Search NASA⌕ Search

SEARCH · Search NASA

Results for “Relative Permeability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,193 records · Page 67

Low cost modular plasma system for reforming of natural gas

The initial aim of this project was to develop a low-cost compact, modularly scalable, point of use, on demand production system for the reforming of natural gas (NG) into products such as acetylene, hydrogen and other related hydrocarbons. Based on a pulsed dielectric barrier discharge (DBD), the fast rising voltage pulses produced by the system causes the dielectric breakdown of the gas to lag behind the rapid voltage increase so that a voltage greater than the static breakdown voltage of the gas, called an overvoltage, is briefly attained. The century long commercial use of the DBD discharge to push the highly endothermic oxygen to ozone reaction served as an additional motivation. The project meets the recommendations of the National Research Council 2007 report on plasma science for a greater investment in low temperature plasma science and engineering. An important finding is that the method investigated has a high specific energy requirement (SER) of the order of 1,000 to 5,000 kWh per kg of hydrogen, and a corresponding low efficiency of only ~0.1 to 0.5% of converting electrical into chemical (ΔH, ΔG) energy. This compares unfavorably with 52 kWh/kgH 2 required for NG thermal plasma reforming, or a pulsed spark discharge, Lotfalipour et. al, and Gao et. al. (For comparison electrolysis of water into hydrogen and oxygen gas requires only 45 to 80kWh/kgH 2 ). This project garnered data with different reactor configurations, materials, gases and mixtures including NG, methane, hydrogen, propane, argon, nitrogen and air, gap sizes ranging from 0.5 to 4.1 mm, electrode areas from 5 to 460 cm, voltages to 27 kV, pulse frequencies to 20 kHz and peak currents into the hundreds of amperes, temperatures to 625 °C and pressures from 15 mbar to 2 bar. An SRS 300 residual gas analyzer (RGA) yielded quadrupole mass spectrometry (QMS) data on the reformate. To analyze the data we extended the public domain software OpenChrom®, Wenig, to QMS data, yielding accurate identification and quantitative data on reformate products. This extension of OpenChrom® is applicable beyond this project and is a significant contribution to the general community of researchers. The documentation is available on the internet, see Whitlock, and a copy has been appended to this report. The main product of methane and natural gas plasma reforming is hydrogen, constituting ~90% of the products, followed by 1% to 10% ethane, propane, ethylene, acetylene and isobutene. Neopentane, propene, butane and pentane constitute less than 1 % of product. Adding a nickel catalyst increases the selectivity for hydrogen. Carbon nanosheets (graphene), a product of commercial interest, were synthesized by plasma reforming of acetylene at low pressure. The reformate analysis shows hat saturated and branched hydrocarbons are favored compared with unsaturated and linear hydrocarbons. For example, ethane, propane, iso-butane, 2-methyl butane, and 2-methyl pentane are produced in higher amounts compared with unsaturated and linear components. At low pressure acetylene and ethylene production rate is higher and propane production lower. We developed a recirculating system in which hydrogen is removed through a permeable membrane as fast as it is being produced by the reactor and the remaining products are recirculated at a high flow rate of several liters per minute. This keeps the concentration of H 2 in the reactor low, while achieving a total output concentration of 79%, high enough for pressure swing adsorption to be used for further purification. The recirculating system could be used with other gas reforming technologies. We report on four different reactors,1) a spark discharge reactor, 2) a standard DBD cylindrical reactor, 3) a small DBD reactor where catalyst powder can be quickly loaded onto a carrier to investigate the effect of the plasma on the catalyst and the effectiveness of the of the catalyst in promoting gas reformation and 4) a configurable DBD reactor to study the performance effects of dielectric selection, electrode gap distance, and electrode/dielectric interface on plasma reactor operation. This project achieved a commercializable 1kW plasma system including reactors a plasma pulse generator and a gas supply module.

