Search NASA⌕ Search

SEARCH · Search NASA

Results for “RADIOACTIVE WASTES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

Construction, Startup and Operation of a New LLRW Disposal Facility in Andrews County, Texas - 12151

During this last year, Waste Control Specialists LLC (WCS) completed construction and achieved start of operations of a new low level radioactive waste (LLRW) disposal facility in Andrews County Texas. Disposal operations are underway for commercial LLRW, and start up evolutions are in progress for disposal of Department of Energy (DOE) LLRW. The overall approach to construction and start up are presented as well as some of the more significant challenges and how they were addressed to achieve initial operations of the first new commercial low level radioactive waste disposal facility in more than 30 years. The WCS disposal facility consists of two LLRW disposal cells, one for Texas Compact waste, and a separate disposal cell for DOE waste. Both disposal cells have very robust and unique designs. The cells themselves are constructed entirely in very low permeability red bed clay. The cell liners include a 0.91 meter thick clay liner meeting unprecedented permeability limits, 0.3 meter thick reinforced concrete barriers, as well as the standard geo-synthetic liners. Actions taken to meet performance criteria and install these liners will be discussed. Consistent with this highly protective landfill design, WCS chose to install a zero discharge site water management system. The considerations behind the design and construction of this system will be presented. Other activities essential to successful start of LLRW disposal operations included process and procedure development and refinement, staffing and staff development, and training. Mock ups were built and used for important evolutions and functions. Consistent with the extensive regulation of LLRW operations, engagement with the Texas Commission on Environmental Quality (TCEQ) was continuous and highly interactive. This included daily activity conference calls, weekly coordination calls and numerous topical conference calls and meetings. TCEQ staff and consultants frequently observed specific construction evolutions, such as geological feature mapping of designated excavation faces, disposal cell clay liner installation, disposal cell concrete barrier construction, etc. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Best Practice on Facility Characterisation from a Material and Waste End- State Perspective - 16041

Radiological characterisation plays a significant role in the process of decommissioning of shut-down nuclear facilities in order to ensure the protection of the environment and radiation safety. At all stages of a decommissioning programme or project, adequate radiological characterisation is of crucial importance, not least from a material and waste perspective. The radiological characterisation is a key element for planning, controlling and optimising decommissioning and dismantling activities. Experience has shown that data and information from the operation of a facility can - supplemented by recently collected and analysed data and information - be of crucial importance for decisions on waste management and for characterisation of radioactive waste. Once the dismantling has been done, some information may be hard, costly or even impossible to obtain later in the waste management process. This was the reason why the Working Party on Decommissioning and Dismantling (WPDD) of the OECD Nuclear Energy Agency (NEA) decided in late 2013 to extend the mandate of the Task Group on Radiological Characterisation and Decommissioning (TGRCD) for a second phase focusing on nuclear facility characterisation from a waste and material end-state perspective whereas the first phase focused on overall strategies of radiological characterisation. This paper gives an overview of the activities and findings within both phases up to now. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operational Safety Analysis for Disposal Period of the Future Belgian Geological Disposal Facility - 19249

For more than 40 years, ONDRAF/NIRAS (the federal agency responsible for managing radioactive waste and enriched fissile materials in Belgium) has been studying the concept of a geological disposal facility (GDF) in poorly indurated clays as an option for the long-term management of both category B waste (low-level and intermediate-level long-lived waste - LILW-LL) and category C waste (high-level waste - HLW and spent fuel). In the absence of a policy decision, the proposed Belgian reference option for disposal of such waste is a GDF in poorly indurated clays, located at a depth between 200 m and 600 m. ONDRAF/NIRAS has developed a reference disposal concept for research, development and demonstration (RD and D) purposes. At the current stage of this program, the primary objective of ONDRAF/NIRAS is to establish the safety and feasibility of constructing, operating and closing a Geological Disposal Facility (GDF) at the conceptual design level, without any presumption about the exact location of the facility. This will be evaluated in a first version of the safety and feasibility case (SFC-1 V1) for the geological disposal of category B and C radioactive wastes. Analysis of the operational safety is an important part of the SFC-1 V1. ONDRAF/NIRAS, supported by BGE Technology GmbH, has prepared an operational safety analysis of the current GDF reference design and the processes occurring during the operation and closure period. A SWIFT methodology (Structured What If Technique) is used to identify risks and the measures required to mitigate their consequences. In parallel to this SWIFT analysis, specific attention is also given to fire risk, especially in the blind-ending disposal galleries (DG). Based on understanding of fire risk analysis, recommendations suggest using exclusively electrically driven equipment to reduce fire loads and minimize the fire hazard. In addition, strict working procedures could prevent the presence of workers between the DG dead end and equipment presenting significant fire load. The use of mobile refuge chambers should also be part of the safety concept. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatment of Uranium Catalyst Waste for High Volume Reduction of the Final Waste to be Disposed - 19023

