Search NASA⌕ Search

SEARCH · Search NASA

Results for “PERMANENT MAGNETS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

UNH TDP - Concurrent Measurements of Inflow, Power Performance, and Loads for a Grid-Synchronized Vertical Axis Cross-Flow Turbine Operating in a Tidal Estuary

This data was collected between October 12 and December 15 of 2021 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). This data set includes over 29 days of grid connected turbine operation during this 65 day time frame. The priority for this measurement campaign was to collect data while the turbine was electrically connected to the grid by means of a rectifier and inverter. The Fall_2021_UNH_Measurement_Timeline.png highlights when each instrument was functioning and the Fall_2021_UNH_Test_Log.jpg indicates the four main regions for analysis available from this measurement campaign. The TDP is a floating structure moored on the Portsmouth facing side of Memorial Bridge pier #2, which spans the Piscataqua River between Portsmouth, NH and Kittery, ME. The Piscataqua River connects the Great Bay Estuary to the Gulf of Maine and the river currents are dominated by tidal forcing with water velocities exceeding 2.5 m/s during spring ebb tides at this site which were previously characterized by Kaelin Chancey (Assessment Of The Localized Flow And Tidal Energy Conversion System At An Estuarine Bridge - UNH MS Thesis 2019). The turbine under test was a modified New Energy Corporation (Calgary, CA) model EVG-025 4-blade H-Darrius type vertical axis cross flow turbine that rotates in the clockwise direction with a rotor diameter of 3.2m and blade length of 1.7m. The hydro-foil profile was a NACA 0021 with a 10 inch chord length and a blade preset pitch angle of +4deg with a positive angle corresponding with the toe in direction. The standard EVG-025 has a rotor diameter of 3.4m and its rated power output is 25kW at 3 m/s. The rotor diameter was reduced to accommodate the size of the existing TDP moon-pool. This project was pursued to quantify device performance for cross flow turbines operating in a marine environment. Accurate physical models, to characterize cross flow turbine performance, require real operational data sets due to the complexity of blade fluid interactions. This data can help support model development which will help predict turbine performance when analyzing perspective project locations in the future. Instrumentation was deployed to measure; water speed/direction, electrical power output, turbine shaft speed, turbine thrust force, and platform motion. Concurrent measurements of these parameters allow for correlations (cause and affect) to be inferred, allowing for characterization of device performance over a range of operating conditions. Water currents were measured using Acoustic Doppler Current Profilers (ADCP's) and Acoustic Doppler Velocimeters (ADV's) directly upstream and downstream of the turbine for inflow, wake and turbulence measurements. Electrical power output was measured using the Voltsys rectifier and the Shark power meter. Shaft speed was calculated based on the Voltsys measurements of the permanent magnet three phase generator AC generation frequency, coupled directly to the cross flow turbine under test (i.e., no gear box). Platform motions were captured using a Yost IMU (inertial measurement unit). Turbine thrust loading was measured using a reaction arm about the turbine deployment platform spanning beam, where two bi-directional load cells were connected to the system via a pinned connection. This submission includes zipped folders for each instrument containing quality controlled (QC'd) data in daily .csv files for the relevant duration specific to each instrument, along with separate .csv file that contains the units for each variable. Some instrument daily files are quite large and can pose a challenge for a visual spreadsheet editor to open. A processing software like MATLAB or Python is recommended. Note the degree of QC varied between each instrument due to time constraints. Particular time and attention was given to perform quality control tests on the acoustic based instruments that are particularly suscep...

16 TIDAL AND WAVE POWER↗

In-Situ Blade Strain Measurements of a Crossflow Turbine Operating in a Tidal Flow

