sufficient information is available to evaluate potential corrective action alternatives at each CAS. The CAU 546 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Because DQO data needs were met, and corrective actions have been implemented, it has been determined that no further corrective action (based on risk to human receptors) is necessary for the CAU 546 CASs. The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • No further corrective actions are needed for CAU 546 CASs. • No Corrective Action Plan is required. • A Notice of Completion to the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 546. • Corrective Action Unit 546 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order. Analytes detected during the CAI were evaluated against final action levels established in this document. No analytes were detected at concentrations exceeding final action levels. However, contaminants of concern were presumed to be present in the subsurface soil at CAS 09-20-01. Therefore, the corrective action of close in place was selected as the preferred alternative for this CAS. Potential source material was removed from CAS 06-23-02; therefore, the corrective action of clean closure was selected as the preferred alternative at this CAS.

54 ENVIRONMENTAL SCIENCES↗

HANFORD DOUBLE SHELL TANK THERMAL AND SEISMIC PROJECT BUCKLING EVALUATION METHODS AND RESULTS FOR THE PRIMARY TANKS

This report documents a detailed buckling evaluation of the primary tanks in the Hanford double-shell waste tanks (DSTs), which is part of a comprehensive structural review for the Double-Shell Tank Integrity Project. This work also provides information on tank integrity that specifically responds to concerns raised by the Office of Environment, Safety, and Health (ES&H) Oversight (EH-22) during a review of work performed on the double-shell tank farms and the operation of the aging waste facility (AWF) primary tank ventilation system. The current buckling review focuses on the following tasks: (1) Evaluate the potential for progressive anchor bolt failure and the appropriateness of the safety factors that were used for evaluating local and global buckling. The analysis will specifically answer the following questions: (a) Can the EH-22 scenario develop if the vacuum is limited to -6.6-inch water gage (w.g.) by a relief valve? (b) What is the appropriate factor of safety required to protect against buckling if the EH-22 scenario can develop? (c) What is the appropriate factor of safety required to protect against buckling if the EH-22 scenario cannot develop? (2) Develop influence functions to estimate the axial stresses in the primary tanks for all reasonable combinations of tank loads based on detailed finite element analysis. The analysis must account for the variation in design details and operating conditions between the different DSTs. The analysis must also address the imperfection sensitivity of the primary tank to buckling. (3) Perform a detailed buckling analysis to determine the maximum allowable differential pressure for each of the DST primary tanks at the current specified limits on waste temperature, height, and specific gravity. Based on the concrete anchor bolt loads analysis and the small deformations that are predicted at the unfactored limits on vacuum and axial loads, it is very unlikely that the EH-22 scenario (i.e., progressive anchor bolt failure leading to global buckling of the tank under increased vacuum) could occur. After releasing Revision 0 of this report, an independent review of the Double Shell Tanks (DST) Thermal and Operating Loads Analysis (TaLA) combined with the Seismic Analysis was conducted by Dr. Robert P. Kennedy of RPK Structural Mechanics Consulting and Dr. Anestis S. Veletsos of Rice University. Revision I was then issued to address their review comments (included in Appendix D). Additional concerns involving the evaluation of concrete anchor loads and allowables were found during a second review by Drs. Kennedy and Veletsos (see Appendix G). Extensive additional analysis was performed on the anchors, which is detailed by Deibler et al. (2008a, 2008b). The current report (Revision 2) references this recent work, and additional analysis is presented to show that anchor loads do not concentrate significantly in the presence of a local buckle.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Independent Validation and Verification of Process Design and Optimization Technology Diagnostic and Control of Natural Gas Fired Furnaces via Flame Image Analysis Technology