A large volume of problematic radioactive waste of spent uranium catalyst, approximately 7,000 drums was generated by a chemical company in Korea. The spent uranium catalyst has since been stored onsite awaiting a management strategy that is to minimize the volume/cost requirements for final disposal of the uranium-bearing waste. This work developed for the first time a process to greatly reduce the waste volume to be disposed while the secondary wastes generated from the process being released to the environment are controlled to meet the discharge criteria in Korea. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Activities ONDRAF/NIRAS related to the decommissioning of nuclear facilities

Since 1980, the Agency is responsible by law for the safe management of all radioactive waste produced in Belgium, including decommissioning wastes. By the law of 11 January 1991 and the implementing Royal Decree of 16/10/1991, ONDRAF/NIRAS has been entrusted with a mission concerning the decommissioning of nuclear facilities. This mission involves the collection and assessment of data concerning decommissioning forecasts for nuclear facilities, the approval of facilities' decommissioning programmes, the establishment - in consultation with operators - of financing conditions for decommissioning, as well as the implementation of these programmes on request by the operator, or in the case of its failure to do so. This is the case for the company Best Medical Belgium SA located at Fleurus (MDS Nordion SA, till April 2011), which produced radioisotopes for medical applications and went bankrupt in 2012. These installations have been entrusted to ONDRAF/NIRAS. A plan of action was developed for taking over the operations in the framework of remediation and decommissioning. Steps have been taken to integrate his new role as a nuclear operator. The installations of Best Medical Belgium SA are now referred to as the 'O/N - Site Fleurus.' Nuclear facility operators, or any person requesting to operate a nuclear facility, are obliged to provide ONDRAF/NIRAS, under their responsibility and in due time, with all the necessary information concerning these facilities' decommissioning forecasts, the nature, quantities and dates of transfer of the resulting waste, and the financing conditions for these facilities' decommissioning. In order to make the necessary funds available for decommissioning a nuclear facility when it will be shut down, operators are obliged to establish provisions during the facility's active life. These provisions are calculated in such a way that the total amount established at the time of the final shutdown covers all costs resulting from the facility's final phase, namely the preparation of decommissioning, decontamination, more or less long-term maintenance, dismantling, treatment, conditioning and disposal of waste produced during this phase. In order to face to multiple and repeated evaluation processes, the Agency, already in the early 90's, started with the implementation of its own integrated data processing system, recording the physical and radiological inventories of nuclear facilities, and allowing the evaluation of the quantities of decommissioning materials and wastes as well as of the decommissioning costs of these facilities. The cost evaluations cover all decommissioning activities from final shutdown of the facility until final release from nuclear control, as well as conventional demolition and site restoration if required. Beside the information related to the inventories, the database involves so called auxiliary tables integrating unit prices of the various decontamination and dismantling techniques, unit rates for radioactive waste processing, interim storage and final disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Summary of the Integrated Disposal Facility Performance Assessment

