Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Lessons learned in deploying software estimation technology and tools

Developing a software product involves estimating various project parameters. This is typically done in the planning stages of the project when there is much uncertainty and very little information. Coming up with accurate estimates of effort, cost, schedule, and reliability is a critical problem faced by all software project managers. The use of estimation models and commercially available tools in conjunction with the best bottom-up estimates of software-development experts enhances the ability of a product development group to derive reasonable estimates of important project parameters. This paper describes the experience of the IBM Software Solutions (SWS) Toronto Laboratory in selecting software estimation models and tools and deploying their use to the laboratory's product development groups. It introduces the SLIM and COSTAR products, the software estimation tools selected for deployment to the product areas, and discusses the rationale for their selection. The paper also describes the mechanisms used for technology injection and tool deployment, and concludes with a discussion of important lessons learned in the technology and tool insertion process.

Panlilio-Yap, Nikki↗

Lessons Learned for Improving Spacecraft Ground Operations

NASA policy requires each Program or Project to develop a plan for how they will address Lessons Learned. Projects have the flexibility to determine how best to promote and implement lessons learned. A large project might budget for a lessons learned position to coordinate elicitation, documentation and archival of the project lessons. The lessons learned process crosses all NASA Centers and includes the contactor community. o The Office of The Chief Engineer at NASA Headquarters in Washington D.C., is the overall process owner, and field locations manage the local implementation. One tool used to transfer knowledge between program and projects is the Lessons Learned Information System (LLIS). Most lessons come from NASA in partnership with support contractors. A search for lessons that might impact a new design is often performed by a contractor team member. Knowledge is not found with only one person, one project team, or one organization. Sometimes, another project team, or person, knows something that can help your project or your task. Knowledge sharing is an everyday activity at the Kennedy Space Center through storytelling, Kennedy Engineering Academy presentations and through searching the Lessons Learned Information system. o Project teams search the lessons repository to ensure the best possible results are delivered. o The ideas from the past are not always directly applicable but usually spark new ideas and innovations. Teams have a great responsibility to collect and disseminate these lessons so that they are shared with future generations of space systems designers. o Leaders should set a goal for themselves to host a set numbers of lesson learned events each year and do more to promote multiple methods of lessons learned activities. o High performing employees are expected to share their lessons, however formal knowledge sharing presentation are not the norm for many employees.

Bell, Michael↗

Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

Measures↗

The Sellafield Plan - 12458

The Sellafield Performance Plan represents the start of a new era for the Sellafield site. It is a key driver in the Nuclear Management Partners mission to make Sellafield safer, cleaner, more productive, more cost effective and a better neighbour. When published in summer 2011, the Sellafield Performance Plan set out exactly what work would be completed at Sellafield between 2010/11 and 2025/26, how all of the facilities on the site interact, and what new facilities would be needed in order to deliver the risk and hazard reduction mission. The plan is the first credible and underpinned lifetime plan for the Sellafield site - the most complex part of the UK's civil nuclear estate. Under the Sellafield Performance Plan there are projected to be more jobs longer creating opportunities for the site, its workforce and the economic stability of West Cumbria. The Sellafield Ltd performance plan sets out how NMP will apply their global experience to improve operations, generate efficiencies and deliver detailed programmes of work with the aim of accelerating decommissioning and providing value for money. Successful delivery of the plan will also ensure the site continues to effectively operate critical national infrastructure that supports the UK's energy programme, and maintains the safe and secure management and storage of nuclear materials. The NDA and UK Government have demonstrated their confidence in NMP and Sellafield Ltd's capability to deliver this plan by providing the highest-ever Annual Site Funding Limit for the site in 2011/12. The Sellafield Performance Plan also creates both the foundation and the environment for a vibrant West Cumbrian economy through significant opportunities for the local supply chain and real prospects for further inward investment. By working flexibly and accelerating the decommissioning programme, the plan provides the opportunity for significant retraining to adapt to future challenges on the site and for other potential new nuclear missions in West Cumbria. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of Irrigation Modernization and Conduit Hydropower Funding and Support Programs

