Search NASA⌕ Search

SEARCH · Search NASA

Results for “DOLLARS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

Breaking Through Historical Biases in Performance Assessments - 18056

Performance assessments (referred to as safety assessments internationally), which include mathematical modeling of natural and engineered systems for many hundreds and thousands of years, play an important role in decision-making for disposal of radioactive waste and cleanup of sites and facilities contaminated with radioactive material. These decisions can involve options costing hundreds of millions or even billions of dollars. Thus, it is critical to understand the underlying assumptions behind regulatory and technical aspects of these assessments to better understand and communicate the basis for decisions. Policy and technical biases deliberately built into early assessment approaches allowed safety margin to account for uncertainties known to be present, but not quantitatively assessed. Many of these biases (e.g., regulatory standards, human habits, effectiveness of waste forms, inadvertent intrusion assumptions, etc.) continue to exist in spite of advances in technical approaches and knowledge. These built-in biases, often not effectively communicated, can lead to misleading interpretation of results and potentially influence public confidence and costly regulatory decisions regarding the safety of a disposal facility or a closure action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How Successful Site Preparation Work at a Large, Commercial, Hazardous and Toxic Waste Site Can Benefit DOE Cleanup Projects - 18111

Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computational Fluid Dynamics Modeling of Bubbling in a Viscous Fluid for Validation of Waste Glass Melter Modeling

At the Hanford site, radioactive waste stored in underground tanks is slated for vitrification for final disposal. A comprehensive knowledge of the glass batch melting process will be useful in optimizing the process, which could potentially reduce the cost and duration of this multi-billion dollar cleanup effort. We are developing a high-fidelity heat transfer model of a Joule-heated ceramic lined melter to improve the understanding of the complex, inter-related processes occurring with the melter. The glass conversion rates in the cold cap layer are dependent on promoting efficient heat transfer. In practice, heat transfer is augmented by inserting air bubblers into the molten glass. However, the computational simulations must be validated to provide confidence in the solutions. As part of a larger validation procedure, it is beneficial to split the physics of the melter into smaller systems to validate individually. The substitution of molten glass for a simulant liquid with similar density and viscosity at room temperature provides a way to study mixing through bubbling as an isolated effect without considering the heat transfer dynamics. The simulation results are compared to experimental data obtained by the Vitreous State Laboratory at the Catholic University of America using bubblers placed within a large acrylic tank that is similar in scale to a pilot glass waste melter. Comparisons are made for surface area of the rising air bubbles between experiments and CFD simulations for a variety of air flow rates and bubble injection depths. Also, computed bubble rise velocity is compared to a well-accepted expression for bubble terminal velocity (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Soft Robotic Glove System for Wearable Haptic Teleoperation - 18373

Managing nuclear waste is a difficult, dangerous, and costly task. Teleoperation of robotic operators is an important functionality for this application, allowing robotic devices to operate in dangerous environments while still leveraging the existing abilities and technical knowledge of human workers. One difficulty in implementing effective teleoperation systems is that human operators rely on more senses beside sight: in particular, touch. The sense of touch could provide significant benefits for teleoperation, preventing environmental mishaps that could cost millions of dollars. To help remedy this problem, we present a soft haptic feedback glove system. The primary functionality of this system is to provide tactile and force feedback on the user's hands. This was achieved using custom cylindrical pneumatic actuators. These actuators consist of plastic sheeting folded into a hollow-walled cylinder which is connected to a pressure source. When pressurized, the cylinder walls expand and the cylinder straightens, with the force being related to the pressure. The glove system has one of these actuators over each of the user's three main fingers (index, middle, and thumb), where pressurizing the actuator applies a reaction force to the finger of the user, mimicking the resistance of a grasped object. The expansion of these actuators also causes them to physically press against the user's fingers, giving them the feeling of contact. To demonstrate the usability of this system, we implemented a virtual environment in V-REP simulating the interactions between a robotic Jaco Arm and a floating ball. This simulation receives hand and figure positions from the haptic glove and used them to drive the state of the simulated Jaco Arm. In response to the interactions between the Jaco and the floating ball, the simulation returns commands to the glove, instructing it to pressurize or depressurize its actuators as appropriate, allowing the user to feel the ball in their hand. We tested users in their ability to prevent the ball from floating away using this system with and without the haptic feedback. Results show that the addition of haptic feedback significantly improved the ability of users to interact precisely with the environment. We also used the finger positions of the haptic glove to control a physical robotic hand, and demonstrated the system's usability for control of real robots, though the lack of sensors on the robot made providing the tactile feedback impractical. However, there is more to grasping and holding an object than just the feeling of contact and the resistance to closing one's hand. The weight of the object will apply forces to the user's other joints as they hold it. To this end, we added a haptic feedback device for the user's wrist, a technique that can be generalized to the user's other joints. This is made up of reverse Pneumatic Artificial Muscles (rPAMs) stretching across the wrist between mounts on the hand and forearm. These rPAM actuators are tubes of silicone wrapped in thread such that they extend when pressurized. This extension can apply torque on the user's wrist, mimicking the feeling of gravity, or allowing the simulation of additional contact forces (such as the user's hand impacting an object). We tested this wrist device independently using a simulated path-following experiment. Users showed a significant improvement in performance when aided by haptic feedback during sinusoidal path experiments, demonstrating the usability of this approach. We then integrated the two systems, further demonstrating the usability of this approach. This project represents the first step towards a more effective robotic teleoperation system, allowing skilled human workers to perform tasks more effectively while remaining out of danger. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unique Facilities, Innovative Treatment Processes, and a Talented Workforce Allow Fluor Idaho to Successfully Disposition Transuranic Waste - 18388

