Search NASA⌕ Search

SEARCH · Search NASA

Results for “testing facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Scaling Studies for Advanced High Temperature Reactor Concepts, Final Technical Report: October 2014—December 2017

Computer simulations of nuclear reactor thermal-hydraulic phenomena are often used in the design and licensing of nuclear reactor systems. In order to assess the accuracy of these computer simulations, computer codes and methods are often validated against experimental data. This experimental data must be of sufficiently high quality in order to conduct a robust validation exercise. In addition, this experimental data is generally collected at experimental facilities that are of a smaller scale than the reactor systems that are being simulated due to cost considerations. Therefore, smaller scale test facilities must be designed and constructed in such a fashion to ensure that the prototypical behavior of a particular nuclear reactor system is preserved. The work completed through this project has resulted in scaling analyses and conceptual design development for a test facility capable of collecting code validation data for the following high temperature gas reactor systems and events— 1. Passive natural circulation core cooling system, 2. pebble bed gas reactor concept, 3. General Atomics Energy Multiplier Module reactor, and 4. prismatic block design steam-water ingress event. In the event that code validation data for these systems or events is needed in the future, significant progress in the design of an appropriate integral-type test facility has already been completed as a result of this project. Where applicable, the next step would be to begin the detailed design development and material procurement. As part of this project applicable scaling analyses were completed and test facility design requirements developed. Conceptual designs were developed for the implementation of these design requirements at the Oregon State University (OSU) High Temperature Test Facility (HTTF). The original HTTF is based on a ¼-scale model of a high temperature gas reactor concept with the capability for both forced and natural circulation flow through a prismatic core with an electrical heat source. The peak core region temperature capability is 1400°C. As part of this project, an inventory of test facilities that could be used for these experimental programs was completed. Several of these facilities showed some promise, however, upon further investigation it became clear that only the OSU HTTF had the power and/or peak temperature limits that would allow for the experimental programs envisioned herein. Thus the conceptual design and feasibility study development focused on examining the feasibility of configuring the current HTTF to collect validation data for these experimental programs. In addition to the scaling analyses and conceptual design development, a test plan was developed for the envisioned modified test facility. This test plan included a discussion on an appropriate shakedown test program as well as the specific matrix tests. Finally, a feasibility study was completed to determine the cost and schedule considerations that would be important to any test program developed to investigate these designs and events.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Wave Energy Research, Testing and Demonstration Center

The purpose of this project was to build upon the research, development and testing experience of the Northwest National Marine Renewable Energy Center (NNMREC) to establish a non-grid connected open-ocean testing facility for wave energy converters (WECs) off the coast of Newport, Oregon. The test facility would serve as the first facility of its kind in the continental US with a fully energetic wave resource where WEC technologies could be proven for west coast US markets. The test facility would provide the opportunity for self-contained WEC testing or WEC testing connected via an umbilical cable to a mobile ocean test berth (MOTB). The MOTB would act as a “grid surrogate” measuring energy produced by the WEC and the environmental conditions under which the energy was produced. In order to realize this vision, the ocean site would need to be identified through outreach to community stakeholders, and then regulatory and permitting processes would be undertaken. Part of those processes would require environmental baseline studies and site analysis, including benthic, acoustic and wave resource characterization. The MOTB and its myriad systems would need to be designed and constructed.The first WEC test at the facility with the MOTB was completed within this project with the WET-NZ device in summer 2012. In summer 2013, the MOTB was deployed with load cells on its mooring lines to characterize forces on mooring systems in a variety of sea states. Throughout both testing seasons, studies were done to analyze environmental effects during testing operations. Test protocols and best management practices for open ocean operations were developed. As a result of this project, the non-grid connected fully energetic WEC test facility is operational, and the MOTB system developed provides a portable concept for WEC testing. The permitting process used provides a model for other wave energy projects, especially those in the Pacific Northwest that have similar environmental considerations. While the non-grid connected testing facility provides an option for WEC developers to prove their technology in a fully-energetic wave environment, the absence of grid connection is somewhat of a limitation. To prove that their technology is commercially viable, developers seek a multi-year grid connected testing option. To address this need, NNMREC is developing a companion grid connected test facility in Newport, Oregon, where small arrays of WECs can be tested as well.