This memo reviews and evaluates existing funding mechanisms that support off-farm irrigation modernization and conduit hydropower projects. Irrigation modernization projects, both on and off-farm, can be challenging to move through planning, permitting, development and installation processes and some evidence indicates that funding mechanisms can be a barrier to successful deployments. This memo is important because access to equitably and efficiently deployed project planning and development funding may be a key pre-requisite to increasing the pace and scale of irrigation modernization project deployments that incorporate hydropower. We evaluated an array of federal and state funding programs and took a close look at Energy Trust of Oregon’s funding mechanisms due to the organization’s apparent success in increasing the pace and scale of modernization in its state.

13 HYDRO ENERGY↗

The APT/ERE planning and scheduling manifesto

The Entropy Reduction Engine, ERE project, is focusing on the construction of integrated planning and scheduling systems. Specifically, the project is studying the problem of integrating planning and scheduling in the context of the closed loop plan use. The results of this research are particularly relevant when there is some element of dynamism in the environment, and thus some chance that a previously formed plan will fail. After a preliminary study of the APT management and control problem, it was felt that it presents an excellent opportunity to show some of the ERE Project's technical results. Of course, the alignment between technology and problem is not perfect, so planning and scheduling for APTs presents some new and difficult challenges as well.

Drummond, Mark↗

Scale-Up of Coal-Based Supercritical CO 2 cycle technology

The Allam Cycle is a transformational technology that enables a step change in the performance, efficiency, and cost of electricity for electrical generating units by using supercritical CO 2 (sCO 2 ) as the working fluid in the turbine for power generation. The objectives of this Phase I effort were to select a host site for a large pilot system through a process of down selection, develop a conceptual design, and conduct a pre-front-end engineering design (pre-FEED) study for a sCO 2 cycle pilot plant that uses domestic coal reserves as the primary feedstock, thereby furthering technology development of the coal-based Allam Cycle. The project was divided into four main tasks: 1) Project Management and Planning; 2) Conceptual Pilot Plant Definition and Host Site Selection; 3) Preliminary Design, Cost, and Schedule Development; and 4) Commitments and Environmental Information Volume (EIV). All project management activities occurred in Task 1. Host site selection was conducted in Task 2, while conceptual design and pre-FEED activities took place under Task 3. Task 4 enhanced the project by securing commitments for the next phase of the program and completing an initial EIV. The Great Plains Synfuels Plant (GPSP) has been selected as the host site for the large-scale pilot, and its owner, Dakota Gasification Company (DGC), is a committed partner. GPSP was compared to two other host site candidates during Phase I: the existing natural gas Allam Cycle facility in La Porte, Texas, and the Energy & Environmental Research Center’s (EERC) high-bay demonstration facility in Grand Forks, North Dakota. Costs for hosting the pilot plant were estimated for each facility, and those costs are shown in Table ES-1. Based on these estimates, the DGC site was clearly shown to be the lowest cost option and was selected as the host site for the project.

01 COAL, LIGNITE, AND PEAT↗

Hydrogen Sustainable Infrastructure Guidelines (H2SIG)

