At least 1,225 records · Page 68

Integrated simulations of CO 2 spreading and pressure response in the multilayer saline aquifer of South Scania Site, Sweden

In this paper, an integrated modeling approach/workflow, in which a series of mathematical models of different levels of complexity are applied to evaluate the geological storage capacity of the Scania Site, southwest Sweden, is presented. The storage formation at the site is a layered formation limited by bounding fault zones, and injection is assumed to take place from one existing deep borehole into all layers. A semi-analytical model for two-phase flow is first used to evaluate the pressure response and related parameter sensitivity, as well as the first estimates of acceptable injection rates. These results are then used to guide the more detailed numerical simulations that address both pressure response and plume migration. The vertical equilibrium (VE) model is used to obtain a preliminary understanding of the plume migration with a larger number of simulations. Finally the full TOUGH2/ECO2N simulations are performed for the most detailed analyses of pressure responses and plume migration. Throughout, the results of the different modeling approaches are compared to each other. It is concluded that the key limiting factor for the storage capacity at the site in the injection scenario considered is the fast CO 2 migration within the high permeability layer. Finally, future studies can address alternative injection scenarios, including using horizontal injection wells and injection to other layers than the high permeability layer.

54 ENVIRONMENTAL SCIENCES↗

Understanding Solar Photovoltaic System Performance: An Assessment of 75 Federal Photovoltaic Systems

This report presents a performance analysis of 75 photovoltaic systems based on PV system production data collected as part of a FEMP Federal PV Performance Assessment project combined with co-incident insolation, and ambient temperature to analyze how actual performance compares with a performance model. FEMP collaborated with 17 Federal agencies and sub-agencies to collect the information required to analyze the performance of each system. The systems represent a total capacity of 30,714 kW and range in size from 1 kW to 4,043 kW, with an average size of 410 kW, and were installed between 2011 and 2020. The data is analyzed for Key Performance Indicators, Availability, Performance Ratio and Energy Ratio by comparing the measured production data to model production data. The System Advisor Model (SAM) combines a description of the system (such as inverter capacity, de-rating for temperature, balance-of-system efficiency) with environmental parameters (coincident solar and temperature data) to calculate predicted performance. The performance metrics are calculated by lining up the measured production data with the model estimate on an hour-by-hour, day-by-day, or month-by-month basis (depending on the interval resolution of the production data). A report with system description, photo of the system, special assumptions made for the site, graph of measured production and model production, table of key performance indicators, and links to O&M resources that might improve performance was produced and delivered to site and agency staff with a short on-line briefing.

14 SOLAR ENERGY↗

Potential missions for advanced airships

The freight commodity transport and the intercity passenger travel markets in the U.S. for 1967 and 1972 are analyzed, along with 1985 estimates, in order to establish the size, speed and cost enabling use of the airship in these markets. Items examined include frozen meat, confectionary, drugs, electrical equipment, mechanical parts, clothing and plastic products. A 50 ton/500 passenger payload capacity, a cruise speed of 100 kt and a VTOL capability or at minimum short take-off and vertical landing capability are needed to make an LTA vehicle viable in the transport market if it had a direct operating cost of $500 to $800 per hour for freight carrying and $1100 to $2700 an hour in passenger service with utilizations between 2000 hours and 4000 hours a year.

Grant, D. T.↗

Contemporary Trends in the Acid-Base Status of the Two Acid-Sensitive Streams in Western Maryland

Recovery of streamwater acid neutralizing capacity (ANC) resulting from declines in regional acid deposition was examined using contemporary (1990-2005) data from two long-term monitoring stations located on the Appalachian Plateau in western Maryland, U.S. Two computational methods were used to estimate daily, monthly, and annual fluxes and discharge-weighted concentrations of ANC, sulfate, nitrate, and base cations over the period of record, and two statistical methods were used to evaluate long-term trends in fluxes and concentrations. The methods used to estimate concentrations, as well as the, statistical techniques, produced very similar results, underlining the robustness of the identified trends. We found clear evidence that streamwater sulfate concentrations have declined at an average rate of about 3 (microns)eq L(exp -1) yr(exp -1) at the two sites due to a 34% reduction in wet atmospheric sulfur deposition. Trends in nitrate concentrations appear to be related to other watershed factors, especially forest disturbance. The best evidence of recovery is based on a doubling of ANC (from 21 to 42 (microns)eq L(exp -1) at the more acid-sensitive site over the 16-year period. A slowing, or possible reversal, in the sulfate, nitrate, and SBC trends is evident in our data and may portend a decline in the rate of--or end to--further recovery.