03 NATURAL GAS↗

Williston Basin Resource Study for Commercial-Scale Subsurface Hydrogen Storage

The Energy & Environmental Research Center (EERC), in partnership with the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL), the EERC’s State Energy Research Center (SERC), MPLX Operations LLC, and TC Energy Development Holdings Inc. (a subsidiary of TC Energy Corporation), studied the potential for subsurface hydrogen storage and recovery in the Williston Basin of western North Dakota. The project’s goal was to evaluate the feasibility of large-scale, secure geologic H 2 storage to support future hydrogen generation, storage, and use. This work included laboratory testing, H 2 –rock–fluid exposure experiments, literature reviews on H 2 embrittlement, and reservoir modeling and simulations. The study included an assessment of storage potential across three types of storage reservoirs using both reservoir simulation and DOE’s web-based tool SHASTA-HELP (Subsurface Hydrogen Assessment, Storage, and Technology Acceleration – Hydrogen Estimator for Logistical Planning), as well as investigation of potential H 2 production and markets for commercial-scale deployment. Building on prior EERC gas storage research, three storage options were selected for detailed evaluation: the Broom Creek Formation (a clastic saline reservoir), the Dickinson Lodgepole Mounds (DLM) complex (carbonate mud mound structures) of the Lodgepole Formation (an active oil and gas producing reservoir), and the Dunham Salt Interval of the Piper Formation (to be used for engineered salt cavern development). These targets were prioritized based on prior EERC research using datasets related to seal capacity, reservoir quality, mechanical integrity, and injectivity. Exposure tests on Broom Creek and DLM samples showed mineral dissolution and precipitation that increased brine salinity and altered reservoir rock surfaces. Although these results provide useful insight, they are limited by small sample sizes and short-term (30-day) exposure, requiring further study to assess long-term storage integrity. Salt formations were not tested because of their known nonreactivity and established mechanical stability. Results of reservoir simulations performed for a single site demonstrated that the Broom Creek Formation may be capable of receiving up to 42,000 tonnes of injected H 2 over 7 months via one well. H 2 recovery took place over 5 months, resulting in approximately 26,000 tonnes (~62% without cushion gas [CG]). This work suggests water production may be important and subsequent cycles of injection and production may perform more efficiently; however, significant site-specific work in the future is needed to assess actual reservoir performance of injection and withdrawal of H 2 storage. For oil reservoir potential, a multiple-well model was used to simulate injection of approximately 32,000 tonnes of H 2 into a single wellbore while simultaneously producing in place reservoir fluids from four offset wells to maintain reservoir pressure. The simulation results suggested a high recovery (~98%); in addition, cost advantages through existing infrastructure could be realized. Challenges in this reservoir include vi managing gas purity and leakage risks. In both scenarios, production of H 2 takes place in a single-well scenario with 10 cycles (7 months of injection and 5 months of production) over 10 years. Finally, the use of engineered caverns in the Dunhan Salt was evaluated, and the results suggest that while they have a smaller capacity (<1000 tonnes per cavern), they exhibit nearly complete gas recovery (>99%), fast response times, and low purity risk. While caverns in North Dakota may be smaller in capacity, fields can be developed in galleries to accommodate the volumetric needs and rapid turnaround times necessary to meet market demands. Geographic limitations and thin salt intervals in North Dakota may represent less total storage potential than salt domes elsewhere, but significant opportunities exist to expand this market for gas storage in North Dakota. A basinwide assessment was performed to estimate a first-of-its-kind value for H 2 storage on a large scale. DOE’s SHASTA-HELP, combined with EERC simulation work, was used to perform the assessment. Estimated H 2 storage potential varied widely for each formation type. The Broom Creek saline formation was estimated to have a storage potential of approximately 1.7–90.5 million tonnes (MMt). The DLM oil reservoirs were estimated to have 0.07–0.19 MMt of capacity. Notably, each of these estimates relies on significant assumptions regarding reservoir thickness, porosity, permeability, and CG needed for operation. Much research is needed to understand the true site-specific storage resource potential of each formation. Using the Dunham Salt Interval for cavern development may result in as much as 4.79 MMt (up to 2.87 MMt working gas) of H 2 storage potential. An important note for consideration is that the values presented here need significantly more geological characterization and engineering assessments prior to gaining confidence in performance. This will be a focal point for future research and development needs. The basinwide evaluation also indicated that North Dakota has significant H 2 generation potential, with estimates up to a possible 13 MMt annually, suggesting a substantial opportunity for H 2 market development and thus the need for commercial-scale H 2 storage to facilitate growth and resilience. Key Recommendations 1. Conduct detailed site characterization (3D seismic, well logs, core sampling) to reduce geologic uncertainty. 2. Perform techno-economic analyses incorporating market, regulatory, and incentive frameworks. 3. Investigate long-term interactions among H 2 , CGs, well materials, and formations to assess risks. 4. Develop pilot- and field-scale demonstrations to validate models and establish best practices.

