Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

Space science to the twenty-first century and the technological implications for implementation

The paper presents the specific plan for NASA space science missions to the 21st century and highlights the major technological advances that must be effected to accomplish the planned missions. Separate consideration is given to plans for astrophysics, planetary exploration, the solar terrestrial area, and life sciences. The technological consequences of the plans in these separate areas are discussed.

Herman, D. H.↗

Acoustics Division recent accomplishments and research plans

The research program currently being implemented by the Acoustics Division of NASA Langley Research Center is described. The scope, focus, and thrusts of the research are discussed and illustrated for each technical area by examples of recent technical accomplishments. Included is a list of publications for the last two calendar years. The organization, staff, and facilities are also briefly described.

Clark, L. R.↗

Cassini science planning process

The mission design for Cassini-Huygens calls for a four-year orbital survey of the Saturnian system and the descent into the Titan atmosphere and eventual soft-landing of the Huygens probe. The Cassini orbiter tour consists of 76 orbits around Saturn with 44 close Titan flybys and 8 targeted icy satellite flybys. The Cassini orbiter spacecraft carries twelve scientific instruments that will perform a wide range of observations on a multitude of designated targets. The science opportunities, frequency of encounters, the length of the Tour, and the use of distributed operations pose significant challenges for developing the science plan for the orbiter mission. The Cassini Science Planning Process is the process used to develop and integrate the science and engineering plan that incorporates an acceptable level of science required to meet the primary mission objectives far the orbiter. The bulk of the integrated science and engineering plan will be developed prior to Saturn Orbit Insertion (Sol). The Science Planning Process consists of three elements: 1) the creation of the Tour Atlas, which identifies the science opportunities in the tour, 2) the development of the Science Operations Plan (SOP), which is the conflict-free timeline of all science observations and engineering activities, a constraint-checked spacecraft pointing profile, and data volume allocations to the science instruments, and 3) an Aftermarket and SOP Update process, which is used to update the SOP while in tour with the latest information on spacecraft performance, science opportunities, and ephemerides. This paper will discuss the various elements of the Science Planning Process used on the Cassini Mission to integrate, implement, and adapt the science and engineering activity plans for Tour.

Cassini↗

The Waypoint Planning Tool: Real Time Flight Planning for Airborne Science

NASA Earth science research utilizes both spaceborne and airborne real time observations in the planning and operations of its field campaigns. The coordination of air and space components is critical to achieve the goals and objectives and ensure the success of an experiment. Spaceborne imagery provides regular and continual coverage of the Earth and it is a significant component in all NASA field experiments. Real time visible and infrared geostationary images from GOES satellites and multi-spectral data from the many elements of the NASA suite of instruments aboard the TRMM, Terra, Aqua, Aura, and other NASA satellites have become norm. Similarly, the NASA Airborne Science Program draws upon a rich pool of instrumented aircraft. The NASA McDonnell Douglas DC-8, Lockheed P3 Orion, DeHavilland Twin Otter, King Air B200, Gulfstream-III are all staples of a NASA's well-stocked, versatile hangar. A key component in many field campaigns is coordinating the aircraft with satellite overpasses, other airplanes and the constantly evolving, dynamic weather conditions. Given the variables involved, developing a good flight plan that meets the objectives of the field experiment can be a challenging and time consuming task. Planning a research aircraft mission within the context of meeting the science objectives is complex task because it is much more than flying from point A to B. Flight plans typically consist of flying a series of transects or involve dynamic path changes when "chasing" a hurricane or forest fire. These aircraft flight plans are typically designed by the mission scientists then verified and implemented by the navigator or pilot. Flight planning can be an arduous task requiring frequent sanity checks by the flight crew. This requires real time situational awareness of the weather conditions that affect the aircraft track. Scientists at the University of Alabama-Huntsville and the NASA Marshall Space Flight Center developed the Waypoint Planning Tool, an interactive software tool, that enables scientists to develop their own flight plans (also known as waypoints) with point-and-click mouse capabilities on a digital map draped with real time satellite imagery. The Waypoint Planning Tool has further advanced to include satellite orbit predictions and seamlessly interfaces with the Real Time Mission Monitor which tracks the aircraft s position when the planes are flying. This presentation will describe the capabilities and features of the Waypoint Planning Tool highlighting the real time aspect, interactive nature and the resultant benefits to the airborne science community.

