Search NASA⌕ Search

SEARCH · Search NASA

Results for “Completion Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

Status of Dynamic Radioisotope Power System Development for NASA Missions

Under the Radioisotope Power Systems Program, NASA and the Department of Energy have been advancing a novel Radioisotope Power System (RPS) based on dynamic energy conversion. This approach will manifest a dynamic RPS (DRPS) option with a conversion efficiency at least three times greater than thermoelectric based RPS. Significant progress has recently been made towards this end. A one-year system design phase has been completed by industry partner Aerojet Rocketdyne which resulted in a 300-We DRPS with convertor-level redundancy. In-house technology development at NASA Glenn Research Center has demonstrated the conversion devices in relevant environments and shown all requirements can be met. Progress has also been made on the control electronics necessary for dynamic energy conversion. Flight-like controllers were recently upgraded and achieved an 11-percentage-point increase in efficiency. Control architectures have been developed to handle the multi-convertor arrangements in the latest DRPS design. A system-level DRPS Testbed is being assembled now that will experimentally demonstrate the DRPS concept being pursued.

Stirling↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations program is transforming Kennedy Space Center into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton (t) Block 1 configuration, and will then evolve to an ultimate capability of 130 t. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS -- Exploration Mission-1 (EM-1), an un-crewed mission to orbit the moon and return. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

June 1997 ER-2 Flight Measurements

Within our current understanding of the atmospheric ionizing radiation, the ER-2 flight package was designed to provide a complete characterization of the physical fields and evaluate various dosimetric techniques for routine monitoring. A flight plan was developed to sample the full dynamic range of the atmospheric environment especially at altitudes relevant to the development of the High Speed Civil Transport. The flight of the instruments occurred in June of 1997 where predictive models indicated a maximum in the high altitude radiation environment occurring approximately nine months after the minimum in the solar sunspot cycle. The flights originated at Moffett field at the Ames Research Center on ER-2 aircraft designated as 706. The equipment was shipped mid- May 1997 for unpacking and checkout, size fitting, systems functional test, and preflight testing on aircraft power with flight readiness achieved on May 30, 1997. The equipment was qualified on its first engineering flight on June 2, 1997 and the subsequent science gathering flights followed during the period of June 5-15, 1997. Herein we give an account of the flight operations.

Jones, Irby W.↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton Block 1 configuration, and will then evolve to an ultimate capability of 130 metric tons. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS - Exploration Mission-1 (EM-1), an uncrewed mission to orbit the moon and return, and progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance (ULA) in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Thermal design analysis of shuttle cargo bay payloads

The thermal design analysis methodology, the thermal control philosophy, and preliminary thermal analysis results associated with specific shuttle payloads are presented. The payloads considered are the Get-Away Special canisters being developed by NASA Goddard, which may be flown on a variety of missions, and the six experiments which are mounted on the GSFC pallet to be flown on Operational Flight test No. 4 (OFT-4). The thermal control alternatives currently available to OFT-4 instruments are the use of pallet cold plates (if available) or operational constraints which allow passive thermal control without the use of excessive heater power. The characteristics of a completely passive thermal control design are evidenced by the results of the Get-Away Special canister analysis.

Bartoszek, J. T.↗

Test Results for the Automated Rendezvous and Capture System

The Automated Rendezvous and Capture (AR&C) system was designed and tested at NASA's Marshall Space Flight Center (MSFC) to demonstrate technologies and mission strategies for automated rendezvous and docking of spacecraft in Earth orbit, The system incorporates some of the latest innovations in Global Positioning, System space navigation, laser sensor technologies and automated mission sequencing algorithms. The system's initial design and integration was completed in 1998 and has undergone testing at MSFC. This paper describes the major components of the AR&C system and presents results from the official system tests performed in MSFC's Flight Robotics Laboratory with digital simulations and hardware in the loop tests. The results show that the AR&C system can safely and reliably perform automated rendezvous and docking missions in the absence of system failures with 100 percent success. When system failures are included, the system uses its automated collision avoidance maneuver logic to recover in a safe manner. The primary objective of the AR&C project is to prove that by designing a safe and robust automated system, mission operations cost can be reduced by decreasing the personnel required for mission design, preflight planning and training required for crewed rendezvous and docking missions.

