Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerator Design, Technology, Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Low Cost Access to Mars Surface using a Small Impact Lander

In order to reduce the cost of landing small payloads on Mars, a new technology is being developed: the Small High Impact Energy Landing Device concept (SHIELD). The purpose of SHIELD is to provide a low-cost option to deliver up to 6 kg of science payload to the surface of Mars. SHIELD could be launched as a hosted payload, rideshare on as a secondary payload adapter, or launching from a dedicated small launch vehicle using a kick stage to get to Mars. In order to enable delivery of low cost, SHIELD uses a large diameter deployed drag surface (> 2 m diameter) and low entry mass (< 50 kg) to achieve a very low ballistic coefficient (< 10 kg/m^2): this low ballistic coefficient results in low terminal velocity (< 70 m/sec) without requiring a parachute. Upon impacting the Martian surface at terminal velocity, SHIELD uses a mechanism to decelerate the payload to rest in a robust and predictable manner that limits acceleration of the payload to < 2000 g with a duration less than 8 milliseconds. The SHIELD concept payload subsystem includes a “ruggedized” small warm electronics box (WEB). The WEB houses the telecommunications, command and data handling, thermal control, electrical power, and payload subsystems while maintaining an internal operating temperature ranging between -20° to 20° C. The system is designed to survive the Martian night by utilizing electric heaters powered in a highly insulated box that is powered solar cells and secondary batteries. The WEB is designed to be impact resistant, capable of surviving an impact acceleration pulse equal to or less than 2000 g’s.

Woolley, Ryan↗

Feasibility Study of a Multi Tilt-rotor Aircraft as the Artemis Lunar Training Vehicle

The Lunar Landing Research Vehicles (LLRVs) and the Lunar Landing Training Vehicles (LLTVs) provided astronaut candidates for the Apollo program with essential experience and confidence required to complete the missions, and contributed to six successful manned landings on the moon. The primary challenge in terrestrial training was being able to replicate the ratio of bank angle to linear acceleration that a pilot would experience in lunar gravity. Presently, as the Artemis program seeks to return humans to the Moon by 2025, engineers are evaluating suitable platforms to serve as an In-Flight Trainer (IFT) or Artemis Lunar Training Vehicle (ALTV) for astronauts training in the task of manual landing. The program is investigating the viability of current technology in the field of electric vertical takeoff and landing (eVTOL) vehicles and is evaluating using a multi tilt-rotor aircraft platform as a candidate platform for a preliminary ALTV. The tilt-rotor capability enables the vehicle attitude to be decoupled from its flight path, which is a crucial requirement in realistically simulating lunar gravity on Earth. Other key considerations include compensating for a lack of aerodynamic forces while flying through the atmosphere of Earth, as well as the ability to simulate the dynamics of multiple different lander designs for the Human Landing System (HLS) program. This paper details the feasibility study and presents a preliminary flight control architecture for an IFT based on a notional multi tilt-rotor platform. The modeling-following control law, based on nonlinear dynamic inversion (NDI), removes the need for gain scheduling because the vehicle operates across a wide range of flight conditions. The inner-loop dynamic control allocation strategy consists of a static portion that is optimized offline for trim while compensating for the difference in gravity and a dynamic portion that is computed in real time. The reference model consists of the full closed-loop dynamics of a generic HLS design. The modularity of the flight control architecture enables evaluation of multiple HLS concepts with minimal modifications to the control law. Simulation results of the multi tilt-rotor configuration following the final portion of the Apollo 11 descent trajectory are shown.

Jing Pei↗

Ultrahigh resolution soft x-ray emission spectrometer at BL07LSU in SPring-8

An extremely high resolution flat field type slit less soft x-ray emission spectrometer has been designed and constructed for the long undulator beamline BL07LSU in SPring-8. By optimizing the ruling parameters of two cylindrical gratings, a high energy resolution {Delta}E < 100 meV and/or an E/{Delta}E{approx} 10 000 are expected for the energy range of 350 eV - 750 eV taking into account the broadening by the spatial resolution (25 {mu}m) of a CCD detector. A coma-free operation mode proposed by Strocov et al., is also applied to eliminate both defocus and coma aberrations. The spectrometer demonstrated experimentally that E/{Delta}E= 10 050 and 8046 for N 1s (402.1 eV) and Mn 2p (641.8 eV) edges, respectively.