Infrastructure interacts with major global challenges inclusive of climate change, resilience, equity and social justice, environmental protection and biodiversity, public health, and economic recovery. This effort directly addresses how to apply sustainability assessments to the unique aspects of hydrogen (H2) infrastructure projects using the Envision® sustainability framework developed by the Institute for Sustainable Infrastructure (ISI). Envision is a flexible system of criteria and performance objectives to aid decision makers and help project teams identify sustainable approaches during planning, design and construction of infrastructure projects that will continue throughout the project’s operations, maintenance, and end-of-life phases. The goal of this work is to support those interested in conducting sustainability assessments for hydrogen infrastructure projects. Through this work the team has developed hydrogen-specific guidelines and best practices to assist project developers, investors and regulators in straightforward application of the Envision framework to systematically enhance clarity and increase objectivity across hydrogen projects. Subject matter experts from 20 different organizations (industry, non-profits, municipalities, emissions regulators, national labs) were engaged through 7 focus groups to discuss the H2-prioritized Envision requirements and elements to be included in the guidelines. In addition to these guidelines, the team conducted case studies as a way of demonstrating and informing the guidelines and providing examples or ideas for implementing sustainability in future projects. Through this study, the authors found that hydrogen infrastructure projects can incorporate many sustainable practices including reducing GHG emissions affecting climate change, reducing air pollutant emissions affecting the health of communities, synergistically handling waste byproducts, integrating into existing infrastructure, incorporating renewable energy, and addressing equity and environmental justice. Additionally, hydrogen infrastructure projects could benefit from 2-way communication engagement and collaborative planning with stakeholders, educational awareness of hydrogen technology, tracking and reporting on water use and water quality, and including monetized environmental and social benefits in life-cycle cost estimates. This document is the final technical report for the Hydrogen Sustainability Assessment Methods for Project Development project. While the main focus of the report is to provide guidelines for applying sustainability to hydrogen infrastructure, there are sections within the appendix providing completed project tasks and methodology.

08 HYDROGEN↗

Hierarchical Control and Trajectory Planning

Most of the time on this project was spent on the trajectory planning problem. The construction is equivalent to the classical spline construction in the case that the system matrix is nilpotent. If the dimension of the system is n then the spline of degree 2n-1 is constructed. This gives a new approach to the construction of splines that is more efficient than the usual construction and at the same time allows the construction of a much larger class of splines. All known classes of splines are reconstructed using the approach of linear control theory. As a numerical analysis tool control theory gives a very good tool for constructing splines. However, for the purposes of trajectory planning it is quite another story. Enclosed in this document are four reports done under this grant.

Martin, Clyde F.↗

Incorporating social groups' responses in a descriptive model for second- and higher-order impact identification

The response of a social group is a missing element in the formal impact assessment model. Previous discussion of the involvement of social groups in an intervention has mainly focused on the formation of the intervention. This article discusses the involvement of social groups in a different way. A descriptive model is proposed by incorporating a social group's response into the concept of second- and higher-order effects. The model is developed based on a cause-effect relationship through the observation of phenomena in case studies. The model clarifies the process by which social groups interact with a lower-order effect and then generate a higher-order effect in an iterative manner. This study classifies social groups' responses into three forms-opposing, modifying, and advantage-taking action-and places them in six pathways. The model is expected to be used as an analytical tool for investigating and identifying impacts in the planning stage and as a framework for monitoring social groups' responses during the implementation stage of a policy, plan, program, or project (PPPPs).

54 ENVIRONMENTAL SCIENCES↗

Notification of Operational Scope Change for the FTWC Venting Project at Los Alamos National Laboratory (LANL)

This letter is intended to provide you an update on the scope of work for the venting of the Flanged Tritium Waste Containers (FTWCs) at Los Alamos National Laboratory (LANL) Technical Area (TA-) 54. This project was described in the Application for Pre-Construction Approval 1 ("the Application") that was approved by EPA Region 6 on May 22, 2019. As operational planning for this project has been finalized, the scope of work described in the Application has slightly changed. The project has now determined that each FTWC may be vented multiple times, and these venting activities may take place at more than one location. The original application only discussed a single venting operation for each FTWC at a single location, TA-54. However, the radionuclide inventory and expected air releases remain bounded by the values described in the Application.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ultra-secure RF Tags for Safeguards and Security - SBIR Phase II Final Report