Cruzen, Craig↗

Hyper-X Program Status

This paper provides an overview of the objectives and status of the Hyper-X program, which is tailored to move hypersonic, airbreathing vehicle technology from the laboratory environment to the flight environment. The first Hyper-X research vehicle (HXRV), designated X-43, is being prepared at the Dryden Flight Research Center for flight at Mach 7. Extensive risk reduction activities for the first flight are completed, and non-recurring design activities for the Mach 10 X-43 (3rd flight) are nearing completion. The Mach 7 flight of the X-43, in the spring of 2001, will be the first flight of an airframe-integrated scramjet-powered vehicle. The Hyper-X program is continuing to plan follow-on activities to focus an orderly continuation of hypersonic technology development through flight research.

McClinton, Charles R.↗

Hyper-X Program Status

This paper provides an overview of the objectives and status of the Hyper-X program, which is tailored to move hypersonic, airbreathing vehicle technology from the laboratory environment to the flight environment. The first Hyper-X research vehicle (HXRV), designated X-43. is being prepared at the Dryden Flight Research Center for flight at Mach 7. Extensive risk reduction activities for the first flight are completed, and non-recurring design activities for the Mach 10 X-43 (3rd flight) are nearing completion. The Mach 7 flight of the X-43, in the spring of 2001, will be the first flight of an airframe-integrated scramjet-powered vehicle. The Hyper-X program is continuing to plan follow-on activities to focus an orderly continuation of hypersonic technology development through flight research.

C. R. McClinton↗

Hyper-X Program Status

This paper provides an overview of the objectives and status of the Hyper-X program, which is tailored to move hypersonic, airbreathing vehicle technology from the laboratory environment to the flight environment. The first Hyper-X research vehicle (HXRV), designated X-43, is being prepared at the Dryden Flight Research Center for flight at Mach 7. Extensive risk reduction activities for the first flight are completed, and non-recurring design activities for the Mach 10 X-43 (third flight) are nearing completion. The Mach 7 flight of the X-43, in the spring of 2001, will be the first flight of an airframe-integrated scramjet-powered vehicle. The Hyper-X program is continuing to plan follow-on activities to focus an orderly continuation of hypersonic technology development through flight research.

McClinton, Charles R.↗

Low cost miniature data collection platform

The development of the RF elements of a telecommunications package involved detailed study and analysis of concepts and techniques followed by laboratory testing and evaluation of designs. The design goals for a complete telecommunications package excluding antenna were a total weight of 300 grams, in a total volume of 400 cu cm with a capability of unattended operation for a period of six months. Of utmost importance is extremely low cost when produced in lots of 10,000. Early in the program it became apparent that a single Miniature Data Collection Platform would not satisfy all users. A single high efficiency system would not satisfy a user who had available a large battery capacity but required a low cost system. Conversely, the low cost system would not satisfy the end user who had a very limited battery capacity. A system design to satisfy these varied requirements was implemented by designing several versions of the system building blocks and then constructing three systems from these building blocks.

Source record↗

Mars ISRU for Production of Mission Critical Consumables - Options, Recent Studies, and Current State of the Art

In 1978, a ground breaking paper titled, "Feasibility of Rocket Propellant Production on Mars" by Ash, Dowler, and Varsi discussed how ascent propellants could be manufactured on the Mars surface from carbon dioxide collected from the atmosphere to reduce launch mass. Since then, the concept of making mission critical consumables such as propellants, fuel cell reactants, and life support consumables from local resources, commonly known as In-Situ Resource Utilization (ISRU), for robotic and human missions to Mars has been studied many times. In the late 1990's, NASA initiated a series of Mars Human Design Reference Missions (DRMs), the first of which was released in 1997. These studies primarily focused on evaluating the impact of making propellants on Mars for crew ascent to Mars orbit, but creating large caches of life support consumables (water & oxygen) as a backup for regenerative life support systems for long-duration surface stays (>500 days) was also considered in Mars DRM 3.0. Until science data from the Mars Odyssey orbiter and subsequent robotic missions revealed that water may be widely accessable across the surface of Mars, prior Mars ISRU studies were limited to processing Mars atmospheric resources (carbon dioxide, nitrogen, argon, oxygen, and water vapor). In December 2007, NASA completed the Mars Human Design Reference Architecture (DRA) 5.0 study which considered water on Mars as a potential resource for the first time in a human mission architecture. While knowledge of both water resources on Mars and the hardware required to excavate and extract the water were very preliminary, the study concluded that a significant reduction in mass and significant enhancements to the mission architecture were possible if Mars water resources were utilized. Two subsequent Mars ISRU studies aimed at reexamining ISRU technologies, processing options, and advancements in the state-of-the-art since 2007 and to better understand the volume and packaging associated with Mars ISRU systems further substantiated the preliminary results from the Mars DRA 5.0 study. This paper will provide an overview of Mars ISRU consumable production options, the analyses, results, and conclusions from the Mars DRA 5.0 (2007), Mars Collaborative (2013), and Mars ISRU Payload for the Supersonic Retro Propulsion (2014) mission studies, and the current state-of-the-art of Mars ISRU technologies and systems. The paper will also briefly discuss the mission architectural implications associated with Mars resource and ISRU processing options.