43 PARTICLE ACCELERATORS↗

Measurement and Analysis of the Extreme Physical Shock Environment Experienced by Crane-Mounted Radiation Detection Systems.

Potentially, radiation detectors at ports of entry could be mounted on container gantry crane spreaders to monitor cargo containers entering and leaving the country. These detectors would have to withstand the extreme physical environment experienced by these spreaders during normal operations. Physical shock data from the gable ends of a spreader were recorded during the loading and unloading of a cargo ship with two Lansmont SAVER 9X30 units (with padding) and two PCB Piezotronics model 340A50 accelerometers (hard mounted). Physical shocks in the form of rapid acceleration were observed in all accelerometer units with values ranging from 0.20 g’s to 199.99 g’s. The majority of the shocks for all the Lansmont and PCB accelerometers were below 50 g’s. The Lansmont recorded mean shocks of 21.83 ± 13.62 g’s and 24.78 ± 11.49 g’s while the PCB accelerometers experienced mean shocks of 34.39 ± 25.51 g’s and 41.77 ± 22.68 g’s for the landside and waterside units, respectively. Encased detector units with external padding should be designed to withstand at least 200 g’s of acceleration without padding and typical shocks of 30 g’s with padding for mounting on a spreader.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A Multi-TeV Linear Collider Based on CLIC Technology : CLIC Conceptual Design Report

This report describes the accelerator studies for a future multi-TeV e + e - collider based on the Compact Linear Collider (CLIC) technology. The CLIC concept as described in the report is based on high gradient normal-conducting accelerating structures where the RF power for the acceleration of the colliding beams is extracted from a high-current Drive Beam that runs parallel with the main linac. The focus of CLIC R&D over the last years has been on addressing a set of key feasibility issues that are essential for proving the fundamental validity of the CLIC concept. The status of these feasibility studies are described and summarized. The report also includes a technical description of the accelerator components and R&D to develop the most important parts and methods, as well as a description of the civil engineering and technical services associated with the installation. Several larger system tests have been performed to validate the two-beam scheme, and of particular importance are the results from the CLIC test facility at CERN (CTF3). Both the machine and detector/physics studies for CLIC have primarily focused on the 3 TeV implementation of CLIC as a benchmark for the CLIC feasibility. This report also includes specific studies for an initial 500 GeV machine, and some discussion of possible intermediate energy stages. The performance and operation issues related to operation at reduced energy compared to the nominal, and considerations of a staged construction program are included in the final part of the report. The CLIC accelerator study is organized as an international collaboration with 43 partners in 22 countries. An associated report describes the physics potential and experiments at CLIC and a shorter report in preparation will focus on the CLIC implementation strategy, together with a plan for the CLIC R&D studies 2012–2016. Critical and important implementation issues such as cost, power and schedule will be addressed there.

43 PARTICLE ACCELERATORS↗

Conducting Efficient Remote Science and Planning Operations for Ocean Exploration Using Exploration Ground Data Systems (xGDS)

