Search NASA⌕ Search

SEARCH · Search NASA

Results for “procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Application of an AREVA Mobile Evaporator Design Used Successfully at NRC Licensed U.S. Commercial Nuclear Sites to Support Hanford Site Operations - 18134

The U.S. Department of Energy (DOE), Office of River Protection (ORP), manages the River Protection Project at the Hanford site in the South Eastern corner of Washington State in the Pacific Northwest of the United States. The mission of the River Protection Project is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. The Site Tank Operations Contractor (Washington River Protection Solutions (WRPS)) via its site operations teams creates additional space in the Double Shell Tanks (DSTs) using the site's only remaining operational evaporator - 242-A. The current 242-A Evaporator has long been identified as a potential single point of failure that in the event of a major breakdown, could significantly impact retrieval operations at the Hanford Site. Areva has experience both on the Hanford site as an integrated subcontractor to the mission and in the design, procurement and construction of a mobile forced circulation evaporator unit designed to be used on Nuclear Regulatory Commission commercial nuclear utility sites. The mobile unit has been used at the following nuclear power plants: SONGS, Salem, Davis Besse, Waterford and Palo Verde. It was designed to take spent Water-EDTA based chemical cleaning solvent and evaporate water off to reduce the volume of waste required to go through downstream processes. It was further designed to fit inside ISO shipping containers. A multi-step approach will be used to: 1. review lessons learned from the previous DOE study for deploying a mobile evaporator on the Hanford sit, 2. evaluate the proposed waste streams and the required throughput and waste arising, sizing the evaporator appropriately, 3. develop a concept design requirements document for the use of a customized evaporator to meet the Hanford need 4. Design, and build a mobile evaporator and 5. Test, install and commission at a site to be agreed with WRPS/DOE. With an overall budget for the approach described of around $35 m, an operational evaporator could be delivered to site in 18-24 months from the approval of a detailed design package. Potential befits include the elimination of the 242-A evaporator as a single point failure, the creation of additional DST tank space and the elimination of the need to stage waste at the 242-A evaporator by moving the mobile unit to a location where is could be deployed at or close to the tank such as in 200W. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adaptation of Commercially Available Robots for Conditioning and Packaging ILW at Sellafield - 18282

The Legacy Ponds and Silos at Sellafield site contain some of the most hazardous Intermediate Level Waste (ILW) in the UK. As part of a multi-billion pound decommissioning programme, this waste will be retrieved and transported across the site for conditioning and packaging in the Box Encapsulation Plant (BEP). Current plans are to commence plant active commissioning in 2022, which will represent a major milestone in the UK nuclear decommissioning programme. Within the plant, skips of waste will be transferred from the shielded transport package into standard 3 cubic metre ILW containers. Waste from the Pile Fuel Storage Pond and First Generation Magnox Storage Pond will be immobilised in cementitious grout before being transferred to an adjacent store. Waste from the Magnox Swarf Storage Silo will not be immobilised in grout, but will be packaged, providing multi-barrier containment. During the concept design, the project team selected commercially available robots as the most viable technology for carrying out the numerous dexterous and repetitive tasks involved in characterising, conditioning and packaging the waste within the shielded 'hot' cells. Significant technical challenges had to be overcome during the design to adapt a commercially available robot for use within a high radiation / high contamination environment, where human access is not safe even for short periods of time. These challenges included: - Designing robot assemblies that could be retrofitted into the existing cell structure that was constructed as part of an earlier project but never completed; - Designing robot assemblies that could be recovered to their 'transport' position without requiring manual intervention; - Designing robot assemblies that could be remotely removed and replaced with new ones if they failed part way through the plant operational life; - Designing through-wall service and power connections that allow maintenance and recovery; - Designing control systems and human-machine interfaces that enable both manual and automated operation of the robot, whilst avoiding collisions with the in-cell cranes and other in cell furniture; - Assessing the radiation tolerance of all items. Bespoke computer simulations and full-scale development trials have been carried out, using non-active test materials, in order to demonstrate the Technology Readiness Level (TRL) required by Sellafield Limited (SL) at each stage of the project [1]. The results of these trials have been recorded in both video and written form so that they can form part of the project's Knowledge Management database. Detailed designs and specifications for the robot assemblies have been updated to incorporate the recommendations from the development trials. Procurement and manufacture of robot assemblies has already commenced to deliver two waste handling robots, two waste container lidding / swabbing robots and associated critical spares. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 18327

