Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

From Protection and Prevention to Research and Discovery: Eligibility Assessment of the Health Research Laboratory (TA-43) and Historic Documentation for TA-43-0001 - Volume 1

The U.S. Department of Energy National Nuclear Security Administration Los Alamos Field Office (NA-LA) requests the New Mexico State Historic Preservation Officer (SHPO) to concur with the National Register of Historic Places (NRHP)–eligibility determinations detailed in this report for the Health Research Laboratory (HRL) complex in Technical Area 43 (TA-43) at the Los Alamos National Laboratory (LANL). As part of the LANL Footprint Reduction Program’s Decommissioning and Demolition (D&D) process, all facilities of the HRL complex are scheduled for characterization and future demolition.

99 GENERAL AND MISCELLANEOUS↗

MAPGEN : mixed initiative planning and scheduling for the Mars '03 MER mission

The Mars Exploration Rovers Mars '03 mission is one of NASA's most ambitious science missions to date. The rovers will be launched in the summer of 2003 with each rover carrying instruments to conduct remote and in-situ observation to elucidate the planet's past climate, water activity, and habitability. Science is the primary driver of MER and, as a consequence, making best use of the scientific instruments, within the available resources, is a crucial aspect of the mission. To address this critically, the MER project has selected MAPGEN (Mixed-Initiative Activity Plan GENerator) as an activity planning tool. MAPGEN combines two exiting systems, each with a strong heritage: APGEN the Activity Planning tool from the Jet Propulsion Laboratory and the Europs Planning/Scheduling system from NASA Ames Research Center. This paper discusses the issues arising from combining these tools in the context of this mission.

planning and scheduling↗

Dispatch Manager for NEML2 Constitutive Model Calculations Embedded in MOOSE

This report describes the extended capabilities of the NEML2 constitutive modeling library, including a flexible and efficient work dispatching system designed to leverage both CPU and GPU resources. This enhancement addresses one of the primary computational challenges in large-scale simulations: the ability to distribute and execute batches of material model evaluations across heterogeneous computing devices. The new dispatch system introduces a modular set of dispatcher and scheduler classes that coordinate the flow of data and execution between devices. The dispatcher is responsible for efficiently packaging work, managing device-specific memory operations, and synchronizing results. This modularity allows for extensibility, making it straightforward to integrate additional computing backends in the future. From an implementation standpoint, the dispatcher system interfaces seamlessly with NEML2's existing models. They handle device-aware tensor operations, optimize memory transfers, and support asynchronous execution when applicable. This design ensures that batches of material points can be evaluated concurrently, substantially improving throughput compared to previous single-device or serial implementations. These improvements not only enhance the raw performance of NEML2 but also improve its usability in multiscale and high-fidelity simulations, where the simultaneous evaluation of large material point batches is critical. Benchmarks included in the report demonstrate the system’s scalability, highlighting its effectiveness when leveraging modern GPU architectures.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Technology requirements for telerobotic satellite servicing in space

Telerobotic servicer technology requirements were identified for typical on-orbit servicing operations, including: automation requirements and automated system utilization in typical servicing missions; key automation technologies used for servicing; evolution concepts; technology development timetable; and servicing technology drivers. Teleoperation, robotics, and artificial intelligence are needed in the servicing missions investigated. Analysis shows that teleoperation will be used more widely than fully robotic systems, at least during the early space station years because of the diversity and unpredictability of many servicing tasks which call for the human operator's skills, resourcefulness, and decision-making ability. There will be heavy dependence on a sophisticated, flexible, readily accessible, high-speed and high-capacity data management system which can provide the expert system support required in diagnosing, troubleshooting, decision making, task scheduling, and mission planning.

Meissinger, Hans F.↗

Achieving spectrum conservation for the minimum span and minimum-order frequency assignment problems

Effective and efficient solution of frequency assignment problems assumes increasing importance as the radiofrequency spectrum experiences ever-increasing utilization by diverse communications services, requiring that the most efficient use of this resource be achieved. The research presented explores a general approach to the frequency assignment problem, in which such problems are categorized by the appropriate spectrum-conserving objective function, and are each treated as an N-job, M-machine scheduling problem appropriate for the objective. Results obtained and presented illustrate that such an approach presents an effective means of achieving spectrum-conserving frequency assignments for communications systems in a variety of environments.

