SEARCH · Search NASA
Results for “performance monitoring”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Improving Coal-Fired Plant Performance Through Integrated Predictive and Condition-Based Monitoring Tools
The project demonstrated the ability to improve boiler performance and reliability through the integrated use of condition-based monitoring (CBM) and predictions of the impacts of coal quality on boiler operations at a full-scale coal-fired power plant. The advanced tool developed actively monitors and manages coal quality and overall boiler conditions that maximizes availability and maintains generating capacity while reducing cost. The tool is used to forecast and alert plant operators and engineers about poor boiler conditions which may occur as a result of incoming coal and/or current power plant operating conditions. The Combustion System Performance Indices (CSPI) and CoalTracker (CT) programs predicts fireside performance of the plant including slagging, fouling, erosion, slag flow, strength development (sintering/densification), and slag layer thickness based on the composition of delivered coal. CT program is tailored for each plant and is used to track the coal from the point of delivery to the burner. The most successful application of the CSPI-CT has been at plants where the coal composition is determined through the use of a full stream elemental analyzers based on prompt gamma neutron analysis (PGNAA). The CSPI-CT program information is used by coal procurement, coal mining and plant operations personnel to select and blend coal properties for the best plant performance.
Monitoring the Long-Term Safety Performance of a Repository for Used Nuclear Fuel - 12294
The nuclear waste management programs of several nations include plans for the design, construction and operation of deep geological repositories. Some of these programs have initiated the licensing process for their repository designs. Monitoring strategies and systems are at different levels of development in each program and there is common ground with respect to the ultimate goal of the monitoring function. In this context, the primary functions of a monitoring system are considered to be the verification of safety performance and making available information that may be required for implementation of future decisions such as the timing of repository decommissioning and closure or the possible retrieval of waste containers. This study examines some of the relevant issues and outlines a conceptual monitoring system for further study and development during implementation of Adaptive Phased Management, the method selected by the Government of Canada for long-term management of used nuclear fuel. (author)
Modeled Performance of the Hathaway Solar Patriot house - Washington D.C
This Dataset contains field research raw data, analysis spreadsheet, photos, and final report from the Hathaway Solar Patriot House Building America Case Study project. This dataset details the monitored and modeled performance of a solar home outside of Washington, D.C. We modeled the home energy performance using DOE 2.2, performed numerous short-terms tests on the home, and monitored its occupied performance for 29 months. The home used modular construction, solar water heating, a ground-coupled heat pump, efficient appliances, and compact fluorescent lighting to reduce its energy consumption by 35% compared to the Building America research benchmark home. The addition of 6kW of photovoltaics (PV) increased the savings to 67% compared to the Building America research benchmark. A more efficient shell to reduce space conditioning loads would have brought the home closer to its zero energy goals. However, even with efficient lighting and appliances, the lights, appliance and plug loads were a significant energy consumer. About 4 kW of PV was required to meet the needs of these loads alone. To achieve the zero energy goal with no further efficiency increases, the Hathaway house would need about 2.6 kW of PV in addition to the 6.0 kW it now has. Applying advanced efficiency measures available or being developed, such as heat-recovery ventilation, superinsulation, and electrochromic windows, could reduce the heating, cooling, and domestic hot water (DHW) energy use to less than 1700 kWh per year, an 88% reduction in these loads from the Building America Benchmark. At this efficiency level, the appliance and plug loads come to dominate energy consumption and account for nearly 70% of the total energy use. This analysis points out that even with highly effective energy-savings technologies (pushed beyond levels currently practical), whole-house energy use reduction by efficiency measures is only about 60% without also reducing the energy use of appliances and plug loads largely considered outside the designers jurisdiction.
GPR Surveys across a Prototype Surface Barrier to Determine Temporal and Spatial Variations in Soil Moisture Content
Engineered surface barriers are expected to play a critical role in the closure of waste sites within the DOE complex and currently require monitoring to verify performance. The most comprehensive approach to assess performance is by water balance evaluation, which requires knowledge of the soil water storage. However, water storage measurements are still made mostly by point sensors and as result field-scale estimates are subject to much uncertainty. The objective of this study was to assess the viability of using ground penetrating radar (GPR) to monitor changes in soil moisture distribution, and therefore water storage, at multiple scales. Profiles were collected at four times during the year March, May, September and the following January to track the decrease in storage from the spring to the summer followed by the increase in the winter. A series of 40-m long profiles were collected using 100-Mhz antennas with a sample interval of 0.8 ns and 500 samples per trace in a 400-ns window. A common midpoint (CMP) survey was first used to determine an optimal antenna separation (3.5 m) after which data were collected using a wide-offset reflection geometry. Travel times were used to calculate the electromagnetic velocities which were then used to calculate water content using the Topp’s equation. Changes in the GPR response were easily observed over the course of the study and indicated spatial differences in moisture, which owing to the relatively uniform soil, can be attributed to differences in water removal by evapotranspiration. Water content also showed a strong seasonal strong seasonal dependence that correlate well with seasonal changes in precipitation and plant water uptake. An investigation of the effects of soil water content on the amplitude of the ground wave showed weaker amplitudes in the drier spring and summer months than in the winter suggesting a correlation between amplitude and water content. Results show that GPR can provide accurate non-invasive estimates of spatial and temporal changes in water content and therefore soil water storage.