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to cleanup radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever, built for radioactive waste processing. DOE is proceeding with its approach to complete the WTP Project in phases, which includes the following principal actions: - Completing construction of the Low-Activity Waste (LAW) Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB) (collectively referred to as LBL); - Implementing a direct-feed low-activity waste (DFLAW) process to treat low-activity waste independent of the Pretreatment (PT) Facility; - Resolving the technical issues associated with primarily the PT Facility; - Completing the design and construction of the High-Level Waste (HLW) and PT facilities to enable integrated WTP operations. In March 2016, a federal judge amended the 2010 Consent Decree 1 completion milestones for the Hanford WTP, which generally aligns with DOE's plans for completing the WTP facilities in sequence: - Complete LAW Facility hot commissioning: December 31, 2023; - Complete HLW Facility hot commissioning: December 31, 2033; - Complete PT Facility hot commissioning: December 31, 2033; - Achieve initial plant operations for the WTP: December 31, 2036. Having established milestones for completing the WTP facilities has enabled DOE to formally implement its plans for completing the WTP facilities in sequence, starting with the LAW Facility. In December 2016, DOE executed a contract modification and approved a change to the project's performance baseline to complete the LBL facilities and incorporate modifications needed to allow direct feed of low-activity waste to the LAW Facility. Significant progress has been made toward completing the design, construction, and planning for commissioning of the facilities needed to enable the DFLAW operations to commence as early as January 2022. In 2012, DOE partially suspended production work on the WTP's PT Facility and to a lesser degree the HLW Facility because of unresolved technical issues associated with those facilities. In September 2017, DOE acknowledged the WTP contractor had met all the criteria for full resumption of engineering, procurement, and construction (EPC) activities for the HLW Facility. By December 2017, DOE had completed the actions needed to resolve the six of the eight primary technical issues associated with the PT Facility, with the remaining two issues expected to be resolved in the first quarter of 2018. Although significant progress has been made to prepare for resuming production activities for the HLW and PT facilities, DOE has made the decision to constrain EPC work on those facilities in the near term based on DOE's higher priority of completing the WTP facilities needed to begin DFLAW operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Waste Disposal Strategies within the US Army Corps of Engineers FUSRAP - 18328

The U.S. Army Corps of Engineers' (USACE) highest priority is the protection of human health and the environment and public and worker safety during the cleanup, transportation, and disposal of Formerly Utilized Sites Remedial Action Program (FUSRAP) material. In addition to following all appropriate federal and state rules and regulations, the USACE has its own safety program that ensures that we are being protective. One aspect of the USACE FUSRAP is the radioactive waste disposal strategies that we must consider. The USACE will only dispose of FUSRAP material in a facility that is licenses/permitted to accept it. The estimated exposures to facility workers and members of the public from the permitted disposal of FUSRAP wastes is evaluated as part of this process. The USACE uses the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process to study and remediate FUSRAP sites. An evaluation is performed to decide whether it is best to manage the waste on-site or off-site and the requirements for disposal. The action selected must be protective of human health and the environment and must comply with regulations. When making the decision, there are several other factors taken into consideration including cost of the disposal and whether the public and state agencies support the action. Prior to determining disposal options, wastes must first be characterized. This involves an evaluation of both site history and analytical data. Determining the proper disposal requirements and subsequent disposal option involves: Characterizing the waste as stated above. This is important because there are several regulatory agencies which may oversee management of the waste. The US Nuclear Regulatory Commission, the US Environmental Protection Agency (US EPA), the US Department of Transportation, and state hazardous waste and/or radiation protection agencies may all have varying degrees of involvement. Identifying disposal requirements. Certain wastes must be disposed at licensed radioactive waste disposal facilities. Wastes containing US EPA regulated hazardous waste must be disposed at permitted hazardous waste disposal facilities. Certain wastes must be disposed at facilities licensed/permitted for both radioactive and hazardous waste. Some lower activity wastes may be accepted for disposal at other types of landfills. Considering acceptance criteria of the disposal facility. Radionuclides and/or hazardous constituents in the waste, as well as physical and chemical form of the waste, are evaluated to ensure they meet the acceptance criteria of the receiving facility's license and/or permit. If they don't, another disposal location must be used. Considering the accessibility and location of the disposal facility. Some facilities are able to accept shipments only by truck and others can accept material via railcar as well. The distance to a disposal facility impacts the risk of transportation accidents and efficient use of project resources such as the number of trucks required to perform the transportation. These factors are also important in evaluating whether material can be cost effectively shipped to a disposal facility. Evaluating the compliance status of the receiving facility. It is not assumed that just because a facility has a license or permit that it is acceptable for the USACE' waste. Prior to selecting a facility for disposal of FUSRAP waste, a site visit, audit and consultation with the US EPA is required to determine whether there are any known relevant violations at the facility. Facilities that have violations that negatively impact the USACE or US EPA approval of the facility are not used for disposal of FUSRAP waste. Once a facility is selected. The USACE procures contracts, or utilizes existing contracts, to facilitate the transportation and disposal action. Additionally, the USACE continues to consult with US EPA routinely to confirm the compliance status of the facility. Considering state acceptance of wastes to a facility. The USACE seeks to obtain written authorization from the facility state regulator indicating the action is compliant with existing licenses, permits, laws, and regulations. Each of these factors is considered by the USACE in selecting a FUSRAP disposal location. The goal is to provide safe, cost effective disposal which is protective of human health and the environment and which complies with all regulatory requirements. These steps all feed in to the disposal strategy consideration that USACE must go through for our FUSRAP waste streams. There are a number of challenges in the process to include In order to achieve the Congressional mandate of completing cleanup work under FUSRAP in a more cost effective, timely manner, while assuring protection of public health and safety. USACE must determine all disposal options that are available for the types of waste at each FUSRAP site. As a solution, completion of a disposal strategy document can help ensure this goal is met and will foster consistency across the FUSRAP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementing a Direct-Feed Low-Activity Waste Capability in the Hanford Waste Treatment Plant - 18332