Fluor Idaho is utilizing state-of-the-art equipment, treatment technologies, and employee expertise at the Department of Energy's (DOE) Idaho Site to treat contact-handled transuranic (CH-TRU) waste, as well as extremely challenging remote-handled transuranic (RH-TRU) waste forms, to prepare the material for shipment and permanent disposal at the Department's Waste Isolation Pilot Plant (WIPP). Nowhere else in the DOE Complex - perhaps the world - will one find the compilation of tools and an experienced workforce with an unparalleled history of safely retrieving, characterizing, treating, repackaging, certifying, and shipping TRU waste. Since 2003, the Advanced Mixed Waste Treatment Project (AMWTP) has used both conventional and unique retrieval concepts, high-tech characterization equipment - including real-time radiography and radioassay - robotics, and automated treatment processes to retrieve and treat 65,000 cubic meters of above-ground CH-TRU waste. Additionally, engineered controls and specialized personal protective equipment have allowed employees to make thousands of entries into high-radiation areas without a skin or clothing contamination incident - evidence of the employees' commitment to safety. AMWTP has encountered and found solutions for many challenging waste forms, including polychlorinated biphenyl-contaminated wastes, TRU waste containers with up to 1,000 fissile gram equivalent plutonium-239, oversized TRU boxes, and partially absorbed organic sludge waste. By utilizing additional facilities and equipment at the Accelerated Retrieval Project V and VII, Fluor Idaho has developed new processing lines and capabilities to ensure worker safety and milestone completion. These two soft-sided buildings, located at a facility adjacent to AMWTP, were originally constructed to exhume Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) TRU wastes from a section of a 97-acre landfill. After a total of 1,150 cubic meters of targeted waste were removed, personnel, working in collaboration with state regulators, successfully implemented a unique regulatory strategy that allowed these CERCLA facilities to be modified and permitted to treat Resource Conservation and Recovery Act (RCRA) wastes from the AMWTP - a savings of tens of millions of dollars over the cost of constructing new buildings. Adding to the AMWTP's technological uniqueness is its ability to treat wastes from other facilities in the DOE Complex. Two prior decision documents and an agreement with the state of Idaho have allowed AMWTP to treat wastes from 15 other DOE sites. It is the only project in the complex to have done so. At another project located next to AMWTP, targeted waste exhumation within the Subsurface Disposal Area is approximately two years ahead of schedule. Crews have removed more than 8,600 cubic meters of CH-TRU and hazardous wastes from eight exhumation areas that equal a combined footprint of 4.75 acres. Less than one acre remains to be exhumed to satisfy the 2008 Record of Decision waste exhumation end state between the DOE, Environmental Protection Agency, and state of Idaho. Construction of the final building where targeted waste exhumation will continue was completed during the summer of 2017. Exhumation will be completed within the next few years. Following exhumation completion, an evapotranspiration barrier (or cap) will be constructed over the entire landfill. Fluor Idaho continues to make progress on a more challenging project involving an inventory of RH-TRU waste that also contains the reactive metal sodium. Crews are utilizing hot cells, once used for spent nuclear fuel reprocessing and high-level waste treatment at the Idaho Nuclear Technology and Engineering Center, to render this challenging waste form safe for disposal in a national geologic waste repository. The treatment methods being employed on this RH-TRU waste are unique in the DOE Complex. Minute concentrations of water are sprayed onto the sodium-contaminated material in a process called 'spritzing' to chemically change the sodium from a reactive metal to a non-reactive salt. In other cases, sodium-contaminated waste is dipped in water to initiate a reaction in a process called 'immersion.' Lastly, for more challenging waste shapes that could not be successfully treated with the two prior methods, crews lower the sodium-contaminated RH-TRU waste into a one-of-a-kind distillation unit that uses high temperature and vacuum to volatilize the sodium and recapture it in a condenser unit for disposal. The RH-TRU waste treated with this technology is then safe for permanent disposal. Fluor Idaho is proud to operate DOE's CH- and RH-TRU waste treatment facilities, as well as use innovative processes and its talented workforce to complete this important work-scope. Such capabilities allow the contractor to meet the commitments made by the DOE to the state of Idaho. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determining Coal Ash Impacts on Radium and Thorium Background Levels in Soil Using Rare Earth Element Analyses - 18604

