Search NASA⌕ Search

SEARCH · Search NASA

Results for “Energy Code”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

A GENERAL RELATIVISTIC RAY-TRACING METHOD FOR ESTIMATING THE ENERGY AND MOMENTUM DEPOSITION BY NEUTRINO PAIR ANNIHILATION IN COLLAPSARS

Bearing in mind the application to the collapsar models of gamma-ray bursts (GRBs), we develop a numerical scheme and code for estimating the deposition of energy and momentum due to the neutrino pair annihilation ({nu}+{nu}-bar{yields}e{sup -}+e{sup +}) in the vicinity of an accretion tori around a Kerr black hole. Our code is designed to solve the general relativistic (GR) neutrino transfer by a ray-tracing method. To solve the collisional Boltzmann equation in curved spacetime, we numerically integrate the so-called rendering equation along the null geodesics. We employ the Fehlberg (4,5) adaptive integrator in the Runge-Kutta method to perform the numerical integration accurately. For the neutrino opacity, the charged-current {beta}-processes, which are dominant in the vicinity of the accretion tori, are taken into account. The numerical accuracy of the developed code is certified by several tests in which we show comparisons with the corresponding analytical solutions. In order to solve the energy-dependent ray-tracing transport, we propose that an adaptive-mesh-refinement approach, which we take for the two radiation angles ({theta}, {phi}) and the neutrino energy, is useful in reducing the computational cost significantly. Based on the hydrodynamical data in our collapsar simulation, we estimate the annihilation rates in a post-processing manner. Increasing the Kerr parameter from 0 to 1, it is found that the GR effect can increase the local energy deposition rate by about one order of magnitude, and the net energy deposition rate by several tens of percent. After the accretion disk settles into a stationary state (typically later than {approx}9 s from the onset of gravitational collapse), we point out that the neutrino-heating timescale in the vicinity of the polar funnel region can be shorter than the dynamical timescale. Our results suggest that the neutrino pair annihilation is potentially as important as the conventional magnetohydrodynamic mechanism for igniting the GRB fireballs.

79 ASTRONOMY AND ASTROPHYSICS↗

SCALE 6.2 Lattice Physics Performance Assessment

The US Nuclear Regulatory Commission relies on the lattice physics analysis capabilities of the SCALE code system to perform confirmatory licensing analyses. Either SCALE lattice physics code—TRITON/NEWT or Polaris—can be used to generate cross section data used by the PARCS nodal core simulator for full-core neutronics calculations. This report presents an assessment of the accuracy of SCALE lattice physics codes for preparation of lattice physics data that are used to support simulator codes such as the NRC’s PARCS, for UO 2 -mixed oxide (MOX)/Zr fueled light water reactor (LWR) analyses. Due to the nature of lattice physics calculations, critical reactor experiment benchmarks cannot be modeled in explicit detail in a lattice physics code. However, this limitation does not mean that these measurement data are not usable for lattice physics studies. Therefore, either geometry approximations or axial buckling must be implemented to determine the critical water height. These modeling limitations have led to development of a three-phase assessment strategy. In the first phase, selected critical experiment benchmarks are modeled using the SCALE 3D continuous-energy (CE) Monte Carlo (MC) code KENO, which is the most rigorous neutron transport method available in SCALE, with no approximations in the spatial, angle, or energy treatments. Biases and statistical uncertainties in quantities of interest such as k eff and pin power distributions are determined by comparing CE KENO results to experimental data. This first phase in the accuracy assessment is to demonstrate and establish the use of CE KENO as a reference solution for the second phase. In the second phase, 14 numerical test suites are used to compare SCALE lattice physics calculations with CE KENO as a reference solution. In the third phase, SCALE lattice physics depletion calculations are performed, and the spent fuel isotopic results are compared with available radiochemical assay measurements. Isotopic measurement comparisons provide quantitative assessment of isotopic density distribution predictions with the depletion models in SCALE lattice physics codes. This report documents results for all test suites. The assessment was performed using standard production techniques unless otherwise noted. Both TRITON/NEWT and Polaris exhibited acceptable accuracy for most test cases. For the few test cases in which acceptable accuracy criteria were not met, further code and data development are planned. The computer codes used in this assessment are as follows: SCALE 6.2 rev19189 (pre-release of 6.2.1) was used for CE KENO, TRITON/NEWT and Polaris (PWR only) calculations; SCALE 6.2.2 was used for Polaris calculations to address several updates in support of support boiling water reactor (BWR) lattice geometries. For this work, there is no difference between SCALE 6.2.1 and SCALE 6.2.2 beyond the inclusion of the Polaris BWR analysis capability; The ENDF/B-VII.1 continuous energy and 252 group libraries deployed in SCALE 6.2 were generated with AMPX 6.2 that is distributed with SCALE.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