03 NATURAL GAS↗

Initial Assessment of Cover Degradation Features at the Mexican Hat, Utah, UMTRCA Disposal Site - 19556

The Mexican Hat, Utah, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site is located on the Navajo Reservation in southeast Utah. The US Nuclear Regulatory Commission licensed the site to the US Department of Energy Office of Legacy Management (LM) for custody and long-term care. LM manages long-term surveillance and maintenance activities at the site with the principal goal of protecting human health and the environment. The disposal cell was designed to encapsulate low-level radioactive mill tailings and other residual radioactive materials (RRM) in a way that minimizes the need for active maintenance and limits radon gas emanation and precipitation infiltration. The disposal cell has a multicomponent cover, consisting of a 60 cm thick (24 inch), low-permeability, bentonite-amended radon barrier, overlain by a 15 cm thick (6 inch) sandy gravel bedding/filter layer and a 30 cm thick (12 inch) riprap erosion-protection layer. Under UMTRCA, designs intended to control and contain RRM shall be effective for up to 1000 years, to the extent reasonably achievable and, in any case, for at least 200 years. In 2016, multiple subtle depressions were identified on the rock cover along the toe and lower portions of the northeast side slope of the disposal cell. Due to concerns regarding potential impacts to disposal cell performance and erosion resistance, evaluations of the depressions and cell cover design and construction were initiated. The evaluations included reviews of the disposal cell as-built drawings and supporting design calculations for the rock cover components. Also, in 2017, a weather monitoring station was installed at the site to collect continuous site-specific meteorological data, and repeatable ground-based light imaging, detection, and ranging (lidar) topographical and aerial photogrammetry surveys were implemented to monitor for potential changes in the surface depression features. The evaluations also included visual inspections of the depressions, and in 2018, small-area manual excavations of the rock cover components (test pits) were performed to observe the conditions of the cover components, scan for radioactivity, and observe evidence of erosion on the surface of the radon barrier material. Voids and incisions were discovered within the radon barrier on the north and northeast side slopes of the disposal cell. Visual observations at test pits indicate that the bedding/filter material is highly segregated and may not be in conformance with the disposal cell engineering and construction design specifications. Post-construction development of a weak to strongly cemented material has also been observed immediately below the base of the bedding layer in test pits with observed radon barrier degradation. A series of radiological surveys have been performed at the site, and radiological readings have not exceeded natural background conditions in the vicinity of the site. Thus, the site remains protective of human health and the environment. Implementation of continuous radiological monitoring at the site will be initiated in fall 2018 through the deployment of radon cups and thermoluminescent dosimeters to obtain data that provides supporting evidence that the disposal cell remains protective of human health and the environment. Evaluations to determine the cause(s) of the depression features and associated radon barrier erosion are ongoing. Possible mechanisms of cover degradation identified thus far include segregated bedding material that would allow for higher precipitation runoff velocities, resulting in erosion of the radon barrier; post-construction cementation of radon barrier or aeolian material that could negatively affect the performance of the radon barrier; cation exchange leading to the development of cementation; and aeolian deposition affecting precipitation runoff. Moreover, geotechnical sampling and testing is planned to verify spatial cover conditions relative to design specifications. The resulting information will be used to identify possible causes for the surface depressions and associated radon barrier degradation, gain insight on potential long-term performance implications along the side slopes of the disposal cell, and identify potential corrective actions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

In-Situ Testing and Performance Assessment of a Redesigned WIPP Panel Closure - 13192