16 TIDAL AND WAVE POWER↗

25th Space Simulation Conference. Environmental Testing: The Earth-Space Connection

Topics covered include: Methods of Helium Injection and Removal for Heat Transfer Augmentation; The ESA Large Space Simulator Mechanical Ground Support Equipment for Spacecraft Testing; Temperature Stability and Control Requirements for Thermal Vacuum/Thermal Balance Testing of the Aquarius Radiometer; The Liquid Nitrogen System for Chamber A: A Change from Original Forced Flow Design to a Natural Flow (Thermo Siphon) System; Return to Mercury: A Comparison of Solar Simulation and Flight Data for the MESSENGER Spacecraft; Floating Pressure Conversion and Equipment Upgrades of Two 3.5kw, 20k, Helium Refrigerators; Affect of Air Leakage into a Thermal-Vacuum Chamber on Helium Refrigeration Heat Load; Special ISO Class 6 Cleanroom for the Lunar Reconnaissance Orbiter (LRO) Project; A State-of-the-Art Contamination Effects Research and Test Facility Martian Dust Simulator; Cleanroom Design Practices and Their Influence on Particle Counts; Extra Terrestrial Environmental Chamber Design; Contamination Sources Effects Analysis (CSEA) - A Tool to Balance Cost/Schedule While Managing Facility Availability; SES and Acoustics at GSFC; HST Super Lightweight Interchangeable Carrier (SLIC) Static Test; Virtual Shaker Testing: Simulation Technology Improves Vibration Test Performance; Estimating Shock Spectra: Extensions beyond GEVS; Structural Dynamic Analysis of a Spacecraft Multi-DOF Shaker Table; Direct Field Acoustic Testing; Manufacture of Cryoshroud Surfaces for Space Simulation Chambers; The New LOTIS Test Facility; Thermal Vacuum Control Systems Options for Test Facilities; Extremely High Vacuum Chamber for Low Outgassing Processing at NASA Goddard; Precision Cleaning - Path to Premier; The New Anechoic Shielded Chambers Designed for Space and Commercial Applications at LIT; Extraction of Thermal Performance Values from Samples in the Lunar Dust Adhesion Bell Jar; Thermal (Silicon Diode) Data Acquisition System; Aquarius's Instrument Science Data System (ISDS) Automated to Acquire, Process, Trend Data and Produce Radiometric System Assessment Reports; Exhaustive Thresholds and Resistance Checkpoints; Reconfigurable HIL Testing of Earth Satellites; FPGA Control System for the Automated Test of MicroShutters; Ongoing Capabilities and Developments of Re-Entry Plasma Ground Tests at EADS-ASTRIUM; Operationally Responsive Space Standard Bus Battery Thermal Balance Testing and Heat Dissipation Analysis; Galileo - The Serial-Production AIT Challenge; The Space Systems Environmental Test Facility Database (SSETFD), Website Development Status; Simulated Reentry Heating by Torching; Micro-Vibration Measurements on Thermally Loaded Multi-Layer Insulation Samples in Vacuum; High Temperature Life Testing of 80Ni-20Cr Wire in a Simulated Mars Atmosphere for the Sample Analysis at Mars (SAM) Instrument Suit Gas Processing System (GPS) Carbon Dioxide Scrubber; The Planning and Implementation of Test Facility Improvements; and Development of a Silicon Carbide Molecular Beam Nozzle for Simulation Planetary Flybys and Low-Earth Orbit.

Packard, Edward↗

Scaling for Nuclear Reactor System: Overview

A scaling analysis is essential for predicting the behavior of a reactor system under various operating conditions, as well as for ensuring safe and reliable experimentation and adequate dataset generation for supporting the system code model development and assessment in accordance with USNRC guidelines 1.203. Testing and modeling can be carried out at various scales, from small test units to full-scale reactors, to validate the predictions produced by the analysis. However, due to the cost and challenges associated with full-scale testing, the nuclear industry uses scaled test facilities—integral effect test (IET) and separate effect test (SET)—to identify potential design issues and optimize the design to ensure regulatory compliance for safer operation and anticipated accident management. In general, IET facilities are non-nuclear thermal hydraulics test facilities. In contrast, SET facilities can be non-nuclear testing (e.g., steam generator, containment, pump system SETs) and nuclear testing (mostly fuel-material irradiation testing). IETs are used to study the system-level thermal-hydraulic behavior of the reactor coolant system (RCS) under different anticipated operational occurrences (AOOs) and design basis accidents (DBAs) such as loss-of-coolant-accident (LOCA) and loss-of-power (i.e., station blackout) and loss-of-flow (i.e., failure of RCS pump). Several LOCA scenarios could happen in reactor DBAs, such as main steam line break (MSLB), SG tube rapture (SGTR), break in direct vessel injection (DVI), and other small breaks LOCA. Scaling analysis determines the appropriate size and operating conditions for the test facility. This involves analyzing the system's thermal-hydraulic behavior at different scales and identifying the key parameters that affect the thermal-hydraulic behavior of the reactor. These key parameters can be identified so that the scaled facility can replicate the expected conditions in a prototypical setting. The scaled facility can simulate the same flow rates, pressure gradients, heat transfer coefficients, and fluid properties as the prototype. Scaling analysis is used to ensure that the results from these tests can be scaled up to predict the behavior of a full-scale prototype with an acceptable range of scaling distortions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Description of the PMAD systems test bed facility and data system