Model 9975 PCV O-Ring Fixture Long-Term Leak Performance (Seventh Interim Status Report)
A series of experiments to monitor the aging performance of Viton® GLT O-rings used in the Model 9975 package has been ongoing since 2004 at the Savannah River National Laboratory. Seventy tests using mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450ºF. They were leak-tested initially and have been tested periodically to determine if they meet the criterion of leak-tightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400ºF. High temperature aging continues for 23 GLT O-ring fixtures at 200–270ºF. Room temperature leak test failures have been experienced in all of the GLT O-ring fixtures aging at 350ºF and higher temperatures, and in 8 fixtures aging at 300ºF. The remaining GLT O-ring fixtures aging at 300ºF have been retired from testing following more than 5 years at temperature without failure. No failures have yet been observed in GLT O-ring fixtures aging at 200ºF for 54-72 months, which is still bounding to O-ring temperatures during storage in K-Area Complex (KAC). Based on expectations that the fixtures aging at 200ºF will remain leak-tight for a significant period yet to come, 2 additional fixtures began aging in 2011 at an intermediate temperature of 270ºF, with hopes that they may reach a failure condition before the 200ºF fixtures. High temperature aging continues for 6 GLT-S O-ring fixtures at 200–300ºF. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400ºF. No failures have yet been observed in GLT-S O-ring fixtures aging at 200-300ºF for 30-36 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the O-rings displayed a compression set ranging from 51–96%. This is greater than seen to date for any packages inspected during KAC field surveillance (24% average). For GLT O-rings, separate service life estimates have been made based on the O-ring fixture leak test data and based on compression stress relaxation (CSR) data. These two predictive models show reasonable agreement at higher temperatures (350–400ºF). However, at 300ºF, the room temperature leak test failures to date experienced longer aging times than predicted by the CSR-based model. This suggests that extrapolations of the CSR model predictions to temperatures below 300ºF will provide a conservative prediction of service life relative to the leak rate criterion. Leak test failure data at lower temperatures are needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining PCV O-ring fixtures.
Federal Radiological Monitoring and Assessment Center Monitoring Manual Volume 2: Radiation Monitoring and Sampling
The FRMAC Monitoring and Sampling Manual, Volume 2 provides standard operating procedures (SOPs) for field radiation monitoring and sample collection activities that are performed by the Monitoring group during a FRMAC response to a radiological emergency.
Model 9975 O-Ring Fixture Long-Term Leak Performance (Tenth Interim Status Report)
A series of experiments to monitor the aging performance of Viton® GLT O-rings used in the Model 9975 package has been ongoing since 2004 at the Savannah River National Laboratory. One approach has been to periodically evaluate the leak performance of O-rings being aged in mock-up 9975 Primary Containment Vessels (PCVs) at elevated temperatures. Other methods such as compression-stress relaxation (CSR) tests and field surveillance are also on-going to evaluate O-ring behavior. Seventy tests using PCV mock-ups were assembled and heated to temperatures ranging from 200 to 450 ºF. They were leak-tested initially and have been tested periodically to determine if they continue to meet the leak-tightness criterion defined in ANSI standard N14.5-97. Due to material substitution, fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 ºF. High temperature aging continues for 23 GLT O-ring fixtures at 200 – 270 ºF. Room temperature leak test failures have been experienced in all of the GLT O-ring fixtures aging at 350 ºF and higher temperatures, and in 8 fixtures aging at 300 ºF. The earliest 300 °F GLT Oring fixture failure was observed at 34 months. The remaining GLT O-ring fixtures aging at 300 ºF have been retired from testing following more than 5 years at temperature without failure. No failures have yet been observed in GLT O-ring fixtures aging at 200 ºF for 84 - 108 months, which bounds O-ring temperatures anticipated during storage in K-Area Complex (KAC). Based on expectations that the 200 ºF fixtures will remain leak-tight for a significant period yet to come, 2 additional fixtures began aging in 2011 at 270 ºF, with hopes that they may reach a failure condition before the 200 ºF fixtures, thus providing additional time to failure data. High temperature aging continues for 5 GLT-S O-ring fixtures at 200 – 300 ºF. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 ºF, and in one GLT-S O-ring fixture aging at 300 ºF. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 - 250 ºF for 66 months. One O-ring fixture has failed since the last interim report was issued. Both O-rings in one GLTS fixture aging at 300 ºF failed to remain leak-tight after 69 months at temperature. Aging and periodic leak testing will continue for the remaining PCV fixtures. Additional irradiation of several fixtures has been performed in the last year to maintain a balance between thermal and radiation exposures similar to that experienced in storage, and to show the degree of consistency of radiation response between GLT and GLT-S O-rings.