Heyward, Ann O.↗

A Demand Access Paradigm for NASA’s Deep Space Network

NASA’s Deep Space Network (DSN) is the primary resource for communications and navigation for interplanetary space missions, for both NASA and partner agencies. As part of an investigation into improved efficiency and responsiveness, we have been exploring and prototyping the infusion of a ”demand access” model into the DSN scheduling process. Today, DSN is fully pre-scheduled in advance, and many users rely on a stable schedule to plan their own spacecraft activities, weeks in advance of execution. However, a new class of missions is emerging that may not be scheduled as far in advance, and may be event-driven in coming across science targets at unpredictable times. These users could take advantage of an on-demand mechanism to download data. Simulations have shown that such a mechanism could improve latency (time from data collection to download) by 2x, as well as more efficiently utilize the available DSN antennas. In this paper, we describe a prototype of a demand access process and how it addresses the challenges of co-existing with a staticallyscheduled body of missions, while providing the benefits of lower latency science data return.

Lucena, Girly↗

Managing Waste Inventory and License Limits at the Perma-Fix Northwest Facility to Meet CH2M Hill Plateau Remediation Company (CHPRC) American Recovery and Reinvestment Act (ARRA) Deliverables - 12335

CH2M Hill Plateau Remediation Company (CHRPC) is a prime contractor to the U.S. Department of Energy (DOE) focused on the largest ongoing environmental remediation project in the world at the DOE Hanford Site Central Plateau, i.e. the DOE Hanford Plateau Remediation Contract. The East Tennessee Materials and Energy Corporation (M and EC); a wholly owned subsidiary of Perma-Fix Environmental Services, Inc. (PESI), is a small business team member to CHPRC. Our scope includes project management; operation and maintenance of on-site storage, repackaging, treatment, and disposal facilities; and on-site waste management including waste receipt from generators and delivery to on-site and off-site treatment, storage, and disposal facilities. As part of this scope, M and EC staffs the centralized Waste Support Services organization responsible for all waste characterization and acceptance required to support CHPRC and waste generators across the Hanford Site. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 cubic meters (m{sup 3}) of legacy waste was defined as 'no-path-forward waste'. A significant portion of this waste (7,650 m{sup 3}) comprised wastes with up to 50 grams of special nuclear materials (SNM) in oversized packages recovered during retrieval operations and large glove boxes removed from the Plutonium Finishing Plant (PFP). Through a collaborative effort between the DOE, CHPRC, and Perma-Fix Environmental Services, Inc. (PESI), pathways for these problematic wastes were developed that took advantage of commercial treatment capabilities at a nearby vendor facility, Perma-Fix Northwest (PFNW). In the spring of 2009, CHPRC initiated a pilot program under which they began shipping large package, low gram suspect TRU (<15 g SNM per container), and large package contact and remote handled MLLW to the off-site PFNW facility for treatment. PFNW is restricted by the SNM limits set for the total quantity of SNM allowed at the facility in accordance with the facility's radioactive materials license(s) (RML). While both CHPRC and PFNW maintain waste databases to track all waste movements, it became evident early in the process that a tool was needed that married the two systems to better track SNM inventories and sequence waste from the point of generation, through the PFNW facility, and back to the Hanford site for final disposition. This tool, known as the Treatment Integration and Planning Tool (TIPT), has become a robust planning tool that provides real-time data to support compliant and efficient waste generation, transportation, treatment, and disposition. TIPT is developing into the next generation tool that will change the way in which legacy wastes, retrieval wastes and decontamination and decommissioning operations are conducted on the Plateau Remediation Contract (PRC). The real value of the TIPT is its predictive capability. It allows the W and FMP to map out optimal windows for processing waste through the PFNW facility, or through any process that is in some way resource limited. It allows project managers to identify and focus on problem areas before shipments are affected. It has been modified for use in broader applications to predict turnaround times and identify windows of opportunity for processing higher gram wastes through PFNW and to allow waste generators, site-wide, to accurately predict scope, cost, and schedule for waste generation to optimize processing and eliminate storage, double handling, and related costs and unnecessary safety risks. The TIPT addresses the years old problem of how to effectively predict not only what needs to be done, but when. 'When' is the key planning parameter that has been ignored by the generator and processor for many years, but has proven to be the most important parameter for both parties. While further refinement is a natural part of any development process, the current improvements on the TIPT have shown that prediction is a powerful consideration. Even in lean times expected for the foreseeable future, the improved TIPT continues to play a central role in managing our way through those times to assure facilities remain viable and available. It is recommended that other major remediation projects and waste processing facilities incorporate a tool such as TIPT to improve customer-commercial supplier communications and better optimization of resources. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Information Power Grid: Distributed High-Performance Computing and Large-Scale Data Management for Science and Engineering