The United States Department of Energy, Industrial Technologies Program has invested in emerging Process Design and Optimizations Technologies (PDOT) to encourage the development of new initiatives that might result in energy savings in industrial processes. Gas fired furnaces present a harsh environment, often making accurate determination of correct air/fuel ratios a challenge. Operation with the correct air/fuel ratio and especially with balanced burners in multi-burner combustion equipment can result in improved system efficiency, yielding lower operating costs and reduced emissions. Flame Image Analysis offers a way to improve individual burner performance by identifying and correcting fuel-rich burners. The anticipated benefit of this technology is improved furnace thermal efficiency, and lower NOx emissions. Independent validation and verification (V&V) testing of the FIA technology was performed at Missouri Forge, Inc., in Doniphan, Missouri by Environ International Corporation (V&V contractor) and Enterprise Energy and Research (EE&R), the developer of the technology. The test site was selected by the technology developer and accepted by Environ after a meeting held at Missouri Forge. As stated in the solicitation for the V&V contractor, 'The objective of this activity is to provide independent verification and validation of the performance of this new technology when demonstrated in industrial applications. A primary goal for the V&V process will be to independently evaluate if this technology, when demonstrated in an industrial application, can be utilized to save a significant amount of the operating energy cost. The Seller will also independently evaluate the other benefits of the demonstrated technology that were previously identified by the developer, including those related to product quality, productivity, environmental impact, etc'. A test plan was provided by the technology developer and is included as an appendix to the summary report submitted by Environ (Appendix A). That plan required the V&V contractor to: (1) Establish the as-found furnace operating conditions; (2) Tune the furnace using currently available technology to establish baseline conditions; (3) Tune the furnace using the FIA technology; and (4) Document the improved performance that resulted from application of the FIA technology. It is important to note that the testing was not designed to be a competition or comparison between two different methodologies that could be used for furnace tuning. Rather, the intent was to quantify improvements in furnace performance that could not be achieved with existing technology. Therefore, the measure of success is improvement beyond the furnace efficiency obtainable using existing furnace optimization methods rather than improvement from the as found condition.

03 NATURAL GAS↗

Closure Report for Corrective Action Unit 130: Storage Tanks Nevada Test Site, Nevada, Revision 0

This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 130: Storage Tanks, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 130 are located within Areas 1, 7, 10, 20, 22, and 23 of the Nevada Test Site. Corrective Action Unit 130 is comprised of the following CASs: • 01-02-01, Underground Storage Tank • 07-02-01, Underground Storage Tanks • 10-02-01, Underground Storage Tank • 20-02-03, Underground Storage Tank • 20-99-05, Tar Residue • 22-02-02, Buried UST Piping • 23-02-07, Underground Storage Tank This CR provides documentation supporting the completed corrective action investigations and provides data confirming that the closure objectives for CASs within CAU 130 were met. To achieve this, the following actions were performed: • Reviewed the current site conditions, including the concentration and extent of contamination. • Implemented any corrective actions necessary to protect human health and the environment. • Properly disposed of corrective action and investigation-derived wastes. From August 4 through September 30, 2008, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 130, Storage Tanks, Nevada Test Site, Nevada. The purposes of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, confirm that no residual contamination is present, and properly dispose of wastes. Constituents detected during the closure activities were evaluated against final action levels to identify COCs for CAU 130. Assessment of the data generated from closure activities indicates that no further action is necessary because no COCs were identified at any CAU 130 CAS. Debris removal from these CASs was considered a best management practice because no contamination was detected. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • No further corrective action is required at all CAU 130 CASs. • A Notice of Completion to DOE, National Nuclear Security Administration Nevada Site Office, is requested from the Nevada Division of Environmental Protection for closure of CAU 130. • Corrective Action Unit 130 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.

54 ENVIRONMENTAL SCIENCES↗

Idaho Natural Production Monitoring and Evaluation : Annual Progress Report February 1, 2007 - January 31, 2008.