An annual summary on the adequacy of the Hanford Imnmobilized Low-Activity Waste (RLAW) Performance Assessment (PA) is required for each year in which a PA is not issued (DOE 0 435.1, Radioactive Waste Management; DOE M 435.1-1, Radioactive Waste Management Manual; DOE/ORP-2000-0 1, Maintenance Plan For The Hanford Immobilized Low-Activity Tank Waste Performance Assessment). The most recently approved PA is DOE/ORP-2000-24, Hanford Immobilized Low-Activity Waste Performance Assessment: 2001 Version. The ELAW PA evaluated the adequacy of the ILAW disposal facility, now referred to as the Integrated Disposal Facility (11DF), for the safe disposal of vitrified Hanford Site tank waste. More recently, a preliminary evaluation for the disposal of offsite low-level waste and mixed low-level waste was considered in 12 RPP- 15834, Integrated Disposal Facility Risk Assessment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Repository Performance Confirmation - 12119

Repository performance confirmation links the technical bases of repository science and societal acceptance. Among the countless aspects of monitoring, performance confirmation holds a special place, involving distinct activities combining technical and social significance in radioactive waste management. Discussion is divided into four themes: 1. A distinction is drawn between performance confirmation monitoring and other testing and monitoring objectives, 2. A case study illustrates confirmation activities integrated within a long-term testing and monitoring strategy for Yucca Mountain, 3. A case study reviews compliance monitoring developed and implemented for the Waste Isolation Pilot Plant, and 4. An approach for developing, evaluating and implementing the next generation of performance confirmation monitoring is presented. International interest in repository monitoring is exhibited by the European Commission Seventh Framework Programme 'Monitoring Developments for Safe Repository Operation and Staged Closure' (MoDeRn) Project. The MoDeRn partners are considering the role of monitoring in a phased approach to the geological disposal of radioactive waste. As repository plans advance in different countries, the need to consider monitoring strategies within a controlled framework has become more apparent. The MoDeRn project pulls together technical and societal experts to assimilate a common understanding of a process that could be followed to develop a monitoring program. Experience from two repository programs in the United States sheds light on how performance confirmation has been executed. Lessons learned can help the next generation of performance confirmation. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monte Carlo simulations for generic granite repository studies

In a collaborative study between Los Alamos National Laboratory (LANL) and Sandia National Laboratories (SNL) for the DOE-NE Office of Fuel Cycle Technologies Used Fuel Disposition (UFD) Campaign project, we have conducted preliminary system-level analyses to support the development of a long-term strategy for geologic disposal of high-level radioactive waste. A general modeling framework consisting of a near- and a far-field submodel for a granite GDSE was developed. A representative far-field transport model for a generic granite repository was merged with an integrated systems (GoldSim) near-field model. Integrated Monte Carlo model runs with the combined near- and farfield transport models were performed, and the parameter sensitivities were evaluated for the combined system. In addition, a sub-set of radionuclides that are potentially important to repository performance were identified and evaluated for a series of model runs. The analyses were conducted with different waste inventory scenarios. Analyses were also conducted for different repository radionuelide release scenarios. While the results to date are for a generic granite repository, the work establishes the method to be used in the future to provide guidance on the development of strategy for long-term disposal of high-level radioactive waste in a granite repository.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feasibility studies for the design of disposal vaults for multi-purpose containers (MPCs): construction, operation, ventilation and management of heat - 15175

The Nuclear Decommissioning Authority (NDA) subsidiary, Radioactive Waste Management Ltd (RWM) is responsible for the safe implementation of a Geological Disposal Facility (GDF) for radioactive waste in the UK. As part of their generic programme to underpin the planned designs for a GDF, work is ongoing to explore a range of possible geological disposal concepts. This work developed GDF concept designs for Multi-Purpose Containers (MPC) disposal in the generic host rock types considered: higher strength (crystalline), lower strength sedimentary (sedimentary / clay formations) and evaporite rocks. This paper is specific to concepts for the disposal of MPC for Pressurised Water Reactor (PWR) spent nuclear fuel (SF). The key outcomes of the feasibility studies to improve the understanding of the MPC disposal concept and the specific challenges to construct, operate, ventilate, manage heat and backfill associated with this concept are summarised in this paper. The management of the high loading of radiogenic heat (from 12 PWR SF assemblies in MPCs compared to 4 in 'standard' disposal containers) during an extended open phase (delayed backfilling of the disposal area) of up to 300 years was investigated. The concept designs developed demonstrate it is feasible to construct, operate and ventilate disposal vaults to accommodate open 'storage' periods required for transitional thermal decay of high heat generating waste in higher strength and lower strength sedimentary host rock types considered by RWM. This work focused on developing two contrasting disposal concepts which are applicable to both higher strength and lower strength rock environments; both of which illustrate how vault temperature, stability and groundwater inflows can be controlled to delay backfilling and allow MPC package thermal output to decrease. MPC disposal in evaporite rock does not require a cooling period due to its high thermal conductivity and favourable performance at higher temperatures; therefore the concept developed for this rock includes immediate backfilling of disposal tunnels. A clear understanding of the interactions and limitations associated with heat management during the open period was developed by investigation of a 'Heating Ventilation and Air-Conditioning System' (HVAC). It was concluded that removal of heat from the disposal tunnels / vaults is feasible, but introduces significant operational complexity. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applying insights from repository safety assessments.

