Search NASA⌕ Search

SEARCH · Search NASA

Results for “OPERATION AND MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Impact of Load Following on the Economics of Existing Coal-Fired Power Plant Operations

This report evaluates the effects of increased cold starts on an existing 300 MW coal-fired unit operating and maintenance (O&M) and fuel costs resulting from reduced dispatchability in the market. Component level impacts on equipment are characterized and assessed to estimate changes in O&M costs resulting from 1, 6, and 12 cold starts per year. Report findings discuss the change in both O&M and fuel costs based on different number of cold starts and varying capacity factors. Results are presented in terms of impact to cost of electricity ($/MWh).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Compressor-less Hydrogen Refueling Station Using Thermal Compression

The goal of this project was to demonstrate the technical and economic feasibility of using thermal compression to create the hydrogen pressure necessary to operate vehicle hydrogen fueling stations. The concept of utilizing the exergy within liquid hydrogen to build pressure rather than mechanical components such as compressors or cryogenic liquid pumps has several advantages. In theory, the compressor-less hydrogen station will have lower operating and maintenance costs because the compressors found in conventional stations require large amounts of electricity to run and are prone to mechanical breakdowns. The thermal compression station also utilizes some of the energy used to liquefy the hydrogen as work to build pressure, this is energy that in conventional stations is lost as heat to the environment.

08 HYDROGEN↗

Cost Projections for Utility-Scale Battery Storage

In this work we document the development of cost and performance projections for utility-scale lithium-ion battery systems, with a focus on 4-hour duration systems. The projections are developed from an analysis of over 25 publications that consider utility-scale storage costs. The suite of publications demonstrates varied cost reduction for battery storage over time. Figure ES-1 shows the low, mid, and high cost projections developed in this work (on a normalized basis) relative to the published values. Figure ES-2 shows the overall capital cost for a 4-hour battery system based on those projections, with storage costs of 124 dollars/kWh, 207 dollars/kWh, and 338 dollars/kWh in 2030 and 76 dollars/kWh, 156 dollars/kWh, and 258 dollars/kWh in 2050. Battery variable operations and maintenance costs, lifetimes, and efficiencies are also discussed, with recommended values selected based on the publications surveyed.

25 ENERGY STORAGE↗

Unpacking the Disconnect Between Wholesale and Retail Electric Rates [PowerPoint]

The 2017 DOE Staff Report to the Secretary on Electricity Markets and Reliability noted a disconnect between falling wholesale electricity prices and flat or rising retail investor-owned utility (IOU) electricity prices between 2008 and 2016. This analysis sought to assess recent trends in utility costs, retail sales, and/or retail rates vis-à-vis wholesale market prices in order to help explain this disconnect. Using FERC Form 1 and ICE Power Indices data, Berkeley Lab researchers developed key annual metrics between 2007 and 2016 at a regional level for five of the seven NERC regions: Midwest Reliability Organization (MRO), Northeast Power Coordinating Council (NPCC), ReliabilityFirst Corporation (RFC), SERC Reliability Corporation (SERC), and Western Electricity Coordinating Council (WECC). The analyses of these metrics enabled Berkeley Lab researchers to arrive at the following conclusions: Retail and wholesale rates were increasingly disconnected across all included NERC regions; Reductions in wholesale electricity market prices happened concurrently with reductions in IOU fuel and purchased power (FPP) costs, but sizable regional differences in the degree of FPP cost reductions existed; Reductions in IOU FPP costs were offset in part by increases in non-fuel operations and maintenance (O&M) costs, but modest regional differences in the degree of these cost impacts existed; Reductions in IOU FPP costs were also offset in part by increases in capital expenditures, but regional differences in the magnitude and type of investments existed; and, Reductions in retail sales tended to mitigate the effect on retail rates from reductions in total utility costs, but regional differences existed that were sometimes counterintuitive and suggest the value in a more detailed analysis of utility costs vis-à-vis general rate case filings and decisions to better understand retail rate changes over time.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

WGRID-49 GMLC Project Report: Understanding the Role of Short-Term Energy Storage and Large Motor Loads for Active Power Controls by Wind Power

