Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integrated Resource Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

Autoplan: A self-processing network model for an extended blocks world planning environment

Self-processing network models (neural/connectionist models, marker passing/message passing networks, etc.) are currently undergoing intense investigation for a variety of information processing applications. These models are potentially very powerful in that they support a large amount of explicit parallel processing, and they cleanly integrate high level and low level information processing. However they are currently limited by a lack of understanding of how to apply them effectively in many application areas. The formulation of self-processing network methods for dynamic, reactive planning is studied. The long-term goal is to formulate robust, computationally effective information processing methods for the distributed control of semiautonomous exploration systems, e.g., the Mars Rover. The current research effort is focusing on hierarchical plan generation, execution and revision through local operations in an extended blocks world environment. This scenario involves many challenging features that would be encountered in a real planning and control environment: multiple simultaneous goals, parallel as well as sequential action execution, action sequencing determined not only by goals and their interactions but also by limited resources (e.g., three tasks, two acting agents), need to interpret unanticipated events and react appropriately through replanning, etc.

Dautrechy, C. Lynne↗

Medical Data Architecture Project Capabilities and Design

Mission constraints will challenge the delivery of medical care on a long-term, deep space exploration mission. This type of mission will be restricted in the availability of medical knowledge, skills, procedures and resources to prevent, diagnose, and treat in-flight medical events. Challenges to providing medical care are anticipated, including resource and resupply constraints, delayed communications and no ability for medical evacuation. The Medical Data Architecture (MDA) project will enable medical care capability in this constrained environment. The first version of the system, called "Test Bed 1," includes capabilities for automated data collection, data storage and data retrieval to provide information to the Crew Medical Officer (CMO). Test Bed 1 seeks to establish a data architecture foundation and develop a scalable data management system through modular design and standardized interfaces. In addition, it will demonstrate to stakeholders the potential for an improved, automated, flow of data to and from the medical system over the current methods employed on the International Space Station (ISS). It integrates a set of external devices, software and processes, and a Subjective, Objective, Assessment, and Plan (SOAP) note commonly used by clinicians. Medical data like electrocardiogram plots, heart rate, skin temperature, respiration rate, medications taken, and more are collected from devices and stored in the Electronic Medical Records (EMR) system, and reported to crew and clinician. Devices integrated include the Astroskin biosensor vest and IMED CARDIAX electrocardiogram (ECG) device with INEED MD ECG Glove, and the NASA-developed Medical Dose Tracker application. The system is designed to be operated as a standalone system, and can be deployed in a variety of environments, from a laptop to a data center. The system is primarily composed of open-source software tools, and is designed to be modular, so new capabilities can be added. The software components and integration methods will be discussed.

Data architecture↗

Preparation for an Earth Independent Medical Operations Demonstration using the Tempus ALS™ Medical Device

NASA’s exploration-class missions have severe resource constraints, long return trip durations, significant communication delays and limited resupply opportunities. Validation on the International Space Station (ISS) of medical devices that fit within Earth-Independent Medical Operations (EIMO) systems is a necessary preparation step. Key features of an EIMO medical system include: 1) technologies that support the prevention, diagnosis, and treatment of spaceflight medical events; 2) components that meet mass, volume, power and crew time/training constraints; 3) consideration of the medical skill level of the astronaut caregiver; 4) collection, storage and analysis of medical data within a central data architecture; and 5) incorporation of appropriate guidance and support tools that allow crew autonomy. The Human Research Program’s (HRP) Exploration Medical Capability (ExMC) Element and the Exploration Medical Integrated Product Team (XM-IPT) are planning an ISS technology demonstration to determine the feasibility of including a multifunctional medical device into an EIMO medical system. Demonstration Preparations: The Tempus ALS (Remote Diagnostic Technologies, Ltd., Philips Corp., Farnborough, UK) is a commercial-off-the-shelf medical device, with United States Food and Drug Administration clearance and is Conformité Européene marked in Europe. Several thousand units have been sold and are successfully operating in pre-hospital and in remote settings, such as by European Space Agency (ESA) flight surgeons and some of NASA’s commercial partners during post-flight medical operations. The Tempus ALS provides vital sign measurements such as blood pressure, electrocardiograms, heart rate, end tidal CO2, respiration rate, pulse oximetry and temperature. The device has ultrasound imaging and video laryngoscopy capabilities and has automatic or manual defibrillation modes for treating cardiac arrhythmias. It includes procedural guidance capabilities to assist in the collection of the vital sign measurements and it has various data transmission and report generation features. NASA’s HRP ExMC and XM-IPT are partnering with the ESA to demonstrate the Tempus ALS on ISS, with ESA manifesting the Tempus ALS and its accessories. ESA will compare performance of periodic health status exams and medical contingency drills performed nominally and with the Tempus ALS. NASA’s EIMO demonstration will include the use of Tempus ALS to diagnose a complaint of abdominal pain under increasingly independent circumstances. The caregiver must assess the present illness, collect vital sign measurements, and perform an abdominal ultrasound, under one of three communication situations, including real-time, with a several second delay and with a delay on the order of minutes. Expected Outcomes: Information will be gained about the feasibility, benefits, and challenges of using a multifunctional, all-in-one, medical device for medical diagnosis instead of separate devices with singular functionalities. Information will also be collected about performance differences as communication delays increase and available ground support decreases. Gaining this understanding will allow for further development of exploration medical system capabilities which takes the EIMO construct into consideration.