Eshleman, Keith N.↗

Evaluation of Dynamic Coastal Response to Sea-level Rise Modifies Inundation Likelihood

Sea-level rise (SLR) poses a range of threats to natural and built environments, making assessments of SLR-induced hazards essential for informed decision making. We develop a probabilistic model that evaluates the likelihood that an area will inundate (flood) or dynamically respond (adapt) to SLR. The broad-area applicability of the approach is demonstrated by producing 30x30m resolution predictions for more than 38,000 sq km of diverse coastal landscape in the northeastern United States. Probabilistic SLR projections, coastal elevation and vertical land movement are used to estimate likely future inundation levels. Then, conditioned on future inundation levels and the current land-cover type, we evaluate the likelihood of dynamic response versus inundation. We find that nearly 70% of this coastal landscape has some capacity to respond dynamically to SLR, and we show that inundation models over-predict land likely to submerge. This approach is well suited to guiding coastal resource management decisions that weigh future SLR impacts and uncertainty against ecological targets and economic constraints.

Climate-change impacts↗

Techno-Economic Analysis for a Potential Geothermal District Heating System in Tuttle, Oklahoma: Preprint

Geothermal deep direct use (DDU) has potential across a wide swath of the United States but is underutilized due to challenging project economics associated with developing a deep geothermal resource for a large-scale and variable heat demand. The National Renewable Energy Laboratory (NREL) and University of Oklahoma evaluated the feasibility of a geothermal district heating (GDH) and cooling system in two schools and 250 houses by utilizing existing oil and gas (O&G) wells in Tuttle, Oklahoma. Heating and cooling demand in the two schools and a typical single-family house were modeled using EnergyPlus building energy simulation software. The modeling results indicated that annual heating demand in two schools and 250 houses is approximately 2.61 GWhth, and cooling demand in the two schools is approximately 2.65 GWhth. In this scope, the techno-economic analysis (TEA) was conducted using the GEOPHIRES tool combined with the TOUGH2 reservoir simulator. The reservoir performance, including geothermal heat production capacity, was modeled by the reservoir simulator TOUGH2. Then, levelized cost of heat (LCOH) was calculated using GEOPHIRES version 3.0, which includes new features such as hourly heat load optimization and peak performance evaluation. Geothermal reservoir temperature was estimated as 90.5 degrees C at a total depth of 3.3 km by the regional average temperature gradient of 22.8 degrees C/km and validated by cation geothermometer calculations. Four production scenarios with two different well configurations and two different heat load profiles have been developed for well flow rates ranging between 3.1 kg/s and 9.3 kg/s. The LCOH of the district heating and cooling system was calculated between $95 and $210/MWh ($28/MMBtu to $62/MMBtu) for four different production scenarios. Typical natural gas prices for residential customers in Oklahoma have ranged from 9 to 19 $/MMBtu over the past decade, which indicates a challenge for deployment of such a GDH system.

deep direct-use↗

Techno-Economic Analysis for a Potential Geothermal District Heating System in Tuttle, Oklahoma

