Search NASA⌕ Search

SEARCH · Search NASA

Results for “statistical selection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

SCALE 6.2 Lattice Physics Performance Assessment

The US Nuclear Regulatory Commission relies on the lattice physics analysis capabilities of the SCALE code system to perform confirmatory licensing analyses. Either SCALE lattice physics code—TRITON/NEWT or Polaris—can be used to generate cross section data used by the PARCS nodal core simulator for full-core neutronics calculations. This report presents an assessment of the accuracy of SCALE lattice physics codes for preparation of lattice physics data that are used to support simulator codes such as the NRC’s PARCS, for UO 2 -mixed oxide (MOX)/Zr fueled light water reactor (LWR) analyses. Due to the nature of lattice physics calculations, critical reactor experiment benchmarks cannot be modeled in explicit detail in a lattice physics code. However, this limitation does not mean that these measurement data are not usable for lattice physics studies. Therefore, either geometry approximations or axial buckling must be implemented to determine the critical water height. These modeling limitations have led to development of a three-phase assessment strategy. In the first phase, selected critical experiment benchmarks are modeled using the SCALE 3D continuous-energy (CE) Monte Carlo (MC) code KENO, which is the most rigorous neutron transport method available in SCALE, with no approximations in the spatial, angle, or energy treatments. Biases and statistical uncertainties in quantities of interest such as k eff and pin power distributions are determined by comparing CE KENO results to experimental data. This first phase in the accuracy assessment is to demonstrate and establish the use of CE KENO as a reference solution for the second phase. In the second phase, 14 numerical test suites are used to compare SCALE lattice physics calculations with CE KENO as a reference solution. In the third phase, SCALE lattice physics depletion calculations are performed, and the spent fuel isotopic results are compared with available radiochemical assay measurements. Isotopic measurement comparisons provide quantitative assessment of isotopic density distribution predictions with the depletion models in SCALE lattice physics codes. This report documents results for all test suites. The assessment was performed using standard production techniques unless otherwise noted. Both TRITON/NEWT and Polaris exhibited acceptable accuracy for most test cases. For the few test cases in which acceptable accuracy criteria were not met, further code and data development are planned. The computer codes used in this assessment are as follows: SCALE 6.2 rev19189 (pre-release of 6.2.1) was used for CE KENO, TRITON/NEWT and Polaris (PWR only) calculations; SCALE 6.2.2 was used for Polaris calculations to address several updates in support of support boiling water reactor (BWR) lattice geometries. For this work, there is no difference between SCALE 6.2.1 and SCALE 6.2.2 beyond the inclusion of the Polaris BWR analysis capability; The ENDF/B-VII.1 continuous energy and 252 group libraries deployed in SCALE 6.2 were generated with AMPX 6.2 that is distributed with SCALE.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

System Study: High-Pressure Safety Injection 1998-2022

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hours, and failure data from calendar years 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. Highly statistically significant increasing trends were identified in both the HPSI system start-only unreliability and 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: High-Pressure Coolant Injection 1998-2022

This report presents an unreliability evaluation of the high-pressure coolant injection (HPCI) system at 22 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCI results.

99 GENERAL AND MISCELLANEOUS↗

System Study: Emergency Power System 1998-2022

This report presents an unreliability evaluation of the emergency power system (EPS) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of EPS system start-only unreliability, but a highly statistically significant decreasing trend was identified in the industry-wide estimates of EPS system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Auxiliary Feedwater 1998-2022

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar year 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability, but a highly statistically significant decreasing trend was identified in the industry-wide estimates of AFW system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Reactor Core Isolation Cooling 1998-2024

This report presents an unreliability evaluation of the reactor core isolation cooling (RCIC) system at 28 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the RCIC results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Emergency Power System 1998-2024

This report presents an unreliability evaluation of the emergency power system (EPS) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of EPS system start-only unreliability, but a statistically significant decreasing trend was identified in the industry-wide estimates of EPS system 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: High-Pressure Coolant Injection 1998-2024

This report presents an unreliability evaluation of the high-pressure coolant injection (HPCI) system at 22 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCI results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Auxiliary Feedwater 1998-2024