NASA Ames’ Exploration Ground Data Systems (xGDS) supports rapid scientific decision making by synchronizing information in time and space, including video and still images, scientific instrument data, and science and operations notes in geographic and temporal context. We have deployed xGDS at multiple NASA field analog missions over the past decade. In the last two years, we have participated in SUBSEA, a multi-institution collaborative project*. SUBSEA used the research ship E/V Nautilus along with its two remotely operated vehicles (ROVs), Hercules and Argus, to explore deep ocean volcanic vents as an analog for ocean worlds (e.g. Enceladus). This work allowed us to compare the existing oceanographic operations methods and technologies used for ocean exploration with corresponding tools and approaches developed and used at NASA. In the first year of SUBSEA we observed existing remote science operations from the Inner Space Center (ISC)**. In the second year, we deployed xGDS at ISC to complement existing capabilities with xGDS tools designed to support remote Nautilus science operations from the ISC. During operations, video, ROV position and instrument telemetry were streamed from the ship to the ISC. As the science team watched dive operations, they could annotate the data with observations that were relevant to their work domain. Later, the team members could review the data at their own pace to collaboratively develop a dive plan for the next day, which had to be delivered on a fixed daily schedule. The opportunity to compare operations under different conditions enabled us to make several key observations about conducting remote science and planning operations efficiently: (i) Reviewing data collaboratively and interactively with temporal and spatial context was critical for the remote science team’s ability to plan dive operations on the Nautilus. (ii) Science team members were actively engaged with the remote dive operations because they could interact with the collected data and visualize it as they desired. (iii) Being able to replay past events at accelerated speeds, and jump to points in time and spaced based on search results, provided efficient access to critical points of interest in a massive volume of data, so the remote science team could deliver plans on time. * SUBSEA (Systematic Underwater Biogeochemical Science and Exploration Analog) is a multi-institution collaboration supported by NASA, NOAA’s Office of Exploration Research (OER), the Ocean Exploration Trust (OET) and the University of Rhode Island’s Graduate School of Oceanography (GSO).

Cohen, Tamar E.↗

Design of a high-power, high-gain, 2nd harmonic, 22.848 GHz gyroklystron

In this paper we consider the design of a four-cavity, high-gain K-band gyroklystron experiment for high gradient structure testing. The frequency doubling gyroklystron utilizes a beam voltage of 500 kV and a beam current of 200 A from a magnetron injection gun (MIG) originally designed for a lower-frequency device. The microwave circuit features input and gain cavities in the circular TE{sub 011} mode and penultimate and output cavities that operate at the second harmonic in the TE{sub 021} mode. We investigate the MIG performance and study the behavior of the circuit for different values of perpendicular to parallel velocity ratio (α= V{sub ⊥}/ V{sub z}). This microwave tube is expected to be able to produce at least 20 MW of power in 1μs pulses at a repetition rate of at least 120 Hz. A maximum efficiency of 26% and a large signal gain of 58 dB under zero-drive stable conditions were simulated for a velocity ratio equal to 1.35.

43 PARTICLE ACCELERATORS↗

Fast Track NTR Systems Assessment for NASA's First Lunar Outpost Scenario

Integrated systems and mission study results are presented which quantify the rationale and benefits for developing and using nuclear thermal rocket (NTR) technology for returning humans to the moon in the early 2000's. At present, the Exploration Program Office (ExPO) is considering chemical propulsion for its 'First Lunar Outpost' (FLO) mission, and NTR propulsion for the more demanding Mars missions to follow. The use of an NTR-based lunar transfer stage, capable of evolving to Mars mission applications, could result in an accelerated schedule, reduced cost approach to moon/Mars exploration. Lunar mission applications would also provide valuable operational experience and serve as a 'proving ground' for NTR engine and stage technologies. In terms of performance benefits, studies indicate that an expendable NTR stage powered by two 50 klbf engines can deliver approximately 96 metric tons (t) to trans-lunar injection (TLI) conditions for an initial mass in low earth orbit (IMLEO) of approximately 199 t compared to 250 t for a cryogenic chemical TLI stage. The NTR stage liquid hydrogen (LH2) tank has a 10 m diameter, 14.8 m length, and 68 t LH2 capacity. The NTR utilizes a 'graphite' fuel form consisting of coated UC2 particles in a graphite substrate, and has a specific impulse capability of approximately 870 s, and an engine thrust-to-weight ratio of approximately 4.8. The NTR stage and its piloted FLO lander has a total length of approximately 38 m and can be launched by a single Saturn V-derived heavy lift launch vehicle (HLLV) in the 200 to 250 t-class range. The paper summarizes NASA's First Lunar Outpost scenario, describes characteristics for representative engine/stage configurations, and examines the impact on engine selection and vehicle design resulting from a consideration of alternative NTR fuel forms and lunar mission profiles.