We use the term "Grid" to refer to distributed, high performance computing and data handling infrastructure that incorporates geographically and organizationally dispersed, heterogeneous resources that are persistent and supported. This infrastructure includes: (1) Tools for constructing collaborative, application oriented Problem Solving Environments / Frameworks (the primary user interfaces for Grids); (2) Programming environments, tools, and services providing various approaches for building applications that use aggregated computing and storage resources, and federated data sources; (3) Comprehensive and consistent set of location independent tools and services for accessing and managing dynamic collections of widely distributed resources: heterogeneous computing systems, storage systems, real-time data sources and instruments, human collaborators, and communications systems; (4) Operational infrastructure including management tools for distributed systems and distributed resources, user services, accounting and auditing, strong and location independent user authentication and authorization, and overall system security services The vision for NASA's Information Power Grid - a computing and data Grid - is that it will provide significant new capabilities to scientists and engineers by facilitating routine construction of information based problem solving environments / frameworks. Such Grids will knit together widely distributed computing, data, instrument, and human resources into just-in-time systems that can address complex and large-scale computing and data analysis problems. Examples of these problems include: (1) Coupled, multidisciplinary simulations too large for single systems (e.g., multi-component NPSS turbomachine simulation); (2) Use of widely distributed, federated data archives (e.g., simultaneous access to metrological, topological, aircraft performance, and flight path scheduling databases supporting a National Air Space Simulation systems}; (3) Coupling large-scale computing and data systems to scientific and engineering instruments (e.g., realtime interaction with experiments through real-time data analysis and interpretation presented to the experimentalist in ways that allow direct interaction with the experiment (instead of just with instrument control); (5) Highly interactive, augmented reality and virtual reality remote collaborations (e.g., Ames / Boeing Remote Help Desk providing field maintenance use of coupled video and NDI to a remote, on-line airframe structures expert who uses this data to index into detailed design databases, and returns 3D internal aircraft geometry to the field); (5) Single computational problems too large for any single system (e.g. the rotocraft reference calculation). Grids also have the potential to provide pools of resources that could be called on in extraordinary / rapid response situations (such as disaster response) because they can provide common interfaces and access mechanisms, standardized management, and uniform user authentication and authorization, for large collections of distributed resources (whether or not they normally function in concert). IPG development and deployment is addressing requirements obtained by analyzing a number of different application areas, in particular from the NASA Aero-Space Technology Enterprise. This analysis has focussed primarily on two types of users: the scientist / design engineer whose primary interest is problem solving (e.g. determining wing aerodynamic characteristics in many different operating environments), and whose primary interface to IPG will be through various sorts of problem solving frameworks. The second type of user is the tool designer: the computational scientists who convert physics and mathematics into code that can simulate the physical world. These are the two primary users of IPG, and they have rather different requirements. The results of the analysis of the needs of these two types of users provides a broad set of requirements that gives rise to a general set of required capabilities. The IPG project is intended to address all of these requirements. In some cases the required computing technology exists, and in some cases it must be researched and developed. The project is using available technology to provide a prototype set of capabilities in a persistent distributed computing testbed. Beyond this, there are required capabilities that are not immediately available, and whose development spans the range from near-term engineering development (one to two years) to much longer term R&D (three to six years). Additional information is contained in the original.