Despite decades of international consensus that deep geological disposal is the best option for permanent management of long-lived high-level radioactive wastes, no repositories for used nuclear fuel or high-level waste are in operation. Detailed long-term safety assessments have been completed worldwide for a wide range of repository designs and disposal concepts, however, and valuable insights from these assessments are available to inform future decisions about managing radioactive wastes. Qualitative comparisons among the existing safety assessments for disposal concepts in clay, granite, salt, and unsaturated volcanic tuff show how different geologic settings can be matched with appropriate engineered barrier systems to provide a high degree of confidence in the long-term safety of geologic disposal. Review of individual assessments provides insights regarding the release pathways and radionuclides that are most likely to contribute to estimated doses to humans in the far future for different disposal concepts, and can help focus research and development programs to improve management and disposal technologies. Lessons learned from existing safety assessments may be particularly relevant for informing decisions during the process of selecting potential repository sites.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

CEA decommissioning and clean-up activities legacy waste management and lessons learned - 15506

The CEA has generated radioactive waste in both liquid and solid form for more than 50 years within the scope of its R and D, clean-up and dismantling programs. The vast majority of the waste produced is transferred to disposal centers in approved waste packages. Nonetheless, a large quantity of legacy waste still remains in ageing facilities in which the storage conditions are sometimes no longer satisfactory with respect to the safety requirements that are constantly evolving. As part of a broad clean-up and dismantling process focusing on these ageing facilities managed by the CEA, the top priority is to shut down nuclear activities on two symbolic sites: Grenoble and Fontenay-aux-Roses, which are both located in a dense urban environment. After about ten years of dismantling, the nuclear facilities on the Grenoble site are on their way to be completely decommissioned in the regulatory sense of the term. Furthermore, the radwaste issue on this site has raised no specific problems, though it did require developing innovative and sometimes costly waste outlets. The older Fontenay-aux-Roses site is where the first experimental research on minor actinide separation took place. The facilities on this site have reached a stage in dismantling which necessitates the recovery of irradiating legacy waste containing alpha, beta and gamma emitters. The transfer of this waste to interim storage centers more than 600 kilometers away is a decisive factor in reducing the site's nuclear source term and in ensuring the satisfactory progress of the dismantling operations. This paper details the issues raised by the recovery of legacy waste, which requires greater characterization to better understand its radiological and chemical status. This waste also requires better characterization to meet the storage requirements of new sites designed for storage periods exceeding 50 years prior to its final disposal in a deep geological repository. The issue of transporting waste on public roads is specifically covered, along with the strategy defined to securely transfer all legacy waste resulting from the CEA's very diverse R and D programs. Emphasis is placed on finding the right balance between collecting the necessary data on the waste to be transported, ensuring the reconditioning of this waste so it can be transported safely, and maintaining an efficient industrial-scale waste transfer process to limit the lead times and costs related to legacy waste recovery operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an Alternative Approach to Demonstrating Environmental Performance in the UK - 19354

