Search NASA⌕ Search

SEARCH · Search NASA

Results for “ENFORCEMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

A framework for WRF to WRF-IBM grid nesting to enable multiscale simulations

With advances in computational power, mesoscale models, such as the Weather Research and Forecasting (WRF) model, are often pushed to higher resolutions. As the model’s horizontal resolution is refined, the maximum resolved terrain slope will increase. Because WRF uses a terrain-following coordinate, this increase in resolved terrain slopes introduces additional grid skewness. At high resolutions and over complex terrain, this grid skewness can introduce large numerical errors that require methods, such as the immersed boundary method, to keep the model accurate and stable. Our implementation of the immersed boundary method in the WRF model, WRF-IBM, has proven effective at microscale simulations over complex terrain. WRF-IBM uses a non-conforming grid that extends beneath the model’s terrain. Boundary conditions at the immersed boundary, the terrain, are enforced by introducing a body force term to the governing equations at points directly beneath the immersed boundary. Nesting between a WRF parent grid and a WRF-IBM child grid requires a new framework for initialization and forcing of the child WRF-IBM grid. This framework will enable concurrent multi-scale simulations within the WRF model, improving the accuracy of high-resolution simulations and enabling simulations across a wide range of scales.

54 ENVIRONMENTAL SCIENCES↗

Estimating the National Carbon Abatement Potential of City Policies: A Data- Driven Approach

Cities are increasingly taking actions such as building code enforcement, urban planning, and public transit expansion to reduce emissions of carbon dioxide in their communities and municipal operations. However, many cities lack the quantitative information needed to estimate policy impacts and prioritize city actions in terms of carbon abatement potential and cost effectiveness. This report fills this research gap by providing methodologies to assess the carbon abatement potential of a variety of city actions. The methodologies are applied to an energy use data set of 23,458 cities compiled for the U.S. Department of Energy’s City Energy Profile tool. The analysis estimates the national carbon abatement potential of the most commonly implemented actions in six specific policy areas. The results of this analysis suggest that, in aggregate, cities could reduce nationwide carbon emissions by about 210 million metric tons of carbon dioxide (MMT CO 2 ) per year in a "moderate abatement scenario" by 2035 and 480 MMT CO 2 /year in a "high abatement scenario" by 2035 through these common actions typically within a city’s control in the six policy areas. The aggregate carbon abatement potential of these specific areas equates to a reduction of 3%-7% relative to 2013 U.S. emissions. At the city level, the results suggest the average city could reduce carbon emissions by 7% (moderate) to 19% (high) relative to current city-level emissions. City carbon abatement potential is sensitive to national and state policies that affect the carbon intensity of electricity and transportation. Specifically, the U.S. Clean Power Plan and further renewable energy cost reductions could reduce city carbon emissions overall, helping cities achieve their carbon reduction goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Clean Energy in City Codes: A Baseline Analysis of Municipal Codification across the United States

Municipal governments in the United States are well positioned to influence clean energy (energy efficiency and alternative energy) and transportation technology and strategy implementation within their jurisdictions through planning, programs, and codification. Municipal governments are leveraging planning processes and programs to shape their energy futures. There is limited understanding in the literature related to codification, the primary way that municipal governments enact enforceable policies. The authors fill the gap in the literature by documenting the status of municipal codification of clean energy and transportation across the United States. More directly, we leverage online databases of municipal codes to develop national and state-specific representative samples of municipal governments by population size. Our analysis finds that municipal governments with the authority to set residential building energy codes within their jurisdictions frequently do so. In some cases, communities set codes higher than their respective state governments. Examination of codes across the nation indicates that municipal governments are employing their code as a policy mechanism to address clean energy and transportation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Weldon Spring, Missouri, Site Annual Report for Calendar Year 2015 June 2016