The power management and distribution (PMAD) systems test bed facility, including the power sources and loads available, is discussed, and the PMAD data system (PDS) is described. The PDS controls the test-bed facility hardware, and monitors and records the electric power system control data bus and external data. The PDS architecture is discussed, and each of the subsystems is described.

Trase, Larry↗

Polarized Photocathode R&D for Future Linear Collliders

It is a challenge to generate full charge electrons from the electron sources without compromising polarization for the proposed ILC and CLIC. It is essential to advance polarized photocathodes to meet the requirements. SLAC has worldwide unique dedicated test facilities, Cathode Test System and dc-Gun Test Laboratory, to fully characterize polarized photocathodes. Recent systematic measurements on a strained-well InAlGaAs/AlGaAs cathode at the facilities show that 87% polarization and 0.3% QE are achieved. The QE can be increased to {approx}1.0% with atomic hydrogen cleaning. The surface charge limit at a very low current intensity and the clear dependence of the polarization on the surface charge limit are observed for the first time. On-going programs to develop photocathodes for the ILC and CLIC are briefly introduced.

08 HYDROGEN↗

Polarized Photocathode R and D for Future Linear Colliders

It is a challenge to generate full charge electrons from the electron sources without compromising polarization for the proposed ILC and CLIC. It is essential to advance polarized photocathodes to meet the requirements. SLAC has worldwide unique dedicated test facilities, Cathode Test System and dc-Gun Test Laboratory, to fully characterize polarized photocathodes. Recent systematic measurements on a strained-well InAlGaAs/AlGaAs cathode at the facilities show that 87% polarization and 0.3% QE are achieved. The QE can be increased to approx1.0% with atomic hydrogen cleaning. The surface charge limit at a very low current intensity and the clear dependence of the polarization on the surface charge limit are observed for the first time. Ongoing programs to develop photocathodes for the ILC and CLIC are briefly introduced.