There are two primary regulatory requirements for Panel Closures at the Waste Isolation Pilot Plant (WIPP), the nation's only deep geologic repository for defense related Transuranic (TRU) and Mixed TRU waste. The Federal requirement is through 40 CFR 191 and 194, promulgated by the U.S. Environmental Protection Agency (EPA). The state requirement is regulated through the authority of the Secretary of the New Mexico Environment Department (NMED) under the New Mexico Hazardous Waste Act (HWA), New Mexico Statutes Annotated (NMSA) 1978, chap. 74-4-1 through 74-4-14, in accordance with the New Mexico Hazardous Waste Management Regulations (HWMR), 20.4.1 New Mexico Annotated Code (NMAC). The state regulations are implemented for the operational period of waste emplacement plus 30 years whereas the federal requirements are implemented from the operational period through 10,000 years. The 10,000 year federal requirement is related to the adequate representation of the panel closures in determining long-term performance of the repository. In Condition 1 of the Final Certification Rulemaking for 40 CFR Part 194, the EPA required a specific design for the panel closure system. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) has requested, through the Planned Change Request (PCR) process, that the EPA modify Condition 1 via its rulemaking process. The DOE has also requested, through the Permit Modification Request (PMR) process, that the NMED modify the approved panel closure system specified in Permit Attachment G1. The WIPP facility is carved out of a bedded salt formation 655 meters below the surface of southeast New Mexico. Condition 1 of the Final Certification Rulemaking specifies that the waste panels be closed using Option D which is a combination of a Salado mass concrete (SMC) monolith and an isolation/explosion block wall. The Option D design was also accepted as the panel closure of choice by the NMED. After twelve years of waste handling operations and a greater understanding of the waste and the behavior of the underground salt formation, the DOE has established a revised panel closure design. This revised design meets both the short-term NMED Permit requirements for the operational period, and also the Federal requirements for long-term repository performance. This new design is simpler, easier to construct and has less of an adverse impact on waste disposal operations than the originally approved Option D design. The Panel Closure Redesign is based on: (1) the results of in-situ constructability testing performed to determine run-of-mine salt reconsolidation parameters and how the characteristics of the bedded salt formation affect these parameters and, (2) the results of air flow analysis of the new design to determine that the limit for the migration of Volatile Organic Compounds (VOCs) will be met at the compliance point. Waste panel closures comprise a repository feature that has been represented in WIPP performance assessment (PA) since the original Compliance Certification Application of 1996. Panel closures are included in WIPP PA models principally because they are a part of the disposal system, not because they play a substantive role in inhibiting the release of radionuclides to the outside environment. The 1998 rulemaking that certified WIPP to receive transuranic waste placed conditions on the panel closure design to be implemented in the repository. The revised panel closure design, termed the Run-of-Mine (ROM) Panel Closure System (ROMPCS), is comprised of 30.48 meters of ROM salt with barriers at each end. The ROM salt is generated from ongoing mining operations at the WIPP and may be compacted and/or moistened as it is emplaced in a panel entry. The barriers consist of bulkheads, similar to those currently used in the panels as room closures. A WIPP performance assessment has been completed that incorporates the ROMPCS design into the representation of the repository, and compares repository performance to that achieved with the approved Option D design. Several key physical processes and rock mechanics principles are incorporated into the performance assessment. First, creep closure of the salt rock surrounding a panel entry results in consolidation of the ROM salt emplaced in the entry. Eventually, the ROM salt comprising the ROMPCS will approach a condition similar to intact salt. As the ROM salt reaches higher fractional densities during consolidation, back stress will be imposed on the surrounding rock mass leading to eventual healing of the disturbed rock zone above and below the panel closure. Healing of the disturbed rock zone above and below the ROMPCS reduces the porosity and permeability in those areas. Analysis of the new design demonstrates that: (1) the WIPP continues to meet regulatory compliance requirements when the ROMPCS design is implemented instead of Option D, and (2) there is no impact on the short-term effectiveness of the panel closure to limit the concentration of VOCs at the WIPP site boundary to a fraction of the health-based exposure limits (HBLs) during the operational period. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