This data was collected between October 25 and December 12 of 2022 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). The goal was to collect blade strain data from a crossflow turbine operating in a tidal flow. A table in ('Deployment Schedule.PNG') outlines the various dates when each instrument was operational, and more details can be found via literature listed in 'Related Publications'.txt. This dataset includes zipped folders for each instrument containing data in .csv files for the relevant duration specific to each instrument, along with separate README file for each measurement. Some instrument files are quite large and can pose a challenge for a visual spreadsheet editor to open. A processing software like MATLAB or Python is recommended. All data contained in this submission is unfiltered/unprocessed data unless otherwise noted in the README file. Blade strain was measured using 8 foil-based strain gauges along the span of a single turbine blade. Water currents were measured using Acoustic Doppler Current Profilers (ADCP's) and Acoustic Doppler Velocimeters (ADV's) both upstream and downstream of the turbine for inflow, wake and turbulence measurements. Electrical power output was measured using the Voltsys rectifier. Shaft speed was calculated based on the Voltsys measurements of the permanent magnet three phase generator AC generation frequency, coupled directly to the cross flow turbine under test (i.e., no gear box). Platform motions were captured using a Yost IMU (inertial measurement unit). Turbine thrust loading was measured using a reaction arm about the turbine deployment platform spanning beam, where two bi-directional load cells were connected to the system via a pinned connection. The TDP is a floating structure moored on the Portsmouth facing side of Memorial Bridge pier #2, which spans the Piscataqua River between Portsmouth, NH and Kittery, ME. The Piscataqua River connects the Great Bay Estuary to the Gulf of Maine and the river currents are dominated by tidal flow with water velocities exceeding 2.5 m/s during spring ebb tides at this site which were previously characterized by Chancey 2019. The turbine under test was a modified New Energy Corporation (Calgary, CA) model EVG-025 4-blade H-Darrius type vertical axis cross flow turbine that rotates in the clockwise direction with a rotor diameter of 3.2m and blade length of 1.7m. The hydro-foil profile was a NACA 0021 with a 10 inch chord length and a blade preset pitch angle of +4deg with a positive angle corresponding with the toe in direction. The standard EVG-025 has a rotor diameter of 3.4m and its rated power output is 25kW at 3 m/s. The rotor diameter was reduced to accommodate the size of the existing TDP moon-pool. A single blade of this turbine was further modified to accommodate 8 full-bridge strain gauges (Bharath et al 2023, Bichanich et al 2024). For power performance and other relevant details on the turbine and its characteristics, see O'Byrne 2022.

16 TIDAL AND WAVE POWER↗

Caloric effects in ferroic materials

The fundamentals and applications of ferroic materials$-$ferromagnetic, ferroelectric, and ferroelastic$-$are common subjects discussed in just about every graduate course related to functional materials. Looking beyond today’s traditional uses, such as in permanent magnets, capacitors, and shape-memory alloys, there are worthwhile and interesting questions common to the caloric properties of these ferroic materials. Can ferroic materials be used in a cooling cycle? Why are these materials susceptible to external fields? Which combination of properties is required to make some of them suitable for efficient cooling and heat pumping? We address these questions in this introduction to ferroic cooling, which comprises magnetocaloric, electrocaloric, elastocaloric and barocaloric approaches and combinations thereof (i.e., multicalorics). These are addressed in greater detail in the articles in this issue.

36 MATERIALS SCIENCE↗

Simulation of Bunch Formation for the Mu2e Experiment

The Fermilab Recycler is an 8 GeV storage ring composed of permanent magnets that was crucial to the success of the Fermilab Tevatron Collider program. It is currently being used to slip-stack protons for the high energy neutrino program and to re-bunch protons for use in the Muon g-2 and Mu2e experiments. For the latter applications, the Recycler re-bunches each 1.6 µs "batch" from the Fermilab Booster into four 2.5 MHz bunches. For the Mu2e experiment, it is crucial that beam more than 125 ns from the nominal bunch center be suppressed by at least a factor of 1E-5. While bunch formation is currently in operation for the g-2 experiment, this out of time requirement has not been met, and the reason is not understood. This work presents a simulation of bunch formation in the Recycler, in an effort to understand the reason for this excessive out of time beam and to search for a way to reduce it.

43 PARTICLE ACCELERATORS↗

CEBAF 22 GeV FFA energy upgrade

Extending the energy reach of CEBAF by increasing the number of recirculations, while using the existing linacs is explored. This energy upgrade is based on the multi-pass acceleration of electrons in a single non-scaling Fixed Field Alternating Gradient (FFA) beam line, using Halbach-style permanent magnets. Encouraged by the recent successful demonstration of CBETA, a proposal was formulated to nearly double the energy of CEBAF from 12 to 22~GeV by replacing the highest energy arcs with FFA transport. The new FFA arcs would support simultaneous transport of an additional 6 passes spanning roughly a factor of two in energy. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing over a wide range of energies. Here, we propose a triplet lattice that provides a stable periodic solution covering an energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac impossible due to the extremely high energy ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate this issue. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. The design presented here is anticipated to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and a relative energy spread of 1×10\textsuperscript{-3}. Further recirculation beyond 22 GeV is limited by the large (974 MeV per electron) energy loss due to synchrotron radiation.

Benesch, J.↗

Exploratory splitter bend system designs for FFA@CEBAF

An upgrade to the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility (JLAB) is anticipated to provide an electron beam of over 20 GeV using the existing superconducting-RF linear accelerator and new fixed-field alternating (FFA) gradient recirculation arcs made up of Halbach-style permanent magnets. In the current design, the FFA arcs will carry six beams with energies of approximately 11, 13, 16, 18, 20, and 22 GeV which will require horizontal splitter lines to match the beam from the preceding linac. In this paper, we describe two alternative splitter beamline designs that are tuned to match the beam's Twiss parameters, R56, time-of-flight, bend-plane offset, and dispersion into the FFA cells.