43 PARTICLE ACCELERATORS↗

Oak Ridge 25URC Tandem Accelerator 2007 SNEAP Lab Report

During FY 2008, the 25URC operated for slightly over 3,000 research hours. The radioactive species 80Ge and 17,18F accounted for 763 of these hours. This included an experiment using 17F which was only possible due to an improvement of a factor of 50 in beam intensity over our previous facility record. Twenty stable beam species were provided this year. Operation for the experimental program was at terminal potentials from 2.02 to 23.8 MV. Approximately 200 hours of conditioning were done to return the machine to operation after tank openings. There were six tank openings during the year: three scheduled for general maintenance and three unscheduled. Two of the unscheduled openings were required to correct shorting rod issues and the other was to reestablish communication with one of the major dead sections. On July 28, an event happened that caused all accelerators at the Holifield Radioactive Ion Beam Facility (HRIBF) to suspend operation. At approximately 8 AM on that Monday, during operations with approximately 12 {micro}A of 50-MeV protons on a uranium carbide target, delivering neutron-rich 81Zn beam to the new Low-energy Radioactive Ion Beam Spectroscopy Station (LeRIBSS), a radiological control technician (RCT) reported higher than normal radiation levels just outside the shield door to the IRIS1 vault (the room in which RIBs are produced at HRIBF). The measured dose rate equivalent was 4 mrem/hr. The presence of radiological contamination on the floor just outside the shield door was subsequently noted, as was the possible presence of airborne radioactivity. These observations were reported to facility management. Accelerators were put in standby immediately and the building evacuated. The event was declared a laboratory operational emergency. Parts of the building were cleared for reentry to collect belongings on Monday afternoon. The entire building was cleared for reoccupation on Tuesday morning after a detailed radiological survey found no contamination outside the shielded vaults. No decontamination was required. No individual received any detectable radiological dose as a result of this event. The 25URC tandem accelerator was given permission to resume operation with stable beams in early September, but radioactive ion production is still not allowed. Subsequent analysis indicated a release that consisted entirely of noble gasses (Xe and Kr isotopes). We believe we have identified two unrelated failures, one associated with the HVAC system and the other with the roughing system exhaust which accounts for both the escape of noble gasses into the IRIS1 vault and their migration outside the vault. An investigation team report is expected by October 24. At that time, corrective actions will be determined and the path to future radioactive ion beam production will be known. The break from operations allowed a few upgrades to be implemented. The most notable was the installation and commissioning of a SNICS ion source purchased from National Electrostatics Corporation (NEC). The SNICS replaced the old Alton/Aarhus source that we have used for many years. An ANU style gas cathode holder was purchased also but has not yet been implemented. The first beams have been produced by the source and the biggest problem encountered was reducing the beam for very low current experiments. A new power supply for the injection magnet was installed during this period also. Radioactive ion beam (RIB) development at the High Power Target Laboratory (HPTL) has been delayed this year while installing the platforms, conduits and equipment for the second Injector for Radioactive Ion Species (IRIS2) which is co-located with the HPTL facility. The majority of development activities have been performed at the two off-line ion source test facilities (ISTF1 and ISTF2) and the On-Line Test Facility (OLTF). Both test facilities have been developing systems which will eventually be used with IRIS2. Two new tunable Ti:Sapphire lasers have been ordered for continuing development of an ion source based on laser ionization using all solid-state lasers. When these are delivered, we will have a complete laser system. The other ion source test facility is continuing development of a negative-ion cooler for beam purification using photodetachment. This process has been demonstrated to work well in three systems so far (removing Co from Ni, removing S from Cl, and removing O from F). The original ion cooler has been modified to allow for use on the IRIS2 platform. Testing of this modified device is starting now. The OLTF has been used to test new types of uranium carbide targets for the electron beam plasma source (which are used for neutron-rich RIB campaigns) and to test a novel ion source which may result in purified beams of radioactive strontium isotopes. This ion source uses a quartz tube in the transfer line between the production target and the ion source to selectively slow down some elements such as rubidium and cesium.

43 PARTICLE ACCELERATORS↗

MCNP6 simulated performance of Micro-Pocket Fission Detectors (MPFDs) in the Transient REActor Test (TREAT) Facility

Micro-Pocket Fission Detectors (MPFDs) are under development for in-core neutron flux measurements at the Transient REActor Test facility (TREAT) and in other experiments at Idaho National Laboratory (INL). The sensitivity of MPFDs to the energy dependent neutron flux at TREAT has been determined for 0.0300-μm thick active material coatings of 242 Pu, 232 Th, natural uranium, and 93% enriched 235 U. Self-shielding effects in the active material of the MPFD was also confirmed to be negligible. Lastly, fission fragment energy deposition was found to be in conformance with previously reported results.