The original design of the Waste Treatment and Immobilization Plant (WTP) requires that all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE) has developed a sequenced approach to completing the WTP Project, beginning with feeding some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. Sending low-activity waste from the tank farms to the LAW Facility is referred to as direct-feed LAW (DFLAW). Under this plan, low-activity waste will be pretreated in the Hanford tank farms for cesium and solids separation to meet LAW Facility waste acceptance criteria and produce an acceptable low-activity waste product. The waste feed will then be transferred to the LAW Facility where it will be immobilized in glass, poured into stainless steel containers, and then transported by truck to the Integrated Disposal Facility, a mixed low-level waste disposal site located in the Hanford 200 East Area. The DFLAW operation will deliver about 1 million gallons of double-shell tank waste for treatment each year of operation, and nominally produce 21 metric tons of immobilized low-activity waste glass per day. The resultant freed space in the double-shell tanks will support safe tank farm operations and staging of additional waste for treatment. In December 2016 DOE executed a contract modification and approved a change to the project's performance baseline to complete the LAW Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB) and incorporate modifications needed to allow direct feed of low-activity waste to the LAW Facility. The contract modification and revised performance baseline support completion and hot commissioning of WTP facilities needed for DFLAW operations is as early as January 2022. DOE has made significant progress on design, equipment procurements, and civil construction of modifications required to implement the DFLAW capability in the WTP, including progress on civil construction of a new effluent management facility, which will process secondary liquid waste resulting from LAW Facility vitrification operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robotic Cleaning of the Total Dissolved Solids Tanks at the Palo Verde Nuclear Generating Station - 18337

Westinghouse is executing a contract from Arizona Public Services to provide a system capable of removing highly radioactive sediment from eight Total Dissolved Solids (TDS) Tanks located at the Palo Verde Nuclear Generating Station. The scope of work covers the design, procurement, fabrication, and eventual operation of the system at the Palo Verde Site. It also includes the factory acceptance testing of the system, prior to operation at the site. Previous attempts to clean the tanks involved working inside and around the tanks for extended periods of time in a high radiation field. Spray hoses were used to wash down the sediment, and hand tools were used to scrape out the remaining sludge at the bottom. This methodology also required the lower manway to be removed. As a result, the worker radiation exposure limit was exceeded on the first of the nine tanks. As a solution to the high radiation environment of the TDS tanks, Westinghouse will provide and operate a pneumatically powered robotic crawler. This crawler traverses the bottom of the tank with a 4,000 psi high-pressure spray head affixed to the front of the crawler to blast sediment from the walls and floor of the TDS tanks. This paper will present the conceptual design of the TDS Tank cleaning system, noting the key benefits of specific components in the overall technology basis. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel reports session