1.1 Purpose and Scope. This report summarizes the activities, compliance status, annual inspection, and environmental monitoring results from calendar year 2015 for the Weldon Spring, Missouri, Site. The U.S. Department of Energy (DOE) prepares this annual report as part of the site’s long-term surveillance and maintenance (LTS&M) activities, in accordance with the requirements of the Long-Term Surveillance and Maintenance Plan for the Weldon Spring, Missouri, Site (LTS&M Plan) (DOE 2008a) and the Federal Facility Agreement for the Weldon Spring Site (DOE 2006). The Weldon Spring site is a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site. 1.2 Site Description. The Weldon Spring site is located in St. Charles County, Missouri, about 30 miles west of St. Louis, Missouri (Figure 1). The site comprises two geographically distinct, DOE-owned properties: the former Weldon Spring Chemical Plant and Raffinate Pit sites (Chemical Plant) and the former Weldon Spring Quarry (Quarry). The former Chemical Plant is located about 2 miles southwest of the junction of Missouri State Route 94 and Interstate 64. The Quarry is about 4 miles southwest of the former Chemical Plant. Both sites are accessible from Missouri State Route 94. During the early 1940s, the Department of the Army acquired 17,232 acres of private land in St. Charles County for the construction of the Weldon Spring Ordnance Works facility. The former Ordnance Works site has since been divided into several contiguous areas under different ownership, as depicted in Figure 2. Current land use of the former Ordnance Works site includes the former Chemical Plant and Quarry, the U.S. Army Reserve Weldon Spring Training Area, the Missouri Department of Conservation (MDC), the Missouri Department of Natural Resources (MDNR) Division of State Parks (MDNR-Parks), Francis Howell High School, a St. Charles County highway maintenance (formerly Missouri Department of Transportation [MoDOT]) facility, the Public Water Supply District No. 2 water supply facility, the St. Charles County law enforcement training center, the village of Weldon Spring Heights, and a University of Missouri research park. The former Chemical Plant and Quarry areas total 228.16 acres. The Former Chemical Plant property occupies 219.50 acres, and the Quarry occupies 8.66 acres.

2015 Annual Report Weldon Spring↗

Capturing Energy-Saving Opportunities: Improving Building Efficiency in Rajasthan through Energy Code Implementation

India adopted the Energy Conservation Building Code (ECBC) in 2007. Rajasthan is the first state to make ECBC mandatory at the state level. In collaboration with Malaviya National Institute of Technology (MNIT) Jaipur, Pacific Northwest National Laboratory (PNNL) has been working with Rajasthan to facilitate the implementation of ECBC. This report summarizes milestones made in Rajasthan and PNNL's contribution in institutional set-ups, capacity building, compliance enforcement and pilot building construction.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I -- National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Thanks to advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India's RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU's anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD $920 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment - from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India's 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MOOSE IPL Extensions (Control Logic)

In FY-2015, the development of MOOSE was driven by the needs of the NEAMS MOOSE-based applications, BISON, MARMOT, and RELAP-7. An emphasis was placed on the continued upkeep and improvement MOOSE in support of the product line integration goals. New unified documentation tools have been developed, several improvements to regression testing have been enforced and overall better software quality practices have been implemented. In addition the Multiapps and Transfers systems have seen significant refactoring and robustness improvements, as has the “Restart and Recover” system in support of Multiapp simulations. Finally, a completely new “Control Logic” system has been engineered to replace the prototype system currently in use in the RELAP-7 code. The development of this system continues and is expected to handle existing needs as well as support future enhancements.

97 MATHEMATICS AND COMPUTING↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India’s Electric Grid, Vol. 1. National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Using advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India’s RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (Berkeley Lab), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU’s anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD 980 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment—from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India’s 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Predicting Baseline for Analysis of Electricity Pricing

To understand the impact of new pricing structure on residential electricity demands, we need a baseline model that captures every factor other than the new price. The standard baseline is a randomized control group, however, a good control group is hard to design. This motivates us to devlop data-driven approaches. We explored many techniques and designed a strategy, named LTAP, that could predict the hourly usage years ahead. The key challenge in this process is that the daily cycle of electricity demand peaks a few hours after the temperature reaching its peak. Existing methods rely on the lagged variables of recent past usages to enforce this daily cycle. These methods have trouble making predictions years ahead. LTAP avoids this trouble by assuming the daily usage profile is determined by temperature and other factors. In a comparison against a well-designed control group, LTAP is found to produce accurate predictions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Efficiency Roadmap for Uganda, Making Energy Efficiency Count. Executive Summary

Like many countries in Sub-Saharan Africa, Uganda has focused its energy sector investments largely on increasing energy access by increasing energy supply. The links between energy efficiency and energy access, the importance of energy efficiency in new energy supply, and the multiple benefits of energy efficiency for the level and quality of energy available, have been largely overlooked. Implementing energy efficiency in parallel with expanding both the electricity grid and new clean energy generation reduces electricity demand and helps optimize the power supply so that it can serve more customers reliably at minimum cost. Ensuring efficient appliances are incorporated into energy access efforts provides improved energy services to customers. Energy efficiency is an important contributor to access to modern energy. This Energy Efficiency Roadmap for Uganda (Roadmap) is a response to the important role that electrical energy efficiency can play in meeting Uganda’s energy goals. Power Africa and the United Nations Sustainable Energy for All (SEforALL) initiatives collaborated with more than 24 stakeholders in Uganda to develop this document. The document estimates that if the most efficient technologies on the market were adopted, 2,224 gigawatt hours could be saved in 2030 across all sectors, representing 31% of the projected load. This translates into 341 megawatts of peak demand reductions, energy access to an additional 6 million rural customers and reduction of carbon dioxide emissions by 10.6 million tonnes in 2030. The Roadmap also finds that 91% of this technical potential is cost-effective, and 47% is achievable under conservative assumptions. The Roadmap prioritizes recommendations for implementing energy efficiency and maximizing benefits to meet the goals and priorities established in Uganda’s 2015 SEforALL Action Agenda. One important step is to create and increase demand for efficiency through long-term enabling policies and financial incentives combined with development of technical expertise in the labor force to allow for the promotion of new business models, such as energy service companies. A combination of enabling policies, financial schemes, regulations, enforcement, and skill development are needed to open the energy efficiency market.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Insights Gained from Forensic Analysis with MELCOR of the Fukushima-Daiichi Accidents.