Geothermal deep direct use (DDU) has potential across a wide swath of the United States but is underutilized due to challenging project economics associated with developing a deep geothermal resource for a large-scale and variable heat demand. The National Renewable Energy Laboratory (NREL) and University of Oklahoma evaluated the feasibility of a geothermal district heating (GDH) and cooling system in two schools and 250 houses by utilizing existing oil and gas (O&G) wells in Tuttle, Oklahoma. Heating and cooling demand in the two schools and a typical single-family house were modeled using EnergyPlus building energy simulation software. The modeling results indicated that annual heating demand in two schools and 250 houses is approximately 2.61 GWhth, and cooling demand in the two schools is approximately 2.65 GWhth. In this scope, the techno-economic analysis (TEA) was conducted using the GEOPHIRES tool combined with the TOUGH2 reservoir simulator. The reservoir performance, including geothermal heat production capacity, was modeled by the reservoir simulator TOUGH2. Then, levelized cost of heat (LCOH) was calculated using GEOPHIRES version 3.0, which includes new features such as hourly heat load optimization and peak performance evaluation. Geothermal reservoir temperature was estimated as 90.5 degrees C at a total depth of 3.3 km by the regional average temperature gradient of 22.8 degrees C/km and validated by cation geothermometer calculations. Four production scenarios with two different well configurations and two different heat load profiles have been developed for well flow rates ranging between 3.1 kg/s and 9.3 kg/s. The LCOH of the district heating and cooling system was calculated between $95 and $210/MWh ($28/MMBtu to $62/MMBtu) for four different production scenarios. Typical natural gas prices for residential customers in Oklahoma have ranged from 9 to 19 $/MMBtu over the past decade, which indicates a challenge for deployment of such a GDH system.

deep direct-use↗

Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative construction techniques. Special efforts were directed toward documenting the (largely original) interior of the plant and installing new equipment without modifying the power plant exterior in order to preserve the historical significance of the facility. In addition, a significant portion of the historical equipment within the power plant was preserved in place. The modernization project began with DOE grant award on January 1, 2010, and the project was completed on December 31, 2012. In addition to city engineering and hydroelectric staff, major project participants included AECOM (design/engineering) Canyon Industries (turbine/generator manufacture), Gracon Corporation (general construction contractor), Exponential Engineering Company (electrical engineering) and URS Corporation (historical documentation), as well as numerous other subcontractors and consultants.

13 HYDRO ENERGY↗

Testing of Strategies for the Acceleration of the Cost Optimization

The general problem addressed in the Nuclear-Renewable Hybrid Energy System (N-R HES) project is finding the optimum economical dispatch (ED) and capacity planning solutions for the hybrid energy systems. In the present test-problem configuration, the N-R HES unit is composed of three electrical power-generating components, i.e. the Balance of Plant (BOP), the Secondary Energy Source (SES), and the Energy Storage (ES). In addition, there is an Industrial Process (IP), which is devoted to hydrogen generation. At this preliminary stage, the goal is to find the power outputs of each one of the N-R HES unit components (BOP, SES, ES) and the IP hydrogen production level that maximizes the unit profit by simultaneously satisfying individual component operational constraints. The optimization problem is meant to be solved in the Risk Analysis Virtual Environment (RAVEN) framework. The dynamic response of the N-R HES unit components is simulated by using dedicated object-oriented models written in the Modelica modeling language. Though this code coupling provides for very accurate predictions, the ensuing optimization problem is characterized by a very large number of solution variables. To ease the computational burden and to improve the path to a converged solution, a method to better estimate the initial guess for the optimization problem solution was developed. The proposed approach led to the definition of a suitable Monte Carlo-based optimization algorithm (called the preconditioner), which provides an initial guess for the optimal N-R HES power dispatch and the optimal installed capacity for each one of the unit components. The preconditioner samples a set of stochastic power scenarios for each one of the N-R HES unit components, and then for each of them the corresponding value of a suitably defined cost function is evaluated. After having simulated a sufficient number of power histories, the configuration which ensures the highest profit is selected as the optimal one. The component physical dynamics are represented through suitable ramp constraints, which considerably simplify the numerical solving. In order to test the capabilities of the proposed approach, in the present report, the dispatch problem only is tackled, i.e. a reference unit configuration is assumed, and each one of the N-R HES unit components is assumed to have a fixed installed capacity. As for the next steps, the main improvement will concern the operation strategy of the ES facility. In particular, in order to describe a more realistic battery commitment strategy, the ES operation will be regulated according to the electricity price forecasts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Estimating the Impacts of Direct Load Control Programs Using GridPIQ, a Web-Based Screening Tool