The GMLC project is built upon the results of pioneering research funded by the U.S. Department of Energy (DOE) and conducted by the National Renewable Energy Laboratory (NREL)—in collaboration with the Electric Power Research Institute and the University of Colorado—on active power controls (APC) by wind power during 2013–2016. The studies detailed in the first APC by wind power project have shown tremendous promise for the potential for wind power plants to provide APC. The goal of this project was to continue the previous work and develop and validate coordinated controls of APC by wind generation, short-term energy storage, and large industrial motor drives for providing various types of ancillary services to the grid and minimizing loading impacts on wind turbines (e.g., drivetrains), thereby reducing operation-and-maintenance (O&M) costs and subsequently reducing the cost of energy generated by wind power. This work used the $30 million, multiyear DOE investments and the unique characteristics of NREL’s existing National Wind Technology Center test site, including a combination of multimegawatt utility-scale wind turbine generators, a 1-MW/1-MWh battery energy storage system (BESS), industrial variable-frequency motor drives, a 1-MW solar photovoltaic (PV) array, and a 7-MVA controllable grid interface. This combination of technologies allows for the optimization, testing, and demonstration of various types of APC by wind power in coordination with other generation sources (including regenerative loads) and energy storage to allow for enhancing or, in some cases, substituting the APC services by wind power and reducing impacts on wind turbine component life and thus increasing the availability and reliability of the power supply from wind

17 WIND ENERGY↗

U.S. Efforts in Support of Examinations at Fukushima Daiichi: 2019 Evaluations

Much is still not known about the end-state of core materials in each unit that was operating on March 11, 2011 at the Fukushima Daiichi Nuclear Power Station (Daiichi). Information obtained from Daiichi is required to inform Decontamination and Decommissioning (D&D) activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This document, which has been updated to include Fiscal Year 2019 (FY2019) information, summarizes results from a U.S. effort to review Daiichi information and extract insights to enhance the safety of existing and future nuclear power plant designs. This U.S. effort, which was initiated in 2014 by the Department of Energy Office of Nuclear Energy (DOE-NE), is completed by a group of experts in reactor safety and plant operations that identify examination needs and evaluate recent Daiichi examination data to address these needs. Each year, annual reports are issued that document significant safety insights being obtained in areas of special emphasis. For FY2019, the areas emphasized by the expert panel include component performance, radionuclide surveys and sampling, debris end-state location, combustible gas effects, and plant operations and maintenance. In addition to reducing uncertainties related to severe accident modeling progression, these insights have and continue to be used to update guidance for severe accident prevention, mitigation, and emergency planning. Reduced uncertainties in modeling the events at Daiichi improve the realism of reactor safety evaluations that inform future D&D activities. In addition, the process established by this U.S. effort provides an example that Japan may wish to implement in future international efforts to support D&D. As emphasized in this FY2019 report, important insights are being gained from examinations of the affected units at Daiichi. Although many results from prior years have been moved to appendices, key areas of interest are highlighted in the main document. For example, larger intact components and fuel containing materials observed on the floor of the primary containment and retained on ex-vessel structures continue to be emphasized because of insights that may be gained with respect to vessel failure and ex-vessel interactions with structures and concrete. In addition, the main report presents insights gained by focused evaluations of plant data because of potential use of systems and components during severe accident conditions and alternate perspectives regarding accident progression that may be inferred from such data. The report also illustrates how systems analysis codes can be applied to reduce uncertainties about the progression of events at Daiichi and how practical insights obtained from Daiichi can be used to enhance radiation safety for the existing fleet. Recent and planned updates to systems analysis codes are also discussed. As in prior years, this report contains an appendix with a list of examination needs that was updated after U.S. experts reviewed recently obtained information from Daiichi. Additional details for higher priority, near-term, examination activities are also provided. This report also includes an appendix with a description of a website that was developed to assist U.S. experts by providing information in an archived retrievable location.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Benchmarking Anticipated Wind Project Lifetimes: Results from a Survey of U.S. Wind Industry Professionals