He, Yubin↗

The Port Hope Area Initiative's Port Granby Project: From Planning to Execution - 17451

The Port Hope Area Initiative's Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of some 450,000 m{sup 3} of LLRW and marginally contaminated soil from the former Port Granby Waste Management Facility (PGWMF) to the newly constructed LTWMF. Presented is an overview of the Port Granby Project and a description of the planning needed to execute the project successfully. A comprehensive suite of approximately 40 pre-construction submittals were developed and submitted for review and approval by Canadian Nuclear Laboratories (CNL), the project authority. Importantly, comprehensive training programs were developed and implemented to ensure all project staff fully understood the scope of the planning documents (covering such things as Quality Control, Environmental Monitoring, Radiation Protection, Dust Management, Noise, Radiation Protection etc.) and possess the appropriate competencies for completing the work to which they have been assigned. The effective planning that has been invested in the Port Granby project, from initial design to project planning and implementation, has allowed this complex project to proceed with minimal difficulty. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Trajectory Generation and Path Planning for Autonomous Aerobots

This paper presents global path planning algorithms for the Titan aerobot based on user defined waypoints in 2D and 3D space. The algorithms were implemented using information obtained through a planner user interface. The trajectory planning algorithms were designed to accurately represent the aerobot's characteristics, such as minimum turning radius. Additionally, trajectory planning techniques were implemented to allow for surveying of a planar area based solely on camera fields of view, airship altitude, and the location of the planar area's perimeter. The developed paths allow for planar navigation and three-dimensional path planning. These calculated trajectories are optimized to produce the shortest possible path while still remaining within realistic bounds of airship dynamics.

trajectory↗

Reengineering the Project Design Process

In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

Jet Propulsion Laboratory JPL project design concu↗

GCS plan for software aspects of certification

As part of the Guidance and Control Software (GCS) research project being sponsored by NASA to evaluate the failure processes of software, standard industry software development procedures are being employed. To ensure that these procedures are authentic, the guidelines outlined in the Radio Technical Commission for Aeronautics (RTCA/DO-178A document entitled, software considerations in airborne systems and equipment certification, were adopted. A major aspect of these guidelines is proper documentation. As such, this report, the plan for software aspects of certification, was produced in accordance with DO-178A. An overview is given of the GCS research project, including the goals of the project, project organization, and project schedules. It also specifies the plans for all aspects of the project which relate to the certification of the GCS implementations developed under a NASA contract. These plans include decisions made regarding the software specification, accuracy requirements, configuration management, implementation development and verification, and the development of the GCS simulator.

Shagnea, Anita M.↗

Autonomous Maneuver Planning and Execution for GeoXO Station Keeping and Momentum Management

GOES-16 was launched in 2016 using GPS at GEO, a first for civil space. With the subsequent launch of GOES-17 in 2018, followed by GOES-18 in 2022, we have accumulated over a decade of error free GPS navigation experience at GEO. Confident in GPS performance at GEO, the next generation/NASA geosynchronous weather satellite program GeoXO will require the spacecraft flight software to automate station keeping and momentum management maneuver planning and execution. Coupled with low thrust propulsion, it gives us assurance that on-board maneuver planning and execution can be implemented at a very low risk, allowing instruments to operate through maneuvers while maintaining a more accurate orbital slot and reducing operational costs. In this paper, we discuss how GOES-R maneuver planning is currently performed on the ground and contrast this with our vision of how it might be automated on-board.

GeoXO↗

From hybrid systems to universal plans via domain compilation

While universal plans tell a system how to reach a goal regardless of what state it is in, such plans are typically too large to represent. Hybrid systems execute plans where each action is implemented to robustly produce effects if the world does not stray outside the action's control envelopes.

embedded real-time planning↗

Low/Medium Density Biomass, Coastal and Ocean Carbon: A Carbon Cycle Mission

As part of the Global Carbon Cycle research effort, an agency-wide planning initiative was organized between October 2000 and June 2001 by the NASA Goddard Space Flight Center (GSFC) at the behest of the Associate Administrator for Earth Science. The goal was to define future research and technology development activities needed for implementing a cohesive scientific observation plan. A timeline for development of missions necessary to acquire the selected new measurements was laid out, and included missions for low - medium density terrestrial biomass / coastal ocean / and ocean carbon. This paper will begin with the scientific justification and measurement requirements for these specific activities, explore the options for having separate or combined missions, and follow-up with an implementation study centered on a hyperspectral imager at geosynchronous altitudes.