WEC-Sim Wave Energy Converter Simulator

WEC-Sim (Wave Energy Converter SIMulator) is an open-source wave energy converter (WEC) simulation tool. The code is developed in MATLAB/SIMULINK using the multi-body dynamics solver SimMechanics. WEC-Sim has the ability to model devices that are comprised of rigid bodies, power-take-off systems, and mooring systems. Simulations are performed in the time-domain by solving the governing WEC equations of motion in 6 degrees-of-freedom. The WEC-Sim project is funded by the U.S. Department of Energy's Wind and Water Power Technologies Office and the code development effort is a collaboration between the National Renewable Energy Laboratory (NREL) and Sandia National Laboratories (SNL).

13 HYDRO ENERGY↗

Applications of FLUKA Monte Carlo Code for Nuclear and Accelerator Physics

FLUKA is a general purpose Monte Carlo code capable of handling all radiation components from thermal energies (for neutrons) or 1 keV (for all other particles) to cosmic ray energies and can be applied in many different fields. Presently the code is maintained on Linux. The validity of the physical models implemented in FLUKA has been benchmarked against a variety of experimental data over a wide energy range, from accelerator data to cosmic ray showers in the Earth atmosphere. FLUKA is widely used for studies related both to basic research and to applications in particle accelerators, radiation protection and dosimetry, including the specific issue of radiation damage in space missions, radiobiology (including radiotherapy) and cosmic ray calculations. After a short description of the main features that make FLUKA valuable for these topics, the present paper summarizes some of the recent applications of the FLUKA Monte Carlo code in the nuclear as well high energy physics. In particular it addresses such topics as accelerator related applications.

43 PARTICLE ACCELERATORS↗

Enabling Interoperable SCADA Communications for PV Inverters through Embedded Controllers

The percentage integration of photovoltaic (PV) inverters in the field has increased significantly in the past 5 years. Regardless of the size of the PV plants and the inverters (residential vs. commercial), it is becoming crucial that these devices have the capability to communicate with peers (other smart devices) and with components that are at a hierarchy above the inverters (e.g., supervisory control and data acquisition (SCADA) systems, distributed controllers, and data managers). This project aims to develop a standard SCADA software code for inverters’ embedded controllers that will enable interoperability with other components in the system. To achieve this, the code will be developed using two different protocols: Distributed Network Protocol 3 and International Electrotechnical Commission 61850. The developed code is aimed to be deployed in simple embedded controllers. It will be tested in the National Renewable Energy Laboratory’s (NREL’s) Energy Systems Integration Facility. The tested code will then be made available through Triangle MicroWorks’s (TMW’s) software platform. The primary objectives of this project include training the NREL team with TMW’s embedded controller libraries, developing an interoperable communication code for embedded controllers, successfully testing and deploying the code, and demonstrating the newly developed code in a conference.