Populations of anadromous salmonids in the Snake River basin declined precipitously following the construction of hydroelectric dams in the Snake and Columbia rivers. Raymond (1988) documented a decrease in survival of emigrating steelhead trout Oncorhynchus mykiss and Chinook salmon O. tshawytscha from the Snake River following the construction of dams on the lower Snake River during the late 1960s and early 1970s. Although Raymond documented some improvements in survival through the early 1980s, anadromous populations remained depressed and declined even further during the 1990s (Petrosky et al. 2001; Good et al. 2005). The effect was disastrous for all anadromous salmonid species in the Snake River basin. Coho salmon O. kisutch were extirpated from the Snake River by 1986. Sockeye salmon O. nerka almost disappeared from the system and were declared under extreme risk of extinction by authority of the Endangered Species Act (ESA) in 1991. Chinook salmon were classified as threatened with extinction in 1992. Steelhead trout were also classified as threatened in 1997. Federal management agencies in the basin are required to mitigate for hydroelectric impacts and provide for recovery of all ESA-listed populations. In addition, the Idaho Department of Fish and Game (IDFG) has the long-term goal of preserving naturally reproducing salmon and steelhead populations and recovering them to levels that will provide a sustainable harvest (IDFG 2007). Management to achieve these goals requires an understanding of how salmonid populations function (McElhany et al. 2000) as well as regular status assessments. Key demographic parameters, such as population density, age composition, recruits per spawner, and survival rates must be estimated annually to make such assessments. These data will guide efforts to meet mitigation and recovery goals. The Idaho Natural Production Monitoring and Evaluation Project (INPMEP) was developed to provide this information to managers. The Snake River stocks of steelhead and spring/summer Chinook salmon still have significant natural reproduction and thus are the focal species for this project's investigations. The overall goal is to monitor the abundance, productivity, distribution, and stock-specific life history characteristics of naturally produced steelhead trout and Chinook salmon in Idaho (IDFG 2007). We have grouped project tasks into three objectives, as defined in our latest project proposal and most recent statement of work. The purpose of each objective involves enumerating or describing individuals within the various life stages of Snake River anadromous salmonids. By understanding the transitions between life stages and associated controlling factors, we hope to achieve a mechanistic understanding of stock-specific population dynamics. This understanding will improve mitigation and recovery efforts. Objective 1. Measure 2007 adult escapement and describe the age structure of the spawning run of naturally produced spring/summer Chinook salmon passing Lower Granite Dam. Objective 2. Monitor the juvenile production of Chinook salmon and steelhead trout for the major population groups (MPGs) within the Clearwater and Salmon subbasins. Objective 3. Evaluate life cycle survival and the freshwater productivity/production of Snake River spring/summer Chinook salmon. There are two components: update/refine a stock-recruit model and estimate aggregate smolt-to-adult survival. In this annual progress report, we present technical results for work done during 2007. Part 2 contains detailed results of INPMEP aging research and estimation of smolt-to-adult return rates for wild and naturally produced Chinook salmon (Objectives 1 and 3). Part 3 is a report on the ongoing development of a stock-recruit model for the freshwater phase of spring/summer Chinook salmon in the Snake River basin (Objective 3). Part 4 is a summary of the parr density data (Objective 2) collected in 2007 using the new site selection procedure. Data are maintained in computer databases housed at the IDFG Nampa Fisheries Research office (described in the Appendix) and are available from the first author. Other project accomplishments during 2007 (e.g., professional presentations) are also summarized in the Appendix.

13 HYDRO ENERGY↗

Closure Report for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada, Revision 0

This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor and radium-226. A corrective action was implemented to remove approximately 50 cubic yards of PCB-contaminated soil, approximately 1 cubic foot of radium-226 contaminated soil (and scabbled asphalt), and a high-efficiency particulate air filter that was determined to meet the criteria of a potential source material (PSM). Electrical and lighting components (i.e., PCB-containing ballasts and capacitors) and other materials (e.g., mercury-containing thermostats and switches, lead plugs and bricks) assumed to be PSM were also removed from Building 2201, as practical, without the need for sampling. Because the COC contamination and PSMs have been removed, clean closure of CAS 26-41-01 is recommended, and no use restrictions are required to be placed on this CAU. No further action is necessary because no other contaminants of potential concern were found above preliminary action levels. The physical end state for Building 2201 is expected to be eventual demolition to slab. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Clean closure is the recommended corrective action for CAS 26-41-01 in CAU 117. • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 117. • Corrective Action Unit 117 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.

54 ENVIRONMENTAL SCIENCES↗

Nevada Test Site National Emission Standards for Hazardous Air Pollutants Calendar Year 2008