In direct load control (DLC) programs, utilities can curtail the demand of participating loads to contractually agreed-upon levels during periods of critical peak load, thereby reducing stress on the system, generation cost, and required transmission and generation capacity. Participating customers receive financial incentives. The impacts of implementing DLC programs extend well beyond peak shaving. There may be a shift of load proportional to the interrupted load to the times before or after a DLC event, and different load shifts have different consequences. Tools that can quantify the impacts of such programs on load curves, peak demand, emissions, and fossil fuel costs are currently lacking. The Grid Project Impact Quantification (GridPIQ) screening tool includes a Direct Load Control module, which takes into account project-specific inputs as well as the larger system context in order to quantify the impacts of a given DLC program. This allows users (utilities, researchers, etc.) to test and compare different program specifications and their impacts.

Demand Reponse↗

Projected impacts of climate change on hydropower potential in China

Hydropower is an important renewable energy source in China, but it is sensitive to climate change, because the changing climate may alter hydrological conditions (e.g., river flow and reservoir storage). Future changes and associated uncertainties in China's gross hydropower potential (GHP) and developed hydropower potential (DHP) are projected using simulations from eight global hydrological models (GHMs), including a large-scale reservoir regulation model, forced by five general circulation models (GCMs) with climate data under two representative concentration pathways (RCP2.6 and RCP8.5). Results show that the estimation of the present GHP of China is comparable to other studies; overall, the annual GHP is projected to change by -1.7 to 2 % in the near future (2020–2050) and increase by 3 to 6 % in the late 21st century (2070–2099). The annual DHP is projected to change by -2.2 to -5.4 % (0.7–1.7 % of the total installed hydropower capacity (IHC)) and -1.3 to -4 % (0.4–1.3 % of total IHC) for 2020–2050 and 2070–2099, respectively. Regional variations emerge: GHP will increase in northern China but decrease in southern China – mostly in south central China and eastern China – where numerous reservoirs and large IHCs currently are located. The area with the highest GHP in southwest China will have more GHP, while DHP will reduce in the regions with high IHC (e.g., Sichuan and Hubei) in the future. The largest decrease in DHP (in %) will occur in autumn or winter, when streamflow is relatively low and water use is competitive. Large ranges in hydropower estimates across GHMs and GCMs highlight the necessity of using multimodel assessments under climate change conditions. This study prompts the consideration of climate change in planning for hydropower development and operations in China, to be further combined with a socioeconomic analysis for strategic expansion.

13 HYDRO ENERGY↗

Assessment of the combination of temperature and relative humidity on kidney stone presentations

Highlights: • Temperature and relative humidity have opposing effects on evaporative water loss. • Wet-bulb temperatures best predicted kidney stone presentations. • Differences in predictive capacity of temperature metrics were greatest in summer. Temperature and relative humidity have opposing effects on evaporative water loss, the likely mediator of the temperature-dependence of nephrolithiasis. However, prior studies considered only dry-bulb temperatures when estimating the temperature-dependence of nephrolithiasis. We used distributed lag non-linear models and repeated 10-fold cross-validation to determine the daily temperature metric and corresponding adjustment for relative humidity that most accurately predicted kidney stone presentations during hot and cold periods in South Carolina from 1997 to 2015. We examined three metrics for wet-bulb temperatures and heat index, both of which measure the combination of temperature and humidity, and for dry-bulb temperatures: (1) daytime mean temperature; (2) 24-h mean temperature; and (3) most extreme 24-h temperature. For models using dry-bulb temperatures, we considered four treatments of relative humidity. Among 188,531 patients who presented with kidney stones, 24-h wet bulb temperature best predicted kidney stone presentation during summer. Mean cross-validated residuals were generally lower in summer for wet-bulb temperatures and heat index than the corresponding dry-bulb temperature metric, regardless of type of adjustment for relative humidity. Those dry-bulb models that additionally adjusted for relative humidity had higher mean residuals than other temperature metrics. The relative risk of kidney stone presentations at the 99th percentile of each temperature metric compared to the respective median temperature in summer months differed by temperature metric and relative humidity adjustment, and ranged from an excess risk of 8–14%. All metrics performed similarly in winter. The combination of temperature and relative humidity determine the risk of kidney stone presentations, particularly during periods of high heat and humidity. These results suggest that metrics that measure moist heat stress should be used to estimate the temperature-dependence of kidney stone presentations, but that the particular metric is relatively unimportant.