Johnston, William E.↗

Runway Operations Planning: A Two-Stage Solution Methodology

The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. Thus, Runway Operations Planning (ROP) is a critical component of airport operations planning in general and surface operations planning in particular. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, may be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. Generating optimal runway operations plans was approached in with a 'one-stage' optimization routine that considered all the desired objectives and constraints, and the characteristics of each aircraft (weight class, destination, Air Traffic Control (ATC) constraints) at the same time. Since, however, at any given point in time, there is less uncertainty in the predicted demand for departure resources in terms of weight class than in terms of specific aircraft, the ROP problem can be parsed into two stages. In the context of the Departure Planner (OP) research project, this paper introduces Runway Operations Planning (ROP) as part of the wider Surface Operations Optimization (SOO) and describes a proposed 'two stage' heuristic algorithm for solving the Runway Operations Planning (ROP) problem. Focus is specifically given on including runway crossings in the planning process of runway operations. In the first stage, sequences of departure class slots and runwy crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the departure class slots are populated with specific flights from the pool of available aircraft, by solving an integer program. Preliminary results from the algorithm implementation on real-world traffic data are included.

Anagnostakis, Ioannis↗

Quantifying the value of hydropower in the electric grid : role of hydropower in existing markets.

The electrical power industry is facing the prospect of integrating a significant addition of variable generation technologies in the next several decades, primarily from wind and solar facilities. Overall, transmission and generation reserve levels are decreasing and power system infrastructure in general is aging. To maintain grid reliability modernization and expansion of the power system as well as more optimized use of existing resources will be required. Conventional and pumped storage hydroelectric facilities can provide an increasingly significant contribution to power system reliability by providing energy, capacity and other ancillary services. However, the potential role of hydroelectric power will be affected by another transition that the industry currently experiences - the evolution and expansion of electricity markets. This evolution to market-based acquisition of generation resources and grid management is taking place in a heterogeneous manner. Some North American regions are moving toward full-featured markets while other regions operate without formal markets. Yet other U.S. regions are partially evolved. This report examines the current structure of electric industry acquisition of energy and ancillary services in different regions organized along different structures, reports on the current role of hydroelectric facilities in various regions, and attempts to identify features of market and scheduling areas that either promote or thwart the increased role that hydroelectric power can play in the future. This report is part of a larger effort led by the Electric Power Research Institute with purpose of examining the potential for hydroelectric facilities to play a greater role in balancing the grid in an era of greater penetration of variable renewable energy technologies. Other topics that will be addressed in this larger effort include industry case studies of specific conventional and hydro-electric facilities, systemic operating constraints on hydro-electric resources, and production cost simulations aimed at quantifying the increased role of hydro.

13 HYDRO ENERGY↗

Planning of distributed data production for High Energy and Nuclear Physics

Modern experiments in High Energy and Nuclear Physics heavily rely on distributed computations using multiple computational facilities across the world. One of the essential types of the computations is a distributed data production where petabytes of raw files from a single source has to be processed once (per production campaign) using thousands of CPUs at distant locations and the output has to be transferred back to that source. The data distribution over a large system does not necessary match the distribution of storage, network and CPU capacity. Therefore, bottlenecks may appear and lead to increased latency and degraded performance. In this paper we propose a new scheduling approach for distributed data production which is based on the network flow maximization model. In our approach a central planner defines how much input and output data should be transferred over each network link in order to maximize the computational throughput. Such plans are created periodically for a fixed planning time interval using up-to-date information on network, storage and CPU resources. The centrally created plans are executed in a distributed manner by dedicated services running at participating sites. In conclusion, our simulations based on the log records from the data production framework of the experiment STAR (Solenoid Tracker at RHIC) have shown that the proposed model systematically provides a better performance compared to the simulated traditional techniques.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Hierarchical Management of Distributed Energy Resources Using Chance-Constrained OPF and Extremum Seeking Control: Preprint