The Nevada Test Site (NTS) is operated by the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office. From 1951 through 1992, the NTS was the continental testing location for U.S. nuclear weapons. The release of radionuclides from NTS activities has been monitored since the initiation of atmospheric testing. Limitation to under-ground detonations after 1962 greatly reduced radiation exposure to the public surrounding the NTS. After nuclear testing ended in 1992, NTS radiation monitoring focused on detecting airborne radionuclides from historically contaminated soils. These radionuclides are derived from re-suspension of soil (primarily by winds) and emission of tritium-contaminated soil moisture through evapotranspiration. Low amounts of tritium were also emitted to air at the North Las Vegas Facility (NLVF), an NTS support complex in the city of North Las Vegas. To protect the public from harmful levels of man-made radiation, the Clean Air Act, National Emission Standards for Hazardous Air Pollutants (NESHAP) (Title 40 Code of Federal Regulations [CFR] Part 61 Subpart H) (CFR, 2008a) limits the release of radioactivity from a U.S. Department of Energy facility (e.g., the NTS) to 10 millirem per year (mrem/yr) effective dose equivalent to any member of the public. This limit does not include radiation not related to NTS activities. Unrelated doses could come from naturally occurring radioactive elements or from other man-made sources such as medical treatments. The NTS demonstrates compliance with the NESHAP limit by using environmental measurements of radionuclide air concentrations at critical receptor locations. This method was approved by the U.S. Environmental Protection Agency for use on the NTS in 2001 and has been the sole method used since 2005. Six locations on the NTS have been established to act as critical receptor locations to demonstrate compliance with the NESHAP limit. These locations are actually pseudo-critical receptor stations, because no member of the public actually resides at these onsite locations. Compliance is demonstrated if the measured annual average concentration of each detected radionuclide at each of these locations is less than the NESHAP Concentration Levels (CLs) for Environmental Compliance listed in 40 CFR 61, Appendix E, Table 2 (CFR, 2008a). At any one location, if multiple radionuclides are detected then compliance with NESHAP is demonstrated when the sum of the fractions (determined by dividing each radionuclide's concentration by its CL and then adding the fractions together) is less than 1.0. In 2008, the potential dose from radiological emissions to air, from both current and past NTS activities, at onsite compliance monitoring stations was a maximum of 1.9 mrem/yr; well below the 10 mrem/yr dose limit. Air sampling data collected at all six pseudo-critical receptor stations had average concentrations of radioactivity that were a fraction of the CL values listed in Table 2 in Appendix E of 40 CFR 61 (CFR, 2008a). Concentrations ranged from less than 1 percent to a maximum of 19 percent of the allowed NESHAP limit. Because the nearest member of the public resides approximately 20 kilometers (12 miles) from the NTS boundary, concentrations at this location would be only a small fraction of that measured on the NTS. Potential dose to the public from NLVF was also very low at 0.00006 mrem/yr; more than 160,000 times lower than the 10 mrem/yr limit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 482: Area 15 U15a/e Muckpiles and Ponds Nevada Test Site

This Corrective Action Decision Document /Closure Report (CADD/CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 482 U15a/e Muckpiles and Ponds. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 482 is comprised of three Corrective Action Sites (CASs) and one adjacent area: CAS 15-06-01, U15e Muckpile; CAS 15-06-02, U15a Muckpile; CAS 15-38-01, Area 15 U15a/e Ponds; and Drainage below the U15a Muckpile. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure with no further corrective action, by placing use restrictions on the three CASs and the adjacent area of CAU 482. To support this recommendation, a corrective action investigation (CAI) was performed in September 2002. The purpose of the CAI was to fulfill the following data needs as defined during the Data Quality Objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If COCs are present, determine their nature and extent. (3) Provide sufficient information and data to determine appropriate corrective actions. The CAU 482 dataset from the CAI was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Tier 2 FALS were determined for the hazardous constituents of total petroleum hydrocarbons (TPH)-diesel-range organics (DRO) and the radionuclides americium (Am)-241, cesium (Cs)-137, plutonium (Pu)-238, and Pu-239. The Tier 2 FALs were calculated for the radionuclides using site-specific information. The hazardous constituents of TPH-DRO were compared to the PALs defined in the CAIP, and because none of the preliminary action levels (PALs) were exceeded, the PALs became the FALs. The radionuclide FALs were calculated using the Residual Radioactive (RESRAD) code (version 6.21). The RESRAD calculation determined the activities of all radionuclides that together would sum to an exposure dose of 25 millirem per year to a site receptor (based on their relative abundances at each CAS). Based on the field investigation, the following contaminants were determined to be present at concentrations exceeding their corresponding FALs: (1) CAS 15-06-01 - None. (2) CAS 15-06-02 - Cs-137 and Pu-239. (3) CAS 15-38-01 - Am-241, Cs-137, Pu-238, and Pu-239. (4) Drainage below CAS 15-06-02 - Cs-137 and Pu-239. Based on the data and risk evaluations, the DQO data needs presented in the Corrective Action Investigation Plan were met, and the data accurately represent the radiological and chemical risk present at CAU 482. Based on the results of the CAI data evaluation, it was determined that closure in place with use restrictions is the appropriate corrective action for CAU 482 and that use restrictions will effectively control exposure to future land users. This is based on the fact that even though the FALs were exceeded in a few samples, this remote, controlled access site poses only limited risk overall to public health and the environment. Given the relatively low levels of contamination present, it would create a greater hazard to worker safety, public health, and the environment to remove the contamination, transport it, and bury it at another location. Therefore, DTRA provides the following recommendations: (1) Close COCs in place at CAS 15-06-02, CAS 15-38-01, and the drainage below CAS 15-06-02 with use restrictions. (2) No further action for CAU 482. (3) A Notice of Completion be issued to DTRA by the Nevada Division of Environmental Protection for closure of CAU 482. (4) Move CAU 482 from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RESULTS FOR THE THIRD QUARTER 2009 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