This section brings together the reports of the 31 panel sessions listed below: - Avoiding the Human Capital Cliff in the DOE (PS22); - Implementing Technically-Based Cleanup; US DOE Balancing Regulatory and Fiscal Complexity (PS24); - United Kingdom - Remediation of Sellafield Legacy Ponds and Silos (PS25); - Aligning Decision-Making to Deliver Timely Results in Large Clean-up Programs (PS38); - Transition to Government Owned-Contractor Operated Site at Canadian Nuclear Laboratories (PS39); - Emerging Middle East Nuclear States' Status and Plans (PS40); - NPP Panel on Waste Management (PS41); - Robotics - International Innovations in Robotic Decommissioning Technology (PS43); - Fukushima Panel (1/2): Japan Fukushima Daiichi Decommissioning Update (PS54); - Fukushima Panel (2/2): Update on the Revitalization of Fukushima and the Surrounding Area (PS55); - US DOE LLW On-Site Disposal: LLW Disposal Facility Federal Review Group Review Process (PS56); - Challenges in DOE HLW Tank Management: Facility Start-up and Waste Disposition (PS57); - Waste Management Planning for Utility Small Modular Reactors (PS58); - US Nuclear Power Plant Waste Management - LLW Disposal Issues (PS59); - DOE-EM Robotics and Emerging Technologies Road-map (4/8) (PS60); - Graduating Students and New Scientists and Engineers - Wants and Needs - Are Companies Even Listening? (PS63); - U.S. Nuclear Robotics: Yesterday, Today, Tomorrow (5/8) (PS74); - US DOE Mixed Waste: Proposals for Dealing with Problematic Waste Streams and Policy Changes (PS76); - Current and Emerging US NRC LLW Regulatory Topics (PS77); - Agency Perspectives (US and International) on the Use of Risk and Dose Assessment Tools (PS80); - Progress on Deep Repository Programs Around the World (PS81); - US DOE Procurement and Contracting Opportunities (PS82); - Collaboration across Borders to Deliver Cleanup and Decommissioning Challenges (PS93a); - DOE Mission Success through Application of Practices and Solutions (PS94); - Challenges in Cask Certification - International Perspectives (PS96); - Robotics: Leveraging Innovations in Science and Technology to Benefit Safety Performance (PS98); - DOE Panel: DOE EM Featured Office - Portsmouth/Paducah Project Office (PS109); - Robotics: Lessons Learned from Industrial Robotics Deployment that can be Applied to the Nuclear Field (PS110a); - Roundtable: DOE Radioactive Management - Energy Facility Contractors Group - Waste Management Working Group (EFCOG WMWG) (PS118); - Thursday Topical Session 'Management of Used Nuclear Fuel: Will the United States Reengage and Align with International Efforts' (PS124); - Remotely Operated Vehicles for Emergency, Disaster, and Operational Upset Response (PS125)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOE Grand Junction Office Marks 75 Years of Contribution to the Nation's Defense Program - 18380

On July 26, 2016, the former US Department of Energy (DOE) Grand Junction Office was listed on the National Register of Historic Places in recognition of its important, historic roles in the Manhattan Project and the Cold War. The work done from Grand Junction, Colorado, was an important component of the nation's defense program; however, because of the classified nature of the work, little of this history was originally available to the public. In 1943, the privately-owned site that later became the Grand Junction Office was purchased by the US government for the Colorado Area Office for the US Army Corps of Engineers Manhattan Engineer District (MED). The Colorado Area Office's mission was to procure and process uranium as part of a nationwide effort to build an atomic bomb. This race to build a bomb ahead of Nazi Germany became known as the Manhattan Project. Approximately 14% of the uranium obtained for the Manhattan Project was from Colorado Plateau ore-the largest source of domestic uranium ore known at the time. Uranium extracted from vanadium mill tailings was concentrated into uranium oxide, or 'yellowcake,' and shipped by rail to a facility in Tonawanda, New York, for further refinement. At the conclusion of World War II, the military MED mission ended, and the Grand Junction site became the principal US Atomic Energy Commission (AEC) office for acquiring and exploring for domestic uranium. The Colorado Raw Materials Office's primary objective was to increase the stockpile of fissionable material as rapidly as possible. To do that, AEC incentivized private industry and invited individual prospectors to locate uranium ores on public lands of the Colorado Plateau. Seemingly overnight, the small city of Grand Junction was transformed into a booming, modern metropolis and the national center of uranium exploration. Program operations in Grand Junction later included those of the National Uranium Resource Evaluation (NURE) program, the Uranium Mill Tailings Radiation Control Act (UMTRCA), vicinity properties cleanup, decontamination and decommissioning, and long-term surveillance and maintenance of legacy sites. In 2001, DOE transferred most of the original Grand Junction 55.7-acre site to the Riverview Technology Corporation, a business-development nonprofit sponsored by Mesa County and the City of Grand Junction. The US Department of Energy Office of Legacy Management continues to operate from leased facilities onsite. The Office of Legacy Management will host the 2018 Long-Term Stewardship Conference in Grand Junction on August 20-23. Conference attendees are invited to participate in a special 75. anniversary celebration at the Grand Junction Office where they will have the opportunity to learn more about the office's historic past, its ongoing and expanding work, and its goals of informing future generations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovation in Contracting Strategy for a Master Services Agreement for Remediation of Low Level Radioactive Waste - 18381