One challenge at large remediation sites contaminated with radiological materials is differentiating between low-level site-related contamination and NORM. This is because sites contaminated with radiological materials, such as thorium processing and mining and milling facilities, often generate wastes that contain contaminants that are similar to NORM deposits. For sites in urban areas, this issue is further compounded due to the presence of historic industrial fill (historic fill) containing materials such as fly ash, coal ash, and red brick, that exhibit elevated radioactivity levels. These materials often have activity levels near, or even well above, a site's cleanup goal. At a large Superfund Site in the eastern US (Site), many of the suspected Site-related fill areas are commingled with coal and fly ash. As the cleanup criteria for the radionuclides of concern (ROC), radium (Ra) and thorium (Th), is 5 pico-Curies per gram above background, a four-pronged approach was developed to determine if the coal and fly ash are impacting the background levels of the ROCs. This evaluation included a review of boring logs to visually confirm the presence of historic fill, as well as coal fragments and coal ash; a literature review to establish the typical concentrations of Ra and Th found in coal and fly ash from US sources; the use of rare earth analyses to establish chemical signatures for non-Site related historic fill containing coal ash versus Site-related fill; and a quantitative analysis of Site-related data to determine if the radioactivity levels in historic fill containing coal were elevated. Soil samples were collected from two locations at the Site; fill areas containing coal ash that were not suspected to be impacted by Site activities, as well as fill areas containing coal ash that were associated with the former processing facility. These samples were analyzed for rare earth elements (REE), as well as Ra-228 and Th-232 and the ratios of lanthanum, cerium, and neodymium to Ra-228 and Th-232 were established for each sample. Based on a comparison of these data, a strong correlation was established between the rare earth/thorium decay chain ratios and the classification of material as either Site or non-Site related. These data were used to develop a higher background activity for fill areas containing non-Site related NORM. While the cleanup level defined in the Record of Decision remained unchanged, the higher background derived from the fly ash/coal ash material, as identified by REE analyses, resulted in higher project screening levels, which ensured that excavation activities did not 'chase' material that was not Site-related. To date, use of the coal ash background level has saved millions of dollars in cleanup costs since non-Site related contamination is not being remediated. Use of this approach to determine the appropriate background level for a site is relatively straightforward since it relies on visual observation of the soil for coal and fly ash, along with REE analyses, which is an inexpensive, quick, and established analytical method for soil samples. As long as a good rare earth profile of both contaminated and natural (in this case fly ash and coal ash) material can be established, the results can be quite definitive, which could result in significant volume reduction by minimizing the amount of material excavated and disposed of. This will lead to cost and time savings for what could be an otherwise costly and potentially complex excavation. Anyone performing environmental remediation of NORM contaminated sites may benefit from this paper and presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Infrastructure and Mission Capability at Hanford - 19048

As Hanford celebrates its 75. anniversary, the challenge to complete the cleanup mission and simultaneously prepare for new nuclear operations puts increasing pressure on an infrastructure system that in some places is nearly the same age. While the cleanup mission began in earnest in 1989 and continues today, completing construction of the country's largest Waste Treatment and Immobilization Plant will put nuclear operations back into the Hanford footprint. Ensuring that the infrastructure originally built to support plutonium production as part of the Manhattan Project is the right size and reliable for the remaining missions is a delicate balance of funding priorities, strategy and a predictable project delivery. The DOE Richland Operations Office (DOE-RL) and other sites across the DOE complex have recognized the need for increased investment in site infrastructure. Combined with this increasing need is the funding reality of variable fiscal budgets that creates challenges for even the best strategists. The current Hanford infrastructure priority list has approximately 100 reliability projects with a combined value over $380 million dollars. At current funding levels, there is a 10 to 15-year backlog. To meet this challenge head on, DOE-RL and Mission Support Alliance (MSA) regularly evaluate project priorities and ongoing maintenance actions to ensure the highest risk systems are addressed. This is done by integrating historical and operational knowledge, system health reports, and maintenance records then coordinating with the Facility Information Management System (FIMS). Sometimes with decades old infrastructure, it can seem as if everything is a number one priority. Recently, in a random testing of approximately 20% of the wooden power poles on site, approximately 92% of the poles were found to be in satisfactory condition with 8% percent failing. MSA Electrical Utilities group immediately replaced one pole, found to have only 8% strength remaining. This type of severely degraded infrastructure is not conducive to reliable mission execution. Given the historical prioritization of funding for cleanup, then operations, followed by infrastructure, it is not surprising that the commitment of funds on infrastructure projects such as sewer collection systems or replacing old electrical transformers has been hard fought. The acknowledgement and re-prioritization of limited funds will work towards creating a more reliable and sustainable infrastructure portfolio that will support and even enhance the cleanup and operations missions. This paper/presentation will outline Hanford's approach to executing reliability projects that will serve the remaining missions on site for years to come. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost-effective Remediation of Legacy Uranium Mines in Canada - 19279