This paper draws on a survey of wind industry professionals to clarify trends in the expected useful life of land-based wind power plants in the United States. The expected useful life of a project affects expectations about its profitability, the timing of possible decommissioning or repowering, and its levelized costs. We find that most wind project developers, sponsors and long-term owners have increased project-life assumptions over time, from a typical term of ~20 years in the early 2000s to ~25 years by the mid-2010s and ~30 years more recently. Current assumptions range from 25 to 40 years, with an average of 29.6 years. The estimated average levelized cost of energy (LCOE) for new wind projects built in 2018 is $\$ $40.4/MWh (real 2018$\$ $), assuming a 20-year project life. With a 25-year useful life and no change in assumed operations and maintenance (O&M) expenditures or wind plant performance over time, LCOE declines by 10%, to $\$ $36.2/MWh, because capital costs are recovered over five additional years of production. At the now-common 30-year assumed life, levelized costs decrease another 7%, to $\$ $33.5/MWh (under the same unaltered assumptions about O&M and performance). Even longer assumed lifetimes lead to further (but diminishing) LCOE reductions—e.g., to $\$ $31.7/MWh and $\$ $30.3/MWh for 35- and 40-year lives, respectively. The data and trends presented here may inform assumptions used by electric system planners, modelers and analysts. The results may also provide useful benchmarks to the wind industry, helping developers and assets owners to compare their expectations with those of their peers.

17 WIND ENERGY↗

U.S. Effort Support to Examinations at Fukushima - Meeting Notes with Updated Information Requests (FY2020)

Much is still not known about the end-state of core materials in each unit that was operating on March 11, 2011 at the Fukushima Daiichi Nuclear Power Station (Daiichi). Information obtained from Daiichi is required to inform Decontamination and Decommissioning (D&D) activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This document, which has been updated to include Fiscal Year 2020 (FY2020) information, summarizes results from a U.S. effort to review Daiichi information and extract insights to enhance the safety of existing and future nuclear power plant designs. This U.S. effort, which was initiated in 2014 by the Department of Energy Office of Nuclear Energy (DOE-NE), is completed by a group of experts in reactor safety and plant operations that identify examination needs and evaluate recent Daiichi examination data to address these needs. Since its inception, comprehensive annual reports were issued that document significant safety insights being obtained in areas of special emphasis: system and component performance, radionuclide surveys and sampling, debris end-state location, combustible gas effects, and plant operations and maintenance. In addition to reducing uncertainties related to severe accident modeling progression, these insights have and continue to be used to update guidance for severe accident prevention, mitigation, and emergency planning. Reduced uncertainties in modeling the events at Daiichi improve the realism of reactor safety evaluations that inform future D&D activities. For FY2020, it was decided that the program would gain more benefit from a more concise report that emphasizes new information and insights that affect prior findings and recommendations from the U.S. experts participating in this effort. A key aspect of prior U.S. efforts, the updated list of information requests, is included in this letter report to ensure that they are transmitted to organizations within Japan. In addition, findings and associated recommendations are provided regarding information presented by TEPCO Holdings, Nuclear Damage Compensation and Decommissioning Facilitation Corporation (NDF), and the Japan Atomic Energy Agency (JAEA). This letter report also continues to emphasize how information obtained from the affected reactors at Daiichi has been and will continue to be used to update severe accident management strategies, improve maintenance activities (especially in areas of radiation protection) and reduce uncertainties in systems analysis code models. In addition, recommendations are included that would expand the use of this information to provide insights regarding maintenance, radiation protection, design, and siting activities of existing and new reactors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Abstract for CRADA among the National Energy Technology Laboratory, National Technology & Engineering Solutions of Sandia, The Regents of the University of California, and Tri-State Generation and Transmission Association, Inc. (AGMT-0855)

The objective of this CRADA is to facilitate cooperation among Tri-State Generation and Transmission Association, Inc. and collaborators of the Institute for the Design of Advanced Energy Systems (IDAES), including the National Energy Technology Laboratory, Sandia National Laboratories, and Lawrence Berkeley National Laboratory. The goal is to develop steady-state and dynamic optimization models of power plants. Tri-State will provide data related to the design and operation of power plants, which will be used to validate the IDAES team’s models and tools. These models will provide insight into potential improvements which could improve heat rate, reduce operations and maintenance costs, and/or improve reliability of the existing fleet of coal plants in the United States.