14 SOLAR ENERGY↗

E-Beam Irradiation Beamline at Jefferson Lab for Wastewater Treatment

Electron beam (e-beam) irradiation is an advanced method for removing the emerging organic contaminants in wastewater, such as 1,4-dioxane, and per- and polyfluoroalkyl sub?stances (PFAS), which have the potential to be regulated in the near future but are difficult to degrade by conventional treatment methods. This dissertation was based on a collabo?rating study between Jefferson Lab (Jlab) and Hampton Roads Sanitation District (HRSD) to evaluate the impacts of e-beam irradiation on the degradation of 1,4-dioxane and PFAS. It presents the detailed design of an e-beam irradiation beamline, the beamline simulation using general particle tracer (GPT), the installation, and the successful commissioning. The beamline is an extended section to the Upgraded Injector Test Facility (UITF) at Jlab, which is a continuous wave (CW), superconducting radio frequency (SRF) linear accelerator with an energy up to 10 MeV. To let the sample volume receive a significant and uniform dose distribution, the sample target was designed by investigating the dose distribution simulated with a Monte-Carlo code, FLUKA. The optimized beam energy was 8 MeV and the beam current for irradiation was ? 100 nA. With the use of a solenoid and a raster, the electron beam was expanded to the optimized size, 1? ? 15 mm, at the sample target. This dis?sertation also presents the irradiation experiments for 64 1,4-dioxane samples and 48 PFAS samples in different water matrices, including real wastewater, which were prepared and an?alyzed by HRSD. The absorbed doses of samples were obtained by designing a new method that combines the FLUKA simulation and dose mapping experiments. The irradiation re?sults showed that around 95% of 1,4-dioxane was removed at a low dose of ? 2 kGy, and PFAS was possibly removed at a lower dose compared to similar research. This work is a first implementation of SRF technology for wastewater irradiation. It pro?vides a valuable new research platform for wastewater remediation. This will be in support of future industrial applications of advanced SRF technologies and better understanding of the effect of e-beam irradiation on wastewater or water treatment.

Li, Xi↗

Numerical 1D PIC-simulations of ion acceleration during laser-plasma interaction: Optimization of a two-component multilayered target structure

Ion beam acceleration is simulated using a one-dimensional 1D2P PIC code. The dependences of the maximum energy and width of the energy spectrum of the generated ion beams on the duration and intensity of laser radiation, as well as on the target parameters (thickness and number of layers, types and densities of atoms), are investigated. The optimal target configuration at which the energy of the accelerated ions is maximum (5-160 MeV for intensities of 5 x 10{sup 18-5} x 10{sup 20} W/cm{sup 2}) is found. The optimal target configuration is shown to depend on the intensity and be independent of the laser pulse duration.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

NASA Lewis Stirling engine computer code evaluation

In support of the U.S. Department of Energy's Stirling Engine Highway Vehicle Systems program, the NASA Lewis Stirling engine performance code was evaluated by comparing code predictions without engine-specific calibration factors to GPU-3, P-40, and RE-1000 Stirling engine test data. The error in predicting power output was -11 percent for the P-40 and 12 percent for the Re-1000 at design conditions and 16 percent for the GPU-3 at near-design conditions (2000 rpm engine speed versus 3000 rpm at design). The efficiency and heat input predictions showed better agreement with engine test data than did the power predictions. Concerning all data points, the error in predicting the GPU-3 brake power was significantly larger than for the other engines and was mainly a result of inaccuracy in predicting the pressure phase angle. Analysis into this pressure phase angle prediction error suggested that improvements to the cylinder hysteresis loss model could have a significant effect on overall Stirling engine performance predictions.

Sullivan, Timothy J.↗

Performance Assurance Planning Guide for Utility Energy Service Contracts: 2025 Edition

Administered by the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), the Utility Program has fostered collaboration among federal agencies and their serving utilities for more than 25 years. The Utility Program supports agencies using Utility Energy Service Contracts (UESCs), a well-developed, effective contracting vehicle that enable the latest approaches to cost-effective energy management at federal sites. Federal agencies have successfully used UESCs to award over 2,000 energy and water efficiency and renewable energy projects, investing approximately $\$$2.8 billion in furthering the Federal Government's efforts to reduce energy intensity. Authorized by 42 U.S. Code section 8256 (10 U.S. Code section 2913 for the Department of Defense), a UESC is a limited-source acquisition between a federal agency and an eligible serving utility for energy management services that generate savings from the implementation of energy- and water -conservation measures (collectively referred to as ECMs), with 42 U.S. Code section 8287 (Defense Federal Acquisition Regulation Supplement, Part 241), providing the term of a UESC, which may extend up to 25 years. Through a UESC, the utility partner assesses designs, and implements the desired ECMs - which can range from lighting retrofits and renewable energy systems, to combined heat and power plants or other technologies and strategies, and may provide financing for the project. The agency may use any combination of appropriations and third-party financing to pay for the project, providing useful flexibility. There is no limit to the project size, big or small, that can be implemented using a UESC. To assist agencies implementing a UESC, FEMP has developed a Utility Energy Service Contract Guide and this companion guidance document to help agencies and their utility partners better understand the best practices for to ensure UESCs continue to perform and generate savings throughout their performance period. These best practices utilize a combination of effective project management, communication, documentation, and a detailed Performance Assurance Plan. This plan is a project specific set of actionable protocols that define important tasks and responsibilities throughout the contract term and reflects the site conditions, complexities, agency capabilities, and operating and maintaining planned ECMs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ASME Code Case Development Strategy for Ferritic/Martensitic HT-9 Steel