This is the Final Report for the DOE Phase II SBIR project “Ultra-secure RF Tags for Safeguards and Security.” The topics covered herein include technical progress made, progress against the planned milestones and deliverables, project outcomes (results, collaborations, intellectual property, etc.), and a discussion on future expectations of deployment and impacts of the results of this work. In brief, all planned work for the project was successfully completed, on or ahead of schedule and on budget. The major accomplishment was the successful development of a very advanced passive ultra-secure RFID tag system with combined security features unmatched by any commercially available ones. These tags have high-level dynamic encrypted authentication, a novel tamper-proofing mechanism, system software including graphical user interfaces and networking, and integration with a fiber-optic seal mechanism. This is all accomplished passively (with no battery) by incorporating sophisticated hardware in the tag which harvests the energy from the RFID readers that are interrogating the tag. Based on initial feedback (and deployments) at DOE’s Lawrence Livermore National Laboratory (LLNL), it is anticipated these tags and their offspring will meet DOE and international community needs for highly secure RFID systems. Beyond the accomplishment of those original objectives for the ultra-secure RF tags, major new spin-off thrusts from the original work were identified and successfully pursued with the cognizance of the DOE sponsor office. In particular, new classes of less sophisticated RFID tags were developed whose lineage derives from the core R&D thrusts of this SBIR. These RF “tag variants” have some, but not necessarily all, of the advanced characteristics described above and can therefore be less expensive and meet far wider markets. With customer pull from the DOE and its national laboratories, new RFID tags and systems (including custom readers and software) for government needs in asset management and tracking were developed. These were tested at a national laboratory and other government facilities, and resulted in immediate procurement actions by the government and deployment of these new systems. Thus, commercialization of the results of this Phase II DOE SBIR was already underway before the end of the SBIR itself. More importantly, operations involving asset management at selected DoE and government sites are already being impacted favorably and could have much broader impacts in the near future.

42 ENGINEERING↗

Recovery Act: Innovative CO 2 Sequestration from Flue Gas Using Industrial Sources and Innovative Concept for Beneficial CO 2 Use

The overall goal of this DOE Phase 2 project was to further develop and conduct pilot-scale and field testing of a biomimetic in-duct scrubbing system for the capture of gaseous CO 2 coupled with sequestration of captured carbon by carbonation of alkaline industrial wastes. The Phase 2 project, reported on here, combined efforts in enzyme development, scrubber optimization, and sequestrant evaluations to perform an economic feasibility study of technology deployment. The optimization of carbonic anhydrase (CA) enzyme reactivity and stability are critical steps in deployment of this technology. A variety of CA enzyme variants were evaluated for reactivity and stability in both bench scale and in laboratory pilot scale testing to determine current limits in enzyme performance. Optimization of scrubber design allowed for improved process economics while maintaining desired capture efficiencies. A range of configurations, materials, and operating conditions were examined at the Alcoa Technical Center on a pilot scale scrubber. This work indicated that a cross current flow utilizing a specialized gas-liquid contactor offered the lowest system operating energy. Various industrial waste materials were evaluated as sources of alkalinity for the scrubber feed solution and as sources of calcium for precipitation of carbonate. Solids were mixed with a simulated sodium bicarbonate scrubber blowdown to comparatively examine reactivity. Supernatant solutions and post-test solids were analyzed to quantify and model the sequestration reactions. The best performing solids were found to sequester between 2.3 and 2.9 moles of CO 2 per kg of dry solid in 1-4 hours of reaction time. These best performing solids were cement kiln dust, circulating dry scrubber ash, and spray dryer absorber ash. A techno-economic analysis was performed to evaluate the commercial viability of the proposed carbon capture and sequestration process in full-scale at an aluminum smelter and a refinery location. For both cases the in-duct scrubber technology was compared to traditional amine- based capture. Incorporation of the laboratory results showed that for the application at the aluminum smelter, the in-duct scrubber system is more economical than traditional methods. However, the reverse is true for the refinery case, where the bauxite residue is not effective enough as a sequestrant, combined with challenges related to contaminants in the bauxite residue accumulating in and fouling the scrubber absorbent. Sensitivity analyses showed that the critical variables by which process economics could be improved are enzyme concentration, efficiency, and half-life. At the end of the first part of the Phase 2 project, a gate review (DOE Decision Zero Gate Point) was conducted to decide on the next stages of the project. The original plan was to follow the pre-testing phase with a detailed design for the field testing. Unfavorable process economics, however, resulted in a decision to conclude the project before moving to field testing. It is noted that CO 2 Solutions proposed an initial solution to reduce process costs through more advanced enzyme management, however, DOE program requirements restricting any technology development extending beyond 2014 as commercial deployment timeline did not allow this solution to be undertaken.