Human Research Program (HRP) Exploration Medical Capability (ExMC) Standing Review Panel (SRP)
The SRP believes strongly that regularly performed in-flight crew assessments are needed in order to identify a change in health status before a medical condition becomes clinically apparent. It is this early recognition in change that constitutes the foundation of the "occupational health model" expounded in the HRP Requirements Document as a key component of the HRP risk mitigation strategy that will enable its objective of "prevention and mitigation of human health and performance risks". A regular crew status examination of physiological and clinical performance is needed. This can be accomplished through instrumented monitoring of routine embedded tasks. The SRP recommends addition of a new gap to address this action under Category 3.0 Mitigate the Risk. This new gap is closely associated with Task 4.19 which addresses the lack of adequate biomedical monitoring capabilities for performing periodic clinical status evaluations and contingency medical monitoring. A corollary to these gaps is the critical emphasis on preventive medicine, not only during pre- and post-flight phases of a mission as is the current practice, but continued into the in-flight phases of exploration class missions.
Using Current Data to Detect Hardware Faults at Solar Plants
Monitoring amperage data is an effective means of detecting faults in PV plant data. Utilizing amperage data collected at the combiner box gives plant operators an up-to-date list of faulted equipment, allowing them to coordinate maintenance needs at much shorter intervals than previously. Shorter maintenance intervals will increase PV plant production levels, narrowing the gap between expected and actual PV plant performance. The amperage monitoring method performs at a high level, with a string-outage related fault detection True Positive Rate of 46% and False Positive Rate of 8%.
A Flexible, High Performance Service-Oriented Architecture for Detecting Cyber Attacks
The next generation of intrusion detection and cyber defense technologies must be highly flexible so that deployed solutions can be quickly modified to detect new attack scenarios. They must also be able to provide the performance necessary to monitor traffic from high speed networks, and scale to enterprise wide deployments. In this paper we describe our experiences in creating a production application for cyber situational awareness. The application exploits the capabilities of several independently developed components and integrates them using SIFT (Scalable Information Fusion and Triage), a service-oriented architecture (SOA) designed for creating domain-independent, enterprise scale analytical applications. SIFT exploits a common design pattern for composing analytical components, and extends an existing messaging platform with scaling capabilities. We describe the design of the application, and provide a performance analysis that demonstrates the capabilities of the SIFT platform. The paper concludes by discussing the lessons we have learned from this project, and outlines the architecture of the MeDICI, the next generation of our enterprise analytics platforms.
Integrated controls and health monitoring fiberoptic shaft monitor
Recent work was performed on development optical technology to provide real time monitoring of shaft speed, shaft axial displacement, and shaft orbit of the OTVE hydrostatic bearing tester. Results show shaft axial displacement can be optically measured (at the same time as shaft orbital motion and speed) to within 0.3 mills by two fiber optic deflectometers. The final results of this condition monitoring development effort are presented.
Digital Divide in Sub-Saharan African Universities: Recommendations and Monitoring
The Digital Divide prevents Africa from taking advantages of new information technologies. One of the most urgent priorities is to bring the Internet in African Universities, Research, and Learning Centers to the level of other regions of the world. eGY-Africa, and the Sharing Knowledge Foundation are two bottom-up initiatives by scientists to secure better cyber-infrastructure and Internet facilities in Africa. Recommendations by the present scientific communities are being formulated at national, regional and international levels. The Internet capabilities are well documented at country level overall, but this is not the case at the University level. The snapshot of the Internet status in universities in 17 African countries, obtained by a questionnaire survey, is consistent with measures of Internet penetration in the corresponding country. The monitoring of Internet performance has been proposed to those African universities to provide an information base for arguing the need to improve the coverage for Africa. A pilot program is recommended that will start scientific collaboration with Europe in western Africa using ICT. The program will lay the foundations for the arrival of new technologies like Grids.
Performance test results of a low cost GPS time and frequency monitor
Final prototype and pilot production performance test results was presented on a single channel C/A code GPS receiver that was optimized for time and frequency applications. Timing accuracy and stability test results are presented, as well as position determination results. Timing accuracy, timing stability, frequency stability, position accuracy and position stability are presented in the results.