Canada's legacy uranium mines were developed and operated in the 1950's and the 1960's when environmental regulations applied to mining activities were not as stringent as they are today. Fortunately, the ore was very low grade and, most of these sites do not currently pose a significant risk. However, the mining practices used at the time would not be considered acceptable today and there is a need to ensure these sites are being managed properly, especially in the context of gaining public support for the development of new uranium mines. At the beginning of the Cold War nuclear arms race, uranium was in high demand. In 1948, bans on private uranium exploration and mining were lifted, resulting in extensive exploration activity across the country, with Canada's second uranium mine beginning production in 1953. By 1958, 19 uranium mills were operating and Canadian production peaked at 12,239 tonnes of uranium metal (tU). The uranium mining boom was short-lived as the United States, the major purchaser, soon had sufficient quantities of uranium to meet its needs and the Canadian contracts were not extended. Uranium mines began closing, and by 1965, only 4 remained in operation. Closure requirements were minimal at that time, and other than sealing shafts and other safety measures, the sites were abandoned by their owners and the wastes were not addressed. In many cases, the company that operated the mine, or its successor, still exists and is now addressing the wastes on its sites. However, sites for which a former operator cannot be found have become a government responsibility. It is not often practical or cost-effective to remediate legacy sites to the standards applied to modern uranium mines. Most of the sites pose a very low risk, due to the very low-grades of ore, their remote locations, and the fact that contamination has spread and dissipated over the last 50 years and the environment will continue to improve through natural attenuation. Owners of legacy uranium mine sites in Canada have developed and successfully carried out cost-effective remediation plans that meet regulatory requirements. Experience from the legacy sites that have been remediated to date in Canada has shown that costs for remediating legacy uranium mines need not be excessive, and should be similar to the cost of remediating other metal mines of comparable size. The main factor in the cost of remediating these sites is the amount of tailings that were generated. On a per unit cost basis (current U.S. dollars), costs of remediation, have ranged from US$0.83 to US$2.57 per tonne of tailings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Indoor Radon Measurements from Residential Buildings with Basements in a Community with Potential LLRW Contamination - 19566

The Port Hope Area Initiative (PHAI) represents the Government of Canada's commitment to the cleanup and safe, local, long-term management of historic low-level radioactive waste (LLRW) in two Southern Ontario municipalities-Port Hope and Clarington. The PHAI (see reference for internet address) is based on community-recommended solutions for the cleanup and safe long-term management of approximately 1.7 million cubic meters of LLRW. It is currently one of Canada's largest environmental remediation projects at a cost of over one billion dollars. Canadian Nuclear Laboratories (CNL) is implementing the PHAI on behalf of Atomic Energy of Canada Limited, a Federal Crown Corporation. An initial characterization and remediation program in the urban area of Port Hope was conducted from 1976 to 1981. The waste is the result of radium and uranium processing in Port Hope by the former Federal Crown Corporation Eldorado Nuclear Limited between 1933 and 1988. One contaminant of concern in the LLRW is radium-226 (Ra-226) which may lead to elevated indoor levels of radon-222 (Rn-222) indoors. As part of CNL's implementation of the PHAI, Arcadis is conducting the Port Hope Project Property Radiological Survey of approximately 4,800 small-scale sites to identify 1) properties that have not been affected by historic operations and 2) properties that have residual historic low-level radioactive waste impacts requiring remediation either for soils or for interior contamination or both. Over the last six years, a component of the Small Scale Sites (SSS) characterization surveys have measured radon concentrations in essentially all buildings in Port Hope using alpha-track detectors. All properties had subsurface characterization including analytical characterization and lithology following the radon measurement reporting to measure if soil concentrations exceeded the PHAI Cleanup Criteria (PHAI CC) for Ra-226 of 0.29 Bq/g. Buildings with radon gas exceeding a trigger level of 200 becquerels per cubic meter (Bq/m{sup 3}) or those with ventilation systems required investigation of soil concentrations around the perimeter of the building. Ra-226 concentrations above the background level of 0.05 Bq/g due to LLRW sources were forwarded to create remedial action plans (RAPs) to remove the contamination near the building. The SSS surveys provide a substantive data set on the approximately 3,000 properties measured to date with interior Rn-222 gas measurements and descriptions of the physical characteristics of the buildings, the lithology of soils near the buildings and the measurements of Ra-226 concentration in the soils on the property. Consideration of the potential for contribution from non-LLRW Ra-226 from natural sources or coal ash was required on some properties. This paper describes the data and exploratory analysis of the relationship(s) between LLRW and non-LLRW factors that affect the variation in indoor radon concentrations. Historical information on the urban area, the measured Ra-226 concentration and the age of the building were correlated with radon concentrations. A large variety of native soils are found in the complex terrain and the type of native soil was correlated with the radon concentrations. A statistical analysis to address the impact of co-related explanatory variables to model indoor radon concentrations is planned when the SSS activities are complete. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative: Information Management for A Very Large Radiation Survey - 19567