Dando, Neal↗

Creating a Comprehensive, Efficient, and Sustainable Nuclear Regulatory Structure: A Process Report from the U.S. Department of Energy's Material Protection, Control and Accounting Program

With the congressionally mandated January 1, 2013 deadline for the U.S. Department of Energy’s (DOE) Nuclear Material Protection, Control and Accounting (MPC&A) program to complete its transition of MPC&A responsibility to the Russian Federation, National Nuclear Security Administration (NNSA) management directed its MPC&A program managers and team leaders to demonstrate that work in ongoing programs would lead to successful and timely achievement of these milestones. In the spirit of planning for successful project completion, the NNSA review of the Russian regulatory development process confirmed the critical importance of an effective regulatory system to a sustainable nuclear protection regime and called for an analysis of the existing Russian regulatory structure and the identification of a plan to ensure a complete MPC&A regulatory foundation. This paper describes the systematic process used by DOE’s MPC&A Regulatory Development Project (RDP) to develop an effective and sustainable MPC&A regulatory structure in the Russian Federation. This nuclear regulatory system will address all non-military Category I and II nuclear materials at State Corporation for Atomic Energy “Rosatom,” the Federal Service for Ecological, Technological, and Nuclear Oversight (Rostechnadzor), the Federal Agency for Marine and River Transport (FAMRT, within the Ministry of Transportation), and the Ministry of Industry and Trade (Minpromtorg). The approach to ensuring a complete and comprehensive nuclear regulatory structure includes five sequential steps. The approach was adopted from DOE’s project management guidelines and was adapted to the regulatory development task by the RDP. The five steps in the Regulatory Development Process are: 1) Define MPC&A Structural Elements; 2) Analyze the existing regulatory documents using the identified Structural Elements; 3) Validate the analysis with Russian colleagues and define the list of documents to be developed; 4) Prioritize and schedule the development of documents; 5) Identify and develop processes to measure effectiveness of regulations. Utilizing this process is resulting in an effective regulatory process that is understood and is being adopted by the four RF organizations. It is anticipated that the current regulatory development process will continue after U.S. support ends. Utilization of the systematic methodology will ensure regulatory development is based on required MPC&A structural elements and will support the continued maintenance and development of an effective regulatory base.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Creating a Comprehensive, Efficient, and Sustainable Nuclear Regulatory Structure

Abstract. With the congressionally mandated January 1, 2013 deadline for the U.S. Department of Energy’s (DOE) Nuclear Material Protection, Control and Accounting (MPC&A) program to complete its transition of MPC&A responsibility to the Russian Federation, NNSA management directed its MPC&A program managers and team leaders to demonstrate that work in ongoing programs would lead to successful and timely achievement of these milestones. In the spirit of planning for successful project completion, the NNSA review of the Russian regulatory development process confirmed the critical importance of an effective regulatory system to a sustainable nuclear protection regime and called for an analysis of the existing Russian regulatory structure and the identification of a plan to ensure a complete MPC&A regulatory foundation. This paper describes the systematic process used by the U.S. DOE MPC&A Regulatory Development Project RDP) to develop an effective and sustainable MPC&A regulatory structure in the Russian Federation. This nuclear regulatory system will address all non-military Category I and II nuclear materials at State Corporation for Atomic Energy “Rosatom,” the Federal Service for Ecological, Technological, and Nuclear Oversight (Rostechnadzor), the Federal Agency for Marine and River Transport (FAMRT, within the Ministry of Transportation), and the Ministry of Industry and Trade (Minpromtorg). The approach to ensuring a complete and comprehensive nuclear regulatory structure includes five sequential steps. The approach was adopted from DOE’s project management guidelines and was adapted to the regulatory development task by the RDP. The five steps in the Regulatory Development Process are: 1) Define MPC&A Structural Elements; 2) Analyze the existing regulatory documents using the identified Structural Elements; 3) Validate the analysis with Russian colleagues and define the list of documents to be developed; 4) Prioritize and schedule the development of documents; 5) Identify and develop processes to measure effectiveness of regulations. Utilizing this process is resulting in an effective regulatory process that is understood and is being adopted by the four RF organizations. It is anticipated that the current regulatory development process will continue after U.S. support ends. Utilization of the systematic methodology will ensure regulatory development is based on required MPC&A structural elements and will support the continued maintenance and development of an effective regulatory base.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluating the Implications of Climate Projections on Heat Hardiness Zones for Green Infrastructure Planning