Accelerator Physics↗

Horizontal Splitter Design For FFA@CEBAF Energy Upgrade: Current Status

Thomas Jefferson National Accelerator Facility (Jefferson Lab) is currently studying the feasibility of an energy upgrade based upon Fixed-Field Alternating Gradient (FFA) permanent magnet technology. The current plan is to replace the highest-energy recirculation arcs with FFA arcs, increasing the total number of beam recirculations, thus the energy. In order to accommodate multiple passes in the FFA arcs, horizontal splitters are being designed to control the beam parameters entering the FFA arcs, as well as the time of flight and R_56. In the current design, six passes will recirculate through the FFA arcs, necessitating the design of six independent beamlines to control the optics and beam dynamics matching into the arcs. These beamlines must fit into the current CEBAF tunnel, while allowing for personnel and equipment access. They must also be flexible enough to accommodate the beam under realistic operational conditions and fluctuations. The constraints on the system are highly restrictive, complicating the design. This document will describe the current state of the design, and indicate the work remaining for a complete conceptual design.

Benesch, Jay↗

New Insertion Device Control System for the APS Upgrade

New Hybrid Permanent Magnet Undulators (HPMUs) have been designed and manufactured using servo motors for precise and reliable gap motion control for the Advanced Photon Source Upgrade (APS-U) project. Meanwhile, existing HPMUs equipped with legacy stepper motors are systematically replaced with servo motors. In parallel with mechanical modifications of the undulators, a comprehensive upgrade has been implemented for the control of the devices. This upgrade includes integration of standardized industrial components for replacement of motor controllers and motor drives using the Kollmorgen Programmable Controller Multi-axis Master (PCMM) controllers and the AKD2G series servo drives. Soft Input Output Controllers (IOCs) are developed and deployed to replace the legacy VME-based IOCs for both single-period undulators and Revolver undulators. In this paper, we will present the architecture of the new insertion device control system, including control mechanisms, interlock protocols, and tools for diagnostics and troubleshooting.

Li, W.↗

Current status of conceptual horizontal splitter design for FFA@CEBAF energy Upgrade

Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) is currently investigating the feasibility of upgrading its maximum operating energy using Fixed-Field Alternating-gradient (FFA) recirculating arcs to increase the total number of recirculations of the beam through the pair of LINACs. These FFA arcs will be composed of permanent magnets, with small Panofsky-style multipole correctors. In order to control the beam parameters through these FFA arcs, horizontal splitters must be used. The geometrical and physical constraints, as well as the beam matching requirements are very restrictive, complicating the design. This work will show the current status of the most mature design, which includes matching solutions, as well as options for extraction of the beam.

Accelerator Physics↗

Design update on the transition beamline for the CEBAF Energy Upgrade

For Jefferson Lab’s 22GeV upgrade, two new permanent-magnet Fixed-Field Alternating Gradient (FFA) arcs will be integrated to serve the accelerator’s six highest-energy recirculation passes. Connecting these FFA arcs to the existing linear accelerator (linac) requires a carefully engineered transition section. The current design has two parts where the first part adiabatically matches the beam dispersion and orbit trajectories, while the second part aligns the Twiss parameters (alpha and beta functions) with those at the linac entrance. Given the tight spatial constraints and multiple matching requirements, a genetic algorithm is being explored to optimize the beam optics matching. This paper presents the current progress in developing and optimizing this transition.

Accelerator Physics↗

Status of conceptual horizontal splitter design for FFA@CEBAF energy upgrade

Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) is currently investigating the feasibility of upgrading its maximum operating energy using Fixed-Field Alternating-gradient (FFA) recirculating arcs to increase the total number of recirculations the beam through the pair of LINACs. These FFA arcs will be composed of permanent magnets, with small Panofsky-style multipole correctors. Horizontal splitters are needed to control the beam parameters through these FFA arcs. The geometrical and physical constraints, as well as the beam matching requirements are very restrictive, complicating the design. This work will show the current status of the most mature design, which includes matching solutions, as well as options for extraction of the beam.

Accelerator Physics↗

Superconductivity for Large Scale Wind Turbines

A conceptual design has been completed for a 10MW superconducting direct drive wind turbine generator employing low temperature superconductors for the field winding. Key technology building blocks from the GE Wind and GE Healthcare businesses have been transferred across to the design of this concept machine. Wherever possible, conventional technology and production techniques have been used in order to support the case for commercialization of such a machine. Appendices A and B provide further details of the layout of the machine and the complete specification table for the concept design. Phase 1 of the program has allowed us to understand the trade-offs between the various sub-systems of such a generator and its integration with a wind turbine. A Failure Modes and Effects Analysis (FMEA) and a Technology Readiness Level (TRL) analysis have been completed resulting in the identification of high risk components within the design. The design has been analyzed from a commercial and economic point of view and Cost of Energy (COE) calculations have been carried out with the potential to reduce COE by up to 18% when compared with a permanent magnet direct drive 5MW baseline machine, resulting in a potential COE of 0.075 $\$$/kWh. Finally, a top-level commercialization plan has been proposed to enable this technology to be transitioned to full volume production. The main body of this report will present the design processes employed and the main findings and conclusions.