Beth Lewandowski↗

Designing the PR100 Study: Puerto Rico Grid Resilience and Transition to 100% Renewable Energy

Puerto Rico has committed to meeting its electricity needs with 100% renewable energy by 2050, along with realizing interim goals of 40% by 2025, 60% by 2040, the phaseout of coal-fired generation by 2028, and a 30% improvement in energy efficiency by 2040 as established in Act 17. [1] To meet these goals and support widespread end-use electrification, the territory must explore how renewable energy and other generation technologies can be developed with energy storage, distributed generation, distribution control, electric vehicles, and energy efficient and responsive loads in each of Puerto Rico's cities and communities. To support Puerto Rico in reaching its renewable energy goals; help ensure energy system resilience against future extreme weather events; improve energy justice; and provide inputs to LUMA Energy's walk, jog, and run approach in its coordinated planning roadmap, the U.S. Department of Energy, National Renewable Energy Laboratory, Argonne National Laboratory, Lawrence Berkeley National Laboratory, Oak Ridge National Laboratory, Pacific Northwest National Laboratory and Sandia National Laboratories propose to evaluate 100% renewable energy pathways through an integrated analysis process. This talk will present steps in designing a two-year study entitled Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy (PR100). [1] U.S. Energy Information Administration (EIA). 2020. Puerto Rico Territory Energy Profile.

100% renewable energy↗

Hybrid power plant design for low-carbon hydrogen in the United States

In this study, we provide a nationwide techno-economic analysis of clean hydrogen production powered by a hybrid renewable energy plant for over 50,000 locations in the United States. We leverage the open-source Hybrid Optimization Performance Platform (HOPP) tool to simulate the hourly performance of an off-grid wind-solar plant integrated with a 1-GW polymer exchange membrane electrolyzer system. The levelized cost of hydrogen is calculated for varying technology costs, and tax credits to explore cost sensitivities independent of plant design, performance, and site selection. Our findings suggest that strategies for cost reduction include selecting sites with abundant wind resources, complementary wind and solar resources, and optimizing the sizing of wind and solar assets to maximize the hybrid plant capacity factor. These strategies are linked to increased hydrogen production and reduced electrolyzer stack replacements, thereby lowering the overall cost of hydrogen.

08 HYDROGEN↗

Shelter Island, New York, Energy Reliability Assessment and Local Generation Options

Shelter Island's Green Options Committee (GOC), an all-volunteer committee tasked with considering all environmental conservation issues, requested technical assistance under the U.S. Department of Energy (DOE)-funded Energy Technology Innovation Partnership Project (ETIPP). The primary goals of this technical assistance project included: 1. Informing the GOC about energy use trends within the community as well as distributed solar, wind and storage opportunities; 2. Providing additional resources and technical feasibility information for geothermal, agrivoltaics and tidal energy; 3. Supporting the development of a community engagement plan; and 4. Supporting collaboration between the GOC and PSEG in order to find mutually beneficial follow-on projects. Assistance from NLR to help the GOC meet these overall project goals was provided through the following primary tasks: 1. Collaborate with the local utility in order to collect energy use data and inform the community on energy use patterns through a baseline assessment; 2. Technical analysis of distributed renewable and resiliency opportunities (solar, wind and storage) that best align with the community's energy priorities; 3. Provide high level feasibility support for future renewable energy scenarios that include agrivoltaic solutions, tidal energy, and geothermal projects on Shelter Island, and 4. Integrate all findings into a Community Outreach presentation to help the GOC engage with community stakeholders to build support and awareness of chosen resilience strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LDEF archival system plan