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from several locations, including the Port Hope Harbour, a closed municipal landfill and approximately 800 residential properties. This complex project requires contracting the services of qualified, skilled and experienced environmental remediation contractors to meet the diverse needs of the myriad tasks that comprise the remediation and restoration of all properties. This paper will highlight how the CNL contracting services team developed an innovative approach to a contracting strategy designed to deliver the safe execution of work and keep the project on time and within budget. The approach addresses the complexities of a scope of work that consists of multiple work packages to be executed both concurrently and in tandem, and that require highly specialized trades/skills, as well as high-level project management expertise to ensure seamless coordination among the various contractors. The author will discuss CNL's strategy to engage the market with a Request for Expression of Interest to identify potential qualified suppliers and gauge their level of interest, issue a Request for Prequalification (RFPQ) to determine eligible contractors and, ultimately, issue a Request for Proposal for a Master Services Agreement (MSA) that would competitively evaluate each contractor's direct experience, technical expertise, quality management programs, safety systems compliance and track record. Using CNL's experience as a case study, the paper will highlight how an innovative approach can positively affect project timelines by describing how CNL addressed the challenge associated with the limited time available to implement procurement processes and deliver a series of executed agreements while ensuring that work would begin on time and key project milestones would be met. The author will summarize how CNL's strategy put the project back on schedule, without compromising the process guideline/requirements, and ensured that a qualified and experienced set of contractors, committed to a strong safety culture, will be available to perform the work required when the cleanup in the Port Hope community begins in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FUSRAP Case Study - Benefits and Lessons Learned from Implementation of a Modern Data Solution at Maywood - 18399

This paper focuses on data production and management practices dating back to 1999 that continue to evolve to support the project today. In 2000, the FUSRAP Maywood Project began using a software environmental data management system and laboratory information management system, developed by a single database administrator (DA) and authored in Microsoft Access{sup TM} (MS Access). The original databases included basic functionality including sample number assignment and label generation, tracking of LIMS gamma spec QC and assignment of basic qualifiers and basic database queries. The DA continued over the next fifteen years to refine the EDMS/LIMS by integrating project-specific data evaluation guidance document processes and Quality Assurance/Quality Control (QA/QC) charting and excursion warning tools. With the retirement of the original DA, the U.S. Army Corps of Engineers (USACE)-Cabrera Team procured and implemented a commercial-leaning solution using modern database tools and an established EDMS vendor. For the database transition process, the project team established and configured the new EDMS/LIMS with basic architecture and accessibility; evaluated existing workflows; established/revised LIMS and EDMS-related documentation (manuals and procedures); and conducted dry runs and validation testing. The overall team coordinated closely to facilitate a seamless transition from initial assessment and authoring, to data migration, and finally to resumption of normal ongoing operations. Key features of the new EDMS Subcontractor's software included lookup tables, an import wizard, data checking options and unique indexes. Since the database systems became operational, the technical staff gathered useful feedback from end users (e.g., lab staff, field engineers, task managers, and the third-party data validator) to refine the EDMS/LIMS operation. This feedback triggered improvements in the performance of onsite laboratory qualification forms, promoted consistency in sample ID numbers between the database sample planning screens and field chain-of-custodies, corrected bugs in the LIMS Duplicate Evaluation Report, eliminated data import issues such as blank, inconsistent or missing data from key fields. One of the advantages of the commercial database solution was that it allowed the project to cut cost over time due to the lower cost of database maintenance provided by the commercial database vendor versus the cost of an on-staff DA. Cost savings are estimated at $40,000 per year. There were also indirect cost savings resulting from implementation of the new database since it allowed better integration of the LIMS and EDMS. While there will always be challenges associated with long term records/data management for any old remediation site, the Maywood Team's approach to an upgraded EDMS/LIMS implementation serves as one element of the overall effort to enhance the integrity and reproducibility of critical data that supports the remediation program while at the same time, more effectively using available resources. These lessons-learned will enhance implementation of cost-effective solutions for similar environmental remediation sites. (authors)

97 MATHEMATICS AND COMPUTING↗

Oxidizer Testing on Alternative Absorbents for Los Alamos National Laboratory - 18656