Borowski, Stanley K.↗

Gas production in the MEGAPIE spallation target

The Megawatt Pilot Experiment (MEGAPIE) project was started in 2000 to design, build and operate a liquid Lead-Bismuth Eutectic (LBE) spallation neutron target at the power level of 1 MW. The target was irradiated for four months in 2006 at the Paul Scherrer Inst. in Switzerland. Gas samples were extracted in various phases of operation and analyzed by {gamma} spectroscopy leading to the determination of the main radioactive isotopes released from the LBE. Comparison with calculations performed using several validated codes (MCNPX2.5.0/CINDER'90, FLUKA/ORIHET and SNT) yields the ratio between simulated in-target isotope production rates and experimental amount released at any given time. This work underlines the weak points of spallation models for some released isotopes. Also, results provide relevant information for safety and radioprotection in an Accelerator Driven System (ADS) and more particularly for the gas management in a spallation target dedicated to neutron production facilities. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Design of a beam emission spectroscopy diagnostic for negative ions radio frequency source SPIDER

A facility will be built in Padova (Italy) to develop, commission, and optimize the neutral beam injection system for ITER. The full scale prototype negative ion radio frequency source SPIDER, featuring up to 100 kV acceleration voltage, includes a full set of diagnostics, required for safe operation and to measure and optimize the beam performance. Among them, beam emission spectroscopy (BES) will be used to measure the line integrated beam uniformity, divergence, and neutralization losses inside the accelerator (stripping losses). In the absence of the neutralization stage, SPIDER beam is mainly composed by H{sup -} or D{sup -} particles, according to the source filling gas. The capability of a spectroscopic diagnostic of an H{sup -} (D{sup -}) beam relies on the interaction of the beam particles with the background gas particles. The BES diagnostic will be able to acquire the H{sub {alpha}} (D{sub {alpha}}) spectrum from up to 40 lines of sight. The system is capable to resolve stripping losses down to 2 keV and to measure beam divergence with an accuracy of about 10%. The design of this diagnostic is reported, with discussion of the layout and its components, together with simulations of the expected performance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Critical Exploration of Liquid Metal Plasma-Facing Components in a Fusion Nuclear Science Facility

Liquid metal (LM) plasma-facing components (PFCs) may provide a resolution to the challenging fusion environment, particularly the first wall and divertor surfaces. Transforming these concepts into viable technologies will require considerable research and development. Here, with the fusion nuclear regime in mind, the Fusion Energy System Studies group examined LM PFCs in order to identify needed research thrusts that could accelerate their development and assess their viability. Liquid metal behavior, solid substrate aspects, and fusion facility integration aspects are examined, with concepts as the research focusing element. The concepts applied to a fusion nuclear device are the primary definer of the LM parameters, environmental conditions, and operational aspects. This forms the research strategy recommended for these complex systems.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Broad-beam high-current dc ion source based on a two-stage glow discharge plasma

We have designed, made, and demonstrated a broad-beam, dc, ion source based on a two-stage, hollow-cathode, and glow discharges plasma. The first-stage discharge (auxiliary discharge) produces electrons that are injected into the cathode cavity of a second-stage discharge (main discharge). The electron injection causes a decrease in the required operating pressure of the main discharge down to 0.05 mTorr and a decrease in required operating voltage down to about 50 V. The decrease in operating voltage of the main discharge leads to a decrease in the fraction of impurity ions in the ion beam extracted from the main gas discharge plasma to less than 0.2 %. Another feature of the source is a single-grid accelerating system in which the ion accelerating voltage is applied between the plasma itself and the grid electrode. The source has produced steady-state Ar, O, and N ion beams of about 14 cm diameter and current of more than 2 A at an accelerating voltage of up to 2 kV.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Safety-Related Instrumentation & Control Pilot Upgrade Initiation Phase Implementation Report

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP) [Reference 2], NISP-EN-04, Standard Digital Engineering Process (SDEP) [Reference 3], and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The CMS Phase-1 Pixel Detector Upgrade

The CMS detector at the CERN LHC features a silicon pixel detector as its innermost subdetector. The original CMS pixel detector has been replaced with an upgraded pixel system (CMS Phase-1 pixel detector) in the extended year-end technical stop of the LHC in 2016/2017. The upgraded CMS pixel detector is designed to cope with the higher instantaneous luminosities that have been achieved by the LHC after the upgrades to the accelerator during the first long shutdown in 2013–2014. Compared to the original pixel detector, the upgraded detector has a better tracking performance and lower mass with four barrel layers and three endcap disks on each side to provide hit coverage up to an absolute value of pseudorapidity of 2.5. This paper describes the design and construction of the CMS Phase-1 pixel detector as well as its performance from commissioning to early operation in collision data-taking.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