The Long Duration Exposure Facility (LDEF) has provided the first significant opportunity to extensively study the space environment and its effects upon spacecraft systems and materials. The long-term value of the data obtained from LDEF, which is applicable to a wide range of areas including space environment definition, space environmental effects, and spacecraft design, will depend upon the system developed to archive and retrieve the data. Therefore, in addition to the large effort undertaken to analyze LDEF data, a substantial effort is also necessary in order to retain and disseminate LDEF resources for future research and design. W. J. Schafer Associates, Inc., has a task subcontract to develop the LDEF archival system. The LDEF resources include data, hardware, photographic records, and publications which cover the 20-year history of LDEF from concept design through data analysis. Chronologically, prelaunch resources include documentation of facility and experiment development, testing integration, and operation. Post-retrieval resources are the observations, testing, analysis, and publications since the January 1990 retrieval of LDEF. A third set of resources is the experiment and facility hardware and specimens, including more than 10,000 test specimens flown on LDEF and subsequently divided and distributed among investigators at numerous laboratories. Many valuable science and technology investigations were undertaken with LDEF experiments and hardware, and many more investigations are being identified in areas not yet explored. LDEF data applications encompass primarily low-Earth orbit spacecraft and structures. The nearly six-year space exposure of LDEF has provided data to evaluate materials, systems, and living specimens exposed to radiation, meteoroids, debris, and other constituents of the low-Earth environment. Structural, mechanical, electrical, optical, and thermal systems were studied, and materials with applications in all aspects of space systems were exposed to the space environment. The objectives of the LDEF archival system are to maintain the existing LDEF hardware, data, analysis, publications, and photographs as a long term resource, and to provide a quick and simple mechanism by which LDEF resources can be identified, located, and applied.

Wilson, Brenda K.↗

Integration of In-Flight and Post-Flight Water Monitoring Resources in Addressing the U.S. Water Processor Assembly Total Organic Carbon (TOC) Anomaly

Beginning in June of 2010, the total organic carbon (TOC) concentration in the U.S. Water Processor Assembly (WPA) product water started to increase. A surprisingly consistent upward TOC trend was observed through weekly ISS total organic carbon analyzer (TOCA) monitoring. As TOC is a general organic compound indicator, return of water archive samples was needed to make better-informed crew health decisions on the specific compounds of concern and to aid in WPA troubleshooting. TOCA-measured TOC was more than halfway to the health-based screening limit of 3,000 g/L before archive samples were returned. Archive samples were returned on 22 Soyuz in September 2010 and on ULF5 in November of 2010. The samples were subjected to extensive analysis. Although TOC was confirmed to be elevated, somewhat surprisingly, none of the typical target compounds were detected at high levels. After some solid detective work, it was confirmed that the TOC was associated with a compound known as dimethylsilanediol (DMSD). DMSD is believed to be a breakdown product of siloxanes which are thought to be ubiquitous in the ISS atmosphere. A toxicological limit was set for DMSD and a forward plan was developed for conducting operations in the context of understanding the composition of the TOC measured in flight. This required careful consideration of existing ISS flight rules, coordination with ISS stakeholders, and development of a novel approach for the blending of inflight TOCA data with archive results to protect crew health. Among other challenges, team members had to determine how to utilize TOCA readings when making decisions about crew consumption of WPA water. This involved balancing very real concerns associated with the assumption that TOC would continue to be comprised of only DMSD. Demonstrated teamwork, multidisciplinary awareness, and innovative problem-solving were required to respond effectively to this anomaly.

Straub, John E., II↗

Co-Optimization of Electricity Transmission and Generation Resources for Planning and Policy Analysis: Review of Concepts and Modeling Approaches

The recognition of transmission's interaction with other resources has motivated the development of co-optimization methods to optimize transmission investment while simultaneously considering tradeoffs with investments in electricity supply, demand, and storage resources. For a given set of constraints, co-optimized planning models provide solutions that have lower costs than solutions obtained from decoupled optimization (transmission-only, generation-only, or iterations between them). This paper describes co-optimization and provides an overview of approaches to co-optimizing transmission options, supply-side resources, demand-side resources, and natural gas pipelines. In particular, the paper provides an up-to-date assessment of the present and potential capabilities of existing co-optimization tools, and it discusses needs and challenges for developing advanced co-optimization models.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Identifying Hydropower Operational Flexibilities in Presence of Streamflow and Net-load Uncertainty (Final Technical report)