In the summer of 2016, during glovebox operations in TA-55, cheesecloth, a cellulosic material, was used to clean up a small spill of 9.8 molar nitric acid (oxidizer). Because cellulosic materials and oxidizers are incompatible, this prompted a chemical compatibility evaluation of the waste in TA-55 to determine if this waste was Resource Conservation and Recovery Act (RCRA) ignitable waste (D001) or RCRA reactive waste (D003). After testing and consulting with the Carlsbad Field Office in Carlsbad (CBFO), Los Alamos National Laboratory (LANL) NPI-7 decided to look for alternative absorbents to use in the gloveboxes that would not create an incompatibility issue with an oxidizer. While small spills are infrequent, they do happen and LANL wanted to be proactive and search for a material that would be compatible with an oxidizer. In December 2016, LANL NPI-7 requested LANL-Carlsbad's (LANL-CO) Difficult Waste Team to perform compatibility testing on potential alternative wipes for disposal at the Waste Isolation Pilot Plant (WIPP). The purpose for testing was to meet the Operational Experience Level 3 (OE-3) requirements that states 'any proposed use of organic absorbents or engineered absorbents in combination with potentially oxidizing TRU waste, wet or dry, should be evaluated and approved by the National TRU Program, Carlsbad Field Office' [1]. LANL NPI-7 requested LANL-CO to perform these tests because they were the group that performed all of the oxidizer testing for CBFO for the Basis of Knowledge (BoK) [2]. LANL NPI-7 chose nine fabrics and KMI Zeolite to be tested. The testing in Carlsbad took approximately 2 months to prepare the procedures, test plans and for the procurement of items. The burn rate testing was done in accordance with the requirements discussed in the BoK and approved by the LANL-CO Difficult Waste Team. Each absorbent was tested for 1) capacity limiting tests, 2) verifying the non-oxidizer threshold concentration of the oxidizer and 3) establishing the non-oxidizer concentration based on the experimental results. The effect of rinsing cheesecloth samples that have absorbed an oxidizer was also tested [3]. The burn rate testing provided three potential alternative absorbents (Spilfyter Hazmat Sorbent SM Pads Premium, Kimtech Pure W4 Wipers and Polybenzimidazole (PBI) Staple fiber) that produced a non-oxidizer result as defined by the BoK. Two wipes Spilfyter Hazmat Sorbent SM Pads Premium and Kimtech Pure W4 Wipers were able to absorb the highest concentration of potassium nitrite and still produce a non-oxidizer. TA-55 has used Spilfyter Hazmat Sorbent SM Pads Premium for a number of years in several of the processes and has ordered Kimtech Pure W4 Wipers for use in the facility. PBI fabric passed at 25 wt. % solution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Perspectives on Previous DOE Transportation Acquisition Efforts - 19049

The Department of Energy (DOE) is planning for future large-scale transport of commercial Spent Nuclear Fuel (SNF) and High-Level Radioactive Waste (HLW) to eventual disposal and/or storage facilities. Various options for procuring transportation services are being evaluated. To inform this work, a review of past comments received on DOE transportation acquisition activities in the early 1990's through 2016 was conducted. Through the course of data collection, staff analyzed comments submitted from ten DOE initiatives from DoE's Office of Civilian Radioactive Waste Management (OCRWM) and DoE's Office of Nuclear Energy (DOE-NE). This paper summarizes and outlines key themes arising from these comments. Past issues identified by a wide variety of commenters (nuclear industry and cask vendors, nuclear utilities and purchasers, states, Tribes, local governments, rail carriers, nongovernmental organizations, trade organizations, engineering firms, and members of the public) were examined. These issues concerned DoE's activities to make maximum use of the private sector to transport and store SNF and HLW. The key themes analyzed include: Uniqueness of the Shipping Campaign, Views on Privatization, Industry Risk and Privatization, Unclear Roles and Responsibilities, and Responsibilities Recommended for DOE to Maintain. This paper concludes by discussing lessons that can be learned from analyzing these public comments and what that may mean moving forward in the U.S. radioactive waste management program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In Situ Cold-Spray Repair of Environmental Mission Infrastructure for Component Life Extension - 19424

Cold spray offers a potential option for performing in situ repair of U.S. Department of Energy (DOE) complex infrastructure critical to the Office of Environmental Management cleanup mission. Application to the DOE complex has the potential to reduce cost, schedule, and safety risk impacts associated with component failures and would negate the need to procure and construct replacement infrastructure. A concept and technical basis are presented for developing remotely deployable cold-spray systems for performing in situ repairs in hazardous environments such as nuclear waste tanks, piping, and process vessels to extend component service life or return critical infrastructure to service. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternative Impact Limiter Designs for Used/Spent Nuclear Fuel Transportation Casks - 19496

With the need to eventually transport used/spent nuclear fuel (UNF/SNF) from existing storage sites to a consolidated interim storage facility, disposal site, and/or recycling facility, a preliminary evaluation was performed by the University of North Carolina at Charlotte (UNCC) in collaboration with Orano to examine the feasibility of an alternate impact limiter design for Used/Spent Nuclear Fuel Transportation Casks. Many of the previous designs involved complex designs and in some cases, utilized scarce materials, which resulted in expensive impact limiter systems to build and procure. The objective of this evaluation was to examine the availability of alternative materials which could be potentially implemented in simpler designs and result in significant cost savings over some of the current impact limiters designs. The project was divided into three phases: (1) performance of a comprehensive survey of the energy absorbing properties of composite materials that have become available since the original impact limiter designs were licensed; (2) designing and modeling of an impact limiter capable of meeting the hypothetical accident conditions (HAC) identified in 10CFR71.73; and (3) testing of the new materials identified for use in the newly designed impact limiter and feeding this test date to model of the new impact limiter. To design and model the new impact limiter, a specific transportation cask system was selected which was the Orano TN MP187. This paper provides details of the three phases of the project and the estimated cost savings from the new impact limiters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EM Program Expectations on Implementation of DOE O 458: Radiation Protection of Public/Environment - 19553