The Port Hope Area Initiative (PHAI) represents the Government of Canada's commitment to the cleanup and safe, local, long-term management of historic low-level radioactive waste (LLRW) in two Southern Ontario municipalities - Port Hope. The PHAI is based on community-recommended solutions for the cleanup and safe long-term management of approximately 1.7 million cubic meters of LLRW. It is currently one of Canada's largest environmental remediation projects at a cost of over one billion dollars. The PHAI is being implemented by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. The waste is the result of radium and uranium processing in Port Hope by the former federal crown corporation Eldorado Nuclear Limited between 1933 and 1988. The waste has been distributed in the Municipality of Port Hope through placement of contaminated materials (e.g. fill), reuse of contaminated objects (e.g. tailings use in concrete, steel posts, structural wood) and air-borne deposition. Signature contaminants of potential concern (COPCs) are Ra-226, Th-230, uranium and arsenic; however, there are an additional 17 COPCs that also need to be considered. A very large amount of information has been collected during the survey and effectively managing and analyzing this information is critical to the success for the property owners, CNL's implementation of the PHAI, and Arcadis. Data collected during the survey includes information pertaining to long-term interior radon gas measurements, interior gamma radiation surveys, contaminated objects and surfaces, exterior gamma radiation and subsurface investigations. exterior gamma radiation surveys. The information management (IM) is structured with SharePoint as a focal point supported by an EQuIS database, mobile data collection and GIS support. The IM process for this project is being advanced using recent software developments to assist with internal activities (e.g. QA) and interactions with CNL including notifications and scheduling and status of property completion. Different applications have been developed to help automate, visualize, actively track, and QA different processes using recent software developments by Microsoft. We have used SharePoint to organize and track our data. Power BI has been used to actively track and visualize our data from Interior gamma surveying to exterior drilling. The creation of dynamic/advanced visualizations in Power BI gathers data daily from our multiple sources and analyzes it for anomalous data and trends. Microsoft Flow syncs with Power BI and has been implemented to automate many processes including the QA of surveys and soil results for identification of LLRW. To tie everything together, our GIS and EQuIS systems are our primary data compilation source that makes our advanced analytics/visualization and automation/tracking our data possible. Specific examples will be discussed, as will challenges encountered during the continuing development of the IM system. The incorporation of software advancements to the existing IM system for Port Hope characterization has improved the quality of the surveys, the tracking of completion, meeting schedule requirements and providing the required data for tracking, report preparation and supporting remediation of contamination on the properties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Melter Modeling over a Range of Scales to Support Vitrification at the WTP - 19664

Computational modeling is a powerful complement to laboratory experiments and testing of systems at various scales. When properly applied and validated, computational fluid dynamics (CFD) can provide information not readily obtainable by physical testing, especially in cases where the operating environment does not permit visual observation or the insertion of typical data acquisition instrumentation as in the case of waste glass vitrification. A series of CFD and heat transfer models over a range of scales are being developed to support melter operations at the Hanford Waste Treatment and Immobilization Plant. This paper provides a description of the models and the resulting information they provide that can be used to improve melter throughput, as well as aid in evaluating and resolving operating plant issues or upsets. This work is important for the WTP operation by providing a potential for model-predictive control of the melter operation. Increases in the rate of glass production and avoiding idling can significantly decrease the duration and cost of the vitrification campaign, potentially saving billions of dollars. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Systematic Analysis of Drivers and Barriers of Cross-Sectorial Learning Between Nuclear and Oil and Gas Decommissioning Projects - 20139

Project and megaproject management in the energy sector have historically focused on the planning and delivery of the construction of infrastructure. Therefore, policies are predominantly oriented to support the construction of infrastructure rather than its decommissioning. However, globally, several facilities have reached (or will soon reach) their end-of-life and need to be decommissioned. These facilities span across the energy sector, including nuclear power plants and oil and gas rigs, whose decommissioning present unprecedented techno-socio-economic challenges. Moreover, globally, their decommissioning cost is estimated to reach hundreds of billions of US dollars and this budget keeps increasing, with limited knowledge-transfer across industries to mitigate the spiraling increase of this figure. Cross-sectorial knowledge-transfer is a way to tackle this matter and improve the planning and delivery of decommissioning and waste management projects. The aim of this research is to build a road-map based on cross-sectorial industrial experience, designed to promote the sharing of good practices between projects both within and across industries dealing with major decommissioning and waste management challenges. To reach this aim, the tacit knowledge of senior practitioners on several large scale nuclear and oil and gas decommissioning projects is made explicit by the means of semi-structured interviews, systematically analyzed through directed content analysis. The results of this analysis include a list of good practices that could and should be transferred to nuclear decommissioning projects, including the need to promote the adoption of incentives explicitly linked to the project deliverables, and to develop long-term plans to support smooth transition from operations to decommissioning. Suggestions about how the knowledge-transfer can be promoted within and across organizations are also discussed. In this way, this research provides practical guidance for project managers and policymakers on how to support the planning and delivery of projects with improved performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Acquisition and Implementation of a Comprehensive Environmental Permits Linking Tool at Savannah River Site - 20234