20 FOSSIL-FUELED POWER PLANTS↗

Performance of Photovoltaic Systems Recorded by Open Solar Performance and Reliability Clearinghouse (oSPARC)

This article analyzes data from 2,200 photovoltaic systems collected through the Open Solar Performance and Reliability Clearinghouse (oSPARC, 2018) to draw conclusions about the measured performance of the systems, how it compares to expectations, and how wide the variation is. The systems range in size from 2 kW to 1,200 kW, with an average size of 229 kW, and were activated in oSPARC between March 13, 2007 and Dec. 16, 2016. Data regarding co-incident insolation and ambient temperature are provided through the oSPARC platform for the population of systems and summarized here. Results indicate that - after correcting for measured insolation, derating for temperature, and correcting for balance-of-system efficiency and degradation as a result of system age - the performance ratio of these 2,200 systems averages 91.7%. Adjusting for known parameters such as age and efficiency, the ratio would ideally be 100%. Thus, the 'underperformance' of this system sample is measured at 9.3% and suggests that as much as 9.3% could be recovered if the systems were caused to perform as expected through optimal operation and maintenance. Efforts to correlate the performance ratio with environmental conditions resulted in very low coefficients of regression, but the method already normalizes for actual site insolation and temperature, which are responsible for much of the site-specific variation. An exemption is air-quality nonattainment areas, where the measured performance of plants averages 86.9% and is consistently lower than the average of 95.9% in areas that are in compliance with air quality standards, likely because of particulate matter such as diesel soot exacerbating the soiling rate.

14 SOLAR ENERGY↗

Additively Manufactured Photovoltaic Inverter (AMPVI)

Successful integration of hundreds of gigawatts of solar photovoltaics (PV) into the electric power system requires transformative power conversion system design that optimizes various trade-offs among conflicting objectives, such as performance, reliability, functionality, and cost. To address this need, National Renewable Energy Laboratory, Oak Ridge National Laboratory, and Purdue University teamed up to develop a unique PV inverter design. The Additively Manufactured Photovoltaic Inverter (AMPVI) combines newer wide bandgap high-voltage silicon carbide (SiC) semiconductor devices with revolutionary concepts such as additive manufacturing and multi-objective magnetic design optimization. The AMPVI will not only provide superior technical capabilities in terms of energy conversion but also mitigate market barriers for SiC-based PV inverters. The benefits for this design will include better utilization of PV power due to higher DC voltage, lower operations and maintenance costs, better system efficiency, longer system lifetime, and advanced grid support functionalities for easier grid integration. All these advantages will lead to a significant reduction of the levelized cost of energy for PV systems. Activities in Budget Period 1 (BP1) of this 3-year integrated project were focused on development and component-level validation of the foundational building blocks needed for the AMPVI. Multiple interrelated tasks were completed in parallel during work towards the initial development of the high-voltage SiC-based power block, gate driver, controller board, and control algorithms. Initial development of magnetic design tools and initial inverter thermal and mechanical design was also completed in this period. All these activities ensured that the initial prototype (called “alpha-prototype”) power block and controller would be ready after BP1 for integration into the first inverter prototype (i.e., the alpha-prototype inverter) in BP2.