In the existing operations, hydropower contributions to future system flexibility are generally modeled while maintaining traditional operating rules and constraints in supporting grid operation, such as the balancing of variable renewable energy production. Moreover, operation of large scale hydropower systems on major rivers has been investigated for decades, utilizing various systems engineering approaches, with the evolving electric grid, as the result of renewable resources integration, compounded by the changing climate (variability of river flows, intensification of hydrologic cycle resulting in more frequent extreme events) affecting water availability, the need for more advanced stochastic modeling and effective uncertainty analysis approaches have become necessary. The research results supported by this funding and presented in this report provide a new look at hydropower operational flexibility enforced by the changes identified above. Understanding how hydropower operates in response to the underlying uncertainties with respect to the system constraints is crucial in identifying its operational flexibility potentials. In this project, the flexibility of the operating hydropower facility is described by capturing uncertainties in both water and power system and formulating the operations as a multistage stochastic optimization problem. The proposed approach supports short- to seasonal-term operations and planning decision horizons.

13 HYDRO ENERGY↗

Environmental Testing of the OVEN System for Lunar Water Extraction and Prospecting

Introduction: The presence of water ice in permanently shadowed regions on the lunar surface [1] may enable a sustained human presence on the Moon with minimal need for consumables. However, in order to develop a long term utilization plan that includes the usage of in-situ water we must first understand the abundance, stratigraphy and distribution of this re-source. Multiple space agencies currently have plans for lunar water prospecting missions. The Optimized Volatile Extraction Node (OVEN) was designed for water prospecting missions that require samples to be weighed, sealed, and heated as the means of determining water concentration. This method of water quantification necessitates a fair amount of automation, so a rigorous environmental test program was performed in order to build confidence in the performance of the OVEN design. The work presented here describes the OVEN environmental test program as well as ongoing efforts to improve on the design. Vibration: The OVEN participated in two rounds of random vibration tests. The first test was a stand-alone test performed at the Energy Systems Test Area of the Johnson Space Center. The second test was an integrated test with the mobile platform developed for the Resource Prospector project. The OVEN survived both tests without damage, but the tests did provide valuable lessons learned with regards to specific operations. Thermal Vacuum: The OVEN was successfully demonstrated at a temperature range of -50 to 75 C in a thermal vacuum chamber. The need to heat motor gearboxes at lower temperatures was predetermined so this test program was completed by implementing a method of gearbox heating that used the existing circuitry within the motors. Dust: A custom dynamometer was built in order to determine the torque required to move the various mechanisms within the OVEN at a range of temperatures. The OVEN system was coated with lunar dust simulant in order to determine mechanism torques under a worst-case operating condition. Sublimation: Sublimation losses within the OVEN were quantified through a series of test configurations, including an integrated test in a thermal vacuum chamber at Glenn Research Center [2]. Current Work: The OVEN subsystem is currently not a component of any existing prospecting missions, but work continues that will take the lessons learned from previous environmental tests and improve on the design in order to be considered for future prospecting opportunities. References: [1] Colaprete, A., Schultz, P., Heldmann, J., Wooden, D., Shirley, M., Ennico, K., ... & Sollitt, L. (2010). Detection of water in the LCROSS ejecta plume. science, 330(6003), 463-468. [2] Kleinhenz, J., Smith, J., Roush, T., Colaprete, A., Zacny, K., Paulsen, G., ... & Paz, A. (2018). Volatiles Loss from water bearing regolith simulant at Lunar Environments. In Earth and Space 2018: Engineering for Extreme Environments (pp. 454-466). Reston, VA: American Society of Civil Engineers.

A Paz↗

Argonne's Laboratory Computing Resource Center 2009 annual report.

Now in its seventh year of operation, the Laboratory Computing Resource Center (LCRC) continues to be an integral component of science and engineering research at Argonne, supporting a diverse portfolio of projects for the U.S. Department of Energy and other sponsors. The LCRC's ongoing mission is to enable and promote computational science and engineering across the Laboratory, primarily by operating computing facilities and supporting high-performance computing application use and development. This report describes scientific activities carried out with LCRC resources in 2009 and the broad impact on programs across the Laboratory. The LCRC computing facility, Jazz, is available to the entire Laboratory community. In addition, the LCRC staff provides training in high-performance computing and guidance on application usage, code porting, and algorithm development. All Argonne personnel and collaborators are encouraged to take advantage of this computing resource and to provide input into the vision and plans for computing and computational analysis at Argonne. The LCRC Allocations Committee makes decisions on individual project allocations for Jazz. Committee members are appointed by the Associate Laboratory Directors and span a range of computational disciplines. The 350-node LCRC cluster, Jazz, began production service in April 2003 and has been a research work horse ever since. Hosting a wealth of software tools and applications and achieving high availability year after year, researchers can count on Jazz to achieve project milestones and enable breakthroughs. Over the years, many projects have achieved results that would have been unobtainable without such a computing resource. In fiscal year 2009, there were 49 active projects representing a wide cross-section of Laboratory research and almost all research divisions.