54 ENVIRONMENTAL SCIENCES↗

A microgrid deployment framework to support drayage electrification

The electrification of heavy-duty commercial vehicles (HDCVs) is key to enhancing air quality and reducing urban air pollution, but it also imposes significant demands on an electric grid not designed for such high loads. Without complementary infrastructure, electrification may yield limited air quality improvements. This article explores the critical role of microgrids—integrating solar photovoltaics and battery storage—in supporting HDCV electrification. We present an integrated framework to identify viable microgrid sites in a given region, estimate deployment costs, and optimize power use to reduce dependence on the grid. As a case study, we apply the framework to the region around the Port of Savannah, GA, USA, demonstrating how targeted microgrid deployment can enhance grid capacity, improve energy resiliency, and support electrified freight transport.

Electrical engineering↗

Chromosome-level genome assemblies and genetic maps reveal heterochiasmy and macrosynteny in endangered Atlantic Acropora

Abstract Background Over their evolutionary history, corals have adapted to sea level rise and increasing ocean temperatures, however, it is unclear how quickly they may respond to rapid change. Genome structure and genetic diversity contained within may highlight their adaptive potential. Results We present chromosome-scale genome assemblies and linkage maps of the critically endangered Atlantic acroporids,Acropora palmataandA. cervicornis. Both assemblies and linkage maps were resolved into 14 chromosomes with their gene content and colinearity. Repeats and chromosome arrangements were largely preserved between the species. The family Acroporidae and the genusAcroporaexhibited many phylogenetically significant gene family expansions. Macrosynteny decreased with phylogenetic distance. Nevertheless, scleractinians shared six of the 21 cnidarian ancestral linkage groups as well as numerous fission and fusion events compared to other distantly related cnidarians. Genetic linkage maps were constructed from oneA. palmatafamily and 16A. cervicornisfamilies using a genotyping array. The consensus maps span 1,013.42 cM and 927.36 cM forA. palmataandA. cervicornis, respectively. Both species exhibited high genome-wide recombination rates (3.04 to 3.53 cM/Mb) and pronounced sex-based differences, known as heterochiasmy, with 2 to 2.5X higher recombination rates estimated in the female maps. Conclusions Together, the chromosome-scale assemblies and genetic maps we present here are the first detailed look at the genomic landscapes of the critically endangered Atlantic acroporids. These data sets revealed that adaptive capacity of Atlantic acroporids is not limited by their recombination rates. The sister species maintain macrosynteny with few genes with high sequence divergence that may act as reproductive barriers between them. In the AtlanticAcropora, hybridization between the two sister species yields an F1 hybrid with limited fertility despite the high levels of macrosynteny and gene colinearity of their genomes. Together, these resources now enable genome-wide association studies and discovery of quantitative trait loci, two tools that can aid in the conservation of these species.

Biotechnology & Applied Microbiology↗

Evaluation of Carbon Dioxide Capture From Existing Coal Fired Plants by Hybrid Sorption Using Solid Sorbents