36 MATERIALS SCIENCE↗

Oak Ridge 25URC Tandem Accelerator 2008 SNEAP Lab Report

During FY 2008, the 25URC operated for slightly over 3,000 research hours. The radioactive species {sup 80}Ge and {sup 17,18}F accounted for 763 of these hours. This included an experiment using {sup 17}F which was only possible due to an improvement of a factor of 50 in beam intensity over our previous facility record. Twenty stable beam species were provided this year. Operation for the experimental program was at terminal potentials from 2.02 to 23.8 MV. Approximately 200 hours of conditioning were done to return the machine to operation after tank openings. There were six tank openings during the year: three scheduled for general maintenance and three unscheduled. Two of the unscheduled openings were required to correct shorting rod issues and the other was to reestablish communication with one of the major dead sections. On July 28, an event happened that caused all accelerators at the Holifield Radioactive Ion Beam Facility (HRIBF) to suspend operation. At approximately 8 AM on that Monday, during operations with approximately 12 {micro}A of 50-MeV protons on a uranium carbide target, delivering neutron-rich {sup 81}Zn beam to the new Low-energy Radioactive Ion Beam Spectroscopy Station (LeRIBSS), a radiological control technician (RCT) reported higher than normal radiation levels just outside the shield door to the IRIS1 vault (the room in which RIBs are produced at HRIBF). The measured dose rate equivalent was 4 mrem/hr. The presence of radiological contamination on the floor just outside the shield door was subsequently noted, as was the possible presence of airborne radioactivity. These observations were reported to facility management. Accelerators were put in standby immediately and the building evacuated. The event was subsequently declared a laboratory operational emergency. Parts of the building were cleared for reentry to collect belongings on Monday afternoon. The entire building was cleared for reoccupation on Tuesday morning after a detailed radiological survey found no contamination outside the shielded vaults. No decontamination was required. No individual received any detectable radiological dose as a result of this event. The 25URC tandem accelerator was given permission to resume operation with stable beams in early September, but radioactive ion production is still not allowed. Subsequent analysis indicated a release that consisted entirely of noble gasses (Xe and Kr isotopes). We believe we have identified two unrelated failures, one associated with the HVAC system and the other with the roughing system exhaust which accounts for both the escape of noble gasses into the IRIS1 vault and their migration outside the vault. An investigation team report is expected by October 24. At that time, corrective actions will be determined and the path to future radioactive ion beam production will be known. The break from operations allowed a few upgrades to be implemented. The most notable was the installation and commissioning of a SNICS ion source purchased from National Electrostatics Corporation (NEC). The SNICS replaced the old Alton/Aarhus source that we have used for many years. An ANU style gas cathode holder was purchased also but has not yet been implemented. The first beams have been produced by the source and the biggest problem encountered was reducing the beam for very low current experiments. A new power supply for the injection magnet was installed during this period also. Radioactive ion beam (RIB) development at the High Power Target Laboratory (HPTL) has been delayed this year while installing the platforms, conduits and equipment for the second Injector for Radioactive Ion Species (IRIS2) which is co-located with the HPTL facility. Therefore, the majority of development activities have been performed at the two off-line ion source test facilities (ISTF1 and ISTF2) and the On-Line Test Facility (OLTF). Both test facilities have been developing systems which will eventually be used with IRIS2. Two new tunable Ti:Sapphire lasers have been ordered for continuing development of an ion source based on laser ionization using all solid-state lasers. When these are delivered, we will have a complete laser system. The other ion source test facility is continuing development of a negative-ion cooler for beam purification using photodetachment. This process has been demonstrated to work well in three systems so far (removing Co from Ni, removing S from Cl, and removing O from F). The original ion cooler has been modified to allow for use on the IRIS2 platform. Testing of this modified device is starting now. The OLTF has been used to test new types of uranium carbide targets for the electron beam plasma source (which are used for neutron-rich RIB campaigns) and to test a novel ion source which may result in purified beams of radioactive strontium isotopes.

43 PARTICLE ACCELERATORS↗

A test cassette for x-ray-exposure experiments at the National Ignition Facility

We present the design and operation of a test cassette for exposure of samples to radiation environments at the National Ignition Facility. The cassette provides options for square and round samples and exposure areas; the cassette provides for multiple levels of filtration on a single sample, which allows dynamic range in experiments. The samples had normal lines of sight to the x-ray source in order to have uniform x-ray illumination. The incident x-radiation onto the samples was determined by the choice of filter thicknesses and materials. The samples were held at precise locations, accurate to within a few hundred microns, in the target chamber in order to have a known fluence incident. In the cassette, the samples were held in place in such a way that a minimal ''line contact'' allows them to have the maximal mechanical response to the x-ray load. We present postshot images of the debris found on films used for filters, and pre- and postexposure specimens.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

New potentials of NIICHIMMASH's thermal vacuum facilities

The potentialities of existing test facilities as to simulating space environment governing factors for spacecraft successful development thermal vacuum testing are analyzed, ways of modernizing existing test facilities and specific proposals on their redesign are considered. The problem of spacecraft (S/C) ground development in simulated external environments, the solution of which started more than 30 years ago, has not lost its urgency today. Stringent requirements on S/C active lifetime under space conditions, module large dimensions, great number of extension elements and complicated mode of their interaction in long mission do not allow S/C designers to abandon ground tests. S/C thermal modes development is a combination of calculations, thermal vacuum tests and actions on improving S/C design and its thermal control system. Traditionally, tests are carried out by stages from component and end unit level verifications to complex tests of modules and S/C as a whole. In our opinion, sufficient correctness of calculated models and experience gained in organizations designing space systems allow to reduce cost and time of autonomous tests. Unfortunately, this is not true for complex (integrated) thermal vacuum tests. More than that, their recent programs include tasks of verifying other (than thermal control system) systems if S/C for operation under space simulated conditions. The outlined circumstances are the main reason for critical review of the potentialities of the existing test base, and of NIICHIMMASH's two large thermal vacuum chambers, first of all. The reasons for and ways of enlargement of these facilities potentially are analyzed and the results attained are described.