The US Department of Energy (DOE), Office of Nuclear Energy (NE), is supporting the development of an ASME Code Case for adoption of 12Cr-1Mo-VW ferritic/martensitic (F/M) steel, commonly known as HT-9, primarily for use in design of liquid-metal fast reactors (LMFR) and components. In 2011, Los Alamos National Laboratory (LANL) nuclear engineering staff began assisting in the development of a small modular reactor (SMR) design concept, previously known as the Hyperion Module, now called the Gen4 Module, being developed by Gen4 Energy, Inc. located in Denver, Colorado. LANL engineering staff had initially proposed either T91 (9Cr-1Mo-VNb) or HT-9 for the reactor vessel and components, as well as fuel clad and ducting. Although T91 is currently an approved/authorized material for elevated temperature design in the ASME Code, the preference is utilization of HT-9 due to its extensive irradiation database and similar creep resistance as T91. In addition, HT-9 has relatively good corrosion properties for fast reactor environment, such as liquid lead bismuth eutectic coolant. Although the ASME material Code Case, for adoption of HT-9 as an approved elevated temperature material for LMFR service, is the ultimate goal of this project, several key deliverables have been accomplished in FY2012 to provide assurance to DOE/NE of the viability and feasibility of pursuing this goal. An important key deliverable was the recently completed, Gap Analysis of Material Properties Data for Ferritic/Martensitic HT-9 (1). This report provided a cursory research, accumulation, and documentation of specific material parameters; physical, mechanical, and environmental, which are necessary for ensuring a successful ASME Code Case. Time-independent tensile and ductility data and time-dependent creep and creep-rupture behavior are some of the material properties required for a successful ASME Code case. Unfortunately, results of the Gap Analysis report show that many of the material properties have limited data availability in open-source documentation, or are contained in Applied Technology documents, or there is insufficient data to support the ASME requirement from 3-separate heats of material.

36 MATERIALS SCIENCE↗

Pacific Northwest National Laboratory Site Radionuclide Air Emissions Report for Calendar Year 2011

This report documents radionuclide air emissions that result in the highest effective dose equivalent (EDE) to a member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations (CFR), Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (NESHAP), Subpart H, National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities and Washington Administrative Code (WAC) Chapter 246-247, Radiation ProtectionAir Emissions. The EDE to the PNNL Site MEI due to routine emissions in 2011 from PNNL Site sources was 1.7E 05 mrem (1.7E-7 mSv) EDE. No nonroutine emissions occurred in 2011. The total radiological dose for 2011 to the MEI from all PNNL Site radionuclide emissions was more than 10,000 times smaller than the federal and state standard of 10 mrem/yr, to which the PNNL Site is in compliance.