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability, but a statistically significant decreasing trend was identified in the industry-wide estimates of AFW system 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: High-Pressure Core Spray 1998-2024

This report presents an unreliability evaluation of the high-pressure core spray (HPCS) at eight U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCS results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

HEAO 1 observations of active coronae in main-sequence and subgiant stars

The HEAO 1 data has been searched for evidence of X-ray emission from 105 bright late-type stars of luminosity classes IV and V, selected on the basis of indirect optical evidence of the presence of a hot corona. Six of the target stars were detected at the 3-standard deviation level and 15 were coincident with 2-standard deviation X-ray sources. On a statistical basis no more than 5 of these 21 sources are spurious, and the probability that the identification with the class of active chromosphere stars is spurious is less than 0.00001. The sources lie near a line of X-ray/bolometric luminosity ratio = 0.0001, similar to a solar plage, and it is concluded that the most active coronae of late-type stars which are not members of close binary systems are being observed. The RS CVn systems discovered to date seem to form a distinct class of coronal X-ray sources, but the lowest X-ray luminosity members of the group, of which Capella may be the prototype, appear to overlap the domain of these single stars with active coronae. The data do not fit the coronal model of Gorenstein and Tucker (1976), but they are consistent with the coronal loop model of Rosner et al. (1978) as extended by Walter et al. (1980).

Walter, F. M.↗

First-ranked galaxies in groups

A statistical analysis of five group catalogs shows that the B(0) magnitudes of first-ranked group members are consistent with a statistical model in which the luminosities of all group members are drawn from the same distribution. As in the Hickson compact groups, indications are that first-ranked group members are only rarely the products of distinctive evolutionary processes. Distance-dependent selection effects can introduce spurious correlations among group parameters which may appear to support environment-dependent evolution of the first-ranked group members.

Geller, M. J.↗

Developing Conceptual Hypersonic Airbreathing Engines Using Design of Experiments Methods

Designing a hypersonic vehicle is a complicated process due to the multi-disciplinary synergy that is required. The greatest challenge involves propulsion-airframe integration. In the past, a two-dimensional flowpath was generated based on the engine performance required for a proposed mission. A three-dimensional CAD geometry was produced from the two-dimensional flowpath for aerodynamic analysis, structural design, and packaging. The aerodynamics, engine performance, and mass properties arc inputs to the vehicle performance tool to determine if the mission goals were met. If the mission goals were not met, then a flowpath and vehicle redesign would begin. This design process might have to be performed several times to produce a "closed" vehicle. This paper will describe an attempt to design a hypersonic cruise vehicle propulsion flowpath using a Design of' Experiments method to reduce the resources necessary to produce a conceptual design with fewer iterations of the design cycle. These methods also allow for more flexible mission analysis and incorporation of additional design constraints at any point. A design system was developed using an object-based software package that would quickly generate each flowpath in the study given the values of the geometric independent variables. These flowpath geometries were put into a hypersonic propulsion code and the engine performance was generated. The propulsion results were loaded into statistical software to produce regression equations that were combined with an aerodynamic database to optimize the flowpath at the vehicle performance level. For this example, the design process was executed twice. The first pass was a cursory look at the independent variables selected to determine which variables are the most important and to test all of the inputs to the optimization process. The second cycle is a more in-depth study with more cases and higher order equations representing the design space.

Ferlemann, Shelly M.↗

Temperature-dependent Absolute Refractive Index Measurements of Synthetic Fused Silica

Using the Cryogenic, High-Accuracy Refraction Measuring System (CHARMS) at NASA's Goddard Space Flight Center, we have measured the absolute refractive index of five specimens taken from a very large boule of Corning 7980 fused silica from temperatures ranging from 30 to 310 K at wavelengths from 0.4 to 2.6 microns with an absolute uncertainty of plus or minus 1 x 10 (exp -5). Statistical variations in derived values of the thermo-optic coefficient (dn/dT) are at the plus or minus 2 x 10 (exp -8)/K level. Graphical and tabulated data for absolute refractive index, dispersion, and thermo-optic coefficient are presented for selected wavelengths and temperatures along with estimates of uncertainty in index. Coefficients for temperature-dependent Sellmeier fits of measured refractive index are also presented to allow accurate interpolation of index to other wavelengths and temperatures. We compare our results to those from an independent investigation (which used an interferometric technique for measuring index changes as a function of temperature) whose samples were prepared from the same slugs of material from which our prisms were prepared in support of the Kepler mission. We also compare our results with sparse cryogenic index data from measurements of this material from the literature.