17 WIND ENERGY↗

A Soft-Switching Inverter for High-Temperature Advanced Hybrid Electric Vehicle Traction Motor Drives

The state-of-the-art hybrid electric vehicles (HEVs) require the inverter cooling system to have a separate loop to avoid power semiconductor junction over temperatures because the engine coolant temperature of 105°C does not allow for much temperature rise in silicon devices. The proposed work is to develop an advanced soft-switching inverter that will eliminate the device switching loss and cut down the power loss so that the inverter can operate at high-temperature conditions while operating at high switching frequencies with small current ripple in low inductance based permanent magnet motors. The proposed tasks also include high-temperature packaging and thermal modeling and simulation to ensure the packaged module can operate at the desired temperature. The developed module will be integrated with the motor and vehicle controller for dynamometer and in-vehicle testing to prove its superiority. This report will describe the detailed technical design of the soft-switching inverters and their test results. The experiments were conducted both in module level for the module conduction and switching characteristics and in inverter level for its efficiency under inductive and dynamometer load conditions. The performance will be compared with the DOE original specification.

33 ADVANCED PROPULSION SYSTEMS↗

A 75 MW S-Band Klystron

This program performed computational and preliminary mechanical design for a klystron producing 75 MW at 2.856 GHz using periodic permanent magnet (PPM) focusing. The performance specifications achieved were those for the Matter-Radiation Interactions in the Extremes (MaRIE) project at Los Alamos National Laboratory. The klystron is designed to provide 10 microsecond pulses at 60 Hz with 56 dB gain. The PPM-Focusing eliminates requirements for solenoids and their associated power supplies, cooling systems, interlocks, control and diagnostic instrumentation, and maintenance. The represents a significant in both acquisition and operating costs. It also increases reliability by eliminating many potential failure modes.

43 PARTICLE ACCELERATORS↗

Radiation Damage Studies of Materials and Electronic Devices Using Hadrons

We have irradiated NdFeB permanent magnet samples from different manufacturers and with differing values of coercivity and remanence using stepped doses of 1 MeV equivalent neutrons up to a fluence of 0:64 1015n=cm2 to evaluate effects on magnetization and B field distributions. The samples with high coercivity, irradiated in open circuit configurations, showed no or minimal effects when compared with unirradiated samples, whereas the lower coercivity magnets suffered significant losses of magnetization and changes in the shapes of their field patterns. One such magnet underwent a fractional magnetization loss of 13.1% after a fluence of 0:59 1015 n=cm2. This demagnetization was not uniform. With increasing fluence, B field scans along the centerlines of the pole faces revealed that the normal component of B decreased more near the midpoint of the scan than near the ends. In addition, a fit to the curve of overall magnetization loss with fluence showed a significant deviation from linearity. The results are discussed in light of other measurements and theory. The high coercivity materials appear suitable for use in accelerator applications subject to irradiation by fast neutrons such as dipoles where the internal demagnetizing field is comparable to or less than that of the open circuit samples tested in this study.

Pellett, David↗

GOWind Project Final Technical Report

To obtain a permit, to construct, to connect 3x6MW permanent magnet direct drive wind power generators, and to deliver to the ERCOT grid 18MW of renewable energy from up to 5 miles offshore San Pedro Island, Texas. To further develop the site to accommodate up to 1000MW of productivity and thereby drive down the average cost of construction, making offshore wind power economically competitive with alternative sources of energy.

17 WIND ENERGY↗

Development of a 10 kW, 2.815 GHz Klystron

Development of a Periodic Permanent Magnet (PPM) focused klystron is described. The klystron was designed to produce 10 kW CW at 2.815 GHz. The program developed an innovative PPM circuit that provided extremely uniform magnetic fields at the electron beam location while providing unprecedented access to the RF circuit for tuners and water cooling. Simulations indicated the klystron would produce more than 11 kW with an efficiency exceeding 65%. Problems with the mechanical design prevented successful testing of the initial prototype; however, a new design was successfully developed and implemented in a 6 MW klystron developed in a follow-on program. Funding is being pursued to rebuild the 10 kW RF circuit and complete the klystron development.

43 PARTICLE ACCELERATORS↗