14 SOLAR ENERGY↗

Benchmarking Utility-Scale PV Operational Expenses and Project Lifetimes: Results from a Survey of U.S. Solar Industry Professionals

This paper draws on a survey of solar industry professionals and other sources to clarify trends in the expected useful life and operational expenditure (OpEx) of utility-scale photovoltaic (PV) plants in the United States. Solar project developers, sponsors, long-term owners, and consultants have increased project-life assumptions over time, from an average of ~21.5 years in 2007 to ~32.5 years in 2019. Current assumptions range from 25 years to more than 35 years depending on the organization; 17 out of 19 organizations surveyed or reviewed use 30 years or more. Levelized, lifetime OpEx estimates have declined from an average of ~$\$$35/kW DC -yr for projects built in 2007 to an average of ~$\$$17/kW DC -yr in 2019. Across 13 sources, the range in average lifetime OpEx for projects built in 2019 is broad, from $\$$13 to $\$$25/kW DC -yr. Operations and maintenance (O&M) costs—one component of OpEx—have declined precipitously in recent years, to $\$$5-8/kW DC -yr in many cases. Property taxes and land lease costs are highly variable across sites, but on average are—together—of similar magnitude. Other OpEx line items include security, insurance, and asset management. Given 2007-2009 values for not only project life and OpEx but also other drivers of the levelized cost of energy (LCOE, excluding the investment tax credit), the LCOE for utility-scale PV projects built from 2007 through 2009 averaged $\$$305 /MWh. Using 2019 values for all parameters yields an average LCOE of $\$$51 /MWh. The decline in LCOE from $\$$305 /MWh to $\$$51 /MWh was predominantly caused by reductions in up-front expenditures (and, to a much lesser extent, by changes in capacity factors, financing costs, and tax rates), but 9% ($\$$22 /MWh) of the overall decline is due to improvements in project life and OpEx. Project life extensions and OpEx reductions have had similarly sized impacts on LCOE over this period, at $\$$11 /MWh each. Had project life and OpEx not improved over the last decade, LCOE in 2019 would have instead been $\$$73 /MWh—43% higher. Given the limited quantity and comparability of previously available data on these cost drivers, the data and trends presented here may inform assumptions used by electric system planners, modelers, and analysts. The results may also provide useful benchmarks to the solar industry, helping developers and assets owners compare their expectations for project life and OpEx with those of their peers.

14 SOLAR ENERGY↗

Metal Alloy and RHEA Additive Manufacturing for Nuclear Energy and Aerospace Applications

An open-literature search was conducted to consider the current status of the additive manufacturing (AM) industry with respect to metal alloys and refractory high entropy alloys (RHEAs). Key areas of interest include methodologies and applications that are suitable for the nuclear and aerospace industries, as well as other industrial applications. We investigated various promising 3D metal technologies, with emphasis on cost, operation, throughput, maintenance, and output volume size. In addition, technical issues and the current status of the metal printing market are summarized. The project scope also included the manufacturing of open-literature RHEA test coupons at Sandia's laser engineered net shape (LENS) machine.

36 MATERIALS SCIENCE↗

Addressing Soiling: From Interface Chemistry to Practicality

Natural soiling has reduced the energy output of photovoltaic (PV) systems since the technology was first used. Projecting even a small average annual soiling loss translates to billions of dollars in annual lost revenue worldwide. Production losses due to soiling can be very high in some locations, substantially increasing the levelized cost of electricity (LCOE) due to lost power production, increased operating and maintenance costs, and/or increased finance cost due to the uncertainty. Furthermore, although soiling has been discussed in the literature for more than 70 years, solutions to many problems are still needed. The National Renewable Energy Laboratory (NREL) is working with the PV industry to develop the tools/knowledge so that the effects of soiling can be predicted for different environmental conditions and cost-effective mitigation can be implemented. For this project, NREL performed a number of research and development tasks/subtasks in the following general areas to 1) predict PV module soiling losses based on environmental factors at a PV installation and from its energy production data, 2) quantitatively measure the adhesion forces to understand the physics enabling soiling, and 3) develop related standards on PV module coatings and artificial soiling. At the inception of the project, the PV industry considered these efforts to be the most important and immediate soiling issues that we could address to have the highest impact on LCOE. These focused efforts have led to outstanding accomplishments that have been communicated and very well received by the community.