Leviton, Douglas B.↗

Modern Era Retrospective Restrospective-Analysis for Research and Applications (MERRA) Data and Services at the GES DISC

The Modern Era Retrospective-analysis for Research and Applications (MERRA) dataset is a NASA satellite era, 30 year (1979 - present), reanalysis using the Goddard Earth Observing System Data Assimilation System, Version 5 (GEOS-5). The project, run out of NASA's Global Modeling and Assimilation Office at Goddard Space Flight Center, provides the science and application communities with a state-of-the-art global analysis with emphasis on improved estimates of the hydrological cycle over a broad range of weather and climate time scales. MERRA products are generated as a long-term synthesis that places the NASA EOS suite of observations in a climate context. The MERRA analysis is performed at a horizontal resolution of 2/3 longitude x 1/2 latitude (540x361 global gridpoints) with observational analyses every 6 hours. The MERRA output data will include 3 dimensional state fields for every 6 hourly analysis cycle on 42 pressure levels (or 72 terrain following model coordinate levels) from the surface through the stratosphere. Several data products are specifically designed to support chemistry and stratosphere transport modeling. The 2 dimensional surface and atmospheric diagnostics (numbering 259) are being stored on the native grid at 1 hourly intervals. These include radiation and vertical integrals of the atmosphere for water and energy budget studies and also surface diagnostics where the diurnal cycle is important. The one hourly surface and near surface data product will also facilitate research on the integrated analysis of Earth system observations in the land, ocean and cryosphere. The MERRA products are archived and distributed by the Goddard Earth Sciences Data and Information Services Center (GES DISC) through its Modeling DISC Web (MDISC) portal. Multiple data access methods and services are available for MERRA data through MDISC: (1) Mirador offers a quick, comprehensive search of MERRA and all GES DISC archived data holdings, allowing searches on keywords, location names or latitude/longitude box, and date/time, with responses within a few seconds. (2) Giovanni is a GES DISC developed Web application that provides data visualization and analysis online. Giovanni features popular visualizations such as latitude-longitude maps, animations, cross sections, profiles, time series, etc. and some basic statistical analysis functions such as scatter plots and correlation coefficient maps. Users are able to download results in several different formats, including Google Earth. (3) On-the-fly parameter subsetting of data within a spatial/temporal window is provided through a simple select and click Web page. (4) MERRA data are also available via OPeNDAP, GrADS Data Server (GDS) and can be converted to netCDF on the fly.

Berrick, Stephen W.↗

Systematic Phase Curve Study of Known Transiting Systems from Year One of the TESS Mission

We present a systematic phase curve analysis of known transiting systems observed by the Transiting Exoplanet Survey Satellite (TESS) during year one of the primary mission. Using theoretical predictions for the amplitude of the planetary longitudinal atmospheric brightness modulation, stellar ellipsoidal distortion and Doppler boosting, as well as brightness considerations to select targets with likely detectable signals, we applied a uniform data processing and light-curve modeling framework to fit the full-orbit phase curves of 22 transiting systems with planet-mass or brown dwarf companions, including previously published systems. Statistically significant secondary eclipse depths and/or atmospheric brightness modulation amplitudes were measured for HIP 65A, WASP-18, WASP-19, WASP-72, WASP-100, WASP-111, WASP-121, and WASP-122/KELT-14. For WASP-100b, we found marginal evidence that the brightest region of the atmosphere is shifted eastward away from the substellar point. We detected significant ellipsoidal distortion signals in the light curves of HIP 65A, TOI-503, WASP-18, and WASP-30, with HIP 65A, TOI-503 and WASP-18 also exhibiting Doppler boosting. The measured amplitudes of these signals agree with the predictions of theoretical models. Combining the optical secondary eclipse depths with previously published Spitzer 3.6 and 4.5 μm measurements, we derived dayside brightness temperatures and visible-light geometric albedos for a subset of the analyzed systems. We also calculated updated transit ephemerides combining the transit timings from the TESS light curves with previous literature values.