Esper, Jaime↗

Models for Incorporating Equity in Transportation Electrification Considerations for Public Utility Regulators, An addendum to the NARUC report, Electric Vehicles: Key Trends, Issues, and Considerations for State Regulators

Momentum for the electric vehicle (EV) transition is well underway, and the utility sector plays an important role in supporting its success. For frontline communities, the transition offers a promising solution to improve environmental and public health outcomes, economic development, affordability, and transit equity. However, the transition will need to involve care and intention to ensure that the needs of underserved communities are prioritized throughout the planning, decision-making, and implementation processes. States have taken the lead in some cases, as profiled in Box 6. Whether driven by state commissions or utilities themselves, utilities have a range of options available to ensure equity is central in their transportation electrification plans and programs by drawing from a variety of existing and emerging experiences, as summarized in Table 1.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Models for Incorporating Equity in Transportation Electrification Considerations for Public Utility Regulators, An addendum to the NARUC report, Electric Vehicles: Key Trends, Issues, and Considerations for State Regulators (2019)

Momentum for the electric vehicle (EV) transition is well underway, and the utility sector plays an important role in supporting its success. For frontline communities, the transition offers a promising solution to improve environmental and public health outcomes, economic development, affordability, and transit equity. However, the transition will need to involve care and intention to ensure that the needs of underserved communities are prioritized throughout the planning, decision-making, and implementation processes. States have taken the lead in some cases, as profiled in Box 6. Whether driven by state commissions or utilities themselves, utilities have a range of options available to ensure equity is central in their transportation electrification plans and programs by drawing from a variety of existing and emerging experiences, as summarized in Table 1.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SU-C-BRB-01: Automated Dose Deformation for Re-Irradiation

Purpose: An objective of retreatment planning is to minimize dose to previously irradiated tissues. Conventional retreatment planning is based largely on best-guess superposition of the previous treatment’s isodose lines. In this study, we report a rigorous, automated retreatment planning process to minimize dose to previously irradiated organs at risk (OAR). Methods: Data for representative patients previously treated using helical tomotherapy and later retreated in the vicinity of the original disease site were retrospectively analyzed in an automated fashion using a prototype treatment planning system equipped with a retreatment planning module (Accuray, Inc.). The initial plan’s CT, structures, and planned dose were input along with the retreatment CT and structure set. Using a deformable registration algorithm implemented in the module, the initially planned dose and structures were warped onto the retreatment CT. An integrated third-party sourced software (MIM, Inc.) was used to evaluate registration quality and to contour overlapping regions between isodose lines and OARs, providing additional constraints during retreatment planning. The resulting plan and the conventionally generated retreatment plan were compared. Results: Jacobian maps showed good quality registration between the initial plan and retreatment CTs. For a right orbit case, the dose deformation facilitated delineating the regions of the eyes and optic chiasm originally receiving 13 to 42 Gy. Using these regions as dose constraints, the new retreatment plan resulted in V50 reduction of 28% for the right eye and 8% for the optic chiasm, relative to the conventional plan. Meanwhile, differences in the PTV dose coverage were clinically insignificant. Conclusion: Automated retreatment planning with dose deformation and definition of previously-irradiated regions allowed for additional planning constraints to be defined to minimize re-irradiation of OARs. For serial organs that do not recover from radiation damage, this method provides a more precise and quantitative means to limit cumulative dose. This research is partially supported by Accuray, Inc.

60 APPLIED LIFE SCIENCES↗

A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki

The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.

Delaney, Michael M.↗

Hanford Site Raptor Nest Monitoring Report for Calendar Year 2016

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE activities. Ecological monitoring data provide baseline information about the plants, animals, and habitats under DOE-RL stewardship at Hanford required for decision-making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The Hanford Site Comprehensive Land Use Plan (CLUP, USDOE 1999), which is the Environmental Impact Statement that evaluates the potential environmental impacts associated with implementing a comprehensive land-use plan for the Hanford Site for at least the next 50 years, ensures that DOE-RL, its contractors, and other entities conduct activities on the Hanford Site in compliance with NEPA.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Raptor Nest Monitoring Report for Calendar Year 2015

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE activities. Ecological monitoring data provide baseline information about the plants, animals, and habitats under DOE-RL stewardship at Hanford required for decision-making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The Hanford Site Comprehensive Land Use Plan (CLUP, USDOE 1999), which is the Environmental Impact Statement that evaluates the potential environmental impacts associated with implementing a comprehensive land-use plan for the Hanford Site for at least the next 50 years, ensures that DOE-RL, its contractors, and other entities conduct activities on the Hanford Site in compliance with NEPA.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Long-billed Curlew Monitoring Report for Calendar Year 2016

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE activities. Ecological monitoring data provide baseline information about the plants, animals, and habitats under DOE-RL stewardship at Hanford required for decision-making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The Hanford Site Comprehensive Land Use Plan (CLUP, USDOE 1999), which is the Environmental Impact Statement that evaluates the potential environmental impacts associated with implementing a comprehensive land-use plan for the Hanford Site for at least the next 50 years, ensures that DOE-RL, its contractors, and other entities conduct activities on the Hanford Site in compliance with NEPA.

54 ENVIRONMENTAL SCIENCES↗