General design of the International Fusion Materials Irradiation Facility deuteron injector: Source and beam line

In the framework of the International Fusion Materials Irradiation Facility-Engineering Validation and Engineering Design Activities (IFMIF-EVEDA) project, CEA/IRFU is in charge of the design and realization of the 140 mA cw deuteron Injector. The electron cyclotron resonance ion source operates at 2.45 GHz and a 4 electrode extraction system has been chosen. A 2 solenoid beam line, together with a high space charge compensation have been optimized for a proper beam injection in the 175 MHz radio frequency quadrupole. The injector will be tested with proton and deuteron beam production either in pulsed mode or in cw mode on the CEA-Saclay site before to be shipped to Japan. Special attention was paid to neutron emission due to (d,D) reaction. In this paper, the general IFMIF Injector design is reported, pointing out beam dynamics, radioprotection, diagnostics, and mechanical aspects.

43 PARTICLE ACCELERATORS↗

Roadmap for the design of a superconducting electron cyclotron resonance ion source for Spiral2

A review of today achieved A/Q = 3 heavy ions beams is proposed. The daily operation A/Q = 3 ion beam intensities expected at Spiral2 are at the limit or above best record 3rd generation electron cyclotron resonance ion source (ECRIS) intensities. The necessity to build a new fully superconducting to fulfill these requirements is outlined. A discussion on the volume of the future source is proposed and the minimum value of 12 liters is derived. An analysis of the x-ray absorption superconducting ECRIS is presented based on VENUS experimental data and geometry. This study underlines the necessity to include a complete x-ray study at the time of source conception. The specifications foreseen for the new ECRIS are presented, followed with the roadmap for the design.

43 PARTICLE ACCELERATORS↗

Tidal Energy System for On-Shore Power Generation (Final Technical Report)

Addressing the urgent need to develop LCOE competitive renewable energy solutions for US energy security and to replace fossil-fuel generation with the associated benefits to environment impacts including a reduction in CO2 emissions, this Project focused on the advantages of using hydraulic energy transfer (HET) in large-scale Marine Hydrokinetic (MHK) systems for harvesting off-shore tidal energy in US waters. A recent DOE resource assessment, identifies water power resources have a potential to meet 15% of the US electric supply by 2030, with MHK technologies being a major component. The work covered a TRL-4 laboratory proof-in-concept demonstration plus modeling of a 15MW full scale system based on an approach patented by NASA-JPL, in which submerged high-ratio gearboxes and electrical generators in conventional MHK turbine systems are replaced by a submerged hydraulic radial pump coupled to on-shore hydraulic motors driving a generator. The advantages are; first, the mean-time-between-failure (MTBF), or maintenance, can be extended from approximately 1 to 5 years and second, the range of tidal flow speeds which can be efficiently harvested can be extended beyond that of a conventional submerged generator. The approach uses scalable, commercial-off-the-shelf (COTS) components, facilitating scale-up and commercialization. All the objectives of the Project have been successfully met (1) A TRL4 system was designed, constructed and tested. It simulates a tidal energy turbine, with a 2-m diameter blade in up to a 2.9 m/sec flow. The system consists of a drive motor assembly providing appropriate torque and RPM, attached to a radial piston pump. The pump circulates pressurized, environmentally-friendly, HEES hydraulic fluid in a closed loop to an axial piston motor which drives an electrical generator, with a resistive load. The performance of the components, subsystems and system were evaluated during simulated tidal cycles. The pump is contained in a tank for immersion testing. The COTS pump and motor were selected to scale to MW size and were oversized for the TRL-4 demonstration, operating at only 1-6% of rated values. Nevertheless, in for 2-18 kW drive power, in agreement with manufacturer performance data, we measured efficiencies of 85-90% and 75-80% for the pump and motor, respectively. These efficiencies being 95-96% at higher operating powers. (2) Two follow-on paths were identified. In both cases conventional turbine systems can be modified, replacing existing gear box and generator with a hydraulic pump and on-shore components. On a conventional path, a TRL5/6 15kW turbine system can be engineered and tested on a barge at an existing site in Maine. Alternatively, on an accelerated path, a TRL-8 100kW system can be engineered and tested by modifying a team member's existing MHK turbines, with barge and grid-connected test sites in-place. On both paths the work can be expedited and cost effective by reusing TRL-4 components, modifying existing turbines and using established test sites. (3) Sizing, performance modeling and costing of a scaled 15MW system, suitable for operation in Maine's Western Passage, was performed. COTS components are identified and the performance projections are favorable. The estimated LCOE is comparable to wind generation with peak production at high demand times. (4) We determined that a similar HET approach can be extended to on-shore and off-shore wind turbine systems. These are very large energy resources which can be addressed in parallel for even great National benefit. (5) Preliminary results on this project were presented at two International Conferences on renewable energy in 2012, providing a timely dissemination of information. We have thus demonstrated a proof-in-concept of a novel, tidal HET system that eliminates all submerged gears and electronics to improve reliability. Hydraulic pump efficiencies of 90% have been confirmed in simulated tidal flows between 1 and 3 m/s, and at only 1-6% of rated power. Total system efficiencies have also been modeled, up to MW-scale, for tidal, and wind, systems. Projected efficiencies are between 81% (full rated flow) and 86% (1/3 rated flow). This high efficiency in a wide operating range compares favorably with conventional systems having a performance range of 87% (full rated flow) to 0% (1/3 rated flow) efficiency. An accelerated path to commercialization is identified, leveraging conventional MHK system technology and COTS components to meet the urgent need for renewable energy generation.

