Test plan optimization for an Explorer-size spacecraft
Monte Carlo method for estimating costs and optimal testing of Explorer size spacecraft
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Monte Carlo method for estimating costs and optimal testing of Explorer size spacecraft
Multimission solar electric spacecraft for interchangeable space missions program plans and cost estimates - Vol. 2
Saturn S-4B mission objective cost estimates for incentive and penalty fees, payload capabilities, and telemetry performance
Space shuttle program, considering vehicle configurations mission capabilities and cost estimates with emphasis on ground and flight tests
Ground frequency converters for reception of NTSC color TV transmission from synchronous communication satellites, tabulating cost estimates
Fabrication of prototype low density ablative heat shield panels for space shuttles with production cost estimates
Cost estimates, performance prediction, technology assessment, and configurations for space shuttle
Systems analysis and cost estimates of satellite borne remote sensing for wheat crop and fungus disease control and water management
Mathematical models for application of satellite borne multispectral remote sensors to water and wheat production management and wheat fungi control including cost estimates
Cost estimations, noise constraints, and supercritical wing compatibility in optimization of turbofan engines for Mach 0.90 to Mach 0.98 commercial air transports
Weight and cost estimation for pressurization systems for hydrogen, oxygen, and nitrogen storage
Silicon solar cell lightweight integrated array for large arrays, discussing deployment and orientation mechanisms, ribbon coverglass technique and cost estimates
Asteroids flyby approaches during Jupiter missions and Grand Tours, obtaining gravitational deflection of spacecraft trajectories and mass cost estimates
The Phase III analyses of Flight Research Facilities performed as a portion of the Hypersonic Research Facilities (HYFAC) Study are presented herein. Two attractive flight research vehicle concepts, geared to the development needs of future (1980-2n00) operational hypersonic aircraft systems, are defined. The inherent research capability of each concept is further expanded by incorporating provisions within the basic vehicle design to accommodate the testing of several additional research options. The design feasibility of this approach to achieving increased research flexibility is examined. Near term propulsion systems are employed as the basic power plants to shorten acquisition time, reduce development costs, and provide high confidence in attaining the performance capability desired, Performance is determined for each basic vehicle and for the vehicles when incorporating several optional research packages. Total program cost estimates are developed for each vehicle and for the various research options. This study provides the necessary framework for the formulation of an attractive and needed flight research program which is a key element in the systematic development of an overall advanced research plan.
Data are presented, covering drilling techniques, factors affecting penetration rates, cost estimation, and system improvement. Various drill bits are also discussed.
Results of a preliminary investigation of the effect on the candidate experiment program implementation of experiment module operations in the absence of an orbiting space station and with the availability of the space shuttle orbiter vehicle only are presented. The fundamental hardware elements for shuttle-only operation of the program are: (1) integrated common experiment modules CM-1, CM-3, and CM-4, together with the propulsion slice; (2) support modules capable of supplying on-orbit crew life support, power, data management, and other services normally provided by a space station; (3) dormancy kits to enable normally attached modules to remain in orbit while shuttle returns to earth; and (4) shuttle orbiter. Preliminary cost estimates for 30 day on-orbit and 5 day on-orbit capabilities for a four year implementation period are $4.2 billion and $2.1 billion, respectively.
Tabulated data are presented on the costs, schedules, and technical characteristics for the space station phases C and D program. The work breakdown structure, schedule data, program ground rules, program costs, cost-estimating rationale, funding schedules, and supporting data are included.
A preliminary cost estimate for a small reactor in Brayton space power systems with (u-233)n or (pu-239)n as the fuel in the T-111 fuel elements totaled to about four million dollars; considered is a 22.8 in. diameter reactor with 247 fuel elements.