Historically, Savannah River Nuclear Solutions LLC (SRNS) tracked environmental regulatory commitments and the requirements from hundreds of permits at the Savannah River Site (SRS) using several separate methods, making integrated compliance assurance cumbersome and labor-intensive. When SRNS experienced an increase in environmental issues in 2017, SRNS management and U.S. Department of Energy - Savannah River (DOE-SR) management decided a single, proactive approach was needed to capture environmental permit information (including regulations, Consent Orders, DOE Orders, and any other state or federally issued statement of requirements), track the tasks necessary to ensure compliance with these requirements, and thereby mitigate the risk of noncompliance. SRNS developed a list of mandatory objectives that the tool must meet to function as a Comprehensive Environmental Permits Linking Tool (CEPLT). A key requirement was the ability to map Site permits to their governed locations and display the associated requirements at the compliance point (e.g., outfall, stack, waste unit, etc.). Several options included modifying existing onsite resources, building a custom onsite solution, purchasing an off-the-shelf solution, and contracting an offsite developer to build a custom solution. SRNS concluded an off-the-shelf solution with configuration and customization options would provide the flexibility to fit the unique needs of Savannah River Site (SRS) while taking advantage of industry-tested software and providing a reduced deployment timeline. SRNS chose Gensuite{sup R} a, a cloud-based solution that offers numerous a la carte applications in the environmental, health, and safety arenas, as the best candidate. SRNS selected three (3) integrated applications (Compliance Calendar, Permit Manager, and Mapper) to function as the CEPLT. The Compliance Calendar module allows for creation and tracking of regulatory commitment tasks assigned to responsible environmental professionals. Permit Manager organizes permits and other requirement documents, linking the commitments in each to Compliance Calendar tasks and/or implementing procedures. Mapper provides GIS capability for mapping the data from the other two modules to their physical onsite locations. The CEPLT was configured to allow for other SRS Site Tenants to eventually utilize the applications. Additionally, DOE-SR uses the CEPLT to provide an overview of contractor environmental compliance activities and to organize DOE-specific documents and tasks. The CEPLT fulfilled the requirement of meeting current compliance needs as well as providing the ability to grow as new organizations are incorporated and functionality is expanded. SRNS now uses the CEPLT to more effectively manage permit requirements, improve knowledge transfer, and increase the Site's overall protection of the environment, the Site worker, and the public. Possible future uses of the system include integration of mobile applications for timely communication of potential non-compliant conditions and DOE complex-wide deployment allowing for enhanced DOE site and Head Quarters oversight. Implementation of CEPLT will result in cost savings, both in terms of dollars and man-hours. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-situ Detection of Glovebox Glove Degradation Prior to Glove Failure; Effects on Safety, Waste, and Operational Costs - 20402

Glovebox glove pressure decay leak testing and analysis of the data can greatly improve glovebox safety, minimize Transuranic (TRU) glove waste, and minimize operational cost. It is well known, the weakest point of containment on a glovebox is the glove. Mitigating unplanned openings in gloves is critical to minimizing operational and safety costs in glovebox operations. Mitigating unplanned glove openings due to glove failures will be discussed in this paper. The lack of an engineered solution to determine a gloves operational life in nuclear operations, has lead to use of theoretical and manual subjective methods to determine the life and safety of a glovebox glove. Whether the glove is inspected visually prior to use, or gloves are changed regularly to theoretically avoid failure, both the operators PPE and the room are being exposed to contamination, or un-necessary amounts of TRU glove waste are being generated. Millions of dollars yearly in operational costs are spent on glove failures due to loss of production, incident analysis, regulatory audits, clean up, and paperwork. In a nuclear application, a glove failure could contaminate an operator and laboratory, shut down the operation for weeks, potentially create a regulatory audit, and potentially create a media frenzy; the damages to the organization can be astronomical. Elimination of glove failures is possible by tracking glove material degradation and setting limits to allow glove change when it becomes necessary, prior to glove failure. Analytical pressure decay leak testing allows the detection of material degradation, and in turn the ability to limit operational glove failures. A German based company called MK Versuchsanlagen, e.K., has developed an advanced Glove Integrity Testing System. The system, with its use of proprietary RFID and special software technology, is unique in its capabilities. The system is capable to perform highly accurate regular glove testing on any size glovebox line in minimal time. The system records and can analyze a tremendous amount of system data that in turn can determine, for example, a safe glove change time prior to a glove material failure. This paper will show how an advanced Glove Integrity Testing System can detect glove material degradation and help determine a safe change point prior to glove failure. Pressure decay curves of new gloves and recorded effects of accelerated aging on the glove over time will be shown. The use of this technology in nuclear facilities can greatly improve glovebox operational safety, minimize glovebox glove TRU waste, and save organizations tremendous costs in downtime, clean up, documentation, and potential regulatory review. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating Age Effects on HEPA Filter Performance