Distributed energy resources (DERs) are becoming an important part of distribution systems because of their economic and environmental benefits. Although their inherent intermittency and volatility introduce uncertainties into the system, they have potential to provide controllability to the system under proper coordination. In this paper, we propose a hierarchical control algorithm for distribution systems with DERs so that they have controllability similar to that of a generator bus. The upper level scheduler solves a chance-constrained optimal power flow (OPF) problem to plan the operation of the DERs based on forecasts, and the lower level distributed DER controllers leverage the extremum seeking approach to deliver the planned power at the feeder head. The proposed algorithm is tested on a modified IEEE 13-node feeder, demonstrating its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

RAP: Resource-aware Automated GPU Sharing for Multi-GPU Recommendation Model Training and Input Preprocessing

Ensuring high-quality recommendations for newly onboarded users requires the continuous retraining of Deep Learning Recommendation Models (DLRMs) with freshly generated data. To serve the online DLRM retraining, existing solutions use hundreds of CPU computing nodes designated for input preprocessing, causing significant power consumption that surpasses even the power usage of GPU trainers. To this end, we propose RAP, an end-to-end DLRM training framework that supports Resource-aware Automated GPU sharing for DLRM input Preprocessing and Training. The core idea of RAP is to accurately capture the remaining GPU computing resources during DLRM training for input preprocessing, achieving superior training efficiency without requiring additional resources. Specifically, RAP utilizes a co-running cost model to efficiently assess the costs of various input preprocessing operations, and it implements a resource-aware horizontal fusion technique that adaptively merges smaller kernels according to GPU availability, circumventing any interference with DLRM training. In addition, RAP leverages a heuristic searching algorithm that jointly optimizes both the input preprocessing graph mapping and the co-running schedule to maximize the end-to-end DLRM training throughput. The comprehensive evaluation shows that RAP achieves 78.3× speedup on average over CPU-based DLRM input preprocessing frameworks. In addition, the end-to-end training throughput of RAP is only 2.04% lower than the ideal case, which has no input preprocessing overhead.

Wang, Zheng↗

ORNL National Hydropower Fish Passage Database

Fish passage facilities are used to mitigate impacts of hydropower dams to migratory fish in rivers, but information on the location, types, and characteristics of this infrastructure is incomplete at a national scale. Researchers at Oak Ridge National Laboratory (ORNL) partnered with fish passage engineers and hydropower experts from the US Fish and Wildlife Service (USFWS), the National Oceanic Atmospheric Administration’s National Marine Fisheries Service (NOAA NMFS), and the Low Impact Hydropower Institute (LIHI) to create the first national scale database of fish passage infrastructure at US hydropower developments. This database consists of the ORNL_Fish_Passage_Dataset.zip file with 13 individual .csv files that contain information on fish passage facility engineering characteristics, targeted fish species, operational schedule, and costs. which is of great value to a diverse range of stakeholders. This information was collected between December 2023 and July 2025 from project partners, other hydropower stakeholders, online datasets available for download, and a stakeholder questionnaire Information. This data resource addresses a large gap in knowledge of the deployment of fish passage technology and is freely available to members of the hydropower community, including federal and state regulators and resource agencies, non-governmental organizations (NGOs), industry, and other user groups to support project planning and regulatory (re)licensing activities. This database supports the US Department of Energy Water Power Technologies Office objective to develop decision support tools and data resources that improve environmental performance and ensure hydropower’s long-term value to the American public.

Matson, Paul [Oak Ridge National Laboratory (ORNL)↗

NASA, John F. Kennedy Space Center environmental impact statement

The probable total impact of the John F. Kennedy Space Center (KSC) operations on the environment is discussed in terms of launch operations emissions and environmental quality. A schedule of planned launches through 1973 is included with a description of the systems for eliminating harmful emissions during launch operations. The effects of KSC on wild life and environmental quality are discussed along with the irreversible and irretrievable commitments of natural resources.