Dosimetric commissioning and quality assurance of scanned ion beams at the Italian National Center for Oncological Hadrontherapy
Purpose: To describe the dosimetric commissioning and quality assurance (QA) of the actively scanned proton and carbon ion beams at the Italian National Center for Oncological Hadrontherapy. Methods: The laterally integrated depth-dose-distributions (IDDs) were acquired with the PTW Peakfinder, a variable depth water column, equipped with two Bragg peak ionization chambers. FLUKA Monte Carlo code was used to generate the energy libraries, the IDDs in water, and the fragment spectra for carbon beams. EBT3 films were used for spot size measurements, beam position over the scan field, and homogeneity in 2D-fields. Beam monitor calibration was performed in terms of number of particles per monitor unit using both a Farmer-type and an Advanced Markus ionization chamber. The beam position at the isocenter, beam monitor calibration curve, dose constancy in the center of the spread-out-Bragg-peak, dose homogeneity in 2D-fields, beam energy, spot size, and spot position over the scan field are all checked on a daily basis for both protons and carbon ions and on all beam lines. Results: The simulated IDDs showed an excellent agreement with the measured experimental curves. The measured full width at half maximum (FWHM) of the pencil beam in air at the isocenter was energy-dependent for both particle species: in particular, for protons, the spot size ranged from 0.7 to 2.2 cm. For carbon ions, two sets of spot size are available: FWHM ranged from 0.4 to 0.8 cm (for the smaller spot size) and from 0.8 to 1.1 cm (for the larger one). The spot position was accurate to within ±1 mm over the whole 20 × 20 cm{sup 2} scan field; homogeneity in a uniform squared field was within ±5% for both particle types at any energy. QA results exceeding tolerance levels were rarely found. In the reporting period, the machine downtime was around 6%, of which 4.5% was due to planned maintenance shutdowns. Conclusions: After successful dosimetric beam commissioning, quality assurance measurements performed during a 24-month period show very stable beam characteristics, which are therefore suitable for performing safe and accurate patient treatments.
Systems, methods and computer-readable media to model kinetic performance of rechargeable electrochemical devices
A system includes an electrochemical cell, monitoring hardware, and a computing system. The monitoring hardware samples performance characteristics of the electrochemical cell. The computing system determines cell information from the performance characteristics. The computing system also analyzes the cell information of the electrochemical cell with a Butler-Volmer (BV) expression modified to determine exchange current density of the electrochemical cell by including kinetic performance information related to pulse-time dependence, electrode surface availability, or a combination thereof. A set of sigmoid-based expressions may be included with the modified-BV expression to determine kinetic performance as a function of pulse time. The determined exchange current density may be used with the modified-BV expression, with or without the sigmoid expressions, to analyze other characteristics of the electrochemical cell. Model parameters can be defined in terms of cell aging, making the overall kinetics model amenable to predictive estimates of cell kinetic performance along the aging timeline.
Instrumentation, performance visualization, and debugging tools for multiprocessors
The need for computing power has forced a migration from serial computation on a single processor to parallel processing on multiprocessor architectures. However, without effective means to monitor (and visualize) program execution, debugging, and tuning parallel programs becomes intractably difficult as program complexity increases with the number of processors. Research on performance evaluation tools for multiprocessors is being carried out at ARC. Besides investigating new techniques for instrumenting, monitoring, and presenting the state of parallel program execution in a coherent and user-friendly manner, prototypes of software tools are being incorporated into the run-time environments of various hardware testbeds to evaluate their impact on user productivity. Our current tool set, the Ames Instrumentation Systems (AIMS), incorporates features from various software systems developed in academia and industry. The execution of FORTRAN programs on the Intel iPSC/860 can be automatically instrumented and monitored. Performance data collected in this manner can be displayed graphically on workstations supporting X-Windows. We have successfully compared various parallel algorithms for computational fluid dynamics (CFD) applications in collaboration with scientists from the Numerical Aerodynamic Simulation Systems Division. By performing these comparisons, we show that performance monitors and debuggers such as AIMS are practical and can illuminate the complex dynamics that occur within parallel programs.
Establishing a Proficiency Testing Scheme for Drinking Water Radiochemistry
As part of its international water proficiency testing (PT) scheme, 'Aquacheck', the LGC Proficiency Testing Group has established a new water radiochemistry PT scheme. The PT scheme is aimed at laboratories who undertake radiochemical analysis on drinking water samples as part of an environmental monitoring programme. Following a scheme design and feasibility study, the new scheme was established to monitor the laboratory performance of participants undertaking the determination of gross alpha, gross beta and tritium activity. Three rounds of the new water radiochemistry PT scheme are now complete. This paper explains the process of establishing such a scheme, reviews the results so far, and addresses future development of the scheme.