European basic safety standards require that exposure of humans to the potentially harmful effects of ionising radiation are optimised so that they are as low as reasonably achievable, taking account of economic and societal factors. In the United Kingdom the responsibility for ensuring that exposures to humans are optimised is split between two regulatory functions. The Office of Nuclear Regulation regulates exposures to workers in all scenarios and to members of the public in the event of an accident. Environmental regulators in each of the four nations comprising the United Kingdom regulate exposures to members of the public from normal operations. Since the early 1990's, all permissions granted to nuclear sites in the UK for the discharge/disposal of radioactive waste to the environment have contained conditions requiring holders to demonstrate that they minimise the generation of radioactive waste, apply appropriate abatement and discharge/dispose of it in a way that minimises impacts on members of the public and the environment. For many years, the industry standard for providing this demonstration, which was heavily influenced by regulatory expectations and feedback, was to undertake one or a series of multi-attribute decision assessments (MADA). Wood's team of environmental specialists has been involved in undertaking such MADA studies for many years. Since the mid-2000's, our team has become increasingly aware of some of the limitations of undertaking MADA to demonstrate environmental performance for large scale new nuclear build projects and, in particular, the next generation of new nuclear power stations that are being planned and implemented in the UK. We have collaborated with the vendors of reactor technologies, the prospective/owner operators of new nuclear power stations and the developers of new facilities on existing sites to develop an alternative approach to demonstrating environmental performance. Our alternative approach comprises three main pillars which are summarised as: - Evolution - benefit from progressive improvements, operational experience and recent permitting activities. Our alternative approach uses the claim, argument, evidence approach which is commonly used for nuclear safety cases and which allows us to 'tell the story' of how environmental performance has been achieved. We have successfully deployed this approach for all new nuclear power stations proposed in the UK. - Integration - ensure that optimisation is integrated into the project programme and forms part of the 'big picture'. Our alternative approach allows environmental performance to be managed better throughout the life cycle of the project and ensures that our outputs are 'living' documents and do not 'sit on the shelf'. We have successfully demonstrated how this can be applied during rationalisation of major schemes and significant design changes on nuclear new build projects. - Opportunity - identify the best time to deliver elements of the programme. Our alternative approach aims to minimise the overall time, trouble and costs associated with demonstrating environmental performance by ensuring that decisions are made at the time when they offer greatest benefit and by minimising unnecessary rework. Our advice has helped to reduce the project costs and minimise delays associated with regulatory queries and interventions. This paper describes the journey that we have taken with our clients in developing our alternative approach to demonstrating environmental performance. We explain the UK regulatory context and explore the need for change. We present a number of case studies related to new nuclear power stations and other new facilities on existing nuclear sites that demonstrate the successful application of our alternative approach. We provide examples of how we have successfully implemented the outputs of our alternative approach into project and corporate management arrangements. Finally, we examine feedback from clients, regulators and other interested parties to propose future refinements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Socio-Technical Perspective on Repository Monitoring - 12229

Monitoring geological repositories for high-activity radioactive wastes has both technical and social dimensions, which are closely interrelated. To investigate the implications of this for geological disposal, data on experts' expectations of repository monitoring and the functions that it is expected to serve were analysed. The analysis drew on strategic and technical documents on monitoring produced by national agencies and by international organisations or projects; interviews with specialists in radioactive waste management organisations on monitoring and on their perceptions of societal concerns and expectations; and observations from technical workshops on repository monitoring. Three main rationales for monitoring were found: performance confirmation; decision support in a step-wise process; and public and stakeholder confidence building. The expectation that monitoring will enhance public confidence is then examined from a social scientific perspective and the potential for and challenges to using monitoring in this way are reviewed. In conclusion, implications for stakeholder engagement in the development of monitoring objectives and strategies are discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

License Amendment Request for Storing Exelon Sister Nuclear Stations Class B/C LLRW in the LaSalle Station Interim Radwaste Storage Facility - 13620