Afanassiev, N. A.↗

Code validation of a scaled-down DRACS model in RELAP5/SCDAPSIM/MOD 4.0

Direct Reactor Auxiliary Cooling System (DRACS) is a passive safety system proposed for Fluoride-salt-cooled High-temperature Reactors (FHRs). Additionally, benchmark study of decay heat removal capability of DRACS by natural circulation is critical for FHR safety analysis. Two scaled-down test facilities, a low-temperature DRACS test facility (LTDF) and a high-temperature DRACS test facility (HTDF), were designed following a scaling analysis and constructed to investigate thermal performance and heat removal capability of the DRACS. The LTDF uses water as a surrogate coolant for both the primary and DRACS loops. Two transient scenarios were carried out in the LTDF, namely, DRACS startup and primary coolant pump trip. In both of the scenarios, the experimental results demonstrate sufficient heat removal capabilities of the DRACS with natural circulations established in the system. These two scenarios were simulated using RELAP5/SCDASIM/MOD4.0 code and the code simulation results show good agreement with the LTDF experimental data. For the HTDF, molten salts FLiNaK and KF-ZrF4 are used respectively as the primary coolant and DRACS coolant. Thermodynamic and transport properties of FLiNaK and KF-ZrF4 were implemented into RELAP5/SCDAPSIM/MOD 4.0. Lastly, simulations of transient scenarios in the HTDF were also performed and the code results will be compared with the HTDF experimental data once available

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Flight reentry experiments

The foregoing discussion has show the way in which flight testing supplements, extends, and reinforces the usefulness of data from ground test facilities. Flight tests can provide an anchor point in evaluating ground test data. Although flight tests can avoid some of the inherent problems of ground facilities, they are expensive, putting a premium on each test to provide the most data that can be acquired. The portions of the reentry flight spectrum which can be simulated by "hot" and "cold" ground facilities are reviewed and some of the current flight programs for obtaining data in the Apollo Reentry Envelope are discussed. The programs are categorized as to (1) environment (heating), (2) materials response, (3) communication problems, and (4) observables. A discussion of the launch vehicles, unknown parameters, and methods of data acquisition for each program is presented.

Radio Attenuation↗

Drop Tower Statement of Work

This document details the needs and requirements for a propulsion-assisted drop tower system (further referenced simply as Drop Tower) to perform hardware testing at Lawrence Livermore National Laboratory (LLNL). LLNL is managed and operated by Lawrence Livermore National Security, LLC (LLNS) for the Department of Energy (DOE). LLNL requires a robust testing platform that will allow for the characterization of interactions between objects of interest. The initial siting of the equipment will be located in an existing test facility (B191). When another test facility becomes online, the objective will be to move the test capability to the new facility as a final location (B132N). The Drop Tower will be a cornerstone capability for testing and model validation for LLNL interested programs.

42 ENGINEERING↗

The NASA atomic oxygen effects test program

The NASA Atomic Oxygen Effects Test Program was established to compare the low earth orbital simulation characteristics of existing atomic oxygen test facilities and utilize the collective data from a multitude of simulation facilities to promote understanding of mechanisms and erosion yield dependence upon energy, flux, metastables, charge, and environmental species. Four materials chosen for this evaluation include Kapton HN polyimide, FEP Teflon, polyethylene, and graphite single crystals. The conditions and results of atomic oxygen exposure of these materials is reported by the participating organizations and then assembled to identify degrees of dependency of erosion yields that may not be observable from any single atomic oxygen low earth orbital simulation facility. To date, the program includes 30 test facilities. Characteristics of the participating test facilities and results to date are reported.