Nuclear grade high efficiency particulate air (HEPA) filters are routinely employed as the final control element in confinement ventilation systems. The traditional HEPA filter utilizes a pleated filter medium of fibrous glass that has been produced in a manner analogous to manufacturing paper. These filters are the physically weakest element in a containment ventilation system. Containment ventilation systems are designed to condition the air-stream (temperature, relative humidity, moisture, particle size distribution of aerosols, and aerosol concentration) to levels/conditions that fibrous glass HEPA filters can handle. Approximately 6000 nuclear grade HEPA filters are purchased each year for use in the DOE/NNSA complex. Additional filters are purchased for use in commercial nuclear power generation and ventilation systems of other nuclear applications. These filters are designed and tested in accordance with the American Society of Mechanical Engineers (ASME) AG-1 Code Nuclear Air and Gas Treatment. This code establishes design requirements and qualification procedures. Qualification testing of axial flow filters is described in paragraphs 5000 and following of AG-1. The series of qualification tests are intended to describe the operating envelope of HEPA filters and verify the reliability of a filter design. AG-1 qualification also confirms the pedigree of components used in manufacture for that filter design. The collective set of qualification tests establishes the assumed operating envelope for AG-1 filters. The effects of age on HEPA filter performance have been a concern for at least two decades. A combination of physical evaluation of aged filter media and a review of filter failure records resulted in Appendix C of the Nuclear Air Cleaning Handbook (NACH), Determination of HEPA Filter Life. This states that HEPA filters are not to be used beyond 10 years from the date of manufacture. Additionally, filters put into service in locations where they may become wet are to be taken out of service five years from date of manufacture. Filters that have become wet are to be taken out of service immediately. Finally, it should also be pointed out that filters held in Level B storage are subject to the same 10-year service life. Very limited bench-scale testing in the 1990's raised concern that aging HEPA filters do not have the strength to withstand an accident scenario. In May of 1999, the DNFSB released a Technical Report 23 entitled HEPA Filters Used in the Department of Energy's Hazardous Facilities. This report expressed concerns for the potential vulnerability of HEPA filters in vital safety systems. Concerns and uncertainty associated with degradation of HEPA filter performance over time led the DOE sites to limit HEPA filter service life to 10 years from the date of manufacture or five years in cases where filters may become wet. Establishment of a conservative service life needs to be based on data from a structured series of tests comparing the performance envelope of new and aged full-scale filters. A service life that is insufficiently conservative endangers workers and the public. One that is excessively conservative costs can cause hundreds of otherwise unnecessary filter changes. This increases exposure of employees, disrupts facility operations, and increase disposal costs by millions of dollars annually. Conclusive data are needed to resolve uncertainty associated with the damaging effects of aging on durability of HEPA filters. Therefore, this study needs to provide a sufficient body of evidence to allow DOE and site professionals to make prudent decisions. An updated version of ASME AG-1 Section FC included a non-mandatory appendix that would include the DOE guidance for service life of HEPA filters. Balloting of this revision generated significant resistance to inclusion of any kind of service life language citing the lack of supporting experimental data. Efforts to resolve negative votes failed and resistance to acceptance of the language increased. The result has been to not include service language in Section FC and requests to remove it from sections that already include such language. The recent activity of the ASME AG-1 Committee on Nuclear Air and Gas Treatment effectively de-emphasizes following DoE's service life guidelines. The DOE Office of Nuclear Safety under its NSR and D program provided the Mississippi State University Institute for Clean Energy Technology (ICET) finding to initiate a study to determine the effects of aging on AG-1 axial flow filters just prior to actions taken within the AG-1 committee regarding service life. The NSR and D funding facilitated timely development of a national technical working group comprised of members from the regulatory community, DOE complex, and commercial power to resolve uncertainty associated with effects of aging. The Department of Energy Office of Environmental Management (DOE-EM) has been funding the ICET to evaluate the performance envelope for AG-1 HEPA filters. ICET is one of DOE-EM's qualified suppliers. Synergy has been achieved by associating the NSR and D aged filter activities to testing activities evaluating the performance envelopes of separator and separator-less AG-1 HEPA filters funded by DOE-EM. The DOE-EM funded activities establish baseline data for the aged filter study and future EM funding will provide long term support for testing additional aged filters. EM funding of new filters includes analytical evaluation of media tensile strength by thermal analysis to establish baseline values and determine mass loss of moisture resistance and acrylic binders due to use. All of these values can be used for comparison of test results for aged filters. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Molten Salt Reactor Simulations using MPACT-CTF