Since the accidents at Fukushima-Daiichi, Sandia National Laboratories has been modeling these accident scenarios using the severe accident analysis code, MELCOR. MELCOR is a widely used computer code developed at Sandia National Laboratories since ~1982 for the U.S. Nuclear Regulatory Commission. Insights from the modeling of these accidents is being used to better inform future code development and potentially improved accident management. To date, our necessity to better capture in-vessel thermal-hydraulic and ex-vessel melt coolability and concrete interactions has led to the implementation of new models. The most recent analyses, presented in this paper, have been in support of the of the Organization for Economic Cooperation and Development Nuclear Energy Agency’s (OECD/NEA) Benchmark Study of the Accident at the Fukushima Daiichi Nuclear Power Station (BSAF) Project. The goal of this project is to accurately capture the source term from all three releases and then model the atmospheric dispersion. In order to do this, a forensic approach is being used in which available plant data and release timings is being used to inform the modeled MELCOR accident scenario. For example, containment failures, core slumping events and lower head failure timings are all enforced parameters in these analyses. This approach is fundamentally different from a blind code assessment analysis often used in standard problem exercises. The timings of these events are informed by representative spikes or decreases in plant data. The combination of improvements to the MELCOR source code resulting from analysis previous accident analysis and this forensic approach has allowed Sandia to generate representative and plausible source terms for all three accidents at Fukushima Daiichi out to three weeks after the accident to capture both early and late releases. In particular, using the source terms developed by MELCOR, the MACCS software code, which models atmospheric dispersion and deposition, we are able to reasonably capture the deposition of radionuclides to the northwest of the reactor site.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Energy Savings Analysis of the Proposed Revision of the Washington D.C. Non-Residential Energy Code

This report presents the results of an assessment of savings for the proposed Washington D.C. energy code relative to ASHRAE Standard 90.1-2010. It includes annual and life cycle savings for site energy, source energy, energy cost, and carbon dioxide emissions that would result from adoption and enforcement of the proposed code for newly constructed buildings in Washington D.C. over a five year period.

Commercial Energy Code↗

Evaluation of Preventative Radiological/Nuclear Detector Archetypes to Validate Repurpose to the Consequence Management Mission

In the event of a radiological or nuclear emergency involving a large-scale release of radioactive material, local responders would be the primary means to perform radiation measurements to assess impacts and issue protective action recommendations for the responders and the public. Over the first 24-36 hours, Federal responders and resources will deploy to augment the local efforts, and if necessary, provide extensive radiation monitoring and assessment capabilities coordinated by the Department of Energy-led Federal Radiological Monitoring and Assessment Center and Federal Emergency Management Agency-led Multiagency Coordination Group. Unless Federal resources happen to be deployed at the moment an incident occurs, such as a preventative radiological/nuclear detection mission for a scheduled special event, the local response to an incident will commence and persist for many hours with no on-scene Federal support. For a catastrophic incident, such as a nuclear detonation or severe reactor accident, the local jurisdictions may not have a full range of adequate supplies of health physics instruments and personnel dosimetry. Therefore early in a crisis, the local responders will inevitably conduct their operations with the radiation detection and dosimetry capabilities that they have available until additional resources and support are requested and arrive. Most of the radiation detection instruments currently fielded at the local level are carried by law enforcement personnel and are designed for interdiction missions - referred to here as preventative radiological/nuclear detection (PRND) instruments. This study investigated how this PRND equipment can be repurposed in consequence management (CM) missions.