Banks, Bruce A.↗

An Overview of the NASA Aeronautics Test Program Strategic Plan

U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD), however an overarching strategy for management of these national assets was needed. Therefore, in Fiscal Year (FY) 2006 NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD Test Resources Management Center (TRMC), stewards of the DoD test and evaluation infrastructure. Since then, approximately seventy percent of the ATP budget has been directed to underpin fixed and variable costs of facility operations within its portfolio and the balance towards strategic investments in its test facilities, including maintenance and capability upgrades. Also, a strong guiding coalition was established through the National Partnership for Aeronautics Testing (NPAT), with governance by the senior leadership of NASA s Aeronautics Research Mission Directorate (ARMD) and the DoD's TRMC. As part of its strategic planning, ATP has performed or participated in many studies and analyses, including assessments of major NASA and DoD aeronautics test capabilities, test facility condition evaluations and market research. The ATP strategy has also benefitted from unpublished RAND research and analysis by Ant n et al. (2009). Together, these various studies, reports and assessments serve as a foundation for a new, five year strategic plan that will guide ATP through FY 2014. Our vision for the future is a balanced portfolio of aeronautics ground and flight test capabilities that advance U.S. leadership in aeronautics in the short and long term. Key to the ATP vision is the concept of availability, not necessarily ownership; that is, NASA does not have to own and operate all facilities that are envisioned for future aeronautics testing. However, ATP will enable access to capabilities which are needed but not owned by NASA through strategic partnerships and reliance agreements. This paper will outline the major aspects of the ATP strategic plan for achieving its mission.

Marshall, Timothy J.↗

CRADA Final Report For CRADA NO. CR-12-006 [Operation and Testing of an SO 2 -depolarized Electrolyzer (SDE) for the Purpose of Hydrogen and Sulfuric Acid Production]

Over the past several years, Savannah River National Laboratory (SRNL) has led a team of collaborators under the Department of Energy’s (DOE) nuclear hydrogen production program to develop the Hybrid Sulfur (HyS) Process. HyS is a 2-step water-splitting process consisting of high temperature decomposition of sulfuric acid to generate SO 2 , followed by the electrolysis of aqueous SO 2 to generate hydrogen and sulfuric acid. The latter is fed back into the high temperature reactor. SRNL designed and built an SO 2 -depolarized electrolyzer (SDE) and a test facility. Over 40 SDE’s were tested using different catalysts, membranes and other components. SRNL demonstrated that an SDE could be operated continuously for approximately 200 hours under certain conditions without buildup of sulfur at the SDE’s cathode, thus solving a key technical problem with SDE technology. Air Products and Chemicals, Inc. (APCI) is a major supplier of hydrogen production systems, and they have proprietary technology that could benefit from the SDE developed by SRNS, or some improved version thereof. However, to demonstrate that SRNL’s SDE is a truly viable approach to the electrolyzer design, continuous operation for far greater periods of time than 200 hours must be demonstrated, and the electrolyzer must be scaled up to greater hydrogen production capacities. SRNL and Air Products entered into a Cooperative Research and Development Agreement with the objective of demonstrating the effectiveness of the SDE for hydrogen and sulfuric acid production and to demonstrate long-term continuous operation so as to dramatically increase the confidence in the SDE design for commercial operation. SRNL prepared a detailed technical report documenting previous SDE development, including the current SDE design and operating conditions that led to the 200-hour sulfurfree testing. SRNL refurbished its single cell SDE test facility and qualified the equipment for continuous operation. A new membrane electrode assembly (MEA) was fabricated and installed in the single cell electrolyzer (60 cm 2 active cell area). Shakedown testing was conducted, and several modifications were made to the test facility equipment. Seven different MEAs were used during testing. Beginning on May 20, 2013, SRNL was able to test the SDE continuously for 1200 hours, including 1000 hours under power to generate hydrogen at an average rate of 10.8 liters per hour. The SDE was not removed or repaired during the 50-day test and was successfully restarted after each shutdown. The test was intentionally stopped after 1200 hours (1000 hours of hydrogen production) due to funding constraints. Post-test examination of the MEA using Scanning Electron Microscopy (SEM) and Energy Dispersive X-ray Microanalysis (EDAX) showed no elemental sulfur deposits or sulfur layer inside the cell, thus successfully achieving the test goals. The results demonstrated that the SDE could be operated for extended periods without major performance degradation or the buildup of sulfur inside the MEA. Air Products conducted an assessment of the economic viability of the SDE based on the “as tested” design. The results indicated that the SDE faces significant economic obstacles in its current state. Further development and scale-up are necessary before the SDE is ready for commercialization.

08 HYDROGEN↗