Background: Green Infrastructure (GI) is widely being promoted as an adaptation strategy for urban flooding. Like urban flooding, tree species could be impacted by future climatic conditions. However, there have been limited studies on the implications of future climate on GI planning, mostly due to the lack of climate data at higher spatial resolutions. Objective: Here in this paper, we analyze the implications of climate projections on heat hardiness zones since this could impact the GI landscape in the coming years. This is an extension of our earlier work on evaluating impacts of climate projections on plant hardiness zones. Method: Using downscaled daily temperature data from ten Coupled Model Intercomparison Project Phase 5 (CMIP5) climate models for the historical (1980-2005) and projected (2025-2050) periods, we analyzed future heat hardiness zones in the watershed bounding Knox County, TN. We analyzed the implications of these outputs for the current list of suggested native and non-native tree species selected for GI in the study area. Results: All the models suggest that a considerable part of the study area will move into the next warmer heat zone. While most trees remain suitable for GI, several are at the limit of their ideal heat zones. Conclusion: The insights from this study will help to guide the selection and placement of GI across the study area. Specifically, it should help green infrastructure planners design better mitigation and adaptation strategies to achieve higher returns on investments as more cities are now investing in GI projects.

54 ENVIRONMENTAL SCIENCES↗

SBIR Phase II Final Report - A Robust Wireless Communication System for Harsh Environments Including Nuclear Facilities

This is the Final Report for the DOE Phase II SBIR project “A Robust Wireless Communication System for Harsh Environments Including Nuclear Facilities.” The topics covered herein include technical progress made, progress against the planned milestones and deliverables, project outcomes, and a discussion on future expectations of deployment and impacts of the results of this work. In brief, all planned work for the project was successfully completed, on or ahead of schedule and on budget. The major accomplishment was the successful development of new sensor/communications systems with wideband (WB)/ultra-wideband (UWB) communications based on the software-defined-radio (SDR) technology to improve sensing and control in nuclear power plants and then a broad range of similar sensing applications. The impacts of these disciplines/focuses of this SBIR include: A new multi-frequency SDR-based architecture with WB/UWB communications integrated with sensors was developed, utilizing 310 MHz, 450 MHz, 915 MHz, and 5 GHz frequencies; Secure communications using Advanced Encryption Standard (AES) algorithm; Sensing possibilities not effectively addressed by previous technologies was addressed; and, The newly developed wireless sensor communications system can adapt its communications parameters to its operational environment for optimal performance. The performance of this system has been evaluated by systematic laboratory and field testing. The field testing was conducted at Massachusetts Institute of Technology (MIT)’s Nuclear Test Reactor, and the McClellan Nuclear center at the University of California Davis (UC Davis), as well as at Oak Ridge National Laboratory (ORNL). The success in this project resulted in DSI being awarded “The DOE’s 2018 SBIR/STTR Small Business of the Year”. This technology has attracted interest from The Rolls Royce company with ongoing discussions under NDA for potential strategic partnership between DSI and Rolls Royce in providing wireless sensor communications in nuclear facilities. Furthermore, the success of this project has attracted significant interest from the United Nations International Atomic Agency (IAEA) in Vienna, Austria, as well as other DOE and DOD offices. Currently, per request from IAEA, DOE’s office of International Safeguards has funded DSI to develop a WB/UWB wireless communication system for real-time transmission of images from IAEA’s safeguards cameras in various nuclear facilities. DSI also has received a Phase II and Phase II.5 SBIR awards from ARMY and NAVY for wireless communications capability for various DOD aircraft.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