This report details the chemical and radionuclide contaminant results for the characterization of the 2009 Third Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC). Information from this characterization will be used by Liquid Waste Operations (LWO) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System. Recently, a review of the radionuclide inventory in Saltstone Vaults 1 and 4 identified several additional radionuclides, not currently in the WAC, which require quantification ({sup 40}K, {sup 108m}Ag, {sup 133}Ba, {sup 207}Bi, {sup 227}Ac, {sup 228}Ra, {sup 228}Th, {sup 231}Pa, {sup 247}Cm, {sup 249}Cf, {sup 251}Cf). In addition, several of the radionuclides previously reported with minimum detection limits below the requirements listed in the WAC required analysis with reduced detection limits to support future inventory reporting requirements ({sup 22}Na, {sup 26}Al, {sup 59}Ni, {sup 94}Nb, {sup 106}Ru, {sup 144}Ce, {sup 152}Eu, {sup 155}Eu, {sup 226}Ra). This added scope was formally requested in a revision to the standing Technical Task Request for CY2009 Saltstone support and is further discussed in several supporting documents. The following conclusions are drawn from the analytical results provided in this report: (1) The concentrations of the reported chemical and radioactive contaminants are less than their respective WAC targets or limits unless noted in this section. (2) The reported detection limits for {sup 59}Ni, {sup 94}Nb, {sup 247}Cm, and {sup 249}Cf are above the limits requested by LWO; however, they are below the achievable limits established by Analytical Development (AD). (3) The reported detection limit of isopropanol is lower than its WAC Limit for accident analysis in Appendix 8.1, but higher than its WAC concentration given in Table 4 for vault flammability. The higher detection limit is expected based on current analytical capabilities and is documented in the Task Technical and Quality Assurance Plan (TTQAP). (4) The reported detection limit for Isopar L is lower than its WAC limit for accident analysis in Appendix 8.1 but higher than its WAC concentration given in Table 3 in reference to vault flammability. (5) Isopar L and Norpar 13 have limited solubility in aqueous solutions making it difficult to obtain consistent and reliable sub-samples. The values reported in this memo are the concentrations in the sub-sample as detected by the GC/MS; however, the results may not accurately represent the concentrations of these analytes in the Tank 50 sample received by SRNL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineered Materials for Cesium and Strontium Storage Final Technical Report

Closing the nuclear fuel cycle requires reprocessing spent fuel to recover the long-lived components that still have useful energy content while immobilizing the remnant waste fission products in stable forms. At the genesis of this project, next generation spent fuel reprocessing methods were being developed as part of the U.S. Department of Energy's Advanced Fuel Cycle Initiative. One of these processes was focused on solvent extraction schemes to isolate cesium (Cs) and strontium (Sr) from spent nuclear fuel. Isolating these isotopes for short-term decay storage eases the design requirements for long-term repository disposal; a significant amount of the radiation and decay heat in fission product waste comes from Cs-137 and Sr-90. For the purposes of this project, the Fission Product Extraction (FPEX) process is being considered to be the baseline extraction method. The objective of this project was to evaluate the nature and behavior of candidate materials for cesium and strontium immobilization; this will include assessments with minor additions of yttrium, barium, and rubidium in these materials. More specifically, the proposed research achieved the following objectives (as stated in the original proposal): (1) Synthesize simulated storage ceramics for Cs and Sr using an existing labscale steam reformer at Purdue University. The simulated storage materials will include aluminosilicates, zirconates and other stable ceramics with the potential for high Cs and Sr loading. (2) Characterize the immobilization performance, phase structure, thermal properties and stability of the simulated storage ceramics. The ceramic products will be stable oxide powders and will be characterized to quantify their leach resistance, phase structure, and thermophysical properties. The research progressed in two stages. First, a steam reforming process was used to generate candidate Cs/Sr storage materials for characterization. This portion of the research was carried out at Purdue University and is detailed in Appendix A. Steam reforming proved to be too rigorous for efficient The second stage of this project was carried out at Texas A&M University and is Detailed in Appendix B. In this stage, a gentler ceramic synthesis process using Cs and Sr loaded kaolinite and bentonite clays was developed in collaboration with Dr. M. Kaminski at Argonne National Laboratory.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