The US Department of Energy and industry have shown significant interest in advanced reactors, as evidenced by over 1.3 billion dollars of private investments in companies to develop advanced reactor concepts. More than seven of these advanced reactor concepts use molten salt reactor (MSR) technology. Based on this interest in MSR technology, ORNL has invested in the development of the MSR simulation capability, extending some capabilities in VERA to model this high-profile reactor concept. In this paper, the MPACT deterministic neutron transport capability and the COBRA Two-Fluid (CTF) subchannel capability are adapted to handle liquid fuel MSRs. Specifically, this work focuses on modifications to the depletion algorithms to account for isotopic mixing, continuous feed, and continuous removal. Models will be added to account for drift of precursors and decay heat emitters as the liquid fuel flows through the reactor coolant system. Modifications to CTF, including the addition of molten salt properties, are also addressed. Finally, the coupled MPACT-CTF capability is used to simulate the 30-year operation of an MSR.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dynamic Analysis of the Next Generation Molten-Salt Breeder Reactor System

The conceptual design of a 1000 MWe two-fluid molten-salt breeder reactor (MSBR) station was performed during 1966-1970 at Oak Ridge National Laboratory (ORNL) with the goal of using the U-233 fuel cycle. This modular design with four reactor modules has an electrical output of 250 MW/module. The abundance of Th-232 was attractive in converting it to U-233 in a thermal breeder reactor. The two-fluid reactor is graphite-moderated 'with a {sup 7}LiF-BeF{sub 2}-UF{sub 4} fuel salt circulated through the core and a {sup 7}LiF-ThF{sub 4}-BeF{sub 2} blanket salt circulated through separate flow channels distributed throughout the core, as well as in a surrounding under-moderated region'. This reactor design has the advantages of not producing Pu isotopes and easy chemical separation of U-233 in the blanket material. The low fuel cost and the graphite replacement cost are attractive for such a design, with an estimated cost of $141/kW at 1968-dollar value. Potential non-proliferation features of MSBR, the low costs of raw materials, and established chemical separation of fission products are important factors in further development of MSBRs as an alternative to current light water reactors. These reactors are often referred to as liquid fluoride thorium reactor (LFTR). The current research on the modeling of the MSBR is based on an earlier work on the preliminary dynamic model of the MSBR concept. Revisions are made to the original model. The physics parameters have been modified for the current modeling effort based on additional information including more recent values of model parameters from and several typographical misprints in equations and values. Details of this effort will be presented in a full follow-up paper. This work presents the detailed nodal models of reactor fluid core, blanket fluid loop, graphite moderator, fuel fluid heat exchanger, and the blanket fluid heat exchanger. A set of simulations has been performed to validate the model using the commercial software MATLAB{sup TM}-Simulink. Simulations were performed for the cases of source perturbation and reactivity perturbation. The model is inherently nonlinear. A description of the MSBR conceptual design, along with a tabulation of relevant system parameters, is presented. The results of simulation demonstrate stable behavior of the MSBR dynamics, temperature feedback effects, and load-following capability of the MSBR system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

VERA neutronics high-fidelity benchmark for a modern PWR core design

Nearly 20 years since the origin of the infamous 'Kord Smith Challenge', and after 10 years and hundreds of millions of dollars invested by the US Department of Energy into the development of the Virtual Environment for Reactor Applications (VERA), the capability to accurately simulate a modern pressurized water reactor (PWR) fuel cycle at the fuel rod level with high-fidelity Monte Carlo (MC) stochastic transport methods still evades us. The deterministic methods in VERA make approximations that allow it to be successfully benchmarked against measured data from hundreds of PWR fuel cycles, but none of these benchmarks provided information at the local fuel rod level or allowed quantification of these approximations' impact for modern PWR reload designs. Using MPACT to establish the estimated isotopic distributions and thermal hydraulic conditions in a recent and challenging reactor design, a 2D quarter-core benchmark problem was established and solved consistently with both MPACT, the 51-energy group deterministic transport solver in VERA, and Shift, the continuous-energy MC transport solver in VERA. Impacts of energy groups, ray spacing, and scattering treatment were evaluated. Though MPACT has been previously shown to perform well compared to MC methods for initial Cycle 1 cores with only fresh fuel, this is the first benchmark of MPACT for a challenging modern reload core with depleted fuel and burnable absorbers. This work establishes additional credibility for the methods in MPACT and highlights the efficiency of these methods relative to those in use by MC-based tools. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