54 ENVIRONMENTAL SCIENCES↗

Batched matrix computations on hardware accelerators based on GPUs

Scientific applications require solvers that work on many small size problems that are independent from each other. At the same time, the high-end hardware evolves rapidly and becomes ever more throughput-oriented and thus there is an increasing need for an effective approach to develop energy-efficient, high-performance codes for these small matrix problems that we call batched factorizations. The many applications that need this functionality could especially benefit from the use of GPUs, which currently are four to five times more energy efficient than multicore CPUs on important scientific workloads. This study, consequently, describes the development of the most common, one-sided factorizations, Cholesky, LU, and QR, for a set of small dense matrices. The algorithms we present together with their implementations are, by design, inherently parallel. In particular, our approach is based on representing the process as a sequence of batched BLAS routines that are executed entirely on a GPU. Importantly, this is unlike the LAPACK and the hybrid MAGMA factorization algorithms that work under drastically different assumptions of hardware design and efficiency of execution of the various computational kernels involved in the implementation. Thus, our approach is more efficient than what works for a combination of multicore CPUs and GPUs for the problems sizes of interest of the application use cases. The paradigm where upon a single chip (a GPU or a CPU) factorizes a single problem at a time is not at all efficient in our applications’ context. We illustrate all of these claims through a detailed performance analysis. With the help of profiling and tracing tools, we guide our development of batched factorizations to achieve up to two-fold speedup and three-fold better energy efficiency as compared against our highly optimized batched CPU implementations based on MKL library. Finally, the tested system featured two sockets of Intel Sandy Bridge CPUs and we compared with a batched LU factorizations featured in the CUBLAS library for GPUs, we achieve as high as 2.5× speedup on the NVIDIA K40 GPU.

97 MATHEMATICS AND COMPUTING↗

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2017

This report documents radionuclide air emissions that result in the 2017 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2017 from PNNL Richland Campus sources is 2.1E-5 mrem (2.1E-7 mSv) EDE. The dose from all fugitive sources is 2.1E-6 mrem (2.1E-8 mSv) EDE. The dose from radon emissions is 3.9E-10 mrem (3.9E-12 mSv) EDE. No nonroutine emissions occurred in 2017. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 2.3E-5 mrem (2.3E-7 mSv) EDE, or more than 10,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart H↗

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2018

This report documents radionuclide air emissions that result in the 2018 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2018 from PNNL Richland Campus sources is 1.6E-5 mrem (1.6E-7 mSv) EDE. The dose from all fugitive sources is 2.1E-6 mrem (2.1E-8 mSv) EDE. The dose from radon emissions is 5.6E-10 mrem (5.6E-12 mSv) EDE. No nonroutine emissions occurred in 2018. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 1.8E-5 mrem (1.8E-7 mSv) EDE, or more than 10,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart H↗

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2019

This report documents radionuclide air emissions that result in the 2019 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2019 from PNNL Richland Campus sources is 1.4E-5 mrem (1.4E-7 mSv) EDE. The dose from all fugitive sources is 1.3E-6 mrem (1.3E-8 mSv) EDE. The dose from radon emissions is 1.5E-10 mrem (1.5E-12 mSv) EDE. No nonroutine emissions occurred in 2019. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 1.5E-5 mrem (1.5E-7 mSv) EDE, or more than 10,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart H↗

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2020

This report documents radionuclide air emissions that result in the 2020 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2020 from PNNL Richland Campus sources is 1.5E-5 mrem (1.5E-7 mSv) EDE. The dose from all fugitive sources is 2.0E-6 mrem (2.0E-8 mSv) EDE. The dose from radon emissions is 9.3E-9 mrem (9.3E-11 mSv) EDE. No nonroutine emissions occurred in 2020. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 1.7E-5 mrem (1.7E-7 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart H↗

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2021

This report documents radionuclide air emissions that result in the 2021 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2021 from PNNL Richland Campus sources is 1.7E-5 mrem (1.7E-7 mSv) EDE. The dose from all fugitive sources is 1.2E-6 mrem (1.2E-8 mSv) EDE. The dose from radon emissions is 2.1E-9 mrem (2.1E-11 mSv) EDE. No nonroutine emissions occurred in 2021. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 1.8E-5 mrem (1.8E-7 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart H↗

PNNL-Richland Campus Radionuclide Air Emissions Report for Calendar Year 2022

This report documents radionuclide air emissions that result in the 2022 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2022 from PNNL Richland Campus sources is 2.1E-5 mrem (2.1E-7 mSv) EDE. The dose from all fugitive sources is 1.2E-6 mrem (1.2E-8 mSv) EDE. The dose from radon emissions is 9.2E-9 mrem (9.2E-11 mSv) EDE. No nonroutine emissions occurred in 2022. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 2.3E-5 mrem (2.3E-7 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart↗