A novel hybrid solid sorbent technology for CO₂ capture and separation from coal combustion-derived flue gas was evaluated. The technology – Capture of CO₂ by Hybrid Sorption (CACHYS™) – is a solid sorbent technology based on the following ideas: 1) reduction of energy for sorbent regeneration, 2) utilization of novel process chemistry, 3) contactor conditions that minimize sorbent-CO₂ heat of reaction and promote fast CO₂ capture, and 4) low-cost method of heat management. This report provides key information developed during the course of the project that includes sorbent performance, energy for sorbent regeneration, physical properties of the sorbent, the integration of process components, sizing of equipment, and overall capital and operational cost of the integrated CACHYS™ system. Seven sorbent formulations were prepared and evaluated at the lab-scale for energy requirements and CO₂ capture performance. Sorbent heat of regeneration ranged from 30-80 kJ/mol CO₂ and was found to be dependent on process conditions. Two sorbent formulations (designated HCK-4 & HCK-7) were down-selected for additional fixed-bed testing. Additional testing involved subjecting the sorbents to 100 continuous cycles in the fixed-bed reactor to determine performance as a function of time. The working capacity achieved for HCK-4 sorbent ranged from 5.5-8.0 g CO₂/100 g sorbent, while the HCK-7 typically ranged from 8.0-10.0 g CO₂/100 g sorbent. Overall, there was no deterioration in capacity with continuous cycling for either sorbent. The CACHYS™ bench-scale testing system designed and fabricated under this award consists of a dual circulating fluidized-bed adsorber and a moving-bed regenerator. The system takes a flue gas slipstream from the University of North Dakota’s coal-fired steam plant. Prior to being sent to the adsorber, the flue gas is scrubbed to remove SO₂ and particulate. During parametric testing of the adsorber, CO₂ capture achieved using the 2-bed configuration with recirculation in both beds was 65-70% with a high flue gas CO₂ loading (~7%) and up to 85% with a low flue gas CO₂ loading (~4%). A sorbent regenerator system consisting of a pre-heater, desorber, and cooler is used to heat the CO₂-rich sorbent with direct and indirect steam producing a nearly 100% pure stream of CO₂. Parametric testing of the regenerator system demonstrated the impact of process conditions on both desorption rate and the heat of regeneration. Clear evidence of the use of specific process conditions that lower the overall energy of desorption was identified. This observation validates measurements made at the laboratory-scale. Several longer-term continuous tests were conducted to evaluate the performance of the sorbent/process as a function of time. Using a 2-bed configuration, sustained capture efficiency of 40-60% with a high flue gas CO₂ loading (~8%) and 70-80% with a low flue gas CO₂ loading (~4%) were achieved. However, sorbent working capacity was found to be considerably lower than laboratory-scale measurements. The low working capacity is attributed to insufficient sorbent/gas contact time in the adsorber. Sorbent properties that had a significant impact on CO₂ capture performance were identified. The results show that controlling these sorbent properties substantially improves CO₂ capture performance, with preliminary estimates indicating that relative improvement of ~30% is possible. Testing culminated with an operationally trouble-free test of 15 hours with sustainable performance. Overall, several practical strategies to increase performance of the sorbent and process were identified. The initial technical and economic assessment of the CACHYS™ process estimated the cost of CO2 capture was $36.19/ton with a 48.6% increase in levelized cost of electricity (LCOE) for the 550 MWe net plant. Using additional data gathered over the course of the project, and with revised technical and economic assumptions, the estimated cost of CO₂ capture with the CACHYS™ process is $39/ton (only includes the cost of the CO2 capture system) with an increase in LCOE of 55.9%. Overall, CACHYS™ represents a significant improvement over the benchmark MEA system, and has demonstrated progress towards achieving DOE’s goals for CO₂ capture technologies.

01 COAL, LIGNITE, AND PEAT↗

Investigating Benefits and Challenges of Converting Retiring Coal Plants into Nuclear Plants