Exelon Nuclear (Exelon) designed and constructed an Interim Radwaste Storage Facility (IRSF) in the mid-1980's at LaSalle County Nuclear Station (LaSalle). The facility was designed to store low-level radioactive waste (LLRW) on an interim basis, i.e., up to five years. The primary reason for the IRSF was to offset lack of disposal in case existing disposal facilities, such as the Southeast Compact's Barnwell Disposal Facility in Barnwell, South Carolina, ceased accepting radioactive waste from utilities not in the Southeast Compact. Approximately ninety percent of the Radwaste projected to be stored in the LaSalle IRSF in that period of time was Class A, with the balance being Class B/C waste. On July 1, 2008 the Barnwell Disposal Facility in the Southeast Compact closed its doors to out of- compact Radwaste, which precluded LaSalle from shipping Class B/C Radwaste to an outside disposal facility. Class A waste generated by LaSalle is still able to be disposed at the 'Envirocare of Utah LLRW Disposal Complex' in Clive, Utah. Thus the need for utilizing the LaSalle IRSF for storing Class B/C Radwaste for an extended period, perhaps life-of-plant or more became apparent. Additionally, other Exelon Midwest nuclear stations located in Illinois that did not build an IRSF heretofore also needed extended Radwaste storage. In early 2009, Exelon made a decision to forward Radwaste from the Byron Nuclear Station (Byron), Braidwood Nuclear Station (Braidwood), and Clinton Nuclear Station (Clinton) to LaSalle's IRSF. As only Class B/C Radwaste would need to be forwarded to LaSalle, the original volumetric capacity of the LaSalle IRSF was capable of handling the small number of additional expected shipments annually from the Exelon sister nuclear stations in Illinois. Forwarding Class B/C Radwaste from the Exelon sister nuclear stations in Illinois to LaSalle would require an amendment to the LaSalle Station operating license. Exelon submitted the License Amendment Request (LAR) to NRC on January 6, 2010; NRC approved the LAR on July 21, 2011. A similar decision was made by Exelon in early 2009 to forward Radwaste from Limerick Nuclear Station to its sister station, the Peach Bottom Atomic Power Station; both in Pennsylvania. A LAR submittal to the NRC was also provided and NRC approval was received in 2011. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Building a Successful Communications Program Based on the Needs and Characteristics of the Affected Communities - 13152

Over 200 local residents streamed through the doors of the Port Hope Lions Centre to see the detailed plans for the historic low-level radioactive waste clean-up project about to take place in their community. The event had a congenial atmosphere as people walked through the hall taking in rows of display panels that explained each element of the project, asked questions of project staff stationed around the room and chatted with friends and neighbours over light refreshments. Later that year, the results of the Port Hope Area Initiative (PHAI) 10. annual public attitude survey revealed an all-time high in community awareness of the project (94%) and the highest levels of confidence (84%) recorded since surveying began. Today, as the PHAI transitions from a decade of scientific and technical studies to implementation, the success of its communications program - as evidenced by the above examples - offers room for cautious encouragement. The PHAI has spent the past 10 years developing relationships with the southern Ontario communities of Port Hope and Port Granby in preparation for Canada's largest low-level radioactive waste environmental restoration project. These relationships have been built around a strong understanding of the communities' individual needs and characteristics and on the PHAI's efforts to consider and respond to these needs. The successes of the past, as well as the lessons learned, will inform the next stage of communications as the projects move into waste excavation and transportation and building of the long-term waste management facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MODELING SOLIDIFICATION-INDUCED STRESSES IN CERAMIC WASTE FORMS CONTAINING NUCLEAR WASTES

The goal of this work is to produce a ceramic waste form (CWF) that permanently occludes radioactive waste. This is accomplished by absorbing radioactive salts into zeolite, mixing with glass frit, heating to a molten state 915 C to form a sodalite glass matrix, and solidifying for long-term storage. Less long term leaching is expected if the solidifying cooling rate doesn’t cause cracking. In addition to thermal stress, this paper proposes that a stress is formed during solidification which is very large for fast cooling rates during solidification and can cause severe cracking. A solidifying glass or ceramic cylinder forms a dome on the cylinder top end. The temperature distribution at the time of solidification causes the stress and the dome. The dome height, “the length deficit,” produces an axial stress when the solid returns to room temperature with the inherent outer region in compression, the inner in tension. Large tensions will cause cracking of the specimen. The temperature deficit, derived by dividing the length deficit by the coefficient of thermal expansion, allows solidification stress theory to be extended to the circumferential stress. This paper derives the solidification stress theory, gives examples, explains how to induce beneficial stresses, and compares theory to experimental data.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Simulation of DWPF Chemical Process Cell Using a Reaction Calorimeter