Sanders, G. B.↗

Preparation and Testing of Corrosion and Spallation-Resistant Coatings

This Energy & Environmental Research Center (EERC) project is designed to determine if plating APMT®, a specific highly oxidation-resistant oxide dispersion-strengthened FeCrAl alloy made by Kanthal, onto nickel-based superalloy turbine parts is a viable method for substantially improving the lifetimes and maximum use temperatures of the parts. The method for joining the APMT plate to the superalloys is called evaporative metal bonding and involves placing a thin foil of zinc between the plate and the superalloy, clamping them together, and heating in an atmosphere-controlled furnace. Upon heating, the zinc melts and dissolves the oxide skins of the alloys at the bond line, allowing the two alloys to diffuse into each other. The zinc then diffuses through the alloys and evaporates from their surfaces. During this annual reporting period, the finite element model was completed and used to design clamping jigs to hold the APMT plate to the larger blocks of superalloys during the bonding process. The clamping system was machined from titanium–zirconium–molybdenum and used to bond the APMT plate to the superalloy blocks. The bond between the APMT plate was weak for one of each of the superalloy blocks. We believe that this occurred because enough oxidation had occurred on the surface of the parts as a result of a 1-month time period between sandblasting to prepare the parts and the actual bonding process. The other blocks were, therefore, bonded within 1 day of preparing the parts for bonding, and their joints appear strong. Scanning electron microscopy analyses of representative joints showed that no zinc remained in the alloys after bonding. Also, phases rich in hafnium and tantalum had precipitated near the bond line in the APMT. Iron from the APMT had diffused into the superalloys during bonding, more extensively in the CM247LC than in the Rene 80. Nickel from the superalloys had diffused into the APMT, again more extensively in the joint with the CM247LC than with the Rene 80. One-inch-diameter buttons were machined from each of the bonded blocks and sent to Siemens for standard oxidation, spallation, and corrosion testing, which should be complete in the spring of 2016.

Hurley, John↗

Retrofittable Advanced Combined Cycle Integration for Flexible Decarbonized Generation

This is the final scientific / technical report for Front End Engineering Design (FEED) study “Retrofittable Advanced Combined Cycle Integration for Flexible Decarbonized Generation” funded by the US Department of Energy (DOE), Office of Fossil Energy and Carbon Management (FECM), Carbon Capture R&D Program under award DE-FE0032131. The prime recipient is General Electric Company working through its Gas Power division (GEGP) with subrecipients Southern Company and Linde Engineering plus subcontractor Kiewit. Southern Company’s Plant Barry, a 2x1 7F.04 CCGT, is the host site. GEGP led the overall integration of the carbon capture system (CCS) with the existing natural gas combined cycle (NGCC) facility. Linde provided the detailed process engineering and equipment costing for the carbon capture island. Kiewit focused on plant layout, constructability, and installation. With the FEED study finished, the engineering is approximately 50% complete towards the detailed design package needed to proceed to procure, install, build, commission, and operate the integrated NGCC+CCS facility. This FEED study focuses on retrofitting a 95% CO 2 capture system with attention on plant integration. The study was particularly challenging due to unique and substantial cost impacts related to global sourcing challenges associated with COVID. Additional incentives, regulatory support, and dispatch certainty are needed to move forward with implementing CCS at this or other sites in the US. This FEED study highlights the value of integrating NGCC+CCS and is a template for future CCS retrofit studies.

42 ENGINEERING↗

Design integration and noise studies for jet STOL aircraft. Volume 1: Program summary

This program was undertaken to develop, through analysis, design, experimental static testing, wind tunnel testing, and design integration studies, an augmentor wing jet flap configuration for a jet STOL transport aircraft having maximum propulsion and aerodynamic performance with minimum noise generation. The program had three basic elements: (1) static testing of a scale wing section to demonstrate augmentor performance and noise characteristics; (2) two-dimensional wind tunnel testing to determine flight speed effects on performance; and (3) system design and evaluation which integrated the augmentor information obtained into a complete system and ensured that the design was compatible with the requirements for a large STOL transport having a 500-ft sideline noise of 95 PNdB or less. This objective has been achieved.