A coal-to-nuclear (C2N) transition means siting a nuclear reactor at the site of a recently retired coal power plant. Three overarching questions from the C2N transition guide this research: where in the United States are retired coal facilities located and what factors make a site feasible for transition; what factors of technology, cost, and project timeline drive investor economics over such a decision; and how will C2N impact local communities? The study team evaluated the siting characteristics of recently retired plants and those operating coal-fired power plant sites run by a utility or an independent power producer utilizing publicly available data to screen U.S. coal power plant sites to nuclear-feasible locations. After screening all retired coal sites to a set of 157 potential candidates and screening operating sites to a set of 237 candidates, the study team estimates that 80% of retired and operating coal power plant sites that were evaluated have the basic characteristics needed to be considered amenable to host an advanced nuclear reactor. For the recently retired plant sites evaluated, this represents a capacity potential of 64.8 GWe to be backfit at 125 sites. For the operating plant sites evaluated, this represents a capacity potential of 198.5 GWe to be backfit at 190 sites. This report evaluates a case study for the detailed impacts and potential outcomes from a C2N transition. Based on the nuclear technology choices and sizes evaluated to replace a large coal plant of 1,200 MWe generation capacity at the case study site, nuclear overnight costs of capital could decrease by 15% to 35% when compared to a greenfield construction project, through the reuse of infrastructure from the coal facility. Nuclear replacement designs can have a lower capacity size because nuclear power plants run at higher capacity factors than coal power plants. In the case study replacing coal capacity with 924 GWe of nuclear capacity, the study team found regional economic activity could increase by as much as $\$275 million$ and add 650 new, permanent jobs to the region of analysis. The evaluated site choice in the report is hypothetical for analysis purposes only and based on available data and documented assumptions. Consequently, the findings only inform at a general level. A community, investor, or other interested stakeholder can use these results to set up a detailed, in-depth analysis for a specific application of interest, such as evaluating a C2N transition of a specific coal power plant and a specific nuclear technology design. The report was subjected to independent peer reviews by experts in systems engineering and regional economic modeling to evaluate analysis and assumptions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Floating Photovoltaics in Hydropower Reservoirs in the United States

This report presents a comprehensive analysis of the feasibility of floating photovoltaics (FPV) in federally regulated reservoirs within the continental United States (CONUS) and to present a methodology for capturing the true costs of deployment, potential environmental impacts, and regulatory pathways for open-loop hydropower reservoirs. It is intended for stakeholders who may not be solar industry experts but who are interested in exploring the potential for FPV in their reservoirs. While there are promising opportunities, particularly in enhancing dissolved oxygen (DO) levels and potentially improving compliance with existing hydropower licenses, the current capital costs of FPV are not yet competitive with traditional land-based solar installations at the utility-scale when comparing the LCOE results. A competitive financial outlook is achievable when applying a 30% Investment Tax Credit (ITC) and considering a 5% reduction from the baseline capital expenditures (CapEx) at the Tuckertown Reservoir in North Carolina case study. The study is structured around three key pillars of research: technical potential, environmental impacts and regulatory considerations, and technoeconomic analysis. This report provides a nationwide assessment of the opportunities for FPV in terms of capacity, measured in direct current megawatts (MWDC), in reservoirs managed by the U.S. Bureau of Reclamation (USBR), the U.S. Army Corps of Engineers (USACE), and the Federal Energy Regulatory Commission (FERC). Additionally, the report introduces a heuristic model for estimating the CapEx of utility-scale FPV projects (1–100 MW), offering a baseline cost estimate for stakeholders. Finally, the report applies these models to a case study of a hydropower reservoir in North Carolina to present site-specific results.

13 - HYDRO ENERGY↗

Navigating Economies of Scale and Multiples for Nuclear-Powered Data Centers and Other Applications with High Service Availability Needs

Nuclear energy is increasingly being considered for such targeted energy applications as data centers in light of their high capacity factors and low carbon emissions. This paper focuses on assessing the tradeoffs between economies of scale versus mass production to identify promising reactor sizes to meet data center demands. A framework is then built using the best cost estimates from the literature to identify ideal reactor power sizes for the needs of the given data center. Results should not be taken to be deterministic but highlight the variability of ideal reactor power output against the required demand. While certain advocates claim that with the gigawatts of clean, firm energy needed, large plants are ideal, others advocate for SMRs that can be deployed in large quantities and reap the benefits from learning effects. The findings of this study showcase that identifying the optimal size for a reactor is likely more nuanced and dependent on the application and its requirements. Overall, the study does show potential economic promise for coupling nuclear reactors to data centers and industrial heat applications under certain key conditions and assumptions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