14 SOLAR ENERGY↗

User's Manual for the FE/NETL Onshore CO 2 EOR Cost Model, Version 1

This user's manual describes the conceptual and mathematical basis for the FE/NETL Onshore CO 2 EOR Cost Model (a Fortran program). The model performs a cash flow analysis to estimate the cost of implementing CO 2 EOR using supercritical CO 2 by incorporating oil field performance outputs for a pattern from the FE/NETL CO 2 Prophet Model (available on NETL's website along with its associated user's manuals under the Collection Name: FE/NETL CO 2 Prophet Model) and implementing patterns to develop an oil field for CO 2 EOR. The model calculates capital costs, operation and maintenance costs, and financing costs. The user’s manual also describes how to run the FE/NETL Onshore CO 2 EOR Cost Model, along with the model’s file structure, inputs and outputs. The FE/NETL Onshore CO 2 EOR Cost Model is available on NETL's website under the Collection Name: FE/NETL Onshore CO 2 EOR Cost Model.

54 ENVIRONMENTAL SCIENCES↗

Cost Projections for Utility-Scale Battery Storage (2020 Update)

In this work we describe the development of cost and performance projections for utility-scale lithium-ion battery systems, with a focus on 4-hour duration systems. The projections are developed from an analysis of 19 publications that consider utility-scale storage costs. The suite of publications demonstrates varied cost reductions for battery storage over time. Figure ES-1 shows the low, mid, and high cost projections developed in this work (on a normalized basis) relative to the published values. Figure ES-2 shows the overall capital cost for a 4-hour battery system based on those projections, with storage costs of $\$$144/kWh, $\$$208/kWh, and $\$$293/kWh in 2030 and $\$$88/kWh, $\$$156/kWh, and $\$$219/kWh in 2050. Battery variable operations and maintenance costs, lifetimes, and efficiencies are also discussed, with recommended values selected based on the publications surveyed.

14 SOLAR ENERGY↗

U.S. Efforts in Support of Examinations at Fukushima Daiichi- November 2020 Meeting Notes with Updated Information Requests

Much is still not known about the end-state of core materials in each unit that was operating on March 11, 2011 at the Fukushima Daiichi Nuclear Power Station (Daiichi). Information obtained from Daiichi is required to inform Decontamination and Decommissioning (D&D) activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This information also has important implications for the safety and operation of U.S. commercial nuclear power plants. This document summarizes results from the Fiscal Year 2021 (FY2021) U.S. effort to review Daiichi information and extract insights to enhance the safety of existing and future nuclear power plant designs. This U.S. effort, which was initiated in 2014 by the Department of Energy Office of Nuclear Energy (DOE-NE), is completed by a group of experts in reactor safety and plant operations that identify examination needs and evaluate recent Daiichi examination data to address these needs. Since its inception, annual reports were issued that document significant safety insights being obtained in areas of special emphasis: system and component performance, radionuclide surveys and sampling, debris end-state location, combustible gas effects, and plant operations and maintenance. In addition to reducing uncertainties related to severe accident modeling progression, these insights have and continue to be used to update guidance for severe accident prevention, mitigation, and emergency planning. Reduced uncertainties in modeling the events at Daiichi improve the realism of reactor safety evaluations that inform future D&D activities. A key aspect of prior U.S. efforts, the updated list of information requests, is included in this FY2021 report to ensure that they are transmitted to organizations within Japan. This report also continues to emphasize how information obtained from the affected reactors at Daiichi has been and will continue to be used to update severe accident management strategies and reduce uncertainties in systems analysis code models. In addition, recommendations are included that would expand the use of this information to provide insights regarding maintenance, radiation protection, design, and siting activities for existing and new reactors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

New Pathways for Hydropower: Getting Hydropower Built--What Does it Take?

This report is the result of a collaboration of experts with diverse perspectives and a wealth of experience in designing, developing, owning, and operating small hydropower facilities. These experts met in Golden, Colorado, in December 2013 to put forth innovative ideas about accelerating the development of small hydropower projects. Innovations put forth by these experts can yield more than just technology advancements. Innovation is possible in all phases of project development, from concept to commissioning to operations and maintenance. These innovative ideas were refined and organized in subsequent collaborations among these experts to produce this final version of the report.

13 HYDRO ENERGY↗