Okeefe, V. O.↗

STS payload design load evolution

Payload development and design load requirements for the U.S. National Space Transportation System (STS) are discussed. The STS requires that all payloads be compatible with STS verification loads which are calculated approximately one year prior to launch. Payload design and all verification testing are completed prior to this final load cycle. Various approaches to preliminary design loads, load updates, and test load definitions and also to STS model and forcing functions revisions are presented.

Hamilton, David A.↗

Cryogenic performance of the SIRTF prototype secondary mirror assembly

Results are presented of the first liquid helium temperature testing of the Space Infrared Telescope Facility (SIRTF) prototype Secondary Mirror Assembly (PSMA). Attention is given to the key requirements of PSMA, its design, and the test instrumentation and procedures. Results of preliminary tests completed to date showed that the design of the PSMA forms a very strong basis for meeting the SIRTF requirements.

Stier, M. T.↗

Airframe Design and Integration

The objectives of the project this viewgraph presentation summarizes include the following: (1) Decompose operational, safety, and cost requirements into a comprehensive and consistent set of design criteria for different structural and material concepts for Reusable Launch Vehicles (RLVs); (2) Develop compliance methods to ensure that different structural and material concepts are assessed at a consistent and adequate level of fidelity and safety; (3) Develop and assess weight reduction potential of integrated airframe concepts for RLVs, e.g., Thermal Protection System (TPS)/TPS Support/Cryogenic Tank System; (4) Compare performance and weight of various airframe structural and material concepts and structural arrangements and identify technology development needs; and (5) Develop high fidelity parametric models that include airframe structural interactions and major design drivers. The approaches taken to complete these objectives include the definition of vehicle requirements, airframe structural design requirements, load conditions, factors of safety, and integrated concepts.

Scotti, Stephen↗

Design and Development of a Methane Cryogenic Propulsion Stage for Human Mars Exploration

NASA is currently working on the Evolvabe Mars Campaign (EMC) study to outline transportation and mission options for human exploration of Mars. One of the key aspects of the EMC is leveraging current and planned near-term technology investments to build an affordable and evolvable approach to Mars exploration. This leveraging of investments includes the use of high-power Solar Electric Propulsion (SEP) systems evolved from those currently under development in support of the Asteroid Redirect Mission to deliver payloads to Mars. The EMC is considering several transportation options that combine solar electric and chemical propulsion technologies to deliver crew and cargo to Mars. In one primary architecture option, the SEP propulsion system is used to pre-deploy mission elements to Mars while a high-thrust chemical propulsion system is used to send crew on faster ballistic transfers between Earth and Mars. This high-thrust chemical system uses liquid oxygen - liquid methane main propulsion and reaction control systems integrated into the Methane Cryogenic Propulsion Stage (MCPS). Over the past year, there have been several studies completed to provide critical design and development information related to the MCPS. This paper is intended to provide a summary of these efforts. A summary of the current point of departure design for the MCPS is provided as well as an overview of the mission architecture and concept of operations that the MCPS is intended to support. To leverage the capabilities of solar electric propulsion to the greatest extent possible, the EMC architecture pre-deploys the required stages for returning crew from Mars. While this changes the risk posture of the architecture, it provides mass savings by using higher-efficiency systems for interplanetary transfer. However, this does introduce significantly longer flight times to Mars which, in turn, increases the overall lifetime of the stages to as long as 3000 days. This unique aspect to the concept of operations introduces several challenges, specifically related to propellant storage and engine reliability. These challenges and some potential solutions are discussed. Specific focus is provided on two key technology areas; propulsion and cryogenic fluid management. In the area of propulsion development, the development of an integrated methane propulsion system that combines both main propulsion and reaction control is discussed. This includes an overview of potential development paths, areas where development for Mars applications are complementary to development efforts underway in other parts of the aerospace industry, and commonality between the MCPS methane propulsion applications and other Mars elements, including the Mars lander systems. This commonality is a key affordability aspect of the Evolvable Mars Campaign. A similar discussion is provided for cryogenic fluid management technologies including a discussion of how using cryo-propulsion in the Mars transportation application not only provides performance benefits but also leverages decades of technology development investments made by NASA and its aerospace contractor community.

Percy, Thomas K.↗