The Defense Waste Processing Facility (DWPF) converts liquid radioactive waste into glass using a Sludge Receipt Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME) in addition to other processes. The SRAT and SME processes can be simulated on a small-scale using the Mettler-Toledo Reaction Calorimeter (RC1). This equipment is able to automate the execution and monitoring of experiments involving nonradioactive chemical simulants. During the chemical processing of sludge in the SRAT process, foam begins to form and can foam over the reaction vessel. The current antifoam used at DWPF creates a risk of increased flammability and has a limited pH range. Usually, mercury is circulated back into the reaction vessel during the SRAT process, making it difficult to remove. To combat foam over, novel antifoams will be tested during the boil-up process using the RC1. To improve mercury extraction, 3D-printed coalescer columns will be tested within the Mercury Water Wash Tank (MWWT) of the RC1. Testing of Simulant Sludge Batch 6 (SB6) was performed to ensure: the sludge would form a stable foam at boiling during full SRAT/SME runs; the antifoam would reduce the amount of foam within the vessel The sludge and a Precipitate Reactor Feed Tank (PRFT) simulant with monosodium titanate (MST) were mixed separately, combined, and then heated to boiling. As shown below, the antifoam used was able to eliminate the foam within the vessel, as expected. The FormLabs Form2 3D Printer can be used to create roughly 3-inch tall and 1-inch diameter columns from clear and ceramic resins. The columns will utilize chemical and physical forces to draw the mercury out of a condensed offgas stream leaving the RC1 reaction vessel. These columns will be tested during full SRAT/SME runs on the basis of how well they are able to collect elemental mercury. In preparation for full-scale runs, the RC1 equipment was assembled onto a custom table and tested with water runs. The software used to control automation, iControl, has a user-friendly interface that allows the experiment to be altered as needed. An example of the data recorded during an experimental run is represented in Figure 1 below. Water runs were utilized as a way to prove if the RC1 system was functioning in the following areas: Boil-up rates, Chemical additions using pumps, Temperature readings, Balance readings, Probe readings, Offgas system, Agitation. Future Plans: Five novel antifoams will be tested during full SRAT/SME runs. The most effective antifoam will be utilized in DWPF's Chemical Process Cell. The design of the Mercury Extraction Coalescer can be further manipulated to increase the extraction of not only elemental mercury, but other heavy metals in environmental remediation processes as well.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Inorganic Ba-Sn Nanocomposite Materials for Sulfate Sequestration from Complex Aqueous Solutions

Selective sequestration of sulfate (SO42-) in the form of barite (BaSO4) from alkaline solutions of high ionic strength containing carbonate at high concentrations resembling legacy radioactive waste generated during plutonium cold war era production is problematic due to the preferential formation of BaCO3. Incorporation of sulfate into the insoluble and thermally stable BaSO4 phase can potentially benefit radioactive waste processing in reducing operational challenges and suppressing volatilization of other waste components such as technetium-99. To enhance selectivity of SO42- sequestration, a series of Ba(II)-Sn(IV) materials was prepared using simple hydrothermal synthesis from different Sn(II) and Sn(IV) precursors. Structural characterization indicated that all obtained products predominantly contained BaSn(OH)6 and Ba2SnO2(OH)4(H2O)10 crystalline phases which were disrupted upon exposure to SO42- due to formation of BaSO4. Performance of the Ba(II)-Sn(IV) materials was tested using complex alkaline solutions simulating radioactive waste containing 0.094 M SO42- and 0.5 M CO32- among other constituents. About 54 – 66% of SO42- was converted to BaSO4 when a quantity of Ba(II)-Sn(IV) material containing approximately a stoichiometric amount of Ba2+ relative to SO42- was used. In comparison, previous studies indicate negligible BaSO4 formation under similar conditions when a simple Ba2+ salt is used. This improvement is attributed to the selective replacement of the Ba(II) stannate by SO42-. Thermal stability of the sulfate-loaded product material up to 1100 °C was demonstrated. Obtained materials offer a convenient and economical option for the selective sequestration or removal of SO42- from carbonate containing solutions.

Johnson, Isaac↗