DOE Order 458.1, Radiation Protection of the Public and Environment, was issued in 2011. DOE sites were given 18 months to implement. The revised Order promulgates requirements for property clearance actions and independent verification. DOE Order 458.1 allows for preapproved authorized limits for the clearance of property. However, when property with the potential to contain residual radioactive material does not meet preapproved authorized limits, an authorized limits package must be developed. The Order contains a range of requirements for demonstrating with reasonable assurance that dose constraints are met for any actual or likely future use of the property to be released. EM has developed a draft guidance document that provides the elements of an authorized limits package. These elements are used to review all authorized limits packages that are submitted to EM. Expected elements include property description and process knowledge documentation, current and likely future use, the conceptual site model, dose modeling methodologies, specific authorized limits, dose- or concentration-based constraints, collective dose estimate to the potentially exposed population, stakeholder communications, description of the As Low As Reasonably Achievable (ALARA) analysis, implementation plan, evaluation of difficult to assess surfaces, and independent verification plan. The draft guidance document also provides further explanation of the desired elements of an independent verification (IV) plan. An IV plan should describe the planning phase, implementation phase, assessment phase, and decision phase of an activity. The planning phase includes scope and cost, concurrent with cleanup contractor procurement, and review and approval of site radiological survey clearance program and IV program plans. The implementation phase assures sufficient collection of data and adjustment can be made as necessary. During the assessment phase, data and reports are reviewed, and coordination between the clean-up contractor and IV personnel occurs. A decision of whether or not the clearance actions need to be altered occurs during the decision phase. IV certification that the clearance action is complete also occurs during the decision phase. Issuance of the final guidance document is meant to improve the consultation process and minimize iterative interactions with EM. Standardizing and formalizing property clearance and IV actions also helps assure that cleanup actions are transparent and sustainable for future scrutiny. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dry Cask Shipments of ATR Spent Nuclear Fuel at INL - 19600

The High Load Charger (HLC) cask will be replacing the Advanced Test Reactor (ATR) spent fuel transfer cask that has been used at Idaho National Laboratory (INL) to wet-transfer spent ATR fuel elements from ATR to Idaho Nuclear Technology and Engineering Center (INTEC) in order to support future plans at both facilities. INTEC intends to discontinue use of the CPP-666 storage pools in compliance with the Idaho Settlement Agreement and the basins will no longer be available to store spent ATR fuel elements. In order to support the core-internals change out in 2021 for ATR, spent ATR fuel elements must be removed from the canal and shipped to INTEC. INL contractors will use the HLC cask for safe, dry transfer of spent Advanced Test Reactor (ATR) fuel elements between the ATR Complex managed by Battelle Energy Alliance, LLC and the Idaho Nuclear Technology and Engineering Center (INTEC) managed by Fluor Idaho, LLC. The HLC cask (also known as the High Load Charging Cask or High Load Charger) is a lead-shielded, stainless steel transfer container originally designed in 1954 by the Idaho Nuclear Corporation to meet the radiation and contamination controls requirements of the time for shipment of spent nuclear fuel. The cask has been modified over the years and is currently used for wet-to-dry transfers at INTEC. It is approved only for out-of-commerce transfers. The cask will arrive at the ATR where eight spent ATR fuel elements will be loaded into two, newly-designed buckets. Each bucket is a quarter section, right-cylinder shape that has four compartments. The cask will be lifted out of the ATR canal allowing most of the water to drain from the cask. Processing the 12,500 kg cask will be completed in ATR and then transported on a tractor trailer to INTEC where the loaded buckets will be removed from the cask. The loaded buckets will undergo a drying process before placing the four buckets into a canister for long-term storage in the Irradiated Fuel Storage Facility (IFSF) at INTEC. A new transportation plan that was submitted to, and approved by, the U.S. Department of Energy to provide the cask safety basis, which describes the hazard analysis and accident analysis for the cask during transport. Supporting accident analysis include criticality, thermal, dose, and drop analyses. Of particular interest for this cask was the drop analysis from which was derived the speed limit for the transport. The drop analysis addressed drops in air onto an unyielding surface and in water onto an energy-absorbing pad for the cask in the ATR facility. These analyses are typically applied as the bounding drop scenarios during transport; however, this resulted in a safety basis speed limit of 12.9 kph. In order to more accurately represent the in-transit accident scenario, LS-DYNA software was procured and the model was updated to more closely represent the potential drop heights and impact surfaces of asphalt and soil for the cask while in transit. This analysis resulted in a safety basis speed limit of 48 kph. This safety basis speed limit is more practical to implement and control. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Retrieval and Management of TRU Sludge at Hanford K-Basin - 19641