99 GENERAL AND MISCELLANEOUS↗

The Columbus logistics support at the APMC: Requirements and implementation aspects

This paper focuses on the logistics support to be provided by the APM Center (APMC). Among the Columbus ground infrastructures, this center is tasked to provide logistics, sustaining engineering and P/L integration support to the ongoing missions of the APM, i.e. the Columbus Laboratory attached to the Freedom Space Station. The following is illustrated: an analysis of the requirements that are levied on the logistics support of the APM; how such requirements are reflected in the corresponding support to be available on-ground and at APMC; the functional components of the APMC logistics support and how such components interact each other; how the logistics support function interfaces with the other functions of the ground support; and how the logistics support is being designed in terms of resources (such as hardware, data bases, etc.). Emphasis is given to the data handling aspects and to the related data bases that will constitute for the logistics activities the fundamental source of information during the APM planned lifetime. Functional and physical architectures, together with trades for possible implementation, are addressed. Commonalities with other centers are taken into account and recommendations are made for possible reuse of tools already developed in the C/D phase. Finally, programmatic considerations are discussed for the actual implementation of the center.

Canu, C.↗

The Role of Trust and Interaction in Global Positioning System Related Accidents

The Global Positioning System (GPS) uses a network of satellites to calculate the position of a receiver over time. This technology has revolutionized a wide range of safety-critical industries and leisure applications. These systems provide diverse benefits; supplementing the users existing navigation skills and reducing the uncertainty that often characterizes many route planning tasks. GPS applications can also help to reduce workload by automating tasks that would otherwise require finite cognitive and perceptual resources. However, the operation of these systems has been identified as a contributory factor in a range of recent accidents. Users often come to rely on GPS applications and, therefore, fail to notice when they develop faults or when errors occur in the other systems that use the data from these systems. Further accidents can stem from the over confidence that arises when users assume automated warnings will be issued when they stray from an intended route. Unless greater attention is paid to the role of trust and interaction in GPS applications then there is a danger that we will see an increasing number of these failures as positioning technologies become integral in the functioning of increasing numbers of applications.

Johnson, Chris W.↗

Alternative D and D Planning Tool - 12466

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began cleanup of the East Tennessee Technology Park (ETTP). UCOR's $2.2 billion contract has an initial five-year term and a four-year option period for completing the cleanup of ETTP and performing surveillance and maintenance and waste management operations at both the Oak Ridge National Laboratory and the Y-12 National Security Complex. ETTP D and D work includes disposition of large, complex, contaminated, Manhattan Project-era facilities such as the K-25 and K-27 uranium enrichment facilities. At ETTP, UCOR views the D and D process as a 'Waste Factory' with waste production lines from the point-of-generation to the point-of-disposal. Safely transforming vertically-standing buildings into horizontally-lying waste in a disposal facility is the primary cleanup objective. Whereas a factory produces widgets, D and D produces waste-lots of waste. In support of the Waste Factory view, UCOR is developing a systems planning tool to help better plan how to effect cleanup by improving waste planning, uniting waste generator with waste dis-positioner, and represent the 'waste factory' in a computer model that allows the D and D and waste management teams to better understand available disposal paths, waste uncertainties and potential consequences, driving variables, and sensitivity to changes. Any model of reality represents a compromise. Part of the Waste Factory Model's value may be in providing standardization and relative direction for assisting decision making as opposed to absolute cost or schedule answers. From that relative direction, management can commission detailed planning and estimating. Also, the model's output credibility is tied directly to its input quality. That is why, as discussed above, the Waste Factory Model's key informational component will be the standardized waste streams (e.g., Structure/Debris disposed at EMWMF) and associated standardized unit costs. The model development process generally, and the development team's collaboration, specifically, is most important. Building-in this integrity up-front, transparently, will help ensure that the model outputs are known, understood, and credible (no mysterious 'black-box' components). The Waste Factory Model is envisioned to help improve understanding of a given project's waste implications; help reveal and suggest the important few variables out of the trivial many; reveal likely process bottlenecks, and help focus risk mitigation and assumption management efforts to better manage the projected total cost. In the long term, the UCOR team's goal is to incorporate an information feedback loop to help improve the accuracy of key model attributes, such as the standardized cost information. This way, by design, the model output should improve over time and thus help the model mature into both a credible scenario tool and a standardized project planning resource. The initial model capabilities may be narrow, but with time and effort it may prove to be a timely and cost-effective tool. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Materials Management U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO)