Source record↗

The Geo Quick Ride (GQR) Program: Providing Inexpensive and Frequent Access to Space

This paper examines piggybacking NASA, university, and industry payloads on commercial geosynchronous satellites. NASA's RSDO Office awarded Geo Quick Ride (GQR) study contracts in 1998 to spacecraft manufactures to examine the issues with flying secondary payloads. The study results were very promising. Commercial communication satellites have frequent flights and significant unused resources that could be used to fly secondary payloads. However, manifesting secondary payloads on a commercial revenue-generating satellite is a complex problem to solve. The solution requires multiple simultaneous approaches in order to be successful. There are business, economic, technical, schedule, and organizational issues to be resolved. This paper examines the Geo Quick Ride (GQR) concept, discusses the development issues, and describes how this concept solves many of these issues.

Caffrey, Robert↗

Supportability Challenges, Metrics, and Key Decisions for Future Human Spaceflight

Future crewed missions beyond Low Earth Orbit (LEO) represent a logistical challenge that is unprecedented in human space flight. Astronauts will travel farther and stay in space for longer than any previous mission, far from timely abort or resupply from Earth. Under these conditions, supportability { defined as the set of system characteristics that influence the logistics and support required to enable safe and effective operations of systems { will be a much more significant driver of space system lifecycle properties than it has been in the past. This paper presents an overview of supportability for future human space flight. The particular challenges of future missions are discussed, with the differences between past, present, and future missions highlighted. The relationship between supportability metrics and mission cost, performance, schedule, and risk is also discussed. A set of pro- posed strategies for managing supportability is presented (including reliability growth, uncertainty reduction, level of repair, commonality, redundancy, In-Space Manufacturing (ISM) (including the use of material recycling and In-Situ Resource Utilization (ISRU) for spares and maintenance items), reduced complexity, and spares inventory decisions such as the use of predeployed or cached spares - along with a discussion of the potential impacts of each of those strategies. References are provided to various sources that describe these supportability metrics and strategies, as well as associated modeling and optimization techniques, in greater detail. Overall, supportability is an emergent system characteristic and a holistic challenge for future system development. System designers and mission planners must carefully consider and balance the supportability metrics and decisions described in this paper in order to enable safe and effective beyond-LEO human space flight.

Owens, Andrew C.↗

A parallel workflow implementation for PEST version 13.6 in high-performance computing for WRF-Hydro version 5.0: a case study over the midwestern United States

The Weather Research and Forecasting Hydrological (WRF-Hydro) system is a state-of-the-art numerical model that models the entire hydrological cycle based on physical principles. As with other hydrological models, WRF-Hydro parameterizes many physical processes. Hence, WRF-Hydro needs to be calibrated to optimize its output with respect to observations for the application region. When applied to a relatively large domain, both WRF-Hydro simulations and calibrations require intensive computing resources and are best performed on multimode, multicore high-performance computing (HPC) systems. Typically, each physics-based model requires a calibration process that works specifically with that model and is not transferrable to a different process or model. The parameter estimation tool (PEST) is a flexible and generic calibration tool that can be used in principle to calibrate any of these models. In its existing configuration, however, PEST is not designed to work on the current generation of massively parallel HPC clusters. To address this issue, we ported the parallel PEST to HPCs and adapted it to work with WRF-Hydro. The porting involved writing scripts to modify the workflow for different workload managers and job schedulers, as well as to connect the parallel PEST to WRF-Hydro. To test the operational feasibility and the computational benefits of this first-of-its-kind HPC-enabled parallel PEST, we developed a case study using a flood in the midwestern United States in 2013. Results on a problem involving the calibration of 22 parameters show that on the same computing resources used for parallel WRF-Hydro, the HPC-enabled parallel PEST can speed up the calibration process by a factor of up to 15 compared with commonly used PEST in sequential mode. The speedup factor is expected to be greater with a larger calibration problem (e.g., more parameters to be calibrated or a larger size of study area).

54 ENVIRONMENTAL SCIENCES↗