At the US Department of Energy Hanford site, the K-East and K-West reactor fuel storage basins (KE or KW Basin) were used in the 1970's and 1980's to store more than 100,000 uranium fuel rods and rod fragments that had been irradiated in the Hanford N Reactor. Approximately 2,100 metric tons of spent nuclear fuel that had been stored in the KW Basin were removed in 2004. Over time a mixture of small fuel corrosion particles, fuel rod metal fragments, and other debris accumulated in the KW Basin from the degradation of the spent nuclear fuel during storage. This is the source of the TRU sludge stored in the KW Basin. The corrosion products mixed with windblown sand, concrete dust, and other debris in the basin to form what is known as sludge. In 2006/2007 KE Basin sludge of similar origin as the KW Basin was transferred to KW Basin. Approximately 27 m{sup 3} of highly radioactive sludge was collected and consolidated underwater in six specially designed engineered containers. The mission of the Hanford Sludge Treatment Project (STP) is to develop and deploy technologies to safely retrieve, transport, and interim store the approximately 27 m{sup 3} of remote-handled transuranic (RH-TRU) sludge that is stored in the KW Basin. After extensive technology development, testing (with a bounding range of simulants), design, and procurement a sludge removal and storage system called the Engineered Container Retrieval and Transfer System (ECRTS) completed acceptance testing in 2018. The ECRTS system is designed to remotely retrieve and transport high density, highly erosive, uranium metal pieces as well as small low-density particles. The ECRTS system includes a retrieval tool based on the XAGO{sup tm} design from the United Kingdom, a heavily modified positive displacement pump, a hose-in-hose transfer system, a Sludge Transport and Storage Container (STSC), a settling and decant system, and a shielded transport system. The first sludge transfer was successfully completed on June 12, 2018 proving that the ECRTS process equipment worked as intended on the actual sludge. Three batches (i.e. transfer and decant) were required to obtain a ∼ 100% fill of the first STSC. The STSC was then transported to the on-site storage facility. Over 20 STSCs will be filled with RH-TRU sludge over approximately 16 months. This paper will discuss the issues and successes associated with this project including the operational aspects of this new system. Experience gained from this successful project should assist anyone with the need to retrieve and manage remote handled sludge from fuel storage basins. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

History and Status of DoE's Standardized Canister - 19657

The U.S. Department of Energy (DOE) is responsible for managing spent nuclear fuel (SNF) currently in its possession, as well as SNF that will come into its possession in the future. DOE will rely upon the standardized canister to confine radionuclides and precluding the moderator in order to ensure safe, long-term management and disposition of SNF in its possession. This strategy helps minimize characterization costs (i.e., funds and exposure) and other technical challenges associated with the traditional approach of relying on fuel-specific properties to demonstrate compliance with the regulator. The use of the standardized canister offers the following benefits: - The standardized canister design is complete. It has been tested under a variety of drop and accident scenarios and was subsequently licensed under 10 CFR 72 as a storage system as part of the Foster Wheeler Environmental Corporation (FWENC) Facility. It is also part of the license submittal for Yucca Mountain. - There is high confidence that the standardized canister design can be stored within commercially-available storage casks and licensed as part of a transportation-system package. - A robust standardized canister simplifies accident analyses and does not rely on characterization of the contained waste. This simplifies safety analysis, provides a greater level of confidence with stakeholders and reduces cost and risk. - A common design for the associated packaging, closure, and loadout facilities results in significant savings. - The DOE standardized canister would simplify design efforts, procurement, and fabrication. - Standardizing handling activities and associated training, procedures, equipment, and tooling leads to enhanced safety and surety of operations. The standardized canister is the preferred package for these materials. It withstood scrutiny by the Yucca Mountain Repository License Application, the Nuclear Regulatory Commission's (NRC) Advisory Committee on Nuclear Waste, the Nuclear Waste Technical Review Board, an American Society of Mechanical Engineers peer review, and the FWENC storage license application. This evaluation summarizes and documents the status of the design and rationale for the DOE standardized canister, and outlines remaining needs before deployment. In addition, it discusses the factors that have the potential to influence storage, transportation, and disposal of DOE SNF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