In light of the changing Defense Complex mission, the high cost to storing and protecting nuclear materials, and in consideration of scarcity of resources, it is imperative that the U.S. Department of Energy (DOE) owned nuclear materials are managed effectively. The U.S. Department of Energy, National Nuclear Security Administration (NNSA) Strategic Action Plan outlines the strategy for continuing to meet America’s nuclear security goals, meeting the overall mission challenges of DOE and NNSA as well as giving focus to local missions. The mission of the NNSA/NSO Nuclear Materials Management (NMM) Program is to ensure that nuclear material inventories are accurately assessed and reported, future material needs are adequately planned, and that existing Nevada Test Site (NTS) inventories are efficiently utilized, staged, or dispositioned. The NNSA/NSO understands that the NTS has unique characteristics to serve and benefit the nation with innovative solutions to the complex problems involving Special Nuclear Materials, hazardous materials, and multi-agency, integrated operations. The NNSA/NSO is defining infrastructure requirements for known future missions, developing footprint consolidation strategic action plans, and continuing in the path of facility modernization improvements. The NNSA/NSO is striving for the NTS to be acknowledged as an ideal location towards mission expansion and growth. The NTS has the capability of providing isolated, large scale construction and development locations for nuclear power or alternate energy source facilities, expanded nuclear material storage sites, and for new development in “green” technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Materials Management U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO)

In light of the changing Defense Complex mission, the high cost to storing and protecting nuclear materials, and in consideration of scarcity of resources, it is imperative that the U.S. Department of Energy (DOE) owned nuclear materials are managed effectively. The U.S. Department of Energy, National Nuclear Security Administration (NNSA) Strategic Action Plan outlines the strategy for continuing to meet America’s nuclear security goals, meeting the overall mission challenges of DOE and NNSA as well as giving focus to local missions. The mission of the NNSA/NSO Nuclear Materials Management (NMM) Program is to ensure that nuclear material inventories are accurately assessed and reported, future material needs are adequately planned, and that existing Nevada Test Site (NTS) inventories are efficiently utilized, staged, or dispositioned. The NNSA/NSO understands that the NTS has unique characteristics to serve and benefit the nation with innovative solutions to the complex problems involving Special Nuclear Materials, hazardous materials, and multi-agency, integrated operations. The NNSA/NSO is defining infrastructure requirements for known future missions, developing footprint consolidation strategic action plans, and continuing in the path of facility modernization and improvements. The NNSA/NSO is striving for the NTS to be acknowledged as an ideal location towards mission expansion and growth. The NTS has the capability of providing isolated, large scale construction and development locations for nuclear power or alternate energy source facilities, expanded nuclear material storage sites, and for new development in “green” technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integration of New Technology Considering the Trade-Offs Between Operational Benefits and Risks: A Case Study of Dynamic Line Rating

Electric grid operators are adept at handling complexity and uncertainty. However, with increasing introduction of renewable generation, distributed energy resources, and more frequent severe weather events, operators will experience new workload and challenging decision scenarios. Here, this paper quantifies risks and benefits from an operator's perspective of introducing weather based forecast Dynamic Line Ratings (DLR) using variable wind conditions in addition to ambient temperature to relieve transmission congestion and facilitating more offshore wind (OSW). A concept of operations (CONOPS) applied to a forecast DLR implementation and its integration with OSW is defined. A method for evaluating tradeoffs of derating to make the rating more conservative but decreasing the benefit was developed and applied to a case study for two existing overhead transmission lines on Long Island, New York. The CONOPS uses historical day-ahead and hour-ahead High Resolution Rapid Refresh weather forecasts and weather station data to support planning and real-time operations. The analysis determines the risk of downgrades in real-time operational rating compared to the forecast and quantifies the frequency and severity of last-minute downgrades. The risk is compared against the benefits in increased capacity to provide insights on the additional amount of uncertainty DLR and OSW will add to the operator's workload.

17 WIND ENERGY↗