61 RADIATION PROTECTION AND DOSIMETRY↗

Negotiating Terms and Conditions: An Overview of the Federal Energy Regulatory Commission Hydropower Settlement Agreement Process

The process for obtaining, transferring, or surrendering a Federal Energy Regulatory Commission (FERC) hydropower license or exemption from licensing can be a series of complex negotiations. In many instances, the process may include stakeholders with different and/or competing perspectives or objectives related to the original license, new license (i.e., relicense), transfer of a license, or surrender of a license. Divergent perspectives and objectives can lead to disputes among project participants, which may impact the development of FERC license terms and conditions. One mechanism to resolve disputes between project participants involving a FERC authorization is informal and formal settlement agreement conferences, which often result in settlement agreements addressing the disputed issues. This report provides hydropower stakeholders with a better understanding of the FERC settlement agreement process, including information on: How to initiate a settlement agreement. The procedural steps associated with the settlement agreement process. The legal standards the Commission must adhere to when determining whether settlement agreement provisions can become lawful and enforceable terms or conditions of a FERC authorization. Examples of settlement agreement provisions included as license terms and conditions or in off-license agreements from a collection of settlement agreements and Commission orders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Guidance on How to Report Testing of BOP Shear Rams

The Bureau of Safety and Environmental Enforcement (BSEE) Well Control Rule (Subpart G)1 was published on April 29, 2016, and became effective on July 28, 2016. This rule is part of BSEE regulations pertaining to well control equipment used for oil and gas operations on the U.S. Outer Continental Shelf (OCS).

58 GEOSCIENCES↗

Improved Fracture Models for Relocation Modeling

The BISON fuel performance code is being developed to provide a modern tool that has the flexibility to analyze a wide variety of fuel forms and to model conditions and phenomena that could not be represented in legacy tools. There are a number of motivations for this, including providing support for development of advanced fuel with improved accident tolerance for existing light water (LWR) reactors, improved understanding of mechanisms in fuel designs in current use in a wider variety of conditions, and facilitating the development of fuel for advanced reactor designs. To accomplish these goals, it is clear that BISON must rely on models of fuel behavior that are based on fundamental physical behavior, rather than on empirical correlations that represent that behavior in a simplified fashion. BISON still does employ many empirical models that were originally developed for other fuel performance codes, but efforts are underway to replace these with models that are more physically based. Radial relocation in LWR fuel is an example of a phenomenon that is currently represented by an empirical model, but which is ripe for replacement by physically based models. During normal operation, ceramic LWR fuel experiences significant fracturing that is driven by spatially nonuniform volumetric expansion. This occurs due to the significant thermal gradients within the fuel that occur in fresh and irradiated fuel, as well as nonuniform swelling due to fission products that occurs over longer-term irradiation. Fracture and fragmentation of fuel allows the outer radius of the fuel pellet to expand due to the loss of mechanical constraint and outward radial migration of fragments. This radial expansion has a significant effect on the fuel system response because it decreases the size of the gap between the fuel and cladding. This decreases the thermal resistance across that gap, which leads to decreased fuel centerline temperatures. This report documents recent work to improve the ability of BISON to model radial relocation using the extended finite element method (XFEM). These enhancements include the ability to include cohesive zone models, improved code architecture for propagating cracks based on fracture integrals, and improved handling of fuel and cladding interfaces with XFEM. These capabilities are demonstrated on a simulation of radial relocation including a surface interaction model that enforces residual opening.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

MOOSE IPL Extensions (Documentation)

In FY-2015, The development of MOOSE was driven by the needs of the NEAMS MOOSE-based applications, BISON, MARMOT, and RELAP-7. An emphasis was placed on the continued upkeep and improvement MOOSE in support of the product line integration goals. New unified documentation tools have been developed, several improvements to regression testing have been enforced and overall better software quality practices have been implemented. In addition the Multiapps and Transfers systems have seen significant refactoring and robustness improvements, as has the “Restart and Recover” system in support of Multiapp simulations. Finally, a completely new “Control Logic” system has been engineered to replace the prototype system currently in use in the RELAP-7 code. The development of this system continues and is expected to handle existing needs as well as support future enhancements.

99 GENERAL AND MISCELLANEOUS↗

Progress toward a new implementation of the mortar finite element method in MOOSE

The mortar finite element method has been used for many years in a variety of applications, including the enforcement of continuity conditions across decomposed domains, the implementation of Dirichlet boundary conditions, obtaining improved estimates of surface fluxes, and for solving large deformation contact mechanics problems. There is a currently great deal of interest in developing more robust mechanical and thermal contact solution strategies in the MOOSE framework and physics modules, and schemes based on the mortar finite element approach appear to be a promising avenue of development. There are a number of challenges associated with the development of a robust Lagrange multiplier based formulation of the mortar finite element method which can be tackled using the relatively simple framework of thermal contact problems, before tackling more complicated applications such as thermomechanical contact. In this report, we describe several aspects of our mortar finite element method implementation for solving thermal contact problems. The approach and notation used are based primarily based on the work of Bin Yang et al. ("Two dimensional mortar contact methods for large deformation frictional sliding," International Journal for Numerical Methods in Engineering 62(9), 2005).

97 MATHEMATICS AND COMPUTING↗