16 TIDAL AND WAVE POWER↗

Advanced Power and Propulsion: Insuring Human Survival and Productivity in Deep Space Missions

Dr. Chang-Diaz gave an intriguing presentation of his research in advanced rocket propulsion and its relevance for planning and executing crewed deep space explorations. Though not necessarily exclusively Martian, his thrust looks critically at future Mars missions. Initially Dr. Chang-Diaz showed the time constraints of Mars missions due to orbital mechanics and our present chemically powered rocket technology. Since essentially all the energy required to place current generation spacecraft into a Martian trajectory must be expended in the early minutes of a flight, most of such a mission is spent in free-fall drift, captive to the gravitational forces among Earth, the Sun, and Mars. The simple physics of such chemically powered missions requires nearly a year in transit for each direction of a Mars mission. And the optimal orientations of Earth and Mars for rendezvous require further time on or around Mars to await return. These extensions of mission duration place any crew under a three-fold jeopardy: (1) physiological deconditioning (which in some aspects is still unknown and unpreventable), (2) psychological stress, and (3) ionizing radiation. This latter risk is due to exposure of crew members for extended time to the highly unpredictable and potentially lethal radiations of open space. Any gains in shortening mission duration would reap equivalent or greater benefits for these crew concerns. Dr. Chang-Diaz has applied his training and expertise (Ph.D. from Massachusetts Institute of Technology in applied plasma physics) toward development of continuous rocket propulsion which would offer great time advantages in travel, and also more launch options than are now available. He clearly explained the enormous gains from a relatively low thrust accelerative force applied essentially continuously versus the high, but short-lived propulsion of present chemical rockets. In fact, such spacecraft could be powered throughout the mission, accelerating to approximately the midpoint and decelerating during the latter half. This would not only provide some level of gravity (acceleration) throughout the mission but also allow very high velocities to be achieved, thus saving many months of travel time. In proposing the design of such a spacecraft propulsion system, Dr. Chang-Diaz was quick to acknowledge the need for a large power source, which undoubtedly must be nuclear fueled at the solar distances involved. He calls his system the Variable Specific Impulse Magnetoplasma Rocket (VASIMR). The other major ingredient is a mass (deuterium, which could also function as a radiation shield for crews) for energizing into the ultra hot, high velocity exhaust plasma. He foresees models now functional in the laboratory soon to be tested in space. In fact, some of these concepts have already been tried there. His optimism and determination would have operational rockets in the next decades.

Chang-Diaz, Franklin R.↗