Ian Wong↗

Setting the Bar for the Replacement of the Probability of Collision Metric

To date, satellite conjunction assessment (CA) risk analysis has largely embraced the probability of collision (Pc) as the omnibus metric to evaluate collision likelihood, and its use in such assessments has mostly been straightforward: at the point at which a conjunction mitigation decision is required, the calculated Pc is compared to a threshold; and if the calculated Pc exceeds that threshold, then a mitigation action is warranted. With only minor variation, this approach is employed by major CA risk assessment centers (e.g., NASA, EUSST, CNES, JAXA) and is advanced as the preferred method in the published CA best practices handbooks. Despite this near unanimity of operational practice, there is a major strain of secondary literature critical of the Pc and willing to propose alternatives. Alfano (2005) pointed out the ability of the Pc to underrepresent the risk in certain situations and counselled a maximum Pc construct. Carpenter (2017, 2019) reiterated this criticism and proposed using instead a confidence interval on the miss distance. Balch et al. (2019) identified what they argued was a defect in the entire Bayesian Pc construct and believed that the use of a more conservative methodology based on covariance ellipsoid overlap was necessary. Delande (2022) introduced the framework of collision “plausibility” to the risk assessment process and sketched out how this might be used operationally. Elkantassi (2022) published a full development of the miss distance confidence interval approach and applied it to several worked examples. While these different approaches to collision risk assessment do differ in their details, they all converge on two central points: first, the Pc’s failure to give an adequate expression of the risk in dilution region situations is a fatal flaw; and second, a conjunction should be presumed risky and in need of mitigation until the evidence of the situation can establish otherwise. These criticisms, if correct, would counsel a number of modifications to current CA operational practice; as such, they force a re-examination of fundamental aspects of the CA problem, including the following: 1. Is the CA risk assessment a probability problem, a statistics problem, or something else? 2. If it is a statistics problem, does it lend itself naturally to a hypothesis test construction? 3. If it can be construed as a hypothesis test, what form should the null hypothesis take, to wit: what constraints exist on the choice of the null hypothesis, what selections are in best alignment with all of the attendant parameters of the problem, and what is implied philosophically by different choices? 4. What are the implications of using the different proposed risk assessment parameters for CA? This question should be answered both in determining how frequently the dilution region situation cited by the critics of the Pc actually appears in an operationally significant manner and the missed detection and false alarm rates of all of the proposed risk assessment metrics, compared both to the Pc and to each other. This paper explores and offers preliminary answers to the above questions, presenting a researched treatment of the philosophical nature of the CA problem and the null hypothesis choice that achieves the greatest consistency with all of the different aspects of operational CA conduct. It then profiles all of the different proposed risk assessment metrics enumerated in the earlier paragraph against an extremely large database of conjunction events at both the 550km and 700km altitudes. The combination of the philosophical exploration of the CA problem and the results of the profiling activity articulates what a risk assessment metric will need to demonstrate, in terms of both innate construction and performance, in order to be a true competitor to the Pc.

conjunction assessment↗

Long-Term Statistical Process Monitoring of an Ultrafiltration Water Treatment Process

As water treatment technology has improved, the amount of available process data has substantially increased, making real-time, data-driven fault detection a reality. One shortcoming of the fault detection literature is that methods are usually evaluated by comparing their performance on hand-picked, short-term case studies, which yields no insight into long-term performance. In this work, we first evaluate multiple statistical and machine learning approaches for detrending process data. Then, we evaluate the performance of a PCA-based fault detection approach, applied to the detrended data, to monitor influent water quality, filtrate quality, and membrane fouling of an ultrafiltration membrane system for indirect potable reuse. Based on two short case studies, the adaptive lasso detrending method is selected, and the performance of the multivariate approach is evaluated over more than a year. The method is tested for different sets of three critical tuning parameters, and we find that for long-term, autonomous monitoring to be successful, these parameters should be carefully evaluated. However, in comparison with industry standards of simpler, univariate monitoring or daily pressure decay tests, multivariate monitoring produces substantial benefits in